Sunteți pe pagina 1din 150

AN ISO 9001-2000 CERTIFIED COMPANY

FOR:

Chevron Pakistan Lubricants (Pvt.) Limited


PROUDLY AN ISO 9001:2000
CERTIFIED COMPANY
For The Kind Attention Of:

Muhammad Nadeem
Buyer – Indirect Spend, Pakistan

Chevron Pakistan Lubricants (Pvt.) Limited


HC-3, 13th Floor, Harbor Front, Block 4,
Scheme No. 5 Clifton, Karachi
Pakistan.

Tel: +92 21 36490166

Cell No.: +92 300 0457106

Mnadeem@Chevron.com
COMPANIES PROFILE
FIRMS NAME : M/s S.M.Asghar (Pvt) Limited
An ISO 9001:2000 Certified Company

COMPLETE ADDRESS : 908-910, 9th Floor, Chapal


Plaza, Hasrat Mohani Road
Off I.I.Chundrigar Road
Karachi.

CORPORATE STATUS OF FIRM : PRIVATE LIMITED.

TELEPHONE NO : 00+ 92+21+32468091 -5

FAX NO : 00+92+21+32468090.

FIRMS CUSTOM HOUSE LICENCE NO : 714.

DATE OF REGISTRATION WITH : 30-03-1980.


CUSTOMS

E- MAIL ADDRESS : smasghar@cyber.net.pk

E- MAIL ADDRESS : info@smasghar.com.pk

Web- Page : http://www.smasghar.com.pk

DATE OF ISSUE OF LICENCE : 30-03-1980.

NUMBER OF STAFF EMPLOYED : 22.

YEAR OF ESTABLISHMENT : 1980.


SYED KHALID JAMAL CHIEF EXECUTIVE

SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION

SYED MOHAMMAD ALI KHALID GENNERAL MANAGER


PEOPLE BEHIND THE COMPANY
SYED KHALID JAMAL : CHIEF EXECUTIVE.
SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV
SYED MOHAMMAD ALI KHALID : GENERAL MANAGER

MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.

MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION

MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.

S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.

MOHD SALEEM : ASST PORT OPERATIONS.

MOHAMMAD TARIQ : ASST. PORT OPERATIONS

MOHD JAVED : ASST PORT OPERATIONS.

QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.

SALEEM NOOR : ASST. AIRPORT OPERATIONS

AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY

SAEED KHAN : HEAD OF COMPUTER DIVISION

DILSHAD A. SIDDIQUI. : MANAGER FINANCE

ASIF KHAN : ASST. MANAGER FINANCE

ATIA FASIAL : ASST. OFFICE CO-ORDINATOR

MOHAMMAD SAMI : INCHARGE GD PREPARATION (BY AIR)

ASAD ABBAS : ASST.BILLINGS & ACCOUNTS

MOHSIN KHAN : FIELD OFFICER.

SADDAM HUSSAIN : FIELD OFFICER.

SULEMAN : OFFICE PEON.


USMAN GHANI : OFFICE PEON.
We are pleased to inform you that by the Grace of All mighty
Allah, currently we are Handling Projects for valuing more or
less US $ 1.2 Billion Dollars.

You will appreciates that in all of the Projects mentioned below


we have taken various Exemptions & benefits of various SRO’s
from Customer to Customer & on Project to Project Basis.

With our background experience, M/s. S.M.Asghar (Pvt) Limited


has successfully completed all the major & Prestigious
Projects of National Importance as well as
International Importance.

We on merit got the benefit of various Concessionary


SRO’s & Exemptions to our valued Customer to their
Entire satisfaction & without any problems and difficulty.

Our team of professionals sits with the Customer prior


to the start of the Project/Projects & developed systems
and a general flexibility of approach tailored to our
Clients most Complex of requirements.

We believe that our Professional approach to our


Client is unparalleled by any competitors.

Few of the recent Projects & Customer References


are given below, for whom we have claimed the various SRO’s
& Exemptions to our valued Customer to their entire
satisfaction.

We assure you of our support & Cooperation


MOL MAKORI GAS FIELD
SRO: 678(I)/2004, DT: 07-08-2004

GHAMBAT SOUTH GAS PROCESSING FACILITY


(GPF II)
PROJECT OF PAKISTAN PETROLEUM LIMITED
(PPL)
SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Ravi
SRO: 678(I)/2004, DT: 07-08-2004

SHELL GAS
SRO: 678(I)/2004, DT: 07-08-2004
SHV ENERGY PAKISTAN
Various Equipments & Material Including Break Bulk LPG Mixture
SRO: 678(I)/2004, DT: 07-08-2004

Expansion of Plant: RAVI GAS


SRO: 678(I)/2004, DT: 07-08-2004

WEATHERFORD DRILLING
SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Engineering
(One of the Largest Private Sector Project for OGDCL US $ 135 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
TRANSASIA REFINERY LTD (Re-Location)
(One of the Largest Private Sector Project US $ 700 Million
Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

INDUS REFINERY LTD (Re-Location)


(Another Largest Private Sector Project US $
650 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

DESALINATION & POWER PROJECT” at DHA Karachi


(Total Cost of the Project US $ 160 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi


EXPANSION PROJECT & NEW GANTRY CRANE
(Total Cost of the Project US $ 400 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MIRANI HYDRO POWER DAM PROJECT
(The Project Cost US $ 80 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

