Sunteți pe pagina 1din 26

ENTIDAD MUNICIPALIDAD DISTRITAL DE INKAWAS

OBRA CREACION DEL CAMINO DESDE H


CHANCABAMBA Y LIMONPUQUIO

UBICACIÓN CUSCO-LA CONVENCION-INKAWA


PRESUP. CONTRATADO S/. 1,608,723.06
SUPERVISOR
PRESUPUESTO GENERAL

PRESUPUESTO

ITEM DESCRIPCION Und.


COMPONENTE 1.- ADECUADA VIA DE CAMINO VECINAL Y OBRAS DE ARTE
01 CONSTRUCCION TROCHA CARROZABLE
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACIÓN PZA
01.01.02 CAMPAMENTO, ALMACEN Y GUARDIANIA M2
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO NIVELACION Y REPLANTEO KM
01.02.02 ROCE, LIMPIEZA Y DEFORESTACION HA
01.02.03 TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA KM
01.02.04 RAYADO DE TALUDES KM
01.02.05 SEÑALIZACIÓN Y SEGURIDAD VIAL
01.02.05.01 SEÑAL PREVENTIDA DE SEGURIDAD UND
01.02.05.02 CERCO PERIMETRICO PROVISIONAL DE ARPILLERA H=2.65M m
01.02.05.03 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL DE OBRA MES
01.03 EXPLANACIONES
01.03.01 CORTE DE MATERIAL SUELTO M3
01.03.02 CORTE ROCA FIJA - PERFORACION Y DISPARO M3
01.03.03 CORTE ROCA FIJA - EXCAVACION DESQUICHE Y PEINADO DE TALUDES M3
01.03.04 RELLENO CON MATERIAL PROPIO C/MAQUINARIA m3
01.03.05 ELIMINACION DE MATERIAL EXCEDENTE - TRANSPORTE M3
01.04 AFIRMADO DE CARRETERA
01.04.01 EXTRACCION Y APILAMIENTO M3
01.04.02 CARGUIO M3
01.04.03 TRANSPORTE MATERIAL DE BASE M3
01.04.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE M2
01.05 OBRAS DE DRENAJE
01.05.01 CUNETAS
01.05.01.01 CUNETAS LATERALES - EXCAVACION M
01.05.01.02 EXCAVACION EN ROCA PARA CUNETAS M
01.05.02 ALCANTARILLA TIPO ARMCO 03 UND
01.05.02.01 TRAZO DE NIVELES Y REPLANTEO M2
01.05.02.02 EXCAVACION MASIVA EN LECHO DE RIO CON EQUIPO PESADO M3
01.05.02.03 ELIMINACION MATERIAL EXCEDENTE ACARREADO CON CARRETILLA (50M) M3
01.05.02.04 COLOCACION DE CAMA DE APOYO M3
01.05.02.05 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS M2
01.05.02.06 FALSA ZAPATA CONCRETO F'C= 100 kg/cm2 M3
01.05.02.07 CONCRETO F'C= 175 kg/cm2 M3
01.05.02.08 CONCRETO F'C=210 KG/CM2 M3
01.05.02.09 ACERO DE REFUERZO Fy=4200 kg/cm2 KG
01.05.02.10 ALCANTARILLA TMC Ø=36" C=14 M
01.05.02.11 MAMPOSTERIA DE PIEDRA CON CONCRETO F'C=175 kg/cm2 (E=0.20 m)+ 6 M2
01.05.02.12 RELLENO CON MATERIAL SELECCIONADO M3
01.05.03 BADEN TIPO I 10 M.
01.05.03.01 TRAZO DE NIVELES Y REPLANTEO M2
01.05.03.02 EXCAVACION MASIVA EN LECHO DE RIO CON EQUIPO PESADO M3
01.05.03.03 ENCOFRADO Y DESENCOFRADO M2
01.05.03.04 CONCRETO F'C=210 KG/CM2 M3
01.05.03.05 CONCRETO CICLOPEO F'C=175 kg/cm2 + 30% PM M3
01.05.03.06 MAMPOSTERIA DE PIEDRA CON CONCRETO F'C=175 kg/cm2 (E=0.20 m)+ 6 M2
01.05.03.07 EMPEDRADO E= 0.20 M. M2
01.05.03.08 JUNTA CON SELLO ASFALTICO M
01.06 ALIBIADERO DE MAMPOSTERIA DE PIEDRA
01.06.01 TRAZO DE NIVELES Y REPLANTEO M2
01.06.02 EXCAVACION MASIVA EN LECHO DE RIO CON EQUIPO PESADO M3
01.06.03 MAMPOSTERIA DE PIEDRA CON CONCRETO F'C=175 kg/cm2 (E=0.20 m)+ 60% PM M2
01.06.04 EMPEDRADO E= 0.20 M. M2
01.07 PRUEBAS DE CALIDAD
01.07.01 PRUEBA DE COMPACTACION SUELOS (DENSIDAD DE CAMPO) UND
01.07.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND
01.08 SEÑALIZACIÓN Y SEGURIDAD VIAL
01.08.01 POSTES KILOMETRICOS - EXCAVACION Y COLOCACION HIT
01.08.02 SEÑALES PREVENTIVAS (0.60M x 0.60M) - EXCAVACION Y COLOCACION UND
01.08.03 SEÑALES INFORMATIVAS TIPO I (2.00M x 1.21M) - EXCAVACION Y COLOCACION UND
01.09 TRANSPORTE DE MATERIALES
01.09.01 TRANSPORTE MATERIALES A OBRA KG
01.10 VARIOS
01.10.01 CERCO CON ALAMBRE PUAS G. # 10 M
01.10.02 REPOSICION DE TUBERIA DE PVC SAP DE 4" M
01.10.03 PLACA RECORDATORIO GLB
01.10.04 MANTENIMIENTO DE MAQUINARIA GLB
COMPONENTE 2.- MITIGACION DE IMPACTO AMBIENTAL
02 DISMINUCION DE HUAYCOS
02.01 MITIGACION AMBIENTAL
02.01.01 REPOSICION CON PLANTAS EN AREAS AFECTADAS HA
02.01.02 RESTAURACION DE AREAS AFECTADAS POR CAMPAMENTOS M2
02.01.03 RESTAURACION DE AREAS AFECTADAS POR PATIO DE MAQUINAS M2
02.01.04 OBRAS DE CONTROL EROSIVO Y BOTADEROS M2
02.01.05 ADECUACION DE CANTERAS M2
02.01.06 PROGRAMA DE PREVENCION Y PERDIDA DE CONTINGENCIAS MES

