DIMENSIONES
2.00 CIMIENTOS
N° DE VECES LARGO ANCHO ALTURA DE EXC
EJE A 1 17 0.5 1.45
EJE B Y C 1 17 0.6 1.45
EJE C 1 22.25 0.5 1.45
EJE 2 ESCALERA 1 6 0.95 1.45
EJE 5(SS.HH) 1 14.7 0.25 1.45
TOTALES
D
2.01 ACERO, VIGA DE CIMENT.
N° DE VECES LARGO ANCHO (ESPESOR) ALTURA
EJE 4 0 0 0 0
EJE 5 0 0 0 0
D
3.00 SOBRECIMIENTOS, C° A°
N° DE VECES LARGO ANCHO (ESPESOR) ALTURA
EJE 1 (AULA 4) 0 0 0 0
EJE 2 (AULA 4) 0 0 0 0
EJE 5(SS.HH) 0 0 0 0
DIMENSIONES
4.00 ZAPATAS
N° DE VECES LARGO ANCHO ALTURA DE EXC
SUBTOTALES
TOTALES
CAPACIDADES
DIMENSIONES
DIMENSIONES
1
8.33 12.07 8.33
1
2.70 3.92 2.70
1
11.55 16.75 11.55
1
5.70 8.27 5.70
1
2.34 3.39 2.34
30.62 44.39 30.62
3.06 47.45 33.68
PESOS UNITARIOS DEL ACERO
RESUMEN DE MATERIALES
TIPO W(KG/ML)
UNID CANTIDAD Fe 3/4" 2.26
BL 93.27 Fe 5/8" 1.56
M3 31.44 Fe 1/2" 1.02
M3 16.93 Fe 3/8" 0.56
Fe 1/4" 0.25
ACERO
RESUMEN DE MATERIALES
LONG. TOTAL DE EJE PESO PARCIAL N° DE VARILLAS
9 180.27 13 ELEMENTO UNIDAD
9 115.67 13
9 0.00 0
1.85 42.46 19
24.5 169.58 34
2.9 100.57 45 F 5/8" U
12.5 129.78 26 F 1/2" U
2.9 62.12 28 F 3/8" U
0 0.00 0 F 1/4" U
0 0.00 0 KG
ALAMBRE
0 0.00 0 KG
0 0.00 0 CLAVOS KG
800.45
DE MATERIALES
CANTIDAD
12.84
12.60
59
91
48.03
RESUMEN DE MATERIALES
F 1/2" U 0
F 3/8" U 0
KG 0.00 13.51
ALAMBRE
KG 13.51
CLAVOS KG 27.03
G/CM2)
RESUMEN DE MATERIALES
PESO UNIT. W(KG/ML) PESO PARCIAL K PESO TOTAL N° DE VARILLAS
ELEMENTO
1.02 1.05
94.35 99.07 10 CEMENTO
PIEDRA CHANCADA
1.02 1.05
30.60 32.13 3 ARENA GRUESA
F 1/2"
1.02 1.05
130.90 137.45 14 ALAMBRE
1.02 1.05
64.60 67.83 7
1.02 1.05
26.52 27.85 3
364.32
RESUMEN DE MATERIALES
UNIDAD CANTIDAD
BL 282.88
M3 19.53
M3 19.20
U 35
KG 21.86
SECCION ENCOFRADO y ACERO F'Y = 4200 KG/CM2
5.00 COLUMNAS N° DE VECES ALTURA DESENCOFRADO
a b CONCRETO TIPO W(KG* ML) 1+1D
Fe 3/4" 2.26 1.08
Fe 5/8" 1.56 1.07
C-1 Fe 1/2" 1.02 1.05
12 0.5 0.15 2.4 8.64 2.16
Fe 3/8" 0.56 1.03
Fe 1/4" 0.26 1.02
Fe 3/4" 2.26 1.08
Fe 5/8" 1.56 1.07
C-1E Fe 1/2" 1.02 1.05
3 0.3 0.15 2.4 2.16 0.32
Fe 3/8" 0.56 1.03
Fe 1/4" 0.26 1.02
Fe 3/4" 2.26 1.08
Fe 5/8" 1.56 1.07
C-2E 2 0.4 0.15 2.4 1.44 0.29 Fe 1/2" 1.02 1.05
Fe 3/8" 0.56 1.03
Fe 1/4" 0.26 1.02
Fe 3/4" 2.26 1.08
Fe 5/8" 1.56 1.07
C-3E Fe 1/2" 1.02 1.05
2 0.25 0.25 2.4 2.4 0.30
Fe 3/8" 0.56 1.03
Fe 1/4" 0.26 1.02
Fe 3/4" 2.26 1.08
Fe 5/8" 1.56 1.07
C-4E Fe 1/2" 1.02 1.05
2 0.4 0.25 2.4 2.4 0.48
Fe 3/8" 0.56 1.03
Fe 1/4" 0.26 1.02
TOTALES 21 17.04 3.55
FIERRO 3/4"
FIERRO 5/8"
CHANCADA
HORMIGON
CEMENTO
GRANDE
GRUESA
PIEDRA
PIEDRA
ARENA
CIMIENTOS 93.27 16.93 31.44
VIGA DE CIMENTACION 12.84
SOBRECIMIENTOS 30.59 4.01 8.51
ZAPATAS 282.88 19.53 19.20
COLUMNAS 29.84 2.06 2.02 0 0
VIGAS 79.55 5.49 5.40 0 53.500
ALIGERADO 85.70 5.92 5.82
MUROS 49.67 39.90
TARRAJEO 70.38
PISOS Y PAVIMENTOS 147.88 0.00 4.73 3.68
VEREDA 25.98 1.71 1.38
TOTAL 896 20.9 40 39 77 0 66.34
UNIDADES BLS M3 M3 M3 M3 U U
LADRILLO KK
ARENA FINA
FIERRO 1/2"
FIERRO 3/8"
FIERRO 1/4"
LADRILLO
ALAMBRE
CLAVOS
TECHO
18H
12.60 59 91 48.03
0 0 13.51 27.03
35 21.86
37 3 48 33.29 5.66
45 47 36 98.69 10.76
95 55 74.91 2.48 1135
3.12 7439.06
9.16 9.40
1.58
0.42
225 110 231 290 58 1135 7439 11
U U U KG KG U U M3
METRADO DE INSTALACIONES ELECTRICAS
CANT. PROMEDIO
1.00 PUNTOS DE LUZ 9.00 1.00
INTERRUPTOR DOBLE UN 4.00 0.44
TUBERIA PVC SEL 5/8"(3.00 ML.) UN 21.00 2.33
CABLE ELECTRICO Nª 14 TW ML 126.00 14.00
