4.7 Automatic Air Release Valves ............................................................ 17
4.8 Gun Metal Chrome Finished Ball Valves ........................................... 18
4.9 CI Gate Valve…………………………………………………………… 18
4.10 Presuure gauges……………………………………………………… 18
4.11 Flow Switch…………………………………………………………….. 19
4.12 Flexible Pipe connector………………………………………………….19
Page 2 of 242
This page is intentionally kept blank.
Page 3 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 4 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 5 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Payment:
Interim payment shall be made for at the Contract unit rate the measured length verified
and approved by the Engineer.
Pay item shall be:
1.6.1 Aluminum Conductor - 3.5C x 300 sq. mm Cable lm
1.6.2 Aluminum Conductor - 3.5C x 150 sq. mm Cable lm
1.6.3 Copper Conductor - 4C x 25 sq. mm Wiring lm
1.6.4 Copper Conductor - 4C x 16 sq. mm Wiring lm
1.6.5 Copper Conductor - 4C x 10 sq. mm Wiring lm
1.6.6 Copper Conductor - 4C x 6 sq. mm Wiring lm
1.8.1 50 mm x 6 mm
1.8.2 40 mm x 6 mm
1.8.3 25 mm x 6 mm
Page 6 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
2. 1 M.S. Pipes
This item shall be supplying, installing, testing and commissioning of M.S. Pipes
confirming to IS 3589, 6mm thick, with painting, suitable type of supports, anchor
fasteners, bolts nuts (Galvanised), "U" clamps, bolt, malleable specials such as reducers,
Tees, elbows, flanges. Including cutting, welding, fixing in / on walls, ceiling by using
suitable supports etc., as per drawings. The quoted rate shall also include for chasing /
chipping walls, making bore holes in walls / floor and making them good with filler material
and finished in cement mortar etc. complete.,
Page 7 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
2. 2 GI Pipes
This item shall be supplying, installing, testing and commissioning of G.I. Pipes confirming
to IS 1239 Pt - I Heavy grade with painting, suitable type of supports, anchor fasteners,
bolts nuts (Galvanised), "U" clamps, bolts, malleable specials such as reducers, Tees,
elbows, flanges. Including cutting, welding, fixing in / on walls, ceiling by using suitable
supports etc, as per drawings. The quoted rate shall also include for chasing / chipping
walls, making bore holes in walls / floor and making them good with filler material and
finished in cement mortar etc. complete.
Page 8 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 9 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 10 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
3.3.1 300 mm dia. nos
3.3.2 200 mm dia. nos
3.3.3 150 mm dia. nos
3.3.4 100 mm dia. nos
3.5.1 25 mm dia.
3.5.2 15 mm dia.
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
3.5.1 25 mm dia. nos
3.5.2 15 mm dia. nos
Page 11 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 12 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
4. Hydrant System
4.1 GI Pipes
This item shall be supplying, installing, testing and commissioning of G.I. Pipes confirming
to IS 1239 Pt - I Heavy grade with painting, suitable type of supports ( Shall be fabricated
by M.S. Channel / Angle / Flat for above 50 mm dia), anchor fasteners, bolts nuts, "U"
clamps, bolt, malleable specials such as reducers, Tees, elbows, flanges. Including
cutting, welding, fixing in / on walls, ceiling by using suitable supports etc, as per drawings.
The quoted rate shall also include for chasing / chipping walls, making bore holes in walls
/ floor and making them good with filler material and finished in cement mortar etc.
complete.
Page 13 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
4. 4 Landing Hydrants
This item shall be supplying, erecting and commissioning of Landing Hydrants comprising
of the following in the Fire duct.
Page 14 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 15 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 16 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
This item shall be two lengths of 15 m long, 63mm dia RRL hose with instantaneous
couplings and Hoses shall be stored inside the hose cabinet.
4.6.3 Two Lengths of 15 m long, 63 mm dia. RRL Hose
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
4.6.3 Two Lengths of 15 m long, 63 mm dia. RRL Hose nos
4.7.1 25 mm dia.
4.7.2 20 mm dia.
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
Page 17 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
4.8.1 25 mm dia.
4.8.2 40 mm dia.
4.8.3 50 mm dia
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
4.8.1 25 mm dia. nos
4.8.2 40 mm dia.
4.8.3 50 mm dia nos
Page 18 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
4.10 Pressure Gauges nos
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
4.12.1 150 mm dia. nos
5.1 GI Pipes
This item shall be supplying, installing, testing and commissioning of G.I. Pipes confirming
to IS 1239 Pt - I Heavy grade with painting, suitable type of supports (for above 50 mm
dia, shall be fabricated by M.S. Channel / Angle / Faltsetc), anchor fasteners, bolts, nuts,
clamps, "U" bolt, malleable specials such as reducers, Tees, elbows, flanges. Including
cutting, welding, fixing in / on walls, ceiling by using suitable supports etc, as per drawings.
The quoted rate shall also include for chasing / chipping walls, making bore holes in walls
/ floor and making them good with filler material and finished in cement mortar etc.
complete.,
Page 19 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 20 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
5.3.3 80 mm dia.
