METHOD STATEMENT
MS.010
Revision: 2
Controlled Copy 11 – 2016
1
Survey works main polygon Page 2 of 36
Method Statement MS.010 Rev. 2
Nov 2016
Revision Control
Date Rev. Description Paragraph
2
Survey works main polygon Page 3 of 36
Method Statement MS.010 Rev. 2
Nov 2016
INDEX
Contents
1. OBJECT 4
2. SCOPE 4
3. REFERENCE DOCUMENTS 4
4. DESCRIPTION OF ACTIVITITES 4
5. PRECAUTIONS 4
6. REGISTERS 5
7. HEALTH AND SAFETY AND ENVIRONMENTAL PROTECTION 5
8. RESPONSABILITIES 5
9. ANNEX 1 7
3
Survey works main polygon Page 4 of 36
Method Statement MS.010 Rev. 2
Nov 2016
1. OBJECT
This Method Statement describes the procedure of AZVI in order to ensure the proper survey
works in the main polygon
2. SCOPE
The scope of this methodology is the measurements and cheking of the project
benchmarks and put new ones, for the future works in the Corridor X – Highway E 75;
Section: Grdelica (Gornje Polje ) – Caricina Dolina; LOT 6.
This Method Statement will describe the necessary steps of construction, preconditions
with respect to equipment and material for construction as well as the key requirements
as per Technical Specifications.
3. REFERENCE DOCUMENTS
All executed works will be executed according to the Technical specification of the
Contract.
Standards, normative and other regulations for the execution works are fully enlisted in
section 3.4 Construction of Embankments and this Method Statement. Other general
standards:
Quality Plan
HSE Plan
ISO 14001:2004 - Environmental Protection
ISO 9001:2008 – Quality
4. DESCRIPTION OF ACTIVITITES
The triangulation network for the main alignment (LOT 6) has 15 basic points from
project, 24 new foundation points and 8 help points used just for measurements and
calculations.
For surveying is used a Total Station “LEICA TS 15” and for leveling is used Leica DNA03
The methodology used is base in back-front readings.
For the calculation and adjustment of the adjusted coordinates, “MicroSurvey StarNet V8”
was used. The results are given at the end of this document (ANNEX 1)
In this second report, we have introduced 2 new bases, connecting with the project bases
P97 and P100, and the vrla micropolygon S90.
5. PRECAUTIONS
With all this bnchmarks, if any of such foundations are destroyed could be replace and the
coordinates for the new one would be obtained according this method of statement.
Using these foundations the coordinates for works will keep without changes, will be able
to replace and, even, to keep them for maintenance by Client.
4
Survey works main polygon Page 5 of 36
Method Statement MS.010 Rev. 2
Nov 2016
6. REGISTERS
Inspection reports
Non Conformity Reports
Surveying reports
8. RESPONSABILITIES
Contractor’s
Representative
FCO JAVIER
GARCÍA
Project Manager
JOSE MARIA
CABAÑAS
Engineering Construction
Department Manager
JOSE MIGUEL DRAGOLJUB
AUVRAY BALETIĆ
Project Manager
- To supervise that the work are performed according to the project
Surveyor
- Performs the work and its geometrical control.
- Carries out the topography works and checks the topographical equipment, in compliance with
the specific procedures.
- Performs the inspections set in the inspection program and issues the inspection reports.
5
Survey works main polygon Page 6 of 36
Method Statement MS.010 Rev. 2
Nov 2016
6
Survey works main polygon Page 7 of 36
Method Statement MS.010 Rev. 2
Nov 2016
9. ANNEX 1
Data for concrete foundations:
FIELD DATA
7
Survey works main polygon Page 8 of 36
Method Statement MS.010 Rev. 2
Nov 2016
FIELD DATA
st: G1 st: GH
or: G2 72 10 13 199.627 or: G30 121 44 41 57.265
det: P84 143 8 36 113.672 det: P100 329 10 53 55.755
det: G31 180 56 4 178.917
st: G12
or: P91 50 49 37 104.924 st: G30
det: pom 137 23 44 84.394 or: GH 301 44 40 57.267
det: G31 199 8 1 157.456
st: pom
or: G12 238 40 24 84.386 st: G31
det: G11 76 36 13 44.835 or: G30 19 8 4 157.457
det: G32 152 5 49 145.646
st: G11
or: pom 185 11 41 44.836 st: G32
det: P89 40 52 5 138.216 or: G31 332 5 54 145.649
det: GA 296 7 42 137.164
8
Survey works main polygon Page 9 of 36
Method Statement MS.010 Rev. 2
Nov 2016
Point Hz DHoriz Point Hz DHoriz
9
Survey works main polygon Page 10 of 36
Method Statement MS.010 Rev. 2
Nov 2016
Point Hz DHoriz Point Hz DHoriz
st: HG st: PK
or: G65 92 19 41 37.538 or: G74 310 39 12 69.312
det: P98 358 50 49 56.101 det: P91 238 25 22 97.512
10
Survey works main polygon Page 11 of 36
Method Statement MS.010 Rev. 2
Nov 2016
11