COMPONENTE 3.- ADECUADA CAPACITACION A LA POBLACION BENEFICIA


03 POBLACION BENEFICIARIA
03.01 CAPACITACION
03.01.01 CAPACITACION EN OPERACION Y MANTENIMIENTO DE LA VIA JOR
03.01.02 CAPACITACION EN GESTION AMBIENTAL JOR
03.02 GESTION DE RIESGOS Y DESASTRES
03.02.01 CAPACITACION EN GESTION DE DESASTRES JOR
03.02.02 ELIMINACION DE ESCOMBROS DE LAS ALCANTARILLAS UND
03.03 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
03.03.01 CAPACITACION EN SEGURIDAD Y SALUD DURANTE LA CONSTRUCCION JOR
03.03.02 IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD Y SALUD EN EL TRA GLB

COSTO DIRECTO
GASTOS GENERALES
SUB PRESUPUESTO
GASTOS DE SUPERVISION
EXPEDIENTE TECNICO
LIQUIDACION DE OBRA
PRESUPUESTO TOTAL
VALORIZACION MENSUAL N-01
enero-18
MUNICIPALIDAD DISTRITAL DE INKAWASI
CREACION DEL CAMINO DESDE HUARANCALQUI HASTA LOS SECTORES
CHANCABAMBA Y LIMONPUQUIO

CUSCO-LA CONVENCION-INKAWASI

AVANCES
PRESUPUESTO
ANTERIOR ACUMULADO ACTUAL
Metrado P.U P. Parcial Metrado Parcial % Metrado Parcial %
NAL Y OBRAS DE ARTE APERTURA DE SECCION DE VIA

1.00 751.09 751.09 1.00 751.09 100.00% 0.00 0.00 0.00%


178.55 112.12 20,019.03 178.55 20,019.03 100.00% 0.00 0.00 0.00%
1.00 22,500.00 22,500.00 0.00 0.00 0.00% 0.00 0.00 0.00%

6.05 912.27 5,519.23 1.04 948.76 17.19% 3.60 3,284.17 59.50%


6.05 1,336.51 8,085.89 1.30 1,737.46 21.49% 2.90 3,875.88 47.93%
6.05 622.34 3,765.16 0.00 0.00 0.00% 0.00 0.00 0.00%
6.05 475.37 2,875.99 0.00 0.00 0.00% 0.00 0.00 0.00%

4.00 240.00 960.00 0.00 0.00 0.00% 0.00 0.00 0.00%


110.00 12.26 1,348.60 0.00 0.00 0.00% 0.00 0.00 0.00%
1.00 3,560.67 3,560.67 0.00 0.00 0.00% 0.00 0.00 0.00%