SATPARA HYDRO POWER DAM PROJECT


(The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
GOMAL ZAM HYDRO POWER DAM PROJECT
(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

DUBER KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

KHAN KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I


(The Project Cost US $ 45 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II
(The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

PROGAS LPG STORAGE & HANDLING TERMIANAL


(Private Sector Project US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES


(The Second Expansion Phase Project US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

PETROSIN ENGINEERING (Pvt) LTD


QADIRPUR 600 MMSOFD EXPANSION PROJECT
(The Project Cost US $ 6 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED
PACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR
BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD
(The Project Cost US $ 14 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED


PACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT
PROGRAM FOR ERRA
(The Project Cost US $ 300 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

ALSTOM PAKISTAN LIMITED


FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
(The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAKISTAN LIMITED
ZHORLU WIND POWER ( Heavy Transformers)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
SRO: 575(I)/2006, DT: 05-06-2006

FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)


SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.
(The Project Cost US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1
(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING
SETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
VARIOUS PORTS AT KARACHI

Qasim International Container Limited (QICT) Karachi Port Trust Head office (KPT)

Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)

S.M.ASGHAR (PVT) LIMITED


908-910, 9th Floor, Chapal Plaza, Hasrat Mohani
Road, Off I.I Chundrigar Road, KARACH I
We have a pleasure to give a brief introduction of our Company
M/s. S.M.Asghar (Pvt) Limited, a name famous for its credibility,
reliability & commitment in this part of world.

We are proudly an ISO 9001-2000 Certified Company.

We are among the few & pioneer company who got the ISO Certification in
Custom Clearance in Pakistan.

With our background experience, M/s. S.M.Asghar (Pvt) Limited


has been able to developed systems and a general flexibility of
approach tailored & personalized solutions to our Clients most Complex
Requirements that we believe is unparalleled by any competitors.

Most important our customers are able to deal with an International


Network who can arrange the movement and supervision
of cargo from Europe, and beyond, whilst they only
instruct one control office. This International Strength
and wealth of experience combined with a genuinely personal
approach we feel makes us a formidable contender.

Our Credentials our Enthusiasm and our Track Record speak for themselves.

For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited


have developed & specializes and simultaneously Transform
itself into a PROJECT CLEARANCE SPECIALIST.

If one can give a brief look at the Pakistan’s Most Advanced


& the Important Industrial Estate PORT BIN QASIM,
by the Grace Of All Mighty Allah it is an Honor for
M/s. S.M.Asghar (Pvt) Limited to perform the Complete Custom
Clearance & the Logistics Support in the form of Local Transportation to these
Prestigious Projects.
Privilege To Handle The Prestigious Projects At
Port Bin Qasim Few Are Listed below

PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM


(The Contractor for PARCO Project Cost US $ 300 Million Dollars)

ICI PTA T-11


(The Largest Private Sector Project US $ 480 Million Dollars)

Engro Vopak Terminal Ltd (VCM Tank Farm)

Engro Vopak Terminal Ltd (MEG Tank Farm)

Engro Vopak Terminal Ltd (LPG Tank Farm)

Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm)


(Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)

PROGAS LPG STORAGE & HANDLING TERMINAL


(Private Sector Project US $ 50 Million Dollars)

INDUS REFINERY LIMITED


(Another Largest Private Sector Project US $ 750 Million Dollars)

TRANASIA REFINERY LIMITED


(Another Largest Private Sector Project US $ 800 Million Dollars)

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (FOTCO)


(The Second Expansion Phase Project US $ 30 Million Dollars)

CHINA HARBOR ENGINEERING


(The Contractor for EVTL for the EVTL JETTY Private Sector Project US
$ 4 Million Dollars)
ENGRO ASAHI POLYEMR & CHEMICALS
(Another One of the Largest Private Sector Project US $ 80 Million Dollars)

FAUJI FERTILIZER BIN QASIM LTD


(Handling of Break Bulk Phosphoric Acid)

LPG BREAK BULK SHIPMENT


(Handling of 90% of Pakistan Break Bulk LPG Shipments at EVTL& SSGC Terminal)

VCM BREAK BULK SHIPMENT


(Handling of 100% of Break Bulk VCM Shipments at EVTL)

ETHYLENE BREAK BULK SHIPMENT


(Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)

Karachi International Container Terminal Phase II Expansion PROJECT


Total Cost of the Project US $ 400 Million Dollars
Few To Name Multinational Companies & References
(Currently Serving All)

1) Engro Polymer & Chemicals Limited

Contact Person : Sohail Baig


Contact Number : 0334-43977502
Since 02 Decades

2) Engro Vopak Terminal Limited

Contact Person : Khalid Mukhtar


Contact Number : 0301-8238903
Since 02 Decades

3) Engro Powergen Qadirpur Limited

Contact Person : Iftikhar Daar


Contact Number : 0300-8268486
Since 07 Years

4) Engro Foods Limited

Contact Person : Noman Farooq


Contact Number : 0308-2228879
Since 10 Years

5) Engro Powergen Thar (Pvt) Limited

Contact Person : Bilal Ahmed


Contact Number : 0301-8231779
Since 02 Years
6) Sika Pakistan (Pvt) Limited

Contact Person : Rehman Farooq


Contact Number : 0300-8430091
Since 06 Years

7) PGPC Consortium Limited LNG Terminal

Contact Person : Mujeeb Ur Rehman


Contact Number : 0300-8230846
Since 02 Years

8) Pyramid Gas

Contact Person : Aslam Nadeem


Contact Number : 0303-6668107
Since 05 Years

9) Descon Engineering

Contact Person : Abid Raza


Contact Number : 0300-2135308
Since 08 years

10) SSGC LPG

Contact Person : Jalees Ghalib


Contact Number : 0322-8213192
Since 03 Years
Hydro Power Sector

Privilege to Handle the Major Hydropower Power & Dam Projects of


National Importance, among these Projects of National Importance are:

MIRANI HYDRO POWER DAM PROJECT


(The Project Cost US $ 80 Million Dollars)

SATPARA HYDRO POWER DAM PROJECT


(The Project Cost US $ 30 Million Dollars)

MANGLA RAISING HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

GOMAL ZAM HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

DUBER KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

KHAN KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

ALAI KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)
DHA DESALINATION PLANT 3 MIGD
& 94 MW POWER PLANT KARACHI

Project Name DHA DESALINATION & POWER PLANT


PAKISTAN FIRST EVER SEA DESALINATION
& POWER PLANT

Location: DHA, PHASE VIII. KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 million

CLIENT DHA COGEN LIMITED (DCL)

Completion: UNDER CONSTRUCTION

This is the first ever desalination plant in history of Pakistan. It has a


capacity to Desal, 3 MGD (Million Gallons Per Day) of Water, beside to
Produce & Generate Electricity of a Capacity 95 MW

TOTAL VALUE OF L/C ESTABLISHED:

Siemens AG Germany $ 41,400,000 $ 33,120,000


Siemens AG Germany € 6,550,000 € 5,240,000
Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241
Lincas Electro Vertibas € 295,500 € 236,390
JAMSHORO JOINT VENTURE LIMITED
SINGLE LARGEST LPG EXTRACTION PLANT

Project Name JAMSHORO JOINT VENTURE LIMITED

Location: JAMSHORO, SINDH

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CLIENT ASSOCIATED GROUP

Completion: 2005

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I


(The Project Cost US $ 80 Million Dollars)

M/s. S.M.Asghar (Pvt) Limited was awarded the President of Pakistan


Award by the President General Pervez Musharraf for successfully and
timely performance in Clearance and Logistics of JJVL Phase I Project

JJVL is Pakistan’s single largest producer of Liquefied


Petroleum Gas. Situated in Dei Shah Bukhari, District
Hyderabad, JJVL’s Extraction Plant has a daily output of about
500 metric tons of LPG and 150 metric tons of NGL/Naphtha.
JJVL accounts for about one-third of the total local LPG production of
the country.
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II
(The Project Cost US $ 20 Million Dollars)
PARCO White Oil Pipeline Project
By China Petroleum & Consortium
M/s S.M.Asghar (Pvt Limited also have a privilege of Handling
02 chartered flights carrying main booster pumps weighing
over 100 Tons by Air for
ICI T11 PTA Plant
Project Name ICI PTA T11 PLANT

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 480 million

CLIENT TRANSCAR PROJECTS UK/ FOOSTER WHEELER UK

Completion: 1998
We also have a privilege of handling one of the Heaviest and Length Wise
Piece in History of Pakistan which Weights 265 M/tons and Length
Approx.76 Meters.

REQUIRED FOR CUSTOM CLEARANCE


SCOPE OF WORK
BENEFIT OF VAVARIOUS
CONCESSIONARY
SRO’s & EXEMPTIONS
PREPARATION BEFORE ARRIVAL
OF VESSEL

Upon receipt of the written instruction from the Importer /


Representatives of the Importer, we will be in close contact with the
shipping Company in order to ascertain the expected arrival date
( ETA ) of the Ocean going Vessel at the Un-loading Port of the
Country.

CONFIRMATION OF THE ARRIVAL


OF VESSEL:-

We shall inform the arrival and the berthing date of the vessel to
the Importer / Representatives of the Importer in order to keep a close
Loop for the berthing of the vessel.

CUSTOM CLEARANCE:

We shall collect in full advance all the necessary


documents for the onward Custom Clearance
from the Importer / Representatives of the
Importer when intimated and will prepare GD
and all the required documents and formalities to
be submitted to the related Custom Authority
and Will Complete the preparation of the GD (Goods Declaration) as per
Invoice, Packing List & Bill Of Lading depending on weather the Vessel has
arrived and also subject to the Lodging Of Manifestation of IGM (Import
General Manifest) by the Shipping Company / Shipping Agent.
OBTAINING THE DELIVERY ORDER:

We shall complete all the formalities required by the relative Shipping Agent / Main Carrier
Agent/ relevant Port Authority and will obtain the Delivery Order from the Shipping
Company/ OR their Agent against the presentation/ submission of Original Bill of Lading.
The delivery Order's are generally issued after filing of IGM in order to ascertain the goods
have not been Transshipped.

NECESSARY ASSISTANCE:

We shall provide all necessary Assistance and


Consultancy Services Concerning Custom Clearance to
the Importer / Representatives of the Importer.

AIR CARGOES:

We shall also perform the Works Related to the Air Cargo As per request of
Importer / Representatives of the Importer…
DELIVERY AT / TO THE PLANT SITE

We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low
Bed OR as per the requirement & Nature of Cargo to the Warehouse or the
open storage area as per the instruction of Importer / Representatives of the
Importer.

CUSTOM DUTIES TAXES


SRO’s AND NECESSARY PERMITS

All the Plant, Machinery, Equipment and Parts/Spares which are imported into
Pakistan shall be subject to Custom Duties and Taxes Prevailing at the time of
Import.

