Sunteți pe pagina 1din 2

To: The Project Manager, Contractor: AFC Report: 03 Date: 4/05/2018 from BSBG to PM- AFC

Inspection Area:

With reference to our today’s site HSE joint inspection, we observed the following deficiencies mentioned below, we require contractor to comply with UAE legislation, and the
project specification, Hence the construction director is required to take immediate action and submits the closeout report within the time-frame.

Health & Safety Observation Report


Case Risk Details of action taken by contractor, Closed date by Accepted by
No
Deficiencies, Unsafe Act & Conditions Category Location Target Date Contractor Consultant
(Provide Photographs / records)

Immediate
1 H Zone -01

Immediate Immediate Immediate


2 H Zone -01

3 H Zone -01

4 M Zone -01

AFGRE-HSE-02 Rev 0
Immediate
5 H Zone -01

Immediat
6 H Zone -01

e
Name: Ramalingam Thangavel Approved By: Name:
Issued By:
Name & Signature Name & Signature:
Signature: Signature

CC: Risk Category

: = High (Rectify before work recommence) , M = Medium (Rectify within 12 Hours), L = Low (Rectify within 24 to48 Hours)