CONTENTS
FORMS ........................................................................................................................
21
FO04.01 Document issue/change request ............................................................................21
FO04.02 Customer complaint form ......................................................................................22
FO04.03 Supplier questionnaire ...........................................................................................23
FO04.04 Approved suppliers list ..........................................................................................26
FO04.05 Quaranteed product register ..................................................................................27
FO04.06 Calibration equipment record.................................................................................28
FO04.07 Induction training checklist ....................................................................................29
FO04.08 Skills matrix ...........................................................................................................30
ORGANISATION
Complete the organisation chart for your business based on the job roles
ORGANISATION DIAGRAM
Brilliant White Windows Ltd. specialises in the supply and installation of PVC-U or Aluminium
windows and doors.
The company will provide standards of service and product to meet all customer requirements
of quality and cost. Product delivered to customers shall conform to purchase order
requirements at all stages of procurement, manufacture, stock holding and despatch.
To assist in achieving these objectives, it is the policy of the company to establish and
maintain an effective and efficient factory production control system which conforms to the
requirements of BS EN 14351-1:2006+A1:2010 and to ensure that the products placed on
the market conform with the stated performance characteristics of the standard.
The Company has established, documented, implemented & maintains a factory production
control system in line with the requirements of BS EN 14351:2006+A1:2010.
The key processes needed for the factory production control system and the interaction of
these processes are identified within the documented operational procedures and works
instructions.
The company will determine criteria and methods needed to ensure that both the operation
and control of these processes is effective and maintained.
The company will ensure that adequate resources are provided to support the operation and
monitoring of these processes. Processes will be monitored, measured and analysed to
ensure that planned results are achieved.
The company has appointed The Installation Manager as the person who is responsible for
ensuring that the processes needed for the factory production control system are established,
documented and maintained. The Installation Manager is also responsible for reporting the
performance and need for improvement of this FPC system to company management and
ensuring the promotion and awareness of FPC system throughout the organisation.
2.1 Documentation
Documents required by the factory production system are controlled. All such documents are
controlled in accordance with OP:03.01 FPC System Document Control.
2.3.1 All personnel performing work-affecting the manufacture of product are competent on
the basis of appropriate education, training skills and experience.
Date: 08/01/2013 Page5of35 Issue:001
BRILLIANT WHITE WINDOWS FPC MANUAL
The company will determine the necessary competence for personnel performing work
affecting product quality and provide training or take other actions to satisfy these needs. The
company will evaluate the effectiveness of those actions taken and will ensure that the
employees are aware of the relevance and importance of their activities and how they
contribute to the achievement of the finished product. The company maintains records of all
training and education affecting finished product.
The company will plan and develop the processes needed for production product realisation.
The planning is consistent with the requirements of the other processes of this factory
production control system.
Planning for production and product realisation incorporates the determination of the;
i. Requirements specified by the customer, including the requirements for delivery and
post delivery activities.
ii. Requirements not stated by the customer but necessary for specified intended use,
where known.
iii. Statutory and regulatory requirements related to the product.
iv. Any additional requirements by determined by the company.
The company will review the requirements related to the product. The review will be
performed prior to the company’s commitment to supply a product to a customer and will
ensure that;
The company will ensure that it will determine and implement effective arrangements for
communicating with customers in relation to;
i. Product information.
ii. Enquiries, contracts or order handling, including amendments.
Date: 08/01/2013 Page6of35 Issue:001
BRILLIANT WHITE WINDOWS FPC MANUAL
iii. Customer feedback, including customer complaints.
(See procedures OP 03.02 Sales Order Processing & OP 03.03 Customer Complaints)
2.6 Purchasing
The company will ensure that purchased product required for production and product
realisation conforms to specified purchase requirements.
The company will evaluate and select suppliers based upon their ability to supply product in
accordance with the company’s requirements and in accordance with the requirements of BS
EN 14351-1:2006+A1:2010 standard. Details of supplier selection & evaluation are included
within OP 03.04 Supplier Surveys & Approved Suppliers.