CAJA PASE GALV. OCT. LIV. 4"x1 1/2" UN 9.00 1.00
CAJA PASE RECT.. LIV. 4"x2 1/4"" UN 4.00 0.44
CURVAS DE 5/8" UN 26.00 2.89
02 MOVIMIENTO DE TIERRA
03.01 CONCRETO CIMIENTO CORRIDO 1:10 + 30% P.G. M3 34.55 33.72 1,164.86
03.02 SOLADO PARA ZAPATAS E=4", f´c=100 Kg/cm2 M2 3.06 3.37 10.33
03.03 CONCRETO SOBRECIMIENTO 1:8 + 25% P.M. (H=0.25 M) M3 9.56 50.96 487.16
03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMENTOS M2 103.95 10.34 1,074.85
03.05 ACERO, VIGA DE CIMENTACION KG 800.45 1.21 969.72 3,706.93
05 MUROS Y TABIQUE
07 CIELORASOS
07.01 CIELORASO CON MEZCLA, CON CINTAS M2 103.60 11.06 1,145.59 1,145.59
08 PISOS Y PAVIMENTOS
08.01 FALSO PISO E=4" (MEZCLA 1:10 CEMENTO:HORMIGON) M2 175.00 5.14 898.78
08.02 PISO DE CONCRETO PULIDO SIN COLOREAR, E=2" M2 175.00 5.64 987.51
08.03 VEREDA DE CONCRETO , E=4", SARDINEL, PASTA:1.5CM M2 30.00 10.56 316.74 2,203.02
09 CARPINTERIA METALICA
12 VIDRIOS
13 PINTURA
14 INSTALACIONES ELECTRICAS
15 ARTEFACTOS ELECTRICOS
16 APARATOS SANITARIOS
19 OTROS
TOTAL $ 30,160.69
01 - TRABAJOS PRELIMINARES
02.01 CORTE Y RELLENO DE TERRENO CON MAQUINA M3 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON
Rendimiento : 75.00 M3/DIA
CARGADOR FRONTAL HM 0.106 35.821 3.78
OPERARIO HH 0.212 3.105 0.66
PEON HH 0.106 2.489 0.26
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 0.05 4.75
02.03 EXCAVACION PÁRA ZAPATAS AISLADAS HASTA 1 m. M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON
Rendimiento : 4.00 M3/DIA
PEON HH 2.000 2.489 4.98
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 0.15 5.13
02.04 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON
Rendimiento : 6.00 M3/DIA
PEON HH 1.333 2.489 3.32
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 0.10 3.42
02.05 TERRAPLEN P/FALSO PISO C/PLANCHA COMP., H=0.1 M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON
Rendimiento : 150.00 M2/DIA
PLANCHA COMPACTADORA HM 0.053 2.238 0.12
OPERARIO HH 0.053 3.105 0.16
PEON HH 0.053 2.489 0.13
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 0.01 0.42
03.03 CONCRETO SOBRECIMIENTO 1:8 + 25% P.M. (H=0.25m. M3 0.00-CAP. + 1.00-OPE. + 2.00-OFI. + 8.82-PEON
Rendimiento : 12.00 M3/DIA
MEZCLADORA CONCR. T. TROMPO 8 HP, 9-11 P3 HM 0.666 4.496 2.99
VIBRADOR DE CONCRETO HM 0.666 2.920 1.94
CEMENTO PORTLAND TIPO I BL 3.200 5.075 16.24
PIEDRA MEDIANA M3 0.485 6.716 3.26
HORMIGON M3 0.890 6.159 5.48
OPERARIO HH 0.667 3.105 2.07
OFICIAL HH 1.333 2.790 3.72
PEON HH 5.883 2.489 14.64
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 0.61 50.96
03.05 VIGA DE CIMENTACION, ACERO F Y=4200 KG/CM2 KG 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.00-PEON
Rendimiento : 160.00 KG/DIA
ALAMBRE NEGRO KG 0.050 1.273 0.06
FIERRO FY=4200 KG/CM2 KG 1.070 0.789 0.84
OPERARIO HH 0.050 3.105 0.16
OFICIAL HH 0.050 2.790 0.14
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 0.01 1.21
04.100 CONCRETO LOSA ALIGERADA, F C=175 KG/CM2 M3 0.00-CAP. + 3.00-OPE. + 2.00-OFI. + 11.23-PEON
Rendimiento : 25.00 M3/DIA
MEZCLADORA CONCRETO T. TROMPO 8 HP, 9-11 P3 HM 0.320 4.496 1.44
VIBRADOR DE CONCRETO HM 0.320 2.920 0.93
CEMENTO PORTLAND TIPO I BL 8.400 5.075 42.63
PIEDRA CHANCADA 1/2" M3 0.580 12.820 7.44
ARENA GRUESA M3 0.570 5.870 3.35
OPERARIO HH 0.960 3.105 2.98
OFICIAL HH 0.640 2.790 1.79
PEON HH 3.595 2.489 8.95
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.41 69.91
