Pilgrim INFRASTRUCTURE FOR VRINDAVAN.

VRINDAVAN

VRINDAVAN YAMUNA
EXPRESSWAY
NH2

MATHURA

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
ISSUES

 UPGRADATION OF THE VRINDAVAN PARIKRAMA MARG

 PUBLIC TRANSPORT INFRASTRUCTURE- VRIND VAHINI

 RIVERFRONT GHATS CONSERVATION & REDESIGN

 RIVER TRANSPORT- VRINDAVAN-MATHURA-GOKUL

 IMPROVEMENT OF EXISTING ENTRANCES

 DEVELOPMENT OF TOURIST HUB IN TRANS-YAMUNA ZONE – WITH


PEDESTRIAN BRIDGE.

Pilgrim INFRASTRUCTURE FOR VRINDAVAN.


UPGRADATION OF VRINDAVAN PARIKRAMA MARG
VRINDAVAN PARIKRAMA

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
Raman Reti- KesHighat
10 Km. (Approx)
Available Width Of The
VRINDAVAN PARIKRAMA KESHI GHAT
ParikArma Marg-
• Type –A 4.5 -6.0 Mt Wide
• Type –B 7.5 -9.0 Mt Wide
• Type –C 9.0 -12.0 Mt
Wide
• Type –D 12.0 -15.0 Mt
Wide
• Type –E Above 15 Mt
Wide RAMANRETI
Scope Of Work
• Removal Of
EncroAchmentS
• Realignment Of Right
Of Way
• Drain Cover
• Improvement Of
Footpath
• U.G. CABLING
• Lighting
• Cctv
• Public Address System
• Cable Ducts
• Bollards
• Street Furniture

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –A 4.5 -6.0 MT WIDE

EXISTING

PROPOSED

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –B 7.5 -9.0 MT WIDE

EXISTING

PROPOSED

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –C 9.0 -12.0 MT WIDE

PROPOSED

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
UPGRADATION OF VRINDAVAN PARIKRAMA MARG
TYPE –D 12.0 -15.0 MT WIDE

PROPOSED

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
1. REDEVELOPMENT OF
VRINDAVAN PARIKRMA MARG

PROPOSED

PROPOSED INFRASTRUCTURE FOR TOURISM FACILITIES DEVELOPMENT AT VRINDAVAN, (U.P)


UPGRADATION OF VRINDAVAN PARIKRAMA MARG

PROPOSED

p i l g r i m I N F R A S T R U C T U R E AT V R I N D AVA N .
VRIND-VAHINI- PUBLIC TRANSPORT INFRASTRUCTURE
LOCATIONS: 2
 YAMUNA EXP.WAY LINK ROAD 3
 NEAR MULTI STORIED PARKING,
VRINDAVAN ENTRY/EXIT

TO VRINDAVAN
1
4
TO MATHURA

LEGEND:
1. PARKING STAND

TO MATHURA
2. TOURIST AMENITIES
3. SITTING AREA
4. LOCAL CNG TAXI STAND/ BATTERY
RICKSHAW
PROPOSAL-1
LOCATION MAP AT YAMUNA EXP. WAY LINK ROAD

p i l gPROPOSED
r i m IINFRASTRUCTURE
NFRASTR UTOURISM
FOR C T UFACILITIES
R E AT V R I N AT
DEVELOPMENT DVRINDAVAN,
AVA N . (U.P)
CSR

IMPLEMENTATION
(IN Rs. CRORE)
KEY FEATURES

(IN MONTHS)
PROJECT

PERIOD
COST
SNO

1 Solid waste Management -  Door to door waste Rs. 23.5 Lac Collection to
Mathura collection per month commence
 Waste collection along the including immediately
Parikrama Marg operations Infrastructure to
 Segregation and and capital be completed in
compaction of waste cost recovery 12 months.
 Transportation to disposal over 7 years.
site
 Waste processing Plant
2 Marker when approaching  A round about and screen Rs.3.75 8-12 months from
from Yamuna Expressway element marking the Crores commencement.
entrance to the city

p i l gPROPOSED
r i m IINFRASTRUCTURE
NFRASTR UTOURISM
FOR C T UFACILITIES
R E AT V R I N AT
DEVELOPMENT DVRINDAVAN,
AVA N . (U.P)