SL Description Quantity Unit Rate (Tk.) Amount (Tk.

Pre-engineered hot rolled I-Section


for column ,mainbeam,secondary
1 6,250 Kg 105.00 6,87,500
beam,hot rolled m.s pipe
Connection plate , base plate etc.

2 Galvanised roof Purlin C-100mm 200 Kg 105.00 21,000


Thick 1.6mm .
3 Galvanised Nut Bolts and Washer
150 Kg 210.00 31,500.00
for Joint& Purlin.
4 Anchor Bolt (25mm Dia. Local) 110 Kg 100.00 11,000.00
5 Anchor Bolt Fittings Charge 32 Nos. 200.00 6400.00
6 Red Oxide Berger Paint 35,000

7 Decking Sheet 0.70 mm thick Sft 110.00 45,100
410
(Galvanised)
8 Shear Bolt 110 Nos. 50.00 5,500.00
9 Supply of 0.47mm thick Profile 527 Sft 80.00 42,160.00
Rooflng(China)
10 0.47mm Have Gutter(China) 120 Rft 220.00 26,400.00
11 U.P.V.C Down Pipe With Related 130 Rft. 80.00 10,400.00
Accessories
12 Eave Gutter Clamp 40 Nos. 20.00 800.00
13 Silicon Sealant 3 Tube 220.00 660.00
14 Silicon Dispenser 1 Nos. 300.00 300.00
15 FASTENERS
16 a) -12-14 x 65 HGS (For Roofing) 250 Nos. 6.00 1,500.00
17 b) -12-14 x 20 HWF (For 150 Nos. 6.00 900.00
Decking)
18 TRANSPORTATION CHARGE: LS. 45,000.00
19 Erection of Pre-engineered welded LS 250,000.00
4-
steel Column, Mine Beam, Sub
Beam, Rafter, Truss Member,
Purlin, Fitting & fixing charge of
Roof and including Flashing,
Gutter, Down Pipe etc.
Total 1,21,872.00
Note: VAT & TAX. = (12,18,720 X10%) =1,21,872 Grand Totals (12,18,720+1,21,872)
=13,40,592
Inward: Thirteen Lac forty Thousand five Hundred ninety two Taka Only.