05.01 MURO DE LADRILLO KK DE ARCILLA 24x12x9 CABEZA M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON
Rendimiento : 6.00 M2/DIA
ANDAMIO P2 3.100 0.725 2.25
CLAVOS 3" KG 0.022 1.273 0.03
LADRILLO KK 9x12x24 UN 57.000 0.086 4.90
CEMENTO PORTLAND TIPO I BL 0.408 5.075 2.07
ARENA GRUESA (NO A M3 0.580 5.870 3.40
OPERARIO HH 1.333 3.105 4.14
PEON HH 1.333 2.489 3.32
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.22 20.33
05.02 MURO DE LADRILLO KK DE ARCILLA 24x12x9 SOGA M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.75-PEON
Rendimiento : 9.46 M2/DIA
ANDAMIO P2 2.600 0.725 1.88
CLAVOS 3" KG 0.022 1.273 0.03
LADRILLO KK 9x12x24 UN 37.000 0.086 3.18
CEMENTO PORTLAND TIPO I BL 0.218 5.075 1.11
ARENA GRUESA M3 0.031 5.870 0.18
OPERARIO HH 0.676 3.105 2.10
PEON HH 0.635 2.489 1.58
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.11 10.17
06.02 TARRAJEO EN EXTERIORES (MORTERO 1:5), ANDAMI M2 0.00-CAP. + 1.96-OPE. + 0.00-OFI. + 1.13-PEON
Rendimiento : 12.00 M2/DIA
REGLA DE MADERA P2 0.850 0.725 0.62
ANDAMIO P2 0.025 0.725 0.02
CLAVOS 3" KG 0.022 1.273 0.03
CEMENTO PORTLAND TIPO I BL 0.117 5.075 0.59
ARENA FINA M3 0.016 6.750 0.11
OPERARIO HH 1.307 3.105 4.06
PEON HH 0.753 2.489 1.87
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.30 7.59
07.01 CIELORASO CON MEZCLA, CON CINTAS M2 0.00-CAP. + 2.60-OPE. + 0.00-OFI. + 1.40-PEON
Rendimiento : 12.00 M2/DIA
REGLA DE MADERA P2 2.160 0.725 1.57
ANDAMIO P2 0.027 0.725 0.02
CLAVOS 3" KG 0.009 1.273 0.01
CEMENTO PORTLAND TIPO I BL 0.257 5.075 1.30
ARENA FINA M3 0.033 6.750 0.22
OPERARIO HH 1.733 3.105 5.38
PEON HH 0.933 2.489 2.32
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 0.23 11.06
08.01 FALSO PISO, E=4" (MEZCLA 1:10 CEMENTO:HORMIGO M2 0.00-CAP. + 3.00-OPE. + 0.00-OFI. + 8.00-PEON
Rendimiento : 120.00 M2/DIA
REGLA DE MADERA P2 0.067 0.725 0.05
MEZCLADORA CONCR. T. TROMPO 8 HP, 9-11 P3 HM 0.067 4.496 0.30
CEMENTO PORTLAND TIPO I BL 0.390 5.075 1.98
HORMIGON M3 0.130 6.159 0.80
OPERARIO HH 0.200 3.105 0.62
PEON HH 0.533 2.489 1.33
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.06 5.14
08.02 PISO CONCRETO PULIDO, SIN COLORER, E=2" M2 0.00-CAP. + 4.20-OPE. + 1.00-OFI. + 8.00-PEON
Rendimiento : 120.00 M2/DIA
REGLA DE MADERA P2 0.066 0.725 0.05
MEZCLADORA CONCR. T. TROMPO 8 HP, 9 - P3 HM 0.067 4.496 0.30
CEMENTO PORTLAND TIPO I BL 0.455 5.075 2.31
PIEDRA CHANCADA 3/4" M3 0.027 12.820 0.35
ARENA FINA M3 0.009 6.750 0.06
ARENA GRUESA M3 0.021 5.870 0.12
OPERARIO HH 0.280 3.105 0.87
OFICIAL HH 0.067 2.790 0.19
PEON HH 0.533 2.489 1.33
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.07 5.64
08.03 VEREDA DE CONCRETO E=4" + SARDINEL, PASTA:1.5 M2 0.00-CAP. + 6.34-OPE. + 4.93-OFI. + 9.84-PEON
Rendimiento : 100.00 M2/DIA
REGLA DE MADERA P2 0.080 0.725 0.06
MEZCLADORA CONCR. T. TROMPO 8 HP, 9-11 P3 HM 0.080 4.496 0.36
CLAVOS 3" KG 0.006 1.273 0.01
CEMENTO PORTLAND TIPO I BL 0.840 5.075 4.26
PIEDRA CHANCADA 1/2" M3 0.057 12.820 0.73
ARENA FINA M3 0.014 6.750 0.09
ARENA GRUESA M3 0.046 5.870 0.27
OPERARIO HH 0.507 3.105 1.57
OFICIAL HH 0.395 2.790 1.10
PEON HH 0.787 2.489 1.96
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 10.56
10.01 PUERTA CONTRAPLACADA, 1.00 X 2.10, E=35 MM M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON
Rendimiento : 1.00 UN/DIA