The company will ensure the adequacy of specified purchase requirements prior to their
communication to the supplier.
The company will inspect incoming product in accordance with OP 03.07 Goods Inwards
Inspection. The company relies upon the supplier to take responsibility to ensure that product
purchased conform to agreed specified requirements.
The company will ensure that production or service processes are evaluated and validated to
ensure that the processes will achieve planned results. The company will ensure it
establishes arrangements for these processes including, as applicable
Explain how your company traces the supplied windows and IGUs back to the order?
The company will ensure that it preserves the conformity of product during internal processing
and delivery to the intended destination. This preservation will include identification, handling,
packaging, storage and protection.
2.9.1 General
The company will plan and implement the monitoring, measurement; analysis and
improvement processes needed to demonstrate conformity of the product, to ensure
conformity of the factory production control system and to continually improve the
effectiveness of the quality management system.
The company will monitor information relating to customer complaints as to whether the
organisation has met customer requirements. OP 03.03 customer complaints
The company will apply suitable methods for monitoring and, where applicable, measurement
of the factory production control system processes. These methods will demonstrate the
ability of the processes to achieve planned results. If planned results are not achieved then
corrective action will be taken to ensure conformity of the product. Documented quality
procedures have been implemented to ensure that the organisation’s key processes achieve
planned results in accordance with the BES EN 14351-1:2006+A1:2010 standard.
The company will monitor and measure the characteristics of the product to verify that the
product requirements have been met. This is performed at the goods inwards stage OP
03.07 Goods inwards inspection.
The company will ensure that product which does not conform to specified requirements is
identified and controlled to prevent its unintended use or delivery. The controls and related
responsibilities and authorities are included in OP 03.09 Control of Nonconforming Product.
2.11 Improvement
The company will take action to eliminate the cause of nonconformities in order to prevent
recurrence. Corrective actions will be appropriate to the effects of the nonconformities
encountered. OP 03.03 Customer Complaints procedure has been established to define the
requirements for;
The company will determine action to eliminate the causes of potential nonconformities in
order to prevent their occurrence. OP03.03 Customer Complaints will ensure that the
company can;
RESPONSIBILITY
Departmental
Send ‘Issue/Change Request Form’ Manager/Director
to Installation Manager
No Installation Manager
Discuss with Issue/Chang
Installation e request
Manager approved?
Yes
RESPONSIBILITY
Receive order
by hand, fax,
email, internet or
telephone.
No Are order
Review/discuss Customer services
requirement
with customer s clear?
Yes
Enter order onto computer,
acknowledgement sent to customer
Customer services
No
Advise customer & Are all items Customer services
generate back required
order available?
Yes
Yes
Are there
any Customer Services
shortages?
No
Install Products
Installation Manager
RESPONSIBILITY
Receive complaint
Identify/implement
corrective/preventive action Installation Manager
RESPONSIBILITY
Installation Manager
Issue ‘Supplier Questionnaire’
FO.04.03
Select alternative
supplier
Is information
No received
satisfactory? Installation Manager
Yes
Evaluate supplier
performance Installation Manager
Inform supplier-
requesting details of
actions to be taken No Yes
Is
towards improvement performance
Installation Manager
acceptable?
RESPONSIBILITY
Yes
Set up new product New Installation Manager
on stock ledger product
required?
No
RESPONSIBILITY
RESPONSIBILITY
Goods arrive
Operative
Unload vehicle
Operative
Check/inspect goods
Inform Is delivery
Installation No quantity/ product
Manager correct?
Operative
Notify supplier
Yes
Yes
RESPONSIBILITY
Items to be
Internally calibrated
internally or Installation Manager
externally?
Externally
Calibrate items internally in
accordance with Test
Procedures TP:06.01(01-01) Send items to recognised
calibration laboratory for Installation Manager
calibration
Is item outside
limit of Issue
Do not use. Yes acceptability, No Certificate of
inoperative, Calibration Installation Manager
Appropriate action
suspect or
to be taken
showing evidence
of damage?
