Sunteți pe pagina 1din 3

Drawing Name: Drawn Date:

Typical Access Control Single Door Detail CFV 5/18/04

10 1 Magnetic Lock
8
7 2 Door Position Contacts
9
11
12 3 Single Gang Box — For RQE Push Button
(Secure Side Of Door)
Finished Ceiling
6 4 Single Gang Box — For Card Reader (Public Side Of Door)

5 Single Gang Box — For Piezo & Key Switch


(Secure Side Of Door)
1 2
6 Horizontal Single Gang Box — For RQE Motion Sensor
(Secure Side Of Door)

60” Center Line AFF


7 8” X 8” X 4” Security Junction Box

5 8 1” Conduit To SER Room Filled With 1 ea — 12/C #22,


4/C #18. And 8/C #22 Shielded Pulled Through To Item 4.

42” Center Line AFF


9 3/4” Conduit Filled With 2/C #22 To Item 5
And 4/C #22 To Item 3

3 4 10 3/4” Conduit Filled With 8/C #22 Pulled Through Item 7.

11 1/2” Conduit Filled With 4/C #22.

12 3/4” Conduit Stubbed Into Top Of Door Frame Filled With


1 ea. 2/C #18 and 2/C #22.
Drawing Name: Drawn By: Date:
Typical Access Control Double Door Detail CFV 5/18/04

10 1 Magnetic Locks
8

7 2 Door Position Contacts


9

Finished Ceiling 11 6 3 Single Gang Box — For RQE Push Button


(Secure Side Of Door)

12 12
4 Single Gang Box — For Card Reader (Public Side Of Door)

5 Single Gang Box — For Piezo & Key Switch


1 2 2 1 (Secure Side Of Door)

6 Horizontal Single Gang Box — For RQE Motion Sensor


(Secure Side Of Door)

60” Center Line AFF


7 8” X 8” X 4” Security Junction Box

5 8 1” Conduit To SER Room Filled With 1 ea — 12/C #22,


4/C #18. And 8/C #22 Shielded Pulled Through To Item 4.

42” Center Line AFF


9 3/4” Conduit Filled With 2/C #22 To Item 5
And 4/C #22 To Item 3

3 4 10 3/4” Conduit Filled With 8/C #22 Pulled Through Item 7.

11 1/2” Conduit Filled With 4/C #22.

12 3/4” Conduit Stubbed Into Top Of Door Frame Filled With


1 ea. 2/C #18 and 2/C #22.
Drawing Name: Drawn Date:
Typical Monitored Door Detail CFV 5/18/04

1 Door Position Contacts


4

3 2 Single Gang Box — For Piezo & Key Switch


5 (Secure Side Of Door)

3 4” X 4” X 4” Security Junction Box

Finished Ceiling
6
4 3/4” Conduit To SER Room Filled With — 12/C #22.

5 1/2” Conduit Filled With 2/C #22.

1
6 1/2” Conduit Filled With 2/C #22.

60” Center Line AFF

S-ar putea să vă placă și