CLAVOS 2" KG 0.052 1.273 0.07
MADERA TORNILLO O SIMILAR P2 13.010 0.760 9.89
TRIPLAY DE 3 x 7 x 4 MM PL 2.000 6.570 13.14
LACA GL 0.350 5.880 2.06
COLA SINTETICA GL 0.260 9.700 2.52
FLETE TERRESTRE GLB 1.000 7.460 7.46
OPERARIO HH 8.000 3.105 24.84
PEON HH 4.000 2.489 9.96
DESGASTE DE HERRAMIENTA 3% DE LA MANO DE OBRA 1.04 70.97
13.03 PINTURA EN CARPINTERI METALICA (ESMALTE Y ANTI ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON
Rendimiento : 28.00 M2/DIA
LIJA PARA METAL UN 0.150 1.000 0.15
PINTURA ANTICORROSIVA GL 0.020 8.350 0.17
PINTURA ESMALTE GL 0.037 10.140 0.38
OPERARIO HH 0.286 3.105 0.89
PEON HH 0.143 2.489 0.36
DESGASTE DE HERRAMIENTAS 0 % DE LA MANO DE OBRA 0.00 1.94
14.02 SALIDA PARA BRAQUETE CON PVC PTO 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.75-PEON
Rendimiento : 4.00 PTO/DIA
INTERRUPTOR SIMPLE UN 0.250 4.776 1.19
TUBERIA PVC SEL 5/8"X3.00 ML UN 1.750 1.433 2.51
CABLE ELECTRICO Nª 14 TW ML 15.250 0.147 2.24
CAJA PASE GALV. OCT. LIV. 4"x1 1/2" UN 1.000 0.550 0.55
CAJA PASE GALV. RECT.. LIV. 4"x 2 1/2" UN 0.250 0.550 0.14
CURVAS DE 5/8" UN 2.500 0.092 0.23
OPERARIO HH 2.000 3.105 6.21
PEON HH 1.500 2.489 3.73
DESGASTE DE HERRAMIENTAS 0 % DE LA MANO DE OBRA 0.00 16.80
14.03 SALIDA PARA TOMACORRIENTES DOBLE, PVC PTO 0.00-CAP. + 1.00-OPE. + .00-OFI. + 1.00-PEON
Rendimiento : 4.00 PTO/DIA
TOMACORRIENTE DE BAKELITA DOBLE UN 1.000 5.380 5.38
TUBERIA PVC SEL 3/4"X 3.00 ML ML 2.500 1.443 3.61
CABLE ELECTRICO Nª14 TW ML 14.800 0.147 2.18
CAJA PASE GALV. REC. LIV. 4"x2 1/4" UN 1.000 0.550 0.55
CURVAS DE 5/8" UN 2.000 0.092 0.18
OPERARIO HH 1.000 3.105 3.11
PEON HH 1.000 2.489 2.49
DESGASTE DE HERRAMIENTAS 0 % DE LA MANO DE OBRA 0.00 17.49
14.05 CAJA DE BASE GALV. LIVIANA 6"x6"x3" UN 0.00-CAP. + 1.00-OPE. + 0.50-OFI. + 0.00-PEON
Rendimiento : 8.00 UN/DIA
CAJA PASE GALV. CUAD. LIV 6"x6"x3" UN 1.000 1.343 1.34
OPERARIO HH 1.000 3.105 3.11
OFICIAL HH 0.500 2.790 1.39
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 5.98
15.01 ARTEFACTO PARA 02 FLUORECENTES, INC. LAMPARA UN 0.00-CAP. + 1.00-OPE. + 0.50-OFI. + 0.00-PEON
Rendimiento : 4.00 UN/DIA
ARTEFACTO PARA 2 FLUORECENTES,INC/LAMP. UN 1.000 20.896 20.90
OPERARIO HH 2.000 3.105 6.21
OFICIAL HH 1.000 2.790 2.79
DESGASTE DE HERRAMIENTAS 0 % DE LA MANO DE OBRA 0.19 30.08
15.01 ARTEFACTO FLUORECENTE CIRCULAR, INC. LAMPAR UN 0.00-CAP. + 1.00-OPE. + 0.50-OFI. + 0.00-PEON
Rendimiento : 4.00 UN/DIA
ARTEFACTO FLUORECENTE CIRCULAR, INC/LAMP. UN 1.000 9.552 9.55
OPERARIO HH 2.000 3.105 6.21
OFICIAL HH 1.000 2.790 2.79
DESGASTE DE HERRAMIENTAS 0 % DE LA MANO DE OBRA 0.19 18.74
16.01 INODORO TANQUE BAJO PARA ADULTOS UN 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON
Rendimiento : 0.00 UN/DIA
INODORO TANQUE BAJO PARA ADULTOS C/ACCES UN 1.000 52.24 52.24 52.24
16.02 INODORO TANQUE BAJO PARA NIÑOS UN 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON
Rendimiento : 0.00 UN/DIA
INODORO TANQUE BAJO PARA NIÑOS C/ACCES UN 1.000 56.72 56.72 56.72
16.03 LAVATORIO LOZA BLANCA (INC. COLOCACION) UN 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON
Rendimiento : 4.00 UN/DIA
LAVATORIO LOZA BLANCA 1 LLAVE, C/ACCES UN 1.000 25.37 25.37
GRIFERIA LAVATORIO 1 LLAVE UN 1.000 5.37 5.37 30.75
16.04 URINARIO CORRIDO CON MAYOLICA L=1.20 M.L. ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON
Rendimiento : 1.00 ML/DIA