Survey works main polygon Page 12 of 36
Method Statement MS.010 Rev. 2
Nov 2016
12
Survey works main polygon Page 13 of 36
Method Statement MS.010 Rev. 2
Nov 2016
13
Survey works main polygon Page 14 of 36
Method Statement MS.010 Rev. 2
Nov 2016
P92=410.9059
New heights
P93=396.4175
14
Survey works main polygon Page 15 of 36
Method Statement MS.010 Rev. 2
Nov 2016
15
Survey works main polygon Page 16 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г1
Y: 7588450.895
X: 4731990.880
Z: 406.956
Tип
бетонска
белеге:
ТАЧКА: Г2
Y: 7588515.689
X: 4731802.069
Z: 402.245
Tип
бетонска
белеге:
16
Survey works main polygon Page 17 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г3
Y: 7588553.111
X: 4731698.782
Z: 399.047
Tип
бетонска
белеге:
ТАЧКА: Г70
Y: 7588577.257
X: 4730939.591
Z: 420.865
Tип
бетонска
белеге:
17
Survey works main polygon Page 18 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г71
Y: 7588559.554
X: 4730882.710
Z: 423.870
Tип
бетонска
белеге:
ТАЧКА: Г72
Y: 7588525.304
X: 4730765.586
Z: 414.860
Tип
бетонска
белеге:
18
Survey works main polygon Page 19 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г11
Y: 7588436.165
X: 4730763.236
Z: 406.731
Tип
бетонска
белеге:
ТАЧКА: Г74
Y: 7588400.378
X: 4730703.779
Z: 415.966
Tип
бетонска
белеге:
19
Survey works main polygon Page 20 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г12
Y: 7588469.689
X: 4730639.931
Z: 419.163
Tип
бетонска
белеге:
ТАЧКА: Г50
Y: 7588329.965
X: 4730528.495
Z: 414.896
Tип
бетонска
белеге:
20
Survey works main polygon Page 21 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г10
Y: 7588372.668
X: 4730411.243
Z: 407.560
Tип
бетонска
белеге:
ТАЧКА: Г61
Y: 7588567.820
X: 4729411.936
Z: 399.657
Tип
бетонска
белеге:
21
Survey works main polygon Page 22 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г64
Y: 7588604.368
X: 4729339.196
Z: 403.511
Tип
бетонска
белеге:
ТАЧКА: Г65
Y: 7588567.560
X: 4729260.328
Z: 396.221
Tип
бетонска
белеге:
22
Survey works main polygon Page 23 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г30
Y: 7588635.826
X: 4728818.278
Z: 385.949
Tип
бетонска
белеге:
ТАЧКА: Г31
Y: 7588584.221
X: 4728669.522
Z: 381.142
Tип
бетонска
белеге:
23
Survey works main polygon Page 24 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г32
Y: 7588652.381
X: 4728540.810
Z: 398.988
Tип
бетонска
белеге:
ТАЧКА: Г40
Y: 7588495.517
X: 4728020.311
Z: 375.303
Tип
бетонска
белеге:
24
Survey works main polygon Page 25 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: Г41
Y: 7588484.314
X: 4727944.924
Z: 378.727
Tип
бетонска
белеге:
ТАЧКА: П10
Y: 7588415.665
X: 4727596.995
Z: 357.351
Tип
бетонска
белеге:
25
Survey works main polygon Page 26 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: П11
Y: 7588327.875
X: 4727303.428
Z: 356.906
Tип
бетонска
белеге:
ТАЧКА: П107
Y: 7588221.127
X: 4727224.804
Z: 349.042
Tип
бетонска
белеге:
26
Survey works main polygon Page 27 of 36
Method Statement MS.010 Rev. 2
Nov 2016
T.O. бр. 27
ТАЧКА: П12
Y: 7588245.746
X: 4727122.860
Z: 354.893
Tип
бетонска
белеге:
ТАЧКА: П13
Y: 7588222.769
X: 4727023.412
Z: 354.187
Tип
бетонска
белеге:
27
Survey works main polygon Page 28 of 36
Method Statement MS.010 Rev. 2
Nov 2016
28
Survey works main polygon Page 29 of 36
Method Statement MS.010 Rev. 2
Nov 2016
29
Survey works main polygon Page 30 of 36
Method Statement MS.010 Rev. 2
Nov 2016
Iterations = 2
Number of Stations = 5
Number of Observations = 6
Number of Unknowns = 4
Number of Redundant Obs = 2
Station E N Description
P97 7588475.4250 4729436.1220
P100 7588558.5590 4728896.2810
S90 7588322.4050 4729758.5320
NM1 7588359.9499 4729475.9613
NM2 7588392.5616 4729706.8072
30
Survey works main polygon Page 31 of 36
Method Statement MS.010 Rev. 2
Nov 2016
31
Survey works main polygon Page 32 of 36
Method Statement MS.010 Rev. 2
Nov 2016
Error Propagation
=================
Station E N
P97 0.000001 0.000001
P100 0.000001 0.000001
S90 0.000001 0.000001
NM1 0.011503 0.013621
NM2 0.011729 0.012894
32
Survey works main polygon Page 33 of 36
Method Statement MS.010 Rev. 2
Nov 2016
33
Survey works main polygon Page 34 of 36
Method Statement MS.010 Rev. 2
Nov 2016
LEVELLING OF Rev 02
Cota Cota
partida 394,606 llegada 394,606 Cierre
34
Survey works main polygon Page 35 of 36
Method Statement MS.010 Rev. 2
Nov 2016
P97 394,606
MN1 401,35107
MN2 399,47269
S90 391,50708
35
Survey works main polygon Page 36 of 36
Method Statement MS.010 Rev. 2
Nov 2016
36