Documente Academic
Documente Profesional
Documente Cultură
Ecran précédent
Bienvenue: m89wmy
Produit: CAMION
Modèle: CAMION 789C 2BW00260
Configuration: camion hors route 789C 2BW00001-UP (MACHINE)
ALIMENTÉ PAR le moteur 3516
i02488604
69D (N / S: 9XS1-UP)
769C (N / S: 01X1-UP)
772B (N / S: 64W1-UP)
773B (N / S: 63W1-UP)
773E (N / S: BDA1-UP)
775E (N / S: BEC1-UP)
776 (N / S: 14H1-UP)
776B (N / S: 6JC1-UP)
776C (N / S: 2TK1-UP)
777 (N / S: 84A1-UP)
777B (N / S: 4YC1-UP)
777C (N / S: 4XJ1-UP)
777D (N / S: AGY1-UP)
784B (N / S: 5RK1-UP)
784C (N / S: 2PZ1-UP)
785 (N / S: 8GB1-UP)
785B (N / S: 6HK1-UP)
789 (N / S: 9ZC1-UP)
789B (N / S: 7EK1-UP)
789C (N / S: 2BW1-UP)
793 (N / S: 3SJ1-UP)
793B (N / S: 1HL1-UP)
793C XQ (S / N: CBR1-UP)
797 (N / S: 5YW1-UP)
797B (N / S: JSM1-UP)
73D (N / S: 9YS1-UP)
Camion de carrière:
771C (N / S: 3BJ1-UP)
775B (N / S: 7XJ1-UP)
Service Magazine, SEPD0744, 26 juillet 2004, "Une nouvelle soupape de remplissage d'azote est
disponible". Veuillez ne pas tenir compte de l'article précédent. Veuillez vous référer à l'article qui suit.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&calledpage=/sisweb/s
30/05/2018 789C Off-Highway Truck 2BW00001-UP (MACHINE) POWERED BY 3516 Engine(SEBP2790 - 204) - Systèmes et composants
Illustration 1 g01070332
(1) 238-9928 Valve As
Une nouvelle soupape de remplissage d'azote est utilisée dans les jambes de force avant et arrière des
camions hors route. La nouvelle vanne 238-9928 As (1) remplace la vanne existante 9T-2238 As (2) et la
vanne 175-3184 existante (3). Les vannes existantes ont un joint. La nouvelle valve a deux joints afin
d'aider à prévenir les fuites d'azote. Les mêmes filetages externes sont utilisés sur les nouvelles vannes et
sur les vannes existantes.
Remarque: Les vannes As (2) et 175-3184 (3) existantes 9T-2238 resteront utilisables sur les machines
antérieures. Les nouveaux collecteurs et les nouveaux ensembles de couvercle, qui sont compatibles
avec le nouveau 238-9928 Valve As (1), sont également disponibles auprès du service pièces détachées
en option pour une mise à niveau.
Remarque: La procédure de purge de la bouteille de suspension d'huile et d'azote a également été mise à
jour.
Illustration 2 g01070383
Fente de ventilation qui est sur le nouveau 238-9928 Valve As (1)
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&calledpage=/sisweb/s
30/05/2018 789C Off-Highway Truck 2BW00001-UP (MACHINE) POWERED BY 3516 Engine(SEBP2790 - 204) - Systèmes et composants
Illustration 3 g01070390
Fentes de ventilation sur l'ancienne valve 175-3184 (3)
La conception de la nouvelle vanne 238-9928 (1) comprend une fente d'aération le long de la partie
filetée de la vanne. L'évent est conçu pour libérer la pression de précharge d'azote. Un bruit est créé
lorsque la pression de précharge est évacuée par l'évent. L'ancienne valve 175-3184 (3) comprend
également une caractéristique de ventilation similaire à la nouvelle valve 238-9928 (1).