The Duties and Taxes concerns with the Custom Authorities as per
Pakistan Custom Tariff includes:-

Custom Duty/Duties From 5% Minimum To 20% Maximum

Sales Tax/Taxes 17 %

Income Tax/Taxes 5.5%


The Taxes Concerns with the Port Authorities:-

Port Wharfage

Port Demurrage

Weighment Charges (If any) (for Products like Pipes of Iron/Steel/Coil-Bar)

There Are Two Major Ports in Karachi Namely as below:

Karachi Port

Port Bin Qasim

Karachi Port is Further Divided into 02 Parts, namely;

1) EAST WHARF:

a) Pakistan Container Terminal (PICT) Private Terminal

b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No
03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.

c) Ghass Bunder, For Launches, Steamer and Boats

2) WEST WHARF:

a) Karachi International Container Terminal Ltd (KICT)

b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24
And 25

c) Berth Number 25 is for Heavy Lift Cargo that has On Shore Heavy
Crane for capacity 50 M/Tons.
For Containerized Cargo the various Yards/Ports are charging different
Handling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking
Charges/Yard Storage Charges.

Please note that for all the above mentioned charges the relevant
Port /Yard will issue Receipts for the relevant charges.

Excise Taxes @ 1.0-1.05% on Import Value/Assessed Value/


Appraise Value by the Customs or any other Charges / Taxes prevailing at
the time of Import shall be Paid by the I m p o r t e r immediately before
the Clearance of the Consignments from the Port.

Further the completion of GD’s (Bill of Entry) and other Custom formalities are
subject to the Final Assessment / Valuation / Any SRO Benefits / PCT
confirmation and also the Container / Marks & Number.

Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /


Bill of Lading OR any other relevant documents submitted by the Importer,
will may render in delay to clear the consignment.
SUBMITTAL OF SHIPPING GUARANTEE
BOND IN ABSENCE OF ORIGINAL BILL OF LADING

If there is a delay in the arrival of the Original Bill of Lading, can cause a

delay in getting the Goods/ Cargo release of the from the Port

premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading

would be therefore required by the shipping company in order to issue the

Delivery Order. It shall be discussed and settle before arrival of the vessel.

We will provide all necessary assistance and advice for the Shipping

Guarantee to the Importer / Representatives of the Importer.

During the Unloading of the Break Bulk/ loose Cargo from the vessel

There are chances of getting the goods Damage OR in case we find any

Loss of Goods and or the Goods already Damage on or after its receiving

We shall report to the Importer / Representatives of the Importer or

Arrange a joint survey as soon as possible. Marine/Transit insurance

Shall be arranged by Importer / Representatives of the Importer,


from Place of Origin up to the Plant Site
METHOD STATEMENT
Newly Implemented Web-Based
One Customs WeBoc) SYSTEM

At the present there are 02 procedures for Custom Clearance:-

WEB BASED ONE CUSTOM (WeBOC)


Under this newly implemented procedure if the Vessel is berthed
at any of the below Ports i.e.

Karachi Port Trust (KPT)


Karachi International Container Terminal (KICTL)
Pakistan International Container Terminal (PICTL)
Qasim International Container Terminal (QICTL Port Qasim)
Air Freight Unit (AFU)
FCL/LCL/Loose/Break Bulk

Goods Declaration (GD) is prepared on Line Under the New WeBOC System
(Via Electronic Mail Data Transfer System).

The G.D (Goods Declaration) is prepared in accordance with the declaration


of the Importer and the documents provided by the Importer i.e.
Commercial Invoice, Bill of Landing and the Packing List. Thereafter the G.D
is submitted to the Custom for Assessment on Line.
* The amount of Custom Duties & Taxes and the Sindh Infra Structure
Fee (CESS) has to be paid in advance as per the Importer declaration.

* If the assessment by the WeBOC is done as per the declaration of


Importer, than the G.D is processed and the Importer can take the
delivery of the goods, after the payment of all the necessary Port Dues &
Excise Tax.

In case the goods have been processed under WeBOC SYSTEM does not
accept the Importer Declaration, than the Importer may asked for additional
Duties & Taxes or If the Importer wants to Contest with the views of the
Customs than they can go for appeal & meet the Senior Custom Officials
along with the relevant Documents & Proof to justify their claims.

The Custom Authorities may differ in three basic ways:

1) Disagreement in the PCT OR HS Code Classification.

2) Not Extending the Benefit of the Claimed Benefit/SRO.

3) Disagreement with the Valuation.

The GD is Prepared and filed Online (Via Electronic Filling),


as per declaration of the Importer.

If Customs satisfy with all the 03 criteria’s mentioned above i.e.

PCT
SRO
Valuation

The GD is than completed by the Concerned Group. The Importer has to


than pay the Applicable Duties & Taxes after that the GD is forwarded to
the Port side for Examination after which the Importer can take the
Delivery of the goods after the payment necessary Port Dues.
* If Customs do not satisfy with all the 03 Criteria’s mentioned above i.e.

PCT
SRO
Valuation

Than the GD is forwarded to the Port Side for Physical Examination to


check the goods are in conformity to the declaration of the Importer &
under the light of Examination Report GD will be completed by the
concerned Group in the Custom House.
The following documents are required generally by the customs for processing
the B/E for the Cargo arriving at Sea Port.