33,817.90 6.19 209,332.80 ### 16,094.00 7.69% ### 51,377.00 24.54%


9,257.18 16.44 152,188.04 0.00 0.00 0.00% 0.00 0.00 0.00%
9,257.18 5.90 54,617.36 0.00 0.00 0.00% 0.00 0.00 0.00%
34,237.98 10.93 374,221.12 0.00 0.00 0.00% ### 137,718.00 36.80%
676.68 4.24 2,869.12 0.00 0.00 0.00% 450.00 1,908.00 66.50%

3,629.38 7.51 27,256.64 0.00 0.00 0.00% ### 27,256.64 100.00%


3,629.38 2.94 10,670.38 0.00 0.00 0.00% ### 10,670.38 100.00%
3,629.38 8.64 31,357.84 0.00 0.00 0.00% ### 31,357.84 100.00%
24,195.88 3.81 92,186.30 0.00 0.00 0.00% 0.00 0.00 0.00%

5,728.97 3.46 19,822.24 0.00 0.00 0.00% 0.00 0.00 0.00%


478.78 15.06 7,210.43 0.00 0.00 0.00% 0.00 0.00 0.00%

114.20 1.54 175.87 0.00 0.00 0.00% 0.00 0.00 0.00%


196.62 28.37 5,578.11 0.00 0.00 0.00% 0.00 0.00 0.00%
128.69 10.88 1,400.15 0.00 0.00 0.00% 0.00 0.00 0.00%
9.75 11.04 107.64 0.00 0.00 0.00% 0.00 0.00 0.00%
152.58 50.86 7,760.22 0.00 0.00 0.00% 0.00 0.00 0.00%
8.28 340.32 2,817.85 0.00 0.00 0.00% 0.00 0.00 0.00%
11.31 504.82 5,709.51 0.00 0.00 0.00% 0.00 0.00 0.00%
17.61 561.16 9,882.03 0.00 0.00 0.00% 0.00 0.00 0.00%
1,440.43 8.09 11,653.08 0.00 0.00 0.00% 0.00 0.00 0.00%
27.00 686.10 18,524.70 0.00 0.00 0.00% 0.00 0.00 0.00%
47.07 122.48 5,765.13 0.00 0.00 0.00% 0.00 0.00 0.00%
79.63 15.18 1,208.78 0.00 0.00 0.00% 0.00 0.00 0.00%

216.58 1.54 333.53 0.00 0.00 0.00% 0.00 0.00 0.00%


122.26 28.37 3,468.52 0.00 0.00 0.00% 0.00 0.00 0.00%
147.84 37.35 5,521.82 0.00 0.00 0.00% 0.00 0.00 0.00%
38.64 561.16 21,683.22 0.00 0.00 0.00% 0.00 0.00 0.00%
44.78 389.37 17,435.99 0.00 0.00 0.00% 0.00 0.00 0.00%
12.09 122.48 1,480.78 0.00 0.00 0.00% 0.00 0.00 0.00%
20.58 56.62 1,165.24 0.00 0.00 0.00% 0.00 0.00 0.00%
118.42 6.46 764.99 0.00 0.00 0.00% 0.00 0.00 0.00%

121.50 1.54 187.11 0.00 0.00 0.00% 0.00 0.00 0.00%


44.55 28.37 1,263.88 0.00 0.00 0.00% 0.00 0.00 0.00%
62.55 122.48 7,661.12 0.00 0.00 0.00% 0.00 0.00 0.00%
5.40 56.62 305.75 0.00 0.00 0.00% 0.00 0.00 0.00%

24.00 400.00 9,600.00 0.00 0.00 0.00% 0.00 0.00 0.00%


13.00 50.00 650.00 0.00 0.00 0.00% 0.00 0.00 0.00%

8.00 162.46 1,299.68 0.00 0.00 0.00% 0.00 0.00 0.00%


12.00 370.10 4,441.20 0.00 0.00 0.00% 0.00 0.00 0.00%
4.00 526.84 2,107.36 0.00 0.00 0.00% 0.00 0.00 0.00%

44,544.47 0.45 20,045.01 0.00 0.00 0.00% 0.00 0.00 0.00%

5,259.00 3.70 19,458.30 0.00 0.00 0.00% 0.00 0.00 0.00%


600.00 27.87 16,722.00 0.00 0.00 0.00% 0.00 0.00 0.00%
1.00 800.00 800.00 0.00 0.00 0.00% 0.00 0.00 0.00%
1.00 19,992.70 19,992.70 0.00 0.00 0.00% 0.00 0.00 0.00%
12.82 865.28 11,092.89 0.00 0.00 0.00% 0.00 0.00 0.00%
179.00 2.92 522.68 0.00 0.00 0.00% 0.00 0.00 0.00%
430.00 3.64 1,565.20 0.00 0.00 0.00% 0.00 0.00 0.00%
12,097.94 1.40 16,937.12 0.00 0.00 0.00% 0.00 0.00 0.00%
760.00 2.13 1,618.80 0.00 0.00 0.00% 0.00 0.00 0.00%
3.00 2,500.00 7,500.00 0.00 0.00 0.00% 0.00 0.00 0.00%
OBLACION BENEFICIARIA

