SR Section Description
Plz. reduce qty. upto 627 Ltrs, for below due PMs: (on Hold
due to oil)
CR#02 Due PM (50 Ltrs.),
EDG NAST Due PM (60 Ltrs.),
WL#01 Due PM (24 Ltrs.),
ACT#01 Due PM (24 Ltrs.),
CR#05 Due PM (22 Ltrs.),
CR#04 Due PM 22 Ltrs.),
CR#03 Due PM (35 Ltrs.),
TR#01 Due PM (28 Ltrs.), 118547
TT#01 Due PM (18 Ltrs.), (With
22899
TT#03 Due PM (18 Ltrs.), reduced
WL#04 Duie PM (24 Ltrs.), qty)
LOCO#01 Due PM (36 Ltrs.),
FLT#07 Due PM (12 Ltrs.),
FLT#06 Due PM (12 Ltrs),
FLT#02 Due PM (12 Ltrs.),
Shahzoor FM East Due PM (08 Ltrs.),
Hino Bus TPT Due PM (22 Ltrs.),
Disposal Pump Samejabad Due PM (15 Ltrs.)
Garage average Top Up / Makup in Month ( 60 Ltrs.). (Total
18 PMs out of 48 Vehicls)
Wheel Hub & Rims are required for Stackers, (For Current
Destacking Activity). Even during plant shut down, PH &S 19447 264,000
area is live & de-stacking is on-going for which we need
these items for maintenance.