MAYOLICA BLANCA 15 x 15 M2 3.100 5.37 16.66
PORCELANA KG 0.600 1.63 0.98
LADRILLO KK 9 x12 x24 UN 10.000 0.086 0.86
CEMENTO PORTLAND TIPO I BL 1.570 5.08 7.97
ARENA FINA M3 0.080 6.75 0.54
ARENA GRUESA M3 0.080 5.87 0.47
COMPUERTA TIPO BOLA 1/2" UN 1.000 4.93 4.93
TUBO F° G° REGADOR 1/2" UN 1.200 2.09 2.51
OPERARIO HH 12.000 3.105 37.26
PEON HH 4.000 2.489 9.96
DESGASTE DE HERRAMIENTA 3 % DE LA MANO DE OBRA 1.42 83.54
17.04 TUB. DESAGUE PVC 4" RED EXT. INC/EXC.-RELLENO ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON
Rendimiento : 20 ML/DIA
TUBERIA 4" PVC SAP CLASE 10 ML 1.000 2.310 2.31
PEGAMENTO PLASTICO PVC GL 0.020 12.174 0.24
OPERARIO HH 0.400 3.105 1.24
PEON HH 0.800 2.489 1.99
DESGASTE DE HERRAMIENTAS 0 % DE LA MANO DE OBRA 0.00 5.79
18.02 TUBERIA PVC 3/4", RED EXT. INC/EXC. Y RELLENO ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON
Rendimiento : 30.00 UN/DIA
TUBERIA PVC SAP CLASE 10, 3/4" ML 1.050 1.075 1.13
PEGAMENTO PLASTICO PVC GL 0.015 12.174 0.18
OPERARIO HH 0.267 3.105 0.83
PEON HH 0.533 2.489 1.33
DESGASTE DE HERRAMIENTAS 0 % DE LA MANO DE OBRA 0.000 0.00 3.47
19.02 CUBIERTA LADRILLO PASTELERO, CON MEZCLA M2 0.00-CAP. + 1.75-OPE. + 0.00-OFI. + 1.00-PEON
Rendimiento : 32.00 M2/DIA
REGLA DE MADERA P2 0.007 0.906 0.01
LADRILLO PASTELERO 3x25x25 UN 15.000 0.208 3.12
CEMENTO PORTLAND TIPO I BL 0.220 5.075 1.12
ARENA FINA M3 0.031 7.246 0.22
OPERARIO HH 0.437 3.105 1.36
PEON HH 0.250 2.489 0.62
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.06 6.51
CARGADOR FRONTAL
REGLA DE MADERA
MADERA TORNILLO
COMPACTADORA
HERRAMIENTAS
MADERA PARA
DESGASTE DE
ENCOFRADO
MEZCLADOR
VIBRADORA
N° PARTIDA
OPERARIO
CANTIDAD
ANDAMIO
OFICIAL
FLETE
PEON
PARTIDA
11140
COSTO DIRECTO
IGV (19%)
DIREC. TEC. (4%)
TOTAL
OPERARIO 2.484 0.47196 0.09936 3.105
OFICIAL 2.268 0.43092 0.09072 2.79
PEON 2.024 0.38456 0.08096 2.489
GASTOS GENERALES
1.00
1
N° PARTIDA
ALAMBRE N°8 - N° 16
PIEDRA CHANCADA
PARTIDA
LADRILLO TECHO
PIEDRA GRANDE
ARENA GRUESA
ARERNA FINA
LADRILLO KK
ACERO , KG.
HORMIGON
CEMENTO
YESO
01.00 TRABAJOS PRELIMINARES
01.01ELABORACION DE EXPEDIENTE TECNICO 1.00
01.02LIMPIEZA DEL TERRENO 200.00
01.03TRAZO Y REPLANTEO PRELIMINAR 200.00 10.00
01.04TRANSPORTE DE EQUIPOS Y MAQUINARIAS 1.00
02.00MOVIMIENTO DE TIERRAS
02.02EXCAVACION DE ZANJAS HASTA 1 m 56.84
02.03EXCAVACION PARA ZAPATAS AISLADAS 47.45
02.04ACARREO DE MATERIAL EXCEDENTE 104.29
02.05TERRAPLEN P/FALSO PISO 200.00
03.00OBRAS DE CONCRETO SIMPLE
03.01CONCRETO CIMIENTO CORRIDO 1:10 + 30% P.G. 34.55 93.27 16.93 31.51
03.02SOLADO PARA ZAPATAS 3.06 0.26 0.2 0.2
03.03CONCRETO SOBRECIMIENTO 1:8 + 25% P.M. 9.56 30.59 4.64 8.51
03.04ENCOFRADO-DESENCOFRADO SOBRECIMIENTOS 103.95 27.03 13.5
03.05VIGA DE CIMENTACION, ACERO 800.45 856.5 40.02
04.00OBRAS DE COCNRETO ARMADO
04.01CONCRETO ZAPATAS F'C=175 KG/CM2 33.68 282.88 19.53 19.20
04.02ENCOFRADO Y DESENCOFRADO ZAPATAS 20.16 2.82
04.03ZAPATAS ACERO FY= 4200 KG/CM2 364.32 389.82 18.22
04.04CONCRETO COLUMNAS F'C=175 KG/CM2 3.55 29.84 2.06 2.02
04.05ENCOFRADO Y DESENCOFRADO DE COLUMNAS 17.04 3.65 4.00
04.06COLUMNAS ACERO FY= 175 KG/CM2 471.04 504.02 23.55
04.07CONCRETO VIGAS, F'C=175 KG/CM2 9.47 79.55 5.49 5.40
04.08ENCOFRADO Y DESENCOFRADO DE VIGAS 44.85 9.42 10.76
04.09VIGAS, ACERO FY= 4200 KG/CM2 1,487.93 1592.08 74.40
04.10CONCRETO LOZA ALIGERADA, F'C=175 KG/CM2 10.20 85.70 5.92 5.82
