A New Warehouse- Ceiling Sprinkler A-1 Ceiling Sprinkler with existing network
1. NFPA Standard for calculation A-2 Ceiling Sprinkler with installation New Ring
2. Sprinkler Data Sheet A-3 Ceiling Sprinkler – Actual Requirement @ Source
B New Warehouse- In rack Sprinkler B-1 In rack Sprinkler with existing network
1. NFPA Standard for calculation B-2 In rack Sprinkler with installation New Ring
B-3 In Rack Sprinkler – Actual Requirement @ Source
C Old Warehouse- Cold Room- ESFR C-1 ESFR Sprinkler with existing network
Sprinkler- (Existing) C-2 ESFR Sprinkler with installation New Ring
1. Existing Design Reference C-3 ESFR Sprinkler – Actual Requirement @ Source
2. NFPA Standard for calculation
D New Warehouse- Landing Valve- (Existing) D-1 Landing valve with existing network
1. NFPA Standard for calculation D-2 Landing valve with installation New Ring
D- Landing valve – Actual Requirement @ Source
3 Recommendation
1. Client to provide and install Full/ Complete Fire Fighting Pumping Station Dedicated for GDI warehouse
within Warehouse area with the following Requirement
a) Pressure- 125 Psi
b) Water Flow rate- 1500 GPM
2. Client to upgrade the existing firefighting pump station with the requirements
a) Pressure – 137 Psi
b) Water