10.00 560.00 5,600.00 0.00 0.00 0.00% 0.00 0.00 0.00%


10.00 560.00 5,600.00 0.00 0.00 0.00% 0.00 0.00 0.00%

5.00 1,185.00 5,925.00 0.00 0.00 0.00% 0.00 0.00 0.00%


48.00 10.88 522.24 0.00 0.00 0.00% 0.00 0.00 0.00%

50.00 280.00 14,000.00 0.00 0.00 0.00% 0.00 0.00 0.00%


1.00 6,083.36 6,083.36 0.00 0.00 0.00% 0.00 0.00 0.00%

1,355,056.49 39,550.34 2.92% 267,447.91 19.74%


10.32 % 139,841.83 4,081.60 2.92% 27,600.62 19.74%
1,494,898.32 43,631.94 2.92% 295,048.53 19.74%
5.0 % 67,752.82 1,977.52 2.92% 13,372.40 19.74%
1.01 % 13,686.07
2.39 % 32,385.85
1,608,723.06
PLAZO DE EJECUCION 240 DIAS
FECHA DE INICIO DE OBRA
FECHA DE TERMINO DE OBRA
PROVINCIA LA CONVENCION
DISTRITO INKAWASI
PERIODO DE VALORIZACION 31 DE ENERO
VALORIZACION AL 31 DE ENERO
RESIDENTE

ANCES
SALDO
ACUMULADO
Metrado Parcial % Metrado Parcial %

1.00 751.09 100.00% 0.00 0.00 0.00%


178.55 20,019.03 100.00% 0.00 0.00 0.00%
0.00 0.00 0.00% 1.00 22,500.00 100.00%

4.64 4,232.93 76.69% 1.41 1,286.30 23.31%


4.20 5,613.34 69.42% 1.85 2,472.54 30.58%
0.00 0.00 0.00% 6.05 3,765.16 100.00%
0.00 0.00 0.00% 6.05 2,875.99 100.00%

0.00 0.00 0.00% 4.00 960.00 100.00%


0.00 0.00 0.00% 110.00 1,348.60 100.00%
0.00 0.00 0.00% 1.00 3,560.67 100.00%

### 67,471.00 32.23% 22,917.90 141,861.80 67.77%


0.00 0.00 0.00% 9,257.18 152,188.04 100.00%
0.00 0.00 0.00% 9,257.18 54,617.36 100.00%
### 137,718.00 36.80% 21,637.98 236,503.12 63.20%
450.00 1,908.00 66.50% 226.68 961.12 33.50%

3629.38 27,256.64 100.00% 0.00 0.00 0.00%


3629.38 10,670.38 100.00% 0.00 0.00 0.00%
3629.38 31,357.84 100.00% 0.00 0.00 0.00%
0.00 0.00 0.00% 24,195.88 92,186.30 100.00%

0.00 0.00 0.00% 5,728.97 19,822.24 100.00%


0.00 0.00 0.00% 478.78 7,210.43 100.00%

0.00 0.00 0.00% 114.20 175.87 100.00%


0.00 0.00 0.00% 196.62 5,578.11 100.00%
0.00 0.00 0.00% 128.69 1,400.15 100.00%
0.00 0.00 0.00% 9.75 107.64 100.00%
0.00 0.00 0.00% 152.58 7,760.22 100.00%
0.00 0.00 0.00% 8.28 2,817.85 100.00%
0.00 0.00 0.00% 11.31 5,709.51 100.00%
0.00 0.00 0.00% 17.61 9,882.03 100.00%
0.00 0.00 0.00% 1,440.43 11,653.08 100.00%
0.00 0.00 0.00% 27.00 18,524.70 100.00%
0.00 0.00 0.00% 47.07 5,765.13 100.00%
0.00 0.00 0.00% 79.63 1,208.78 100.00%

0.00 0.00 0.00% 216.58 333.53 100.00%


0.00 0.00 0.00% 122.26 3,468.52 100.00%
0.00 0.00 0.00% 147.84 5,521.82 100.00%
0.00 0.00 0.00% 38.64 21,683.22 100.00%
0.00 0.00 0.00% 44.78 17,435.99 100.00%
0.00 0.00 0.00% 12.09 1,480.78 100.00%
0.00 0.00 0.00% 20.58 1,165.24 100.00%
0.00 0.00 0.00% 118.42 764.99 100.00%

0.00 0.00 0.00% 121.50 187.11 100.00%


0.00 0.00 0.00% 44.55 1,263.88 100.00%
0.00 0.00 0.00% 62.55 7,661.12 100.00%
0.00 0.00 0.00% 5.40 305.75 100.00%

