“Shift Order” indicator in customizing tcode OPU3 controls if the actual dates of the
partially confirmed operations are taken into account during a new scheduling run.
Prerequisite
2. Execute partial confirmation with 5 qty for operation 0010 in tcode CO11N on
2015.05.28.
System ignores the existing actual dates as if no confirmation happeded, and shift
the order to the dates when re-scheduling is executed.
Execute scheduling by clicking the scheduling icon in tcode CO02.Today is 2015.6.4.
Check the rescheduling result. The planned start date was on 2015.6.2, now it starts
on 2015.6.4, the date when re-scheduling is executed.
You can also check the “Confirmed dates” view. The order qty is 10, 5 of them has
been confirmed on 2015.5.28, the other 5 starts from current date 2015.6.4.
Execute scheduling by clicking the scheduling icon in tcode CO02. Check the
rescheduling result. The planned start date was on 2015.6.2, now it starts on
2015.5.28, the actual dates when the partial confimation was executed.
You can also check the dates in “Confirmed Dates” view. Start time is same as the
actual confirmed dates.
Alert Moderator
5 Comments
You must be Logged on to comment or reply to a post.
Kiran Madhurakavi
Jessica,
BR
KK
shailesh mishra
Hello Jessica,
Best Regards
Shailesh
Venkat Sri
Hello Jessica,
Best Regards
Venky
Lahiru Fernando
Hi Jessica
Smart trick and nice document. Thanks for sharing and keep sharing documents like this.
Regards
Suheel