I Original Invoice showing complete description of the goods with value of


the each individual item

II Detail Packing List showing complete Description, Quantity Gross


Wt, Net Wt, Ullage Certificate.

III Original Bill of Lading duly endorsed at the backside in our Favor.

IV Certificate of Origin

V All Govt. Sanctions, Authorization from Government Agencies if any

VII Original Letter of Credit

VIII Sales Tax Registration Certificate

IX Import Registration

X National Tax No Certificate Copy

XI WeBOC Registration (User ID & Pass Word)

Any other document that may be requested by the Custom to verify the
declaration of Importer
The following documents are required generally by the customs for processing
the B/E for the Cargo arriving at Air Port.

I Original Invoice showing complete description of the goods with


value of the each individual item

II Detail Packing List showing complete Description, Quantity, Numbers of


Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter

III Original Airway Bill

IV Certificate of Origin

V Complete Catalogue/Drawing for Machinery & Equipment.

VI All Govt. Sanctions, Authorization from Government Agencies


if any

VII Original Letter of Credit

VII WeBOC Registration (User ID & Pass Word)

Any other document that may be requested by the Custom to verify the
declaration of Importer
POSSBLE
DELAYS

Further to the above there may be delays in Clearance due to following


reasons:-

I Non availability of the Original Documents, such as BL

II Delay in meeting Custom Queries.

III Strikes / Weather, Act of God, Force Major Etc

IV Delays due to Non-availability of concerned officers.

V Delays in receipts of payments

VI Delays due to the Non-fulfillment of Shipping Companies

VII Delays due to Non-availability of Trucks / Trailer


PREVIOUS
PROJECTS
HANDLED
.
CLIENTS PROJECTS

* M/S ICI PAKISTAN LTD.


C/o TRANSCAR PROJECTS LTD
ICI PTA PROJECT PORT QASIM

* M/S ENGRO PAKTANK TERMINAL.


CHEMICAL STORAGE TERMINAL

* M/S NOEL LGA (GERMANY)


LPG EXPANSION & MARKETING

* M/S ENGRO ASAHI POLYMER & CHEMICALS.

ENGRO PVC PLANT PROJECT

* M/s TEKSER INSAAT SAANAYI

CHASMA RIGHT BANK C-65

* M/S FMC. (MARINE LOADING ARM)

FOTCO OIL TERMINAL BIN QASIM

* M/S SECA PAKISTAN.

KHI - HYDERABAD BY PASS

* M/S TRANSCAR PROJECTS LTD.

DHABEJI PUMPING STATION W-19

* M/S TRANSCAR PROJECTS LTD.

NORTH EAST KARACHI STATION W-18


CLIENTS PROJECTS

* M/S CHINA GUANGXI CORPORATION

PATFEEDER CANAL PROJECT

* M/S CHINA DONGFANG CORPORATION

SEWERAGE TREATMENT PROJECT

* M/S CHINA PETROLEUM


KORANGI SEWERAGE TREATMENT

* M/S CHINA YUNNAN CORPORATION


KPT JINNAH BRIDGE PHASE II

* M/S CHINA NATIONAL ELECTRIC WIRE & CABLES

QUEENS ROAD POWER STATION

* M/S CHINA HARBOR ENGINEERING

JETTY FOR ENGRO PAKTANK

* M/S IJM / IGI JOINT VENTURE.

LBOD SANGHAR PROJECTS

* M/S LIFE LINE (Pvt) LTD.

DHURNAL LPG GAS EXPANSION PROJECT

* M/S ENGRO PAKTANK TERMINAL.

LPG TERMINAL AT BIN QASIM

CLIENTS PROJECTS
* M/S ENGRO PAKTANK TERMINAL

VCM TERMINAL HANDLING PROJECT

* M/S HYUNDAI CORP KHI OFFICE.

K.E.S.C HIGH TENSION CABLE PROJ.

* M/S HYDERABAD DEVELOPMENT AUTHORITY.

MACHINERY UNDER SPANISH GRANT

* M/S CHINA YUNNAN CORPORATION.

MALDIVE SPARLIAMENT BUILDING

* M/S CHINA NATIONAL CHEM ENGG CORP.

SUB CONTRACTOR FOR DONGFANG


S2 PROJECT

* ENGRO ASAHI TRADING (PVT) LTD

EXPORT OF PVC WORLD WIDE


CLIENTS PROJECTS

* M/S DESCON ENGINEERING WORKED FOR NUMBER OF PROJECTS

1) EPTL FOR LPG TERMINAL

2) EPTL FOR VCM PROJECT

3) EVTL FOR MEG PROJECT

4) FOR PARCO MID COUNTRY REFINERY

5) LASMO OIL BHIT GAS FIELD PROJECT


US $ 6.5 Million Dollars

* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD

HUB & PIPRI PROJECT FUNDED BY ADB


£ 15.8 Million Sterling

* M/S HYUNDAI HIDCO HAKAS JV

EXPORT OF HEAVY DREDGING MACHINERY


US $ 2.5 Million Dollars

* M/S AL - NOOR SUGAR MILLS LTD

MDF BOARD FIBRE BUILDING BOARD PLANT


(LASSANI)

CLIENTS PROJECTS
* PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.

US $ 4.5 Million Dollars


* M/S ENGRO PAKTANK TERMINAL.