04.11ENCOFRADO Y DESENCOFRADO DE LOZA ALIGERADA 112.91 11.29 12.42
04.12LOZAS, ACERO FY= 4200 KG/CM2 1,041.52 1114.43 52.08
04.13LADRILLOS PARA TECHO, 15X30X30 1,134.75 1191.48
05.00MUROS Y TABIQUES
05.01MURO DE LADRILLO KK DE ARCILLA 24x12x9 CABEZA 0
05.02MURO DE LADRILLO KK DE ARCILLA 24x12x9 SOGA 76.94 16.77 2.39 1.69 2846.78
06.00REVOQUES, ENLUCIDOS Y MOLDURAS
06.01TARRAJEO EN INTERIORES (MORTERO 1:5) 256.50 30.01 4.10 5.64
06.02TARRAJEO EN EXTERIORES (MORTERO 1:5) 0.00 0.00 0.00 0.00
06.03TARRAJEO EN COLUMNAS 37.50 4.39 0.60 0.83
06.04TARRAJEO EN COLUMNAS, ARISTAS 37.00
06.05TARRAJEO EN VIGAS 29.58 3.46 0.47 2.96
06.06TARRAJEO EN VIGAS ARISTAS 33.00
06.07VESTIDURA DE DERRAMES CON MORTERO 1:5 50.40 0.81 0.10
06.08BRUÑA DE 1 CM 25.00
07.00CIELO RASOS
07.01CIELORASO CON MEZCLA, CON CINTAS 103.60 26.63 3.42 0.93
08.00PISOS Y PAVIMENTOS
08.01FALSO PISO E=4" 175.00 68.25 22.75
08.02PISO CONCRETO PULIDO, SIN COLOREAR, E=2" 175.00 79.63 4.73 3.68 1.58
08.03VEREDA DE CONCRETO, E=42 30.00 25.20 1.71 1.38 0.42 0.18
09.00CARPINTERIA METALICA
09.01VENTANAS METALICA 1.60X1.80 6.00
09.02PUERTA METALICA 1.10 X 2.10 4.00
VENTANA - REJA METALICA 0.60 X 3.50 2.00
10.00 CARPINTERIA DE MADERA
09.02 PUERTA APANELADA, MADERA TORNILLO, E=1 1/4"
11.00 CERRAJERIA
11.01 BISAGRA CAPUCHINA 3 1/2" x 3 1/2" 18.00 18.00
11.02 CERRADURA FORTE 2 GOLPES 4.00 4.00
11.03 MANIJA DE BRONCE PARA PUERTAS 4.00 4.00
11.04 CERRADURA TIPO BOLA 2.00 2.00
12.00 VIDRIOS
12.01 VIDRIO SEMIDOBLE 278.00 291.90
MASILLA 18.90
13.00 PINTURA
13.01 PINTURA EN MUROS AL LATEX 513.00 20.52
IMPRIMANTE 10.26
13.02 PINTURA EN CIELORASOS Y VIGAS AL LATEX 103.60 4.14
IMPRIMANTE 2.07
13.03 PINTURA EN CARPINTERIA METALICA #REF!
LIJA PARA METAL #REF!
PINTURA ANTICORROSIVA #REF!
PINTURA ESMALTE #REF!
13.04 PINTURA BARNIZ EN CARPINTERIA DE MADERA #REF!
AGUARRAZ #REF!
LIJA PARA MADERA #REF!
PINTURA BARNIZ #REF!
14.00 INSTALACIONES ELECTRICAS
14.01 SALIDA PARA CENTRO LUZ 16.00
INTERRUPTOR DOBLE 7.04
TUBERIA PVC SEL 5/8" X 3.00 ML 37.28
CABLE ELECTRICO Nª 14 TW 224.00
CAJA PASE GALV. OCT. LIV. 4"x1 1/2" 16.00
CAJA PASE GALV. RECT. LIV. 4"x 2 1/2" 7.04
CURVAS DE 5/8" 46.24
14.02 SALIDA PARA ELECTRICIDAD BRAQUETE 4.00
INTERRUPTOR SIMPLE 1.00
TUBERIA PVC SEL 5/8" 7.00
CABLE ELECTRICO Nª 14 TW 61.00
CAJA PASE GALV. OCT. LIV. 4"x1 1/2" 4.00
CAJA PASE GALV. RECT. LIV. 4"x 2 1/2" 1.00
CURVAS DE 5/8" 10.00
14.03 SALIDA PARA TOMACORRIENTES DOBLE, PVC 12.00
TOMACORRIENTE DE BAKELITA DOBLE 12.00
TUBERIA PVC SEL 5/8" 30.00
CABLE ELECTRICO Nª14 TW 177.60
CAJA PASE GALV. REC. LIV. 4"x2 1/4" 12.00
CURVAS DE 5/8" 24.00
14.04 TABLERO GENERAL, 04 CIRCUITOS 1.00
TABLERO ELCT. GRAL. C/FUSIBLE 4 CIRC. 1.00
TUBERIA PVC SEL 3/4" X 3.00 M.L. 10.00
CABLE ELECTRICO Nª14 TW 60.00
14.05 CAJA DE PASE GALV. LIVIANA 6"x6"x3" 2.00 2.00
15.00 ARTEFACTOS ELECTRICOS
15.01 ARTEFACTO PARA 02 FLUORESCENTES 12.00 12.00
15.02 ARTEFACTO FLUORESC. CIRCULAR INC/LAMP. 4.00 4.00
15.03 ARTEFACTO BRAQUETRE DIRIGIBLE 4.00 4.00
16.00 APARATOS SANITARIOS
16.01 INODORO TANQUE BAJO ADULTOS 1.00 1.00
16.02 INODORO TANQUE BAJO TIPO BABY #REF! #REF!
16.03 LAVATORIO LOZA BLANCA, INC. GRIFERIA Y ACC. 1.00 1.00
LAVATORIO LOZA BLANCA 1 LLAVE, C/ACCES 1.000
16.04 URINARIO CORRIDO L= 1.20M. #REF!
COMPUERTA TIPO BOLA 1/2" #REF!
TUBO F° G° REGADOR 1/2" #REF!