RESPONSIBILITY
Identify non-
conforming
Installation Manager
product
Label product
with ‘On-Hold Installation Manager
Sticker‘
Record details on
‘Quarantined
Product Register’
FO 04.05 Installation Manager
Notify supplier
Installation Manager
Review
disposition of
the product Installation Manager
No
Release? Installation Manager
Yes
Acquire concession
Raise ‘Return to note from supplier if
Supplier Note’ appropriate
RESPONSIBILITY
Remove ‘On-Hold
Stickers’ & release Installation Manager
for stock
RESPONSIBILITY
All new personnel are given
induction training prior to performing
specific tasks. Details are recorded
on the ‘Induction Training Checklist’
Installation Manager
FO 04.07
RESPONSIBILITY
Schedule delivery
RESPONSIBILITY
Operational Procedure:
Issue Approval:
Change Approval:
Issue/Change Requested:
Originator:................................................. Department:......................................
Date:............................................
Completed:..……………………………………………………………Date:…………………..
Customer: Date:
Telephone:
Complaint:
Investigation details:
Company name:......................................................................................................Tel:...................................................
Address:............................................................................................................Fax:.........................................................
.........................................................................................................................................................................................
.........................................................................................................................................................................................
_____________________________________________________________________________________________
.........................................................................................................................................................................................
Company Contacts;
Quality Representative:...................................................................................................................................
Technical Representative:..............................................................................................................................
Sales Representative:.....................................................................................................................................
Purchasing Representative:............................................................................................................................
_____________________________________________________________________________________________
Is your company registered to a nationally recognised third party Quality Assurance Scheme, such as BS EN ISO 9001,
or equivalent.
If YES, state;
Registration Reference:....................................................................................................................................
Level of Registration:........................................................................................................................................
Date of Registration:.........................................................................................................................................
Scope of Registration:......................................................................................................................................
Please attach a copy of the certificate with the questionnaire. Then go to question 2.
Give details;
Organisation:.....................................................................................................................................................
Date:................................................................................................................................................................
_____________________________________________________________________________________________
Question Remarks
1. Quality
1.03. Specifications
a) Is there a system for ensuring the use and control of latest
level drawings, specifications, purchase orders and procedures
throughout the organisation? YES/NO
b) Is there final inspection and test and are the results recorded
and available for analysis? YES/NO
1.07. Records
a) Are records maintained and stored to prevent loss, damage
or deterioration? YES/NO
Question Remarks
2. Product
3. Environment
Supplier Acknowledgement
Signature:.................................................................................... Date:................................................................
_____________________________________________________________________________________________
Date: 08/01/2013
Page29of35
BRILLIANT WHITE WINDOWS
Quarantined Product Register
Issue:001
FPC MANUAL
BRILLIANT WHITE WINDOWS FPC MANUAL
FO: 04.06 CALIBRATION EQUIPMENT RECORD
EQUIPMENT TYPE:
IDENTIFICATION NUMBER:
CALIBRATION FREQUENCY
CALIBRATION
ACTION INITIAL
DATE
The following have been discussed with me. (Tick when completed)
SYMBOL LEVEL
Goals
Process
Name
In-house Calibration:
CONTENTS
Steel Tape
1 CALIBRATION REQUIREMENTS
With the use of an externally calibrated steel tape fixed to a solid timer bar those steel
tapes in use will be positioned at the end of the bar and the point out a distance of 1m
will be checked against that on the bar.
The results are recorded on a record card for the item being calibrated. Steel tapes
will be internally calibrated monthly, all items that can not be repaired and remain
outside the allowable error are scrapped.
Each window or doorset will be supplied with a label to provide product identification
and traceability from original production batch.
2. REQUIREMENTS
Each order will be inspected to ensure that it has its label provided in the customer
documentation to meet the requirements of clause 8, BS EN 14351-1:2006+A1:2010.