Documente Academic
Documente Profesional
Documente Cultură
Introduction
Contents
General Introduction
System Architecture
Hardware Description
2
ZXUR 9000 Location in Mobile Network
ZXUR 9000
MSC-S/VLR GMSC-S
BSC/RNC Nc
Abis PSTN
BTS
Mc
Abis/Iub A/IuCs
BTS/NodeB
Gb/IuPs Other-PLMN
Nb
Iur/Iur-g
MGW GMGW
Abis/Iub A/IuCs
BTS/NodeB
Item Specification
Dimensions (H*D*W) (mm) 2,200 * 800 * 600
Convergence
BGCF MGW
GSM/UMTS/CDMA Co-Platform
MGCF BSC
MME RNC
BSC/RNC/CN Co- Platform
PDN-GW USPP
Serving- SGSN
Converged OMC Platform
GW GGSN
PSS/PES AGW
PDSN/HA
IM-MGW
Common platform enhance board integration, system stability and save spares
GSM and UMTS networks share interfaces and transmission, saving cost
Unified OMC simplifies O&M, saves manpower and unifies GU capacity planning
Resource pool, flexible GU resource allocation
Unified RRM realizes intelligent access, handover and GU load balance
© ZTE All rights reserved 6
ZXUR 9000 Rack Components
Power distribution subrack:
3U height, in top of the rack
Provide power distribution for the whole Ventilation subrack:
system, power indication and outer The ventilation
environment monitoring function Slave subrack is used
subrack 1 to change the
Dual power input, support automatic
vertical
switch between 2 power input ventilation pipe
to be the front-
to-back
The rack:
ventilation pipe,
to effectively
600mm width*800mm depth, in line with Slave cool the service
subrack 2 subrack.
ETS 300 119 or IEC60297 standard
General Introduction
System Architecture
Hardware Description
9
ZXUR 9000 System Architecture
Switching Unit
Access Unit
BTS/Node B
O&M Unit
Environment
BSC/RNC Monitoring Unit
A/Gb/Iu
Power, FAN
CN
STM -1 FE GE(10GE)
E1 485
© ZTE All rights reserved 10
ZXUR 9000 Board Classification
Processing Board
Backup
Board Full Name Function
Principle
Provides global
Universal Management
UMP1c management processing 1+1 backup
Process board 1c
and maintenance
Enhanced XGE Provides the IP 10GE 1+1 backup and Apply to GSM
EXGB1a
Process Board 1b interface load sharing and UMTS
U U U U U U U U U U U U U U
S S S S M M M M S S S S S S
P P P P P P P P P P P P P P
2 2 2 2 1 1 1 1 2 2 2 2 2 2
a a a a c c c c a a a a a a
I I I I E E E E I I I I I I
N N N N G G X X N N N N N N
T T T T B B F F T T T T T T
S S S S
2 2 1 1
a a a a
15 16 17 18 19 20 21 22 23 24 25 26 27 28
U U U U U U U U U U U U U U
S S S S S S S S S S S S S S
P P P P P P P P P P P P P P
2 2 2 2 2 2 2 2 2 2 2 2 2 2
a a a a a a a a a a a a a a
I I I I E E E E I I I I I I
N N N N G G X X N N N N N N
T T T T B B F F T T T T T T
S S S S
2 2 1 1
a a a a
U U U U U U U U U U U U U U
S S S S M M M S S S S S S S
P P P P P P P P P P P P P P
2 2 2 2 1 1 1 1 2 2 2 2 2 2
UMP1c NE operation and maintenance functions a a a a C C C C a a a a a a
UMP1c OMP, Overall Management I I I I E E E E I I I I I I
N N N N G G X X N N N N N N
T T T T B B F F T T T T T T
S S S S
2 2 1 1
a a a a
15 16 17 18 19 20 21 22 23 24 25 26 27 28
© ZTE All rights reserved 19
GSM Single Mode Capacity
System Configuration U U U U U U U U U U U U U U
U U U U U U U U U U U U U U
S S S S S S S S S S S S S S
P P P P P P P P P P P P P P
2 2 2 2 2 2 2 2 2 2 2 2 2 2
a a a a a a a a a a a a a a
I I I I E E E E I I I I I I
N N N N G G X X N N N N N N
T T T T B B F F T T T T T T
S S S S
2 2 1 1
a a a a
1+1
O&M Unit UMP1c
1+1
EGPB2a/EXGB1a 1+1, load sharing
Access Unit ESDTI2a 1+1
ESDTT2a 1+1