16.05 TINA BLANCA 1.50 M. 1.00 1.00
16.06 COLOCACION DE APARATOS SANIT. INC./DUCHA 13.00
17.00 INSTALACIONES DE DESAGUE
17.01 SALIDA DE DESAGUE 4.00
TUBERIA PVC SAL 4" X 3.00 ML 2.160
TUBERIA PVC SAL 2" X 3.00 ML 2.160
TEE PVC SAL 4" X 4" 0.320
TEE SANITARIA 4"X2" 1.240
TEE PVC SAL 2" 0.320
YEE 4" X 4" 1.240
YEE 4" X 2" 2.760
YEE 2" X 2" 0.320
CODO DE 2" X 90° PVC 3.680
REDUCCION DE 4" A 2" PVC 0.320
TRAMPA "P", PVC 2" 1.840
REGISTRO ROSCADO DE 2" 0.320
REGISTRO ROSCADO DE 4" 0.320
SUMIDERO DE 2" 0.600
PEGAMENTO PLASTICO PVC 0.080
17.02 SALIDA DE VENTILACION 2.00
TUBERIA PVC SAL 2" X 3.00 ML 7.000
YEE 2" X 2" 5.000
CODO PVC SAL 2" 8.000
SOMBRERO DE VENTILACION PVC SAL 2" 2.000
PEGAMENTO PLASTICO PVC 0.040
17.04 TUBERIA DESAGUE 4" PVC, RED EXTERIOR 24.00
TUBERIA PVC 4" 24.000 20.000
PEGAMENTO PLASTICO PVC 0.480
17.05 CAJA DE REGISTRO 12" X 24" 4.00
18.00 SALIDAS DE AGUA FRIA
18.01 SALIDA DE AGUA FRIA PVC 6.00
TUBERIA PVC 3/4"X 5.00 ML 2.280
TUBERIA PVC 1/2"X 5.00 ML 2.760
TEE 3/4" X 3/4" PVC 1.860
TEE 3/4" X 1/2" PVC 1.860
TEE 1/2" X 1/2" PVC 2.280
CODO 3/4" X 90° PVC 6.000
CODO 1/2" X 90° PVC 8.280
CODO 1/2" X 90° F°G° 6.000
REDUCCION DE 3/4" A 1/2" PVC 1.380
TAPON DE 1/2" 6.480
PEGAMENTO PLASTICO PVC 0.090
18.02 TUBERIA PVC 3/4", RED EXTERIOR 26.00
TUBERIA PVC SAP CLASE 10, 3/4" 27.300 14.000
PEGAMENTO PLASTICO PVC 0.390
18.03 VALVULA COMPUERTA BRONCE 3/4" 2.00
UNION PVC UNIVERSAL 3/4" 4.000
18.04 VALVULA BRONCE COMPUERTA 1/2" 2.00 2.000
UNION PVC UNIVERSAL 1/2" 4.000
18.05 VALVULA CHECK 3/4" 2.00 2.000
UNION PVC UNIVERSAL 3/4" 4.000
19.00 OTROS
19.01 BLOQUES DE VIDRIOS ORNAMENTAL 120.00
BLOQUES DE VIDRIO ORNAMENTAL 0.24X0.24 ###
CEMENTO BLANCO 42.000
19.02 COBERTURA LADRILLO PASTELERO CON MEZCLA #REF!
19.03 ZOCALO DE MAYOLICA 0.20 X 0.20 16.00
19.04 PIZARRAS 5.2 Mx1.2 M #REF!
PINTURA DE PIZARRA #REF!
MAYOLICA BLANCA 20X20
18.45
16.80
1.65
PORCELANA
3.42
3.12
0.30
LADRILLO PASTELERO 24X24
0
INSUMOS Y MATERIALES DEL PROYECTO
DATOS DEL EXPEDIENTE:
ENTIDAD EJECUTORA: Tierra de niñ@s
ENTIDAD FINANCIERA: Ayuda en Accion
ACTIVIDAD : Construcción de 02 Aulas Y 01 SSHH de CEI para niños y niñas de 03 años.
PROPIETARIO : C.E. PERU-ESPAÑA N° 6099
UBICACIÓN : Villa El Salvador
FECHA DE ANALISIS : 10 SETIEMBRE DEL 2004
TIPO DE CAMBIO = S/. 3.35
PRECIO DE CEMENTO = S/. 5.075
DESCRIPCION DE INSUMOS UNIDAD CANTIDAD UNITARIO PARCIAL
CEMENTO PORTLAND TIPO I BLS 863.72 5.075 4383.37
YESO(BL. DE 25 KG) BLS 10.00 2.72 27.20
PIEDRA GRANDE M3 21.56 6.716 144.82
HORMIGON M3 62.76 6.159 386.55
PIEDRA CHANCADA DE 1/2" Y 3/4" M3 40.02 12.82 513.00
ARENA GRUESA M3 40.10 5.87 235.38
ARENA FINA M3 11.33 6.75 76.46
ACERO, FÝ = 4200 KG/CM2 KG 4456.83 0.789
ACERO 5/8", FÝ = 4200 KG/CM2 UN 66 12.82 850.48
ACERO 1/2", FÝ = 4200 KG/CM2 UN 225 7.26 1630.14
ACERO 3/8", FÝ = 4200 KG/CM4 UN 110 4.21 461.17
ACERO 1/4", FÝ = 4200 KG/CM2 UN 231 2.59 597.53
ALAMBRE NEGRO N° 8 - N° 16 KG 259.65 1.273 330.53
CLAVOS CON CABEZA DE 2 1/2", 3", 4" KG 56.10 1.273 71.41
LADRILLO PARA TECHO 0.30X0.30 UN 1191.48 0.286 340.76
LADRILLO KK 18 HUECOS UN 2881.78 0.086 247.83
LADRILLO PASTELERO 0.08X0.24X0.24 UN 0 0.208 0.00
MAYOLICA BLANCA 15x15 M2 18.45 5.373 99.13
PORCELANA KG 3.42 1.493 5.11