0.00 0.00 0.00% 24.00 9,600.00 100.00%


0.00 0.00 0.00% 13.00 650.00 100.00%

0.00 0.00 0.00% 8.00 1,299.68 100.00%


0.00 0.00 0.00% 12.00 4,441.20 100.00%
0.00 0.00 0.00% 4.00 2,107.36 100.00%

0.00 0.00 0.00% 44,544.47 20,045.01 100.00%

0.00 0.00 0.00% 5,259.00 19,458.30 100.00%


0.00 0.00 0.00% 600.00 16,722.00 100.00%
0.00 0.00 0.00% 1.00 800.00 100.00%
0.00 0.00 0.00% 1.00 19,992.70 100.00%
0.00 0.00 0.00% 12.82 11,092.89 100.00%
0.00 0.00 0.00% 179.00 522.68 100.00%
0.00 0.00 0.00% 430.00 1,565.20 100.00%
0.00 0.00 0.00% 12,097.94 16,937.12 100.00%
0.00 0.00 0.00% 760.00 1,618.80 100.00%
0.00 0.00 0.00% 3.00 7,500.00 100.00%

0.00 0.00 0.00% 10.00 5,600.00 100.00%


0.00 0.00 0.00% 10.00 5,600.00 100.00%

0.00 0.00 0.00% 5.00 5,925.00 100.00%


0.00 0.00 0.00% 48.00 522.24 100.00%

0.00 0.00 0.00% 50.00 14,000.00 100.00%


0.00 0.00 0.00% 1.00 6,083.36 100.00%

306,998.25 22.66% 1,048,058.23 77.34%


31,682.22 22.66% 108,159.61 77.34%
338,680.47 22.66% 1,156,217.84 77.34%
15,349.91 22.66% 52402.91 77.34%
AVANCE MENSUAL - ENERO

ENTIDAD MUNICIPALIDAD DISTRITAL DE INKAWASI


OBRA CREACION DEL CAMINO DESDE HUARANCALQUI HASTA LOS SECTORES
CHANCABAMBA Y LIMONPUQUIO

UBICACIÓN CUSCO-LA CONVENCION-INKAWASI


PRESUP. CONTRATADO S/. 0.00
SUPERVISOR
PRESUPUESTO GENERAL

COSTO DIRECTO

RESUMEN

AVANCE
PRESUPUESTO AVANCE ANTERIOR
ACTUAL

TOTAL COSTO DIRECTO 1,355,056.49 39,550.34 267,447.91

COSTO DIRECTO 1,355,056.49 39,550.34 267,447.91


GASTOS GENERALES 139,841.83 4,081.60 27,600.62
GASTOS DE SUPERVISION 67,752.82 1,977.52 13,372.40
EXPEDIENTE TECNICO 13,686.07 - -
LIQUIDACION DE OBRA 32,385.85 - -

COSTO TOTAL 1,608,723.06


RO

PLAZO DE EJECUCION 240 DIAS


FECHA DE INICIO DE OBRA
FECHA DE TERMINO DE OBRA
PROVINCIA LA CONVENCION
DISTRITO INKAWASI
PERIODO DE VALORIZACION 31 DE ENERO
VALORIZACION AL 31 DE ENERO
RESIDENTE

COSTO DIRECTO

AVANCE AVANCE AVANCE


ACUMULADO
ACTUAL ACUMULADO
% %

306,998.25 19.74% 22.66%

306,998.25 19.74% 22.66%


31,682.22 19.74% 22.66%
15,349.91 19.74% 22.66%
-
-
ENTIDAD MUNICIPALIDAD DISTRITAL DE INKAWASI
OBRA CREACION DEL CAMINO DESDE HUARANCALQUI HA
CHANCABAMBA Y LIMONPUQUIO

