All performed Inspections and Test will be included in an
overall reporting System “Quality Control Tracking Register”, in order to monitor and follow up the Inspection and Test described in the ITP’s. SUBCONTRACTOR´s shall keep a Quality identify, maintain, control, adjust, and calibrate tools, gauges, instruments, and other measuring and testing devices used for activities controlling quality. Calibration will be performed at established periods as specified in project specifications or other international standards, or approved Subcontractors' procedures; in no case shall the calibration cycle exceed six (6) months. Every SUBCONTRACTOR will have an updated list of measuring and testing equipment, which identify the state of calibration for all of them. This record will include at least, the following information: Equipment Identification. Serial Number. First calibration date. Last calibration date. Validity date Repairs that any instrument have been done. Calibration certificate. Calibration records must demonstrate traceability to national /international standards where appropriate. In accordance with this list, every measuring and test equipment will be labeled / tagged. The label contains at least the following information: Measuring and test equipment identification code. Last calibration date. Next calibration date / Validity Date.