Inspection Area:
With reference to our today’s site HSE joint inspection, we observed the following deficiencies mentioned below, we require contractor to comply with UAE legislation, and the
project specification, Hence the construction director is required to take immediate action and submits the closeout report within the time-frame.
Immediate
1 H Zone -01
3 H Zone -01
4 M Zone -01
AFGRE-HSE-02 Rev 0
Immediate
5 H Zone -01
Immediat
6 H Zone -01
e
Name: Ramalingam Thangavel Approved By: Name:
Issued By:
Name & Signature Name & Signature:
Signature: Signature
: = High (Rectify before work recommence) , M = Medium (Rectify within 12 Hours), L = Low (Rectify within 24 to48 Hours)
AFGRE-HSE-02 Rev 0