UBICACIÓN CUSCO-LA CONVENCION-INKAWASI


PRESUP. CONTRATADO S/. 1,608,723.06
SUPERVISOR
PRESUPUESTO GENERAL

PRESUPUESTO

ITEM DESCRIPCION Und. Metrado


COMPONENTE 1.- ADECUADA VIA DE CAMINO VECINAL Y OBRAS DE ARTE
01 CONSTRUCCION TROCHA CARROZABLE
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACIÓN PZA 1.00
01.01.02 CAMPAMENTO, ALMACEN Y GUARDIANIA M2 178.55
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO NIVELACION Y REPLANTEO KM 6.05
01.02.02 ROCE, LIMPIEZA Y DEFORESTACION HA 6.05
01.02.03 TRAZO NIVELACION Y REPLANTEO DURANTE LA OBRA KM 6.05
01.02.04 RAYADO DE TALUDES KM 6.05
01.02.05 SEÑALIZACIÓN Y SEGURIDAD VIAL
01.02.05.01 SEÑAL PREVENTIDA DE SEGURIDAD UND 4.00
01.02.05.02 CERCO PERIMETRICO PROVISIONAL DE ARPILLERA m 110.00
01.02.05.03 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGU MES 1.00
01.03 EXPLANACIONES
01.03.01 CORTE DE MATERIAL SUELTO M3 33,817.90
01.03.02 CORTE ROCA FIJA - PERFORACION Y DISPARO M3 9,257.18
01.03.03 CORTE ROCA FIJA - EXCAVACION DESQUICHE Y PEINADO D M3 9,257.18
01.03.04 RELLENO CON MATERIAL PROPIO C/MAQUINARIA m3 34,237.98
01.03.05 ELIMINACION DE MATERIAL EXCEDENTE - TRANSPORTE M3 676.68
01.04 AFIRMADO DE CARRETERA
01.04.01 EXTRACCION Y APILAMIENTO M3 3,629.38
01.04.02 CARGUIO M3 3,629.38
01.04.03 TRANSPORTE MATERIAL DE BASE M3 3,629.38
01.04.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE M2 24,195.88
01.05 OBRAS DE DRENAJE
01.05.01 CUNETAS
01.05.01.01 CUNETAS LATERALES - EXCAVACION M 5,728.97
01.05.01.02 EXCAVACION EN ROCA PARA CUNETAS M 478.78
01.05.02 ALCANTARILLA TIPO ARMCO 03 UND
01.05.02.01 TRAZO DE NIVELES Y REPLANTEO M2 114.20
01.05.02.02 EXCAVACION MASIVA EN LECHO DE RIO CON EQU M3 196.62
01.05.02.03 ELIMINACION MATERIAL EXCEDENTE ACARREADO M3 128.69
01.05.02.04 COLOCACION DE CAMA DE APOYO M3 9.75
01.05.02.05 ENCOFRADO Y DESENCOFRADO DE ALCANTARILL M2 152.58
01.05.02.06 FALSA ZAPATA CONCRETO F'C= 100 kg/cm2 M3 8.28
01.05.02.07 CONCRETO F'C= 175 kg/cm2 M3 11.31
01.05.02.08 CONCRETO F'C=210 KG/CM2 M3 17.61
01.05.02.09 ACERO DE REFUERZO Fy=4200 kg/cm2 KG 1,440.43
01.05.02.10 ALCANTARILLA TMC Ø=36" C=14 M 27.00
01.05.02.11 MAMPOSTERIA DE PIEDRA CON CONCRETO F'C=175 M2 47.07
01.05.02.12 RELLENO CON MATERIAL SELECCIONADO M3 79.63
01.05.03 BADEN TIPO I 10 M.
01.05.03.01 TRAZO DE NIVELES Y REPLANTEO M2 216.58
01.05.03.02 EXCAVACION MASIVA EN LECHO DE RIO CON EQU M3 122.26
01.05.03.03 ENCOFRADO Y DESENCOFRADO M2 147.84
01.05.03.04 CONCRETO F'C=210 KG/CM2 M3 38.64
01.05.03.05 CONCRETO CICLOPEO F'C=175 kg/cm2 + 30% PM M3 44.78
01.05.03.06 MAMPOSTERIA DE PIEDRA CON CONCRETO F'C=175 M2 12.09
01.05.03.07 EMPEDRADO E= 0.20 M. M2 20.58
01.05.03.08 JUNTA CON SELLO ASFALTICO M 118.42
01.06 ALIBIADERO DE MAMPOSTERIA DE PIEDRA
01.06.01 TRAZO DE NIVELES Y REPLANTEO M2 121.50
01.06.02 EXCAVACION MASIVA EN LECHO DE RIO CON EQUIPO PESA M3 44.55
01.06.03 MAMPOSTERIA DE PIEDRA CON CONCRETO F'C=175 kg/cm2 ( M2 62.55
01.06.04 EMPEDRADO E= 0.20 M. M2 5.40
01.07 PRUEBAS DE CALIDAD
01.07.01 PRUEBA DE COMPACTACION SUELOS (DENSIDAD DE CAMPO UND 24.00
01.07.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPR UND 13.00
01.08 SEÑALIZACIÓN Y SEGURIDAD VIAL
01.08.01 POSTES KILOMETRICOS - EXCAVACION Y COLOCACION HIT 8.00
01.08.02 SEÑALES PREVENTIVAS (0.60M x 0.60M) - EXCAVACION Y C UND 12.00
01.08.03 SEÑALES INFORMATIVAS TIPO I (2.00M x 1.21M) - EXCAVAC UND 4.00
01.09 TRANSPORTE DE MATERIALES
01.09.01 TRANSPORTE MATERIALES A OBRA KG 44,544.47
01.10 VARIOS
01.10.01 CERCO CON ALAMBRE PUAS G. # 10 M 5,259.00
01.10.02 REPOSICION DE TUBERIA DE PVC SAP DE 4" M 600.00
01.10.03 PLACA RECORDATORIO GLB 1.00
01.10.04 MANTENIMIENTO DE MAQUINARIA GLB 1.00

