Project Initiation Documentation Created/updated 24/06/18

Casing and Tubular Running Service for Lear Corporation’s Oil Well.

PROJECT INITIATION DOCUMENTATION

Project Title Casing and Tubular Running Service for


Lear Corporation’s Oil Well.

Date 15th October 2015

Group Name Cov Oil Services

Authors Chiekezie Chukwudebelu (6632511)

Adigwe Olisaemeka (6630492)

Adekunle Oluokun (6600417)

Abdulra’uf Bello (6740746)

Client LEAR CORP

Document Number COVOS2015PID101

Project Proposal – Casing of Production Oil Well in Coventry, England.

Abstract – Lear Corporation, a multinational company, with its head office in the United
Kingdom, are looking to invest in the production of crude oil to meet competitive and
consumer increasing demand in the production and supply of crude oil.

A challenge is presented; the formation encountered in one of the wells to be drilled and
produced is extremely weak. This would make drilling and production completely impossible
as drilled formation (rock particles in the earth’s crust) would cave in as soon as the drill
string is pulled out.

Cov Oil services have come up with a suitable solution to this challenge to help ensure that
production is made possible in a very efficient yet cost effective manner. This would require
a casing and tubular running project.
Project Initiation Documentation Created/updated 24/06/18
Casing and Tubular Running Service for Lear Corporation’s Oil Well.

Casing and Tubular running entails the running of a large diameter (casing) or small diameter
(tubing) steel pipe into an already drilled hole to enable effective and undisturbed production
of crude oil.

This would provide;

o Stabilization for the hole/well that has been drilled


o Protection of the hole/well from caving in of weak formation and
contamination from fresh water reservoir fluids
o A smooth passage for the crude oil to be produced

Aims;

Delivering;

 The project of quality that meets the client/stakeholders demands (Lear Corp)
 The project in due time
 The project at minimum cost that would not jeopardize client/stakeholder quality
requirements
 The project highest at the highest safety standards and practices
 A sustainable project

Ultimately these functions will positively impact and increase output balancing the three
ideals; cost, time and quality bearing in mind the sustainability and risk assessment involved
in the project.

The casing of the Goulson well in west-midlands England is the first Production well in this
region. The Project we are about to undertake involves designing, preparing, setting up and
installation of the casing of this well. This Project is going to involve three phases and the
whole project is set to take 45 days. This project is a service for Leah Corporation who
performed the exploration phase of this well. In this Project we intend to achieve the
following Objectives;

.
Project Initiation Documentation Created/updated 24/06/18
Casing and Tubular Running Service for Lear Corporation’s Oil Well.

Scope
At the end of this project we intend to have created a proper casing platform in which the
next phase of the oil production can commence. This project after completion intends to
follow strict safety procedures to leave the nearby residential areas and agriculture unharmed.

Timeframe

Description of Work Start and End Dates


Phase One Interpreting well data 15 October – 25th
TH

October 2015
Phase Two Installation of Conductor and 26th October – 24th
Intermediate casing pipes November 2015
Phase Three Installation of Production casing and 27th November – 1st
casing shoe December 2015

Project Budget

Description of Work Anticipated Costs


Phase One Interpreting well data 5000
Phase Two Installation of casing pipes 40000
Project Initiation Documentation Created/updated 24/06/18
Casing and Tubular Running Service for Lear Corporation’s Oil Well.

Phase Three Installation of casing shoe 5000


Total £ 50,000

This Project is going to be accessed regularly by Leah Corp supervisors and by the QHSE
department of Contracted Company of Leah Corp.

Project Team Members

Chikiezie (Project Manager)

Ade

Abdul

Olisa

References;

 Marcellus coaltion casing program

marcelluscoalition.org (diagram)

 Schlumberger Oil field glossary

www.glossary.oilfield.slb.com