CHEMICAL STORAGE TERMINAL


US $ 5.5 Million Dollars

* M/S SHV ENERGY PAKISTAN

GAS EXPANSION PROJECT


US & 1.5 Million Dollars

* M/S TEKSER INSAAT SANAYI VE TICCARRET

CHASMA RIGHT BANK CANNAL PROJECT C-


65 US $ 260 Million Dollars
BREAK BULK
LIQUID CHEMICALS &
PETROCHEMICALS HANDLING
PROJECTS IN HAND
* SHV ENERGY LIMITED
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS

* JAMSHORO JOINT VENTURE LIMITED

LIQUIFIED PETROLEUM GAS (LPG)


IN BULK OF VARIOUS PARCELS

* AFTAB TRADERS
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS

* CRESS LPG LIQUIFIED PETROLEUM GAS (LPG)


IN BULK OF VARIOUS PARCELS

* RELIANCE CONSULTANCY

LIQUIFIED PETROLEUM GAS (LPG)


IN BULK OF VARIOUS PARCELS

* ENGRO POLYMER & CHEMICAL LIMITED

VINYL CHLORIDE (VCM)


IN BULK OF VARIOUS PARCELS
EDC IN BULK OF VARIOUS PARCELS

CAUSTIC SODA IN BULK ETHELYNE


IN BULK OF VARIOUS PARCELS
UNDER GOING
PROJECTS
IN HAND
* M/S ENGRO FOODS LIMITED

1) LAUNCHING & SETTING UP A COMPLETE STATE OF AN ART


OF O'MORE ICE CREAM PLANT

2) BRAND NEW STATE OF AN ART ENGRO RICE &


PAR BOILING PLANT

3) EXPANSION OF EXISTING DAIRY MILK PLANT. (OLPER'S MILK)


* M/s. FOUNDATION ENERGY LIMITED-1
SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A
CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

* M/s. FOUNDATION ENERGY LIMITED-II


SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A
CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

* M/S. PAK ARAB REFINERY LIMITED

SETTING UP A COMPLETE BRAND NEW ASPHALT BUILT UNIT


(ABU UNIT)

* ENGRO POLYMER TRADING LIMITED

EXPORT OF PVC RESIN (SABZ BRAND) WORLD WIDE


APPROXIMATE EXPORT IN M/TONS 2500 PER MONTH

* M/s. CIVIL AVIATION AUTHORITY


SETTING UP A BRAND NEW BENAZIR BHUTTO
INTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06
REFUEL HYDRANT SYSTEM.
KARKEY PAKISTAN
POWER SHIP & OIL SUPPLY TANKER
VARIOUS OTHER PROJECTS
OF NATIONAL IMPORTANCE INCLUDING
HYDRO, SEWERAGE WATER
TREATMENT, DAMS CHEMICAL
INDUSTRY OIL & GAS SECTOR
* M/S CHINA SINOHYDRO CORPORATION

1) GOMAL ZAM DAM HYDRO POWER

2) DUBAR KHAWAR DAM HYDRO POWER

3) KHAN KHAWAR DAM

4) KWSB K-III

* M/S. INDUS REFINERY LIMITED.

HI-TECH 100,000 BPSD OIL REFINERY


ON RELOCATION BASIS

* M/S. JAMSHORO JOINT VENTURE

LPG EXTRACTION PLANT

* M/S. PETROSIN RAVI ENGINEERING

OIL & GAS PROJECTS LTD.

* M/S. SHELL GAS LPG PAKISTAN LTD

LPG PROJECTS / LPG GAS

* M/S. BI-WATER INTERNATIONAL

KARACHI WATER & SEWERAGE


BOARD HUB & PIPRI PUMPING
STATION PROJECT

* M/S. DESCON ENGINEERING LTD (HYDRO POWER PROJECTS)


1) SATPARA DAM PROJECT

2) MIRANI DAM PROJECT

3) MANGLA RAISING PROJECT

4) TUNSA BARRAGE PROJECT

5) HYDERABAD WATER
TREATMENT PROJECT.

* M/S. FAUJI FERTILIZER BIN QASIM LTD

BREAK BULK HANDLING OF


PHOSPHORIC ACID

* M/S. ENGRO ASAHI POLYMER AND CHEMICAL LTD.

V.C.M / MACHINERY &


EQUIPMENT / EXPORT

* M/S. DHA COGEN LTD.

DESALINATION / POWER
PROJECT

* M/S. BAHRIA TOWN HOUSING & INFRASTRUCTURE P ROJECT

RE-LOCATION OF PLANT &


MACHINERY FOR PRE-
FABRICATING HOUSING
* AREVA T&D PAKISTAN (PVT) LTD.

132 KV GRID STATION AT


CREEK CITY, DHA

* KHALID RAUF & CO., (PVT) LTD.

INFRASTRUCTURE PROJECTS
LAHORE RING ROAD
HYDROPOWER PROJECTS

From our background experience, strength & experiences from


industrial development projects, S.M.Asghar (Pvt) Limited
has rapidly established itself as a key player in infrastructure
projects.

We successfully did the Custom Clearance & In-land


Transportation jobs of large-scale projects like dams, barrages,
highways and housing complexes.

We hold the distinction of being the first ever local company to do


the 07 Major Hydropower Projects Simultaneously of National
Importance in Pakistan
HYDROPOWER
PROJECT
Taunsa Barrage Rehabilitation
And Modernization
Location: Taunsa Pakistan

Year Of Project March 2006-2007

Cost Of Project US $ 140 Million Dollars

Completion : May 2008


HYDROPOWER
PROJECT
MANGLA DAM RAISING
PROJECT
LOCATION Mangla

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION

COST OF PROJECT US $ 140 Million Dollars

Expected September 20 2007


Completion Date:
HYDROPOWER
PROJECT.
SATPARA DAM
HYDROPOWER PROJECT
LOCATION PAKISTAN

NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.

