p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
ISSUES
p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
Raman Reti- KesHighat
10 Km. (Approx)
Available Width Of The
VRINDAVAN PARIKRAMA KESHI GHAT
ParikArma Marg-
• Type –A 4.5 -6.0 Mt Wide
• Type –B 7.5 -9.0 Mt Wide
• Type –C 9.0 -12.0 Mt
Wide
• Type –D 12.0 -15.0 Mt
Wide
• Type –E Above 15 Mt
Wide RAMANRETI
Scope Of Work
• Removal Of
EncroAchmentS
• Realignment Of Right
Of Way
• Drain Cover
• Improvement Of
Footpath
• U.G. CABLING
• Lighting
• Cctv
• Public Address System
• Cable Ducts
• Bollards
• Street Furniture
p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –A 4.5 -6.0 MT WIDE
EXISTING
PROPOSED
p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –B 7.5 -9.0 MT WIDE
EXISTING
PROPOSED
p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –C 9.0 -12.0 MT WIDE
PROPOSED
p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –D 12.0 -15.0 MT WIDE
PROPOSED
p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
1. REDEVELOPMENT OF
VRINDAVAN PARIKRMA MARG
PROPOSED
PROPOSED
p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
VRIND-VAHINI- PUBLIC TRANSPORT INFRASTRUCTURE
LOCATIONS: 2
YAMUNA EXP.WAY LINK ROAD 3
NEAR MULTI STORIED PARKING,
VRINDAVAN ENTRY/EXIT
TO VRINDAVAN
1
4
TO MATHURA
LEGEND:
1. PARKING STAND
TO MATHURA
2. TOURIST AMENITIES
3. SITTING AREA
4. LOCAL CNG TAXI STAND/ BATTERY
RICKSHAW
PROPOSAL-1
LOCATION MAP AT YAMUNA EXP. WAY LINK ROAD
p i l gPROPOSED
r i m IINFRASTRUCTURE
NFRASTR UTOURISM
FOR C T UFACILITIES
R E AT V R I N AT
DEVELOPMENT DVRINDAVAN,
AVA N . (U.P)
CSR
IMPLEMENTATION
(IN Rs. CRORE)
KEY FEATURES
(IN MONTHS)
PROJECT
PERIOD
COST
SNO
1 Solid waste Management - Door to door waste Rs. 23.5 Lac Collection to
Mathura collection per month commence
Waste collection along the including immediately
Parikrama Marg operations Infrastructure to
Segregation and and capital be completed in
compaction of waste cost recovery 12 months.
Transportation to disposal over 7 years.
site
Waste processing Plant
2 Marker when approaching A round about and screen Rs.3.75 8-12 months from
from Yamuna Expressway element marking the Crores commencement.
entrance to the city
p i l gPROPOSED
r i m IINFRASTRUCTURE
NFRASTR UTOURISM
FOR C T UFACILITIES
R E AT V R I N AT
DEVELOPMENT DVRINDAVAN,
AVA N . (U.P)