COMPONENTE 2.- MITIGACION DE IMPACTO AMBIENTAL


02 DISMINUCION DE HUAYCOS
02.01 MITIGACION AMBIENTAL
02.01.01 REPOSICION CON PLANTAS EN AREAS AFECTADAS HA 12.82
02.01.02 RESTAURACION DE AREAS AFECTADAS POR CAMPAMENTOS M2 179.00
02.01.03 RESTAURACION DE AREAS AFECTADAS POR PATIO DE MAQU M2 430.00
02.01.04 OBRAS DE CONTROL EROSIVO Y BOTADEROS M2 12,097.94
02.01.05 ADECUACION DE CANTERAS M2 760.00
02.01.06 PROGRAMA DE PREVENCION Y PERDIDA DE CONTINGENCIA MES 3.00

COMPONENTE 3.- ADECUADACAPACITACION A LA POBLACION BENEFICIA


03 POBLACION BENEFICIARIA
03.01 CAPACITACION
03.01.01 CAPACITACION EN OPERACION Y MANTENIMIENTO DE LA VIA JOR 10.00
03.01.02 CAPACITACION EN GESTION AMBIENTAL JOR 10.00
03.02 GESTION DE RIESGOS Y DESASTRES
03.02.01 CAPACITACION EN GESTION DE DESASTRES JOR 5.00
03.02.02 ELIMINACION DE ESCOMBROS DE LAS ALCANTARILLAS UND 48.00
03.03 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
03.03.01 CAPACITACION EN SEGURIDAD Y SALUD DURANTE LA CONS JOR 50.00
03.03.02 IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURID GLB 1.00

COSTO DIRECTO
GASTOS GENERALES 10.32 %
SUB PRESUPUESTO
GASTOS DE SUPERVISION 5.0 %
EXPEDIENTE TECNICO 1.01 %
LIQUIDACION DE OBRA 2.39 %
PRESUPUESTO TOTAL
AVANCE DIARIO
febrero-18
RITAL DE INKAWASI
MINO DESDE HUARANCALQUI HASTA LOS SECTORES
LIMONPUQUIO

NCION-INKAWASI

PRESUPUESTO

P.U P. Parcial SALDO 1.00 2.00 3.00 4.00 5.00 6.00

NAL Y OBRAS DE ARTE APERTURA DE J V S D L M

751.09 751.09 -
112.12 20,019.03 -
22,500.00 22,500.00 1.00
-
912.27 5,519.23 1.41 0.20 0.20 0.10 0.20 0.20
1,336.51 8,085.89 1.85 0.10 0.10 0.10 0.10 0.10
622.34 3,765.16 6.05
475.37 2,875.99 6.05
-
240.00 960.00 4.00
12.26 1,348.60 110.00
3,560.67 3,560.67 1.00
-
6.19 209,332.80 22,917.90 800.00 900.00
16.44 152,188.04 9,257.18
5.90 54,617.36 9,257.18
10.93 374,221.12 21,637.98 1300.00 1100.00
4.24 2,869.12 226.68 100.00
-
7.51 27,256.64 - 500.00 200.00 227.38 200.00 562.00
2.94 10,670.38 - 500.00 200.00 227.38 200.00 562.00
8.64 31,357.84 - 500.00 200.00 227.38 200.00 562.00
3.81 92,186.30 24,195.88
-
-
3.46 19,822.24 5,728.97
15.06 7,210.43 478.78
-
1.54 175.87 114.20
28.37 5,578.11 196.62
10.88 1,400.15 128.69
11.04 107.64 9.75
50.86 7,760.22 152.58
340.32 2,817.85 8.28
504.82 5,709.51 11.31
561.16 9,882.03 17.61
8.09 11,653.08 1,440.43
686.10 18,524.70 27.00
122.48 5,765.13 47.07
15.18 1,208.78 79.63
-
1.54 333.53 216.58
28.37 3,468.52 122.26
37.35 5,521.82 147.84
561.16 21,683.22 38.64
389.37 17,435.99 44.78
122.48 1,480.78 12.09
56.62 1,165.24 20.58
6.46 764.99 118.42
-
1.54 187.11 121.50
28.37 1,263.88 44.55
122.48 7,661.12 62.55
56.62 305.75 5.40
-
400.00 9,600.00 24.00
50.00 650.00 13.00
-
162.46 1,299.68 8.00
370.10 4,441.20 12.00
526.84 2,107.36 4.00
-
0.45 20,045.01 44,544.47
-
3.70 19,458.30 5,259.00
27.87 16,722.00 600.00
800.00 800.00 1.00
19,992.70 19,992.70 1.00