COST OF US $ 140 Million Dollars


PROJECT

Completion : March 2007


Project Name
Kachhi Canal Project
Contract # KC-03
Location: Taunsa Barrage – Kot Addu

NATURE OF JOB CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF US $ 65 MILLION DOLLARS


PROJECT

Completion: January 2009


Project Name
GOMAL ZAM
HYDROPOWER PROJECT
CLIENT CHINA SIOHYDRO CORPORATION

NATURE OF CUSTOM CLEARANCE & INLAND


JOB TRANSPORTATION.

COST OF US $ 220 MILLION DOLLARS


PROJECT

Completion: 4 YEARS
Project Name
Duber Khwar

The project located on river Duber Khwar, right


Location: bank tributary of Indus river near Patan in NWFP
at a distance 265 Km from Islamabad.

NATURE OF JOB CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF PROJECT US$ 109 million

Completion: 4 YEARS
Location:
Allai Khwar
Hydropower Plant
The Project is located on Allai
Khwar River, Left Tributary of
River Indus near Besham in
NWFP, 245 km from Islamabad.

NATURE OF JOB CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF PROJECT US$ 110 million

Completion: 4 YEARS
Project Name
MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)
West of Turbat Town in Makran Div of
Baluchistan.

NATURE OF JOB CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF US$ 120 million


PROJECT

Completion: 4 YEARS
LPG Storage & Handling Facilities

Project Name
ENGRO PAKTANK
LPG TERMINAL
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF PROJECT US$ 10 million

CAPACITY 4,500 METRIC TONES OF LPG

LPG BULLETS 10 LPG bullets

Completion: 1997 -98


Integrated Bulk Liquid Chemical
Terminal Storage & Handling Facilities
Terminal Information

Item Description
Port Port Muhammad Bin Qasim
Port Entrance Phitti Creek Fairway Buoy 24o33.1’,N, 67o02.9’,E
Tide Table PHB - 2, Pakistan Tide Tables
Local Time GMT + 5 Hrs
Berth Type Jetty
Commissioning 25th November 1997
Depth Alongside 11.0 m
Max LOA 225 m
Max Beam 33 m
Max Deadweight 75,000 tons
Current Operations Unloading and Storage (Chemicals and LPG)
Truck Loading and Pipeline Transfer
Products Handled / Paraxylene (PX), Acetic Acid (AA), Vinyl Chloride
Stored Monomer
(VCM), Acylonitrile (ACN), Phosphoric Acid, Mono
Ethylene Glycol (MEG), Liquefied Petroleum Gas
(LPG) and Ethylene
Heating, Chilling, Weighing and Nitrogen Blanketing,
Services
Water
Storage Capacity 82,400 cubic meters
Number of Tanks 21
Total Area 102 Acres
Access Sea / Road / Pipeline
Investment Over USD 100 million
Project Name
ENGRO PAKTANK VCM
TERMINAL
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

CAPACITY 41,000 CUBIC METER STORAGE FACILITY

SPHERICAL TANK 2 SPHERICAL TANK

Completion: 1997 -98


EVTL Bulk liquid Chemical and Storage Terminal the first phase comprised
construction of 41,000 cubic meter of storage facility the cost of first phase of the
Project was US $ 60 million the tank farm is situated on reclaimed land in the PQA.

PARAXYLENE

ACETIC ACID

PHOSPHORIC ACID (HANDLING ONLY)

VINYL CHLORIDE MONOMER

ACRYLONITRILE

LIQUEFIED PETROLEUM GAS

MONO ETHYLENE GLYCOL


Project Name
ENGRO ASAHI POLYMER
& CHEMICALS LIMITED
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CAPACITY 100,000 (TPA) PVC MANUFACTURING PLANT

CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD

Completion: 1999-2000

Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint

Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi

Corporation (Japan), each with an 80% and 20% shareholding, respectively

EAPCL is the only PVC manufacturer in Pakistan with a Capacity

Of 100,000tons per annum (TPA) and its operations are located at Port Qasim
PARCO Mid Country Refinery (100, 000 BPD)

Project Name PAK ARAB REFINERY COMPANY

Location: MULTAN, PAKISTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CLIENT DESCON ENGINEERING

Completion: 1998
INDUS REFINERY LIMITED
PAKISTAN SECOND LARGEST REFINERY

Project Name IRL is a 100,000 bpd or 4.95 million metric tons per
annum complex fuels refinery. It will be the sixth
petroleum refinery in Pakistan and the country’s
largest refinery.