EGBS2a Load sharing
Switch Unit
EXFS1a Load sharing
Control Plane 1+1
Processing Unit USP2a
User Plane load sharing
ETCB Load sharing
Hardware Layout
3U
1 1 Dummy Panel 14 1U
F D D D D U U U U U U U D U D
r U U U U M M M M S S S U S U
o M M M M P P P P P P P M P M
M M M M 1c 1c 1c 1c 2a 2a 2a M 2a M
n
Y Y Y Y Y Y 11
t
U BSC
R D D E E E D E E E E D D D D
U U X X X U X X G G U U U U
e
M M G G G M F F B B M M M M
a
M M B B B M S S S S M M M M
r
Y Y 1a 1a 1a Y 1a 1a 2a 2a Y Y Y Y
Wind Guiding Shelf
28 15
2 4U
F
r
o
n
t 11
U
R
e
a
r
ZXUR9000
MS
SDR
EXFS1a
ESDTT2a
MSC
© ZTE All rights reserved 25
Traffic Flow ZXUR – 2G Voice Traffic CS (MGW
TDM)
ZXUR9000
MS
SDR
EXFS1a
ESDTT2a
ETCB
MGW
© ZTE All rights reserved 26
Traffic Flow ZXUR – 2G Voice Traffic CS (MGW
IP)
ZXUR9000
MS
SDR
EXFS1a
MGW
© ZTE All rights reserved 27
Traffic Flow ZXUR 9000 – 2G PS Signalling / Traffic
ZXUR9000
MS
SDR
EGPB2a USP2a
CMP
EGBS2a
EGBS
EXFS1a
EGFS
EGPB2a
SGSN
© ZTE All rights reserved 28
Traffic Flow ZXUR – 3G Voice Signalling CS
ZXUR9000
UE
SDR
EXFS1a
EXGB1a
MSC
© ZTE All rights reserved 29
Traffic Flow ZXUR – 3G Voice Traffic CS
ZXUR9000
UE
SDR
EXGB1a EGBS2a CU
DUc
EXFS1a DUm
MGW
© ZTE All rights reserved 30
Traffic Flow ZXUR – 3G PS Signalling
ZXUR9000
UE
SDR
EXGB1a CU
EGBS2a
DUc
EXFS1a Dum
EXGB1a
SGSN
© ZTE All rights reserved 31
Traffic Flow ZXUR – 3G PS Traffic
ZXUR9000
US
SDR
EXGB1a CU
EGBS2a
Duc
EXFS1a Dum
EXGB1a
SGSN
© ZTE All rights reserved 32
Contents
General Introduction
System Architecture
Hardware Description
33
ECDM Board
RUN Green Service status indicator On: The current module is operating.
-48 V (A) Green Power indicator On: The -48 V (A) power supply of the current shelf is normal.
-48 V (B) Green Power indicator On: The -48 V (B) power supply of the current shelf is normal.
Service subrack
19 inch standard subrack
Capacity of USP2a
Index Code Capacity
USP2a (IP A) USP2a (TDM A )
PDCH N_PDCH_USP2a 7168 4480
CS Erl N_Erl_USP2a 12288 -
eBHCA (K) N_eBHCA_USP2a 2800 3500
TRX N_TRX_USP2a 2048 2560
Cell N_Cell_USP2a 1024 1280
Capacity of ETCB
NE
operation and maintenance functions(OMM) :
1.Responsible for NE operation and maintenance.
2.Through the rear board EGBS2a, it externally
provides GE interface to connect EMS.
OMP function:
1.Processes global procedure, controls the
operation and maintenance of the entire System.
2.UMP1c directly or indirectly monitors and
manages the boards in the system and manages
the configuration of each board and other
components.
UMP1c UMP1c
EGBS2a EXFS1a
(OMM) (OMP)
U E E E E E
S S S X G T
P D D G P C
2a T T B B B
I T 1a 2a
2a 2a
Base Ethernet
Inner Bus Fabric Ethernet
EGBS2a EGBS2a
BITS,line 8K reference
Slave 2
EGBS2a
EGBS2a GPS Master Shelf
EXFS1a
EGBS2a
One 1G interface inside
EXFS1a EXFS1a
H/S Indicator
Rack Wiring
All cables are laid on the rear of rack.
Cables can be laid upwards and downwards to agree with the installation
mode of the rack.
Cable Connection
Fabric plane fiber
Connect the 40G fiber between EXFS1a in different shelves.
Base plane GE
Connect the 1GE Ethernet cable between EGBS2a in different shelves.
Clock cable:
Connect the RJ45 clock distribution cable between EXFS1a in different shelves.
The EXFS1a in master subrack connect the outside clock reference
485 monitoring cable:
Connect the 485 monitoring cable form PDU (Power Distribution Unit ) at the rack
top to the EGBS2a panel interfaces.
GE
40G fiber