-
-
865.28 11,092.89 12.82
2.92 522.68 179.00
3.64 1,565.20 430.00
1.40 16,937.12 12,097.94
2.13 1,618.80 760.00
2,500.00 7,500.00 3.00

OBLACION BENEFICIARIA -

-
-
560.00 5,600.00 10.00
560.00 5,600.00 10.00
-
1,185.00 5,925.00 5.00
10.88 522.24 48.00
-
280.00 14,000.00 50.00
6,083.36 6,083.36 1.00

1,355,056.49
139,841.83
1,494,898.32
67,752.82
13,686.07
32,385.85
1,608,723.06
PLAZO DE EJECUCION 240 DIAS
FECHA DE INICIO DE OBRA
FECHA DE TERMINO DE OBRA
PROVINCIA LA CONVENCION
DISTRITO INKAWASI
PERIODO DE VALORIZACION 31 DE ENERO
VALORIZACION AL 31 DE ENERO
RESIDENTE

febrero
7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00
MI J V S D L M MI J

0.20 0.20 0.20 0.10 0.20 0.20 0.20 0.20


0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

900.00 800.00 900.00

1200.00 1300.00 1200.00


200.00

300.00 440.00 300.00 400.00 500.00


300.00 440.00 300.00 400.00 500.00
300.00 440.00 300.00 400.00 500.00
ero
16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00
V S D L M MI J V S

0.20 0.10 0.10 0.10 0.10 0.10 0.10 0.10


0.10 0.10 0.20 0.20 0.20 0.20 0.20 0.10

900.00 800.00 700.00 800.00

1400.00 1200.00 1300.00 1200.00


150.00
actual anterior total saldo
25.00 26.00 27.00 28.00
D L M MI

0.00 1.00 1.00 0.00


0.00 178.55 178.55 0.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 0.00
0.10 0.10 0.10 3.60 1.04 4.64 1.41
0.10 0.10 0.10 2.90 1.30 4.20 1.85
0.00 0.00 0.00 6.05
0.00 0.00 0.00 6.05
0.00 0.00 0.00 0.00
0.00 0.00 0.00 4.00
0.00 0.00 0.00 110.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 0.00
800.00 8300.00 2600.00 10900.00 22917.90
0.00 0.00 0.00 9257.18
0.00 0.00 0.00 9257.18
1400.00 12600.00 0.00 12600.00 21637.98
450.00 0.00 450.00 226.68
0.00 0.00 0.00 0.00
3629.38 0.00 3629.38 0.00
3629.38 0.00 3629.38 0.00
3629.38 0.00 3629.38 0.00
0.00 0.00 0.00 24195.88
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 5728.97
0.00 0.00 0.00 478.78
0.00 0.00 0.00 0.00
0.00 0.00 0.00 114.20
0.00 0.00 0.00 196.62
0.00 0.00 0.00 128.69
0.00 0.00 0.00 9.75
0.00 0.00 0.00 152.58
0.00 0.00 0.00 8.28
0.00 0.00 0.00 11.31
0.00 0.00 0.00 17.61
0.00 0.00 0.00 1440.43
0.00 0.00 0.00 27.00
0.00 0.00 0.00 47.07
0.00 0.00 0.00 79.63
0.00 0.00 0.00 0.00
0.00 0.00 0.00 216.58
0.00 0.00 0.00 122.26
0.00 0.00 0.00 147.84
0.00 0.00 0.00 38.64
0.00 0.00 0.00 44.78
0.00 0.00 0.00 12.09
0.00 0.00 0.00 20.58
0.00 0.00 0.00 118.42
0.00 0.00 0.00 0.00
0.00 0.00 0.00 121.50
0.00 0.00 0.00 44.55
0.00 0.00 0.00 62.55
0.00 0.00 0.00 5.40
0.00 0.00 0.00 0.00
0.00 0.00 0.00 24.00
0.00 0.00 0.00 13.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 8.00
0.00 0.00 0.00 12.00
0.00 0.00 0.00 4.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 44544.47
0.00 0.00 0.00 0.00
0.00 0.00 0.00 5259.00
0.00 0.00 0.00 600.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 12.82
0.00 0.00 0.00 179.00
0.00 0.00 0.00 430.00
0.00 0.00 0.00 12097.94
0.00 0.00 0.00 760.00
0.00 0.00 0.00 3.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 10.00
0.00 0.00 0.00 10.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 5.00
0.00 0.00 0.00 48.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 50.00
0.00 0.00 0.00 1.00