Location: PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 700 million

CLIENT INDUS REFINERY LIMITED

Completion: UNDER CONSTRUCTION


RELOCATION OF 100,000 BARRELS CAPACITY REFINERY
PETRO CANADA REFINERY TO PAKISTAN PORT QASIM
Gambat South Gas Processing Facility
(GPF-||) Project

Gambat South Gas Processing Facility


Project

50 MMSCFD Gas Processing


PROJECT NATURE LPG 11 MTPD, Condensate 1050 BPD

Location: Distt. Sanghar, Sindh-Pakistan


Capacity: 50 MMSCFD Gas Processing
LPG 11 MTPD, Condensate 1050 BPD
Scope: EPCC of Complete Facility
Major Equipment

 Wellhead Air Cooler


 Inlet Separation
 Feed Gas Compressor
 Amine Purification Unit (MDEA Type)
 HCDP Control Unit
 (Propane based Refrigeration Compressor Package)
 Condensate Stabilization Unit
 LPG Recovery Unit
 Recycle Gas Compressor
 Sales Gas Compressing & Metering
 LPG Storage & Metering
 Chemical Injection Packages
TRANSASIA REFINERY LIMITED
PAKISTAN SECOND LARGEST REFINERY

Project Name TRL is a 100,000 bpd or 4.00 million metric tons per
annum complex fuels refinery. It will be the state of an
Art petroleum refinery in Pakistan and will be one of
the country’s largest refinery.

Location: PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 700 million

CLIENT TRANSASIA REFINERY LIMITED

Completion: UNDER CONSTRUCTION


TRANASIA REFINERY LIMITED
WIND POWER
PROJECTS
FAUJI FERTILIZER ENERGY COMPNAY
LIMITED (FFCEL) 49.5 MW WIND ENERGY
PROJECT AT JHAMPIR, KARACHI

Project Name FFCEL WIND ENERGY PROJECT OF CAPACITY 49.5 MW

Location: JHAMPIR, NEAR THATTA

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 110 million

CLIENT DESCON ENGINEERING LIMITED

Completion: ALREADY COMPLETED


Project Name ASPHALT BUILT UNIT PROJECT (ABU)
FOR PARCO

Location: PARCO MID COUNTRY REFINERY, MULTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 30 Million

Completion: DECEMBER 2012


Project Name 49.5 MW FOUNDATION WIND ENERGY-1 PROJECT

Location: JHAMPIR, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 Million

Completion: SEPTEMBER 2014


Project Name 49.5 MW FOUNDATION WIND ENERGY-II (Pvt) Ltd.
PROJECT

Location: JHAMPIR, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 Million

Completion: SEPTEMBER 2014


Project Name NEW KHANKI BARRAGE HYDROPOWER PROJECT

Location: RIVER CHENAB, DISTT GUJRANWALA

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 70 Million

Completion: SEPTEMBER 2016


Project Name ASPHALT BUILT UNIT PROJECT (ABU)
FOR PARCO

Location: PARCO MID COUNTRY REFINERY, MULTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 30 Million

Completion: DECEMBER 2012


Project Name METRO HABIB CASH & CARRY PAKISTAN (PVT) LTD

Location: HEAD OFFICE THOKAR NIAZ BAIG, MULTAN RD, LHR.

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 3.4

Completion: STILL UNDERGOING


KARACHI INTERNATIONAL CONTAINER
TERMINAL (KICTL) KARACHI

Project Name KARACHI INTERNATIONAL CONTAINER


TERMINAL (KICTL)
PHASE III EXPANSION PROJECT

Location: WEST WHARF ROAD, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 400 million

CLIENT KICTL PAKISTAN

Completion: UNDER CONSTRUCTION


BAHRIA TOWN (PVT) LIMITED
RAWALPINDI

Project Name BAHRIA TOWN (Pvt) LIMITED


AWAMI VILLAS PROJECT.
TOTAL # OF VILLAS 8000

Location: RAWALPINDI, PAKISTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 120 million

CLIENT BAHRIA TOWN (Pvt) LIMITED

Completion: UNDER CONSTRUCTION/ PROGRESS


HEALTH, SAFETY AND ENVIRONMENT
S.M.Asghar (Pvt) Limited believes that ACCIDENTS
DON’T JUST happen, they’re caused, and it is the duty of the Company
to remove and minimize all possible causes of Accidents.

We at S.M.Asghar (Pvt) Limited takes preliminary guide to the


recognition of potential hazards to the following.

MOST-SAFE-PLACES

M MACHINERY : Sources of Mechanical Power

O OPENINGS : Pits, Sumps, Ducts & Drains

S STACKS : Stores Materials, Raw & Process.

T TOOLS : All type of Tools.


SAFE-PLACES
S STRUCTURE : Floors, Walls, Ceilings, Road

A ATMOSPHERE : Dust, gases, fumes & Spray.

F FIRE : Fire Points & Fire Exits.

E ELECTRICITY : Wires, Cables, Switches.

P PRESSURE VESSEL : Boilers & Compressors

L LADDERS : Steps, trestles & Scaffolds

A ATTIRE : Protective Clothing, Helmets

C CRANES : Hoist, Derricks & Ropes / Hooks

E EXPLOSIVES : Flammable Liquids, LPG, Radioactive.

S For SIGNALS : Warning Light, Telephone Buzzers.

As a Company Policy we take care of our Employee to the best Standards because
Employees are Our Assets.
We provide following safety Equipments to our Port staff such as :

Safety Belts : They are provided to the Staff who


Works On the Ship /Vessel (VCM/LPG)

Emergency Lights : In case of Night Delivery at the Port


Premise/ Highways

Safety Helmets : At time of delivery at the Port Area


During Loading/ Unloading
Heavy Machineries/ Hazardous Cargo
Safety Boots : At the Ship Derricks & the Port Premises

Safety Glasses : They are provided to the Staff who


Work on the Ship /Vessel.
HEAVY & SUPER HEAVY LIFT
TRANSPORTATION EXPERIENCE
WE CALLED THIS AS
ABNORMAL LOADS

S-ar putea să vă placă și