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
5.3.1 150 mm dia. nos
5.3.2 100 mm dia. nos
5.3.3 80 mm dia. nos
5.4.2 Upright
Page 21 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
5.5.1 150 mm dia. nos
5.5.2 100 mm dia. nos
Page 22 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Page 23 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
joint, adaptors, wall pipes with paddle flanges, spool pieces, bends, Tees...etc. the work
shall also include accessories necessary for proper installation. in accordance to
specification, drawings and preamble subject to the approval of the Engineer.
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be:
5.12.1 150 mm nominal dia. nos
5.12.2 100 mm nominal dia. nos
6. Fire Extinguishers
6.1.1 22 kg Capacity
6.1.2 2 kg Capacity
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be
6.1.1 22 kg Capacity nos
6.1.2 4.5 kg Capacity nos
6.1.2 2 kg Capacity nos
Page 24 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
6.3.1 25 kg Capacity
6.3.2 5 kg Capacity
Measurement:
Shall be measured in numbers of the work completed on the site.
Payment:
Interim payment shall be made for at the Contract unit rate the measured numbers verified
and approved by the Engineer.
Pay item shall be
6.3.1 25 kg Capacity nos
6.3.2 5 kg Capacity nos
Item 7.1 SS TYPE-2 for OCC Building No. 32 ( Room no 003 BMS room)
These items shall be full compensation for all works required for Supply, fixing, testing
and commissioning of Suppression System Type-2 for Signaling Equipment & Telecom
(SNT) Room-27 with all incidentals necessary for the arrangement and completion of the
work.
Page 25 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Measurement
The work shall be measured as set of work completed.
Payment
Interim Payment shall be made for the work completed in place in accordance with the
Drawings and Specification and accepted by the Engineer.
Pay Item shall be:
7.1 SS TYPE-2 for OCC Building No. 32 ( Room no 003 BMS
room) set
Item 7.2 SS TYPE-2 for OCC Building No. 32 ( Room no 201 Signalling Equipment room)
These items shall be full compensation for all works required for Supply, fixing, testing
and commissioning of Suppression System Type-2 for OCC Room-32 with all incidentals
necessary for the arrangement and completion of the work.
Measurement
The work shall be measured as set of work completed.
Payment
Interim Payment shall be made for the work completed in place in accordance with the
Drawings and Specification and accepted by the Engineer.
Pay Item shall be:
7.2 SS TYPE-2 for OCC Building No. 32 ( Room no 201 set
Signalling Equipment room)
Item 7.3 SS TYPE-2 for OCC Building No. 32 ( Room no 241 UPS/Battery room)
These items shall be full compensation for all works required for Supply, fixing, testing
and commissioning of Suppression System Type-2 for DCC Room-49 with all incidentals
necessary for the arrangement and completion of the work.
Measurement
The work shall be measured as set of work completed.
Payment
Interim Payment shall be made for the work completed in place in accordance with the
Drawings and Specification and accepted by the Engineer.
Pay Item shall be:
7.3 SS TYPE-2 for OCC Building No. 32 ( Room no 241 set
UPS/Battery room)
Item 7.4 SS TYPE-2 for OCC Building No. 32 ( Room no 242 Scada room)
These items shall be full compensation for all works required for Supply, fixing, testing
and commissioning of Suppression System Type-2 for DCC Room-49 with all incidentals
necessary for the arrangement and completion of the work.
Measurement
The work shall be measured as set of work completed.
Payment
Page 26 of 242
Dhaka Mass Rapid Transit Development Project – Bidding Documents – Volume 1 –Section VII: Pricing Documents – Mechanical Works
Interim Payment shall be made for the work completed in place in accordance with the
Drawings and Specification and accepted by the Engineer.
Pay Item shall be:
7.4 SS TYPE-2 for OCC Building No. 32 ( Room no 242 Scada set
room)
Item 7.5 SS TYPE-2 for OCC Building No. 32 ( Room no 243 Communication Equipment
room)
These items shall be full compensation for all works required for Supply, fixing, testing
and commissioning of Suppression System Type-2 for DCC Room-49 with all incidentals
necessary for the arrangement and completion of the work.
Measurement
The work shall be measured as set of work completed.
Payment
Interim Payment shall be made for the work completed in place in accordance with the
Drawings and Specification and accepted by the Engineer.
Pay Item shall be:
7.5 SS TYPE-2 for OCC Building No. 32 ( Room no 243 set
Communication Equipment room)
Item 7.6 SS TYPE-2 for OCC Building No. ( Room no 301 OCC room)
These items shall be full compensation for all works required for Supply, fixing, testing
and commissioning of Suppression System Type-2 for DCC Room-49 with all incidentals
necessary for the arrangement and completion of the work.
Measurement
The work shall be measured as set of work completed.
Payment
Interim Payment shall be made for the work completed in place in accordance with the
Drawings and Specification and accepted by the Engineer.
Pay Item shall be:
7.6 SS TYPE-2 for OCC Building No. 32 ( Room no 301 OCC set
room)