Illustration 4 g01070396
(2) 9T-2238 Valve As
Illustration 5 g01070415
Un exemple de l'emplacement de la ligne de ventilation (A)
Cependant, la conception de l'ancienne vanne 9T-2238 As (2) ne repose pas sur une fente d'aération afin
de garantir que la pression de précharge d'azote est évacuée. Au lieu de cela, l'évacuation de la soupape
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&calledpage=/sisweb/s
30/05/2018 789C Off-Highway Truck 2BW00001-UP (MACHINE) POWERED BY 3516 Engine(SEBP2790 - 204) - Systèmes et composants
As (2) 9T-2238 est réalisée par l'existence d'une ligne d'évent. Pour que ces groupes puissent utiliser la
nouvelle vanne 238-9928 (1), les composants correspondants doivent être remplacés ou modifiés en
bouchant la ligne d'évent.
1. Remove the nitrogen charging valve. Refer to the Disassembly and Assembly for the proper
procedure.
Illustration 6 g01070415
An example of the location of the vent line
2. Drill a bore to a diameter of 6.2 mm (0.24 inch) into vent line (A). The depth of the bore is at least
14 mm (0.55 inch) through to the internal passage.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&calledpage=/sisweb/s
30/05/2018 789C Off-Highway Truck 2BW00001-UP (MACHINE) POWERED BY 3516 Engine(SEBP2790 - 204) - Systèmes et composants
4. Apply 155-0695 Thread Lock Compound to the plug. Install 3D-4603 Pipe Plug.
3. Tighten the hex of the main body to a torque of 13 ± 0.5 N·m (120 ± 5 lb in).
4. Ensure that the charging valve is installed perpendicular to the mating surface.
Refer to the Service Manuals for the suspension cylinder for all warnings, other references and pictures.
Table 2
Tools Needed
Do not, under any condition, remove valves, cover or plugs from the
cylinder unless the rod is fully retracted and all the nitrogen pressure is
released.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&calledpage=/sisweb/s
30/05/2018 789C Off-Highway Truck 2BW00001-UP (MACHINE) POWERED BY 3516 Engine(SEBP2790 - 204) - Systèmes et composants
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Illustration 7 g01072660
238-9928 Valve As
(A) Cap
1. Remove valve caps (A) from the charging valves that are located on each of the rear suspension
cylinders. Disconnect the charging hoses from the rest of the 9U-5617 Oil Refill Pump. Turn the
check valves on the 1S-8938 Chuck counterclockwise in order to ensure that the charging valves
will not open during installation. Install the charging hoses to charging valves with 1S-8938
Chucks. The charging hoses will be used to drain oil into an approved container.
2. Turn the check valves on the 1S-8938 Chucks clockwise. This opens the secondary seal in the
charging valves. Hold hex (B) while you loosen swivel nut (C). Loosen nut (C) by two and half
turns. This opens the primary seal. This allows oil and nitrogen to flow through charging valves.
When the suspension cylinders have bottomed completely, leave the check valves in position for
five minutes in order to allow the pressure in the suspension cylinders to equalize.
3. After the pressure has equalized, close the primary valve seal by tightening swivel nut (C) to a
torque of 6 ± 0.5 N·m (60 ± 5 lb in). Hold hex (B) while you tighten swivel nut (C). Then, turn the
check valves on 1S-8938 Chuck counterclockwise. This closes the secondary seal in the charging
valves.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&calledpage=/sisweb/s
30/05/2018 789C Off-Highway Truck 2BW00001-UP (MACHINE) POWERED BY 3516 Engine(SEBP2790 - 204) - Systèmes et composants
4. Remove the charging hoses from charging valves. Attach the charging hoses to the rest of the 9U-
5617 Oil Refill Pump. Place the ends of the charging hoses into an approved container or into the
filler tube of the 9U-5617 Oil Refill Pump. Cycle some oil in order to ensure that the charging
hoses are full of clean oil. Attach the 1S-8938 Chucks to charging valves.
Copyright 1993 - 2018 Caterpillar Inc. Wed May 30 2018 02:30:14 GMT+0200 (Paris, Madrid (heure d’été))
Tous droits réservés.
m89wmy
Réseau privé pour utilisateurs autorisés de SIS.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/productsearch/productheaderinfoframeset.jsp&calledpage=/sisweb/s