BISAGRA CAPUCHINA 3 1/2" x 31/2" UN 18.00 1.642 29.56
CERRADURA FORTE 2 GOLPES UN 4.00 16.418 65.67
MANIJA DE BRONCE 4" UN 4.00 3.05 12.20
CERRADURA TIPO BOLA UN 2.00 6.567 13.13
VIDRIO INCOLORO 3 MM P2 291.90 1.33 388.23
MASILLA KG 18.90 0.5 9.45
PINTURA LATEX GL 24.66 11.14 274.76
IMPRIMANTE (BOLSA DE 25 KG) UN 12.33 3.47 42.79
INTERRUPTOR DOBLE UN 8.04 4.776 38.40
TUBERÍA PVC SEL 5/8"X3.00 ML UN 74.28 1.433 106.44
CABLE ELECTRICO N° 14 TW ML 462.60 0.147 68.00
CAJA PASE GALVANIZADA OCT. LIV. 4"x 1 1/2" UN 32.00 0.55 17.60
CAJA PASE GALVANIZADA RECT. LIV. 4"x 2 1/2" UN 32.04 0.55 17.62
CURVAS DE 5/8" UN 80.24 0.092 7.38
TABLERO GENERAL 4 CIRCUITOS UN 1.00 25.07 25.07
CAJA PASE GALVANIZADA CUAD. LIV. 6"x6"x3" UN 2.00 1.343 2.69
ARTEFACTO PARA 2 FLUORESCENTE INC. LAMP. UN 12.00 20.896 250.75
ARTEFACTO P/FLUORESCENTE CIRCULAR UN 4.00 9.552 38.21
ARTEFACTO BRAQ. DIRIGIBLE, LAMP. 50-75 W UN 4.00 5.373 21.49
INODORO TANQUE BAJO, ADULTOS, INC. ACC. UN 1.00 52.24 52.24
LAVATORIO LOZA BLANCA 1 LLAVE, C/ACCES UN 1.00 30.75 30.75
TUBERIA PVC SEL 4" X 3.00 ML UN 22.16 2.31 51.19
TUBERIA PVC SEL 2" X 3.00 ML UN 9.16 1.134 10.39
TEE PVC SAL 4" X 4" UN 0.32 3.25 1.04
TEE SANITARIA DE 4"X2" UN 1.24 3.25 4.03
TEE 2"X2" PVC UN 0.32 0.96 0.31
YEE DE 4" X 4" UN 1.24 3.25 4.03
YEE DE 4" X 2" UN 2.76 3.25 8.97
YEE DE 2" X 2" UN 5.32 0.96 5.11
CODO DE 2" X 90° PVC UN 11.68 0.52 6.07
REDUCCION DE 4" A 2" PVC UN 0.32 0.52 0.17
TRAMPA TIPO P PVC SAL 2" UN 1.84 1.92 3.53
REGISTRO ROSCADO DE BRONCE 2" UN 0.32 1.75 0.56
REGISTRO ROSCADO DE BRONCE 4" UN 0.32 2.705 0.87
SUMIDERO DE BRONCE 2" UN 0.60 1.894 1.14
PEGAMENTO PLASTICO PVC GL 1.04 12.174 12.66
SOMBRERO DE VENTILACION PVC SAL 2" UN 2.00 1.4 2.80
TUBERIA PVC SAP CLASE 10, 3/4" X 5.00 ML UN 16.28 5.373 87.47
TUBERIA PVC SAP CLASE 10, 1/2"X 5.00 ML UN 2.76 3.885 10.72
TEE 3/4" X 3/4 PVC" UN 1.86 0.745 1.39
TEE 3/4" X 1/2" PVC UN 1.86 0.745 1.39
TEE 1/2" X 1/2" PVC UN 2.28 0.537 1.22
CODO 3/4" X 90° PVC UN 6.00 0.46 2.76
CODO 1/2" X 90° PVC UN 8.28 0.46 3.81
CODO 1/2" X 90° F°G° UN 6.00 0.374 2.24
REDUCCION DE 3/4" A 1/2" PVC UN 1.38 0.374 0.52
TAPON DE 1/2" UN 6.48 0.358 2.32
VALVULA BRONCE COMPUERTA 3/4" UN 2.00 5.07 10.14
VALVULA BRONCE COMPUERTA 1/2" UN 2.00 4.077 8.15
VALVULA CHECK 3/4" UN 2.00 6.269 12.54
UNION PVC UNIVERSAL 3/4" UN 8.00 0.448 3.58
UNION PVC UNIVERSAL 1/2" UN 4.00 0.35 1.40
BLOQUES DE VIDRIO ORNAMENTAL 0.24X0.24 UN 120.00 4.777 573.24
CEMENTO BLANCO KG 42.00 1.343 56.41
SUB TOTAL 1 12,805.47
MAQUINARIA Y EQUIPO
CARGADOR FRONTAL 125 HP HM 0.00 35.82 0.00
COMPACTADOR VIB. TIPOP PLANCHA 5.8 HP HM 10.60 2.24 23.72
MEZCLADORA DE CONCRETO T. TAMBOR 23 HP 11P3 HM 64.10 4.50 288.21
VIBRADOR DE CONCRETO 4 HP, 1.5 PLG. HM 38.25 2.92 111.70
MADERA TORNILLO P2 4.00 0.76 3.04
MADERA PARA ENCOFRADO P2 1,454.72 0.67 980.48
REGLAS DE MADERA Y/O ALUMINIO P2 496.08 0.73 359.66
ANDAMIOS METÁLICOS HM 246.16 0.73 178.47
TRANSPORTE DE HERRAMIENTAS GLB 1.00 250.00 250.00
SUB TOTAL 3 2195.28
MANO DE OBRA
ELABORACION DE EXPEDIENTE TECNICO UN 1.00 350.00 350.00
OPERARIO HH 1,655.70 3.11 5140.94
OFICIAL HH 788.52 2.79 2199.97
PEON HH 1,526.25 2.49 3798.84
DESGASTE DE HERRAMIENTAS %DE M.O. 1 286.0 286.04
SUB TOTAL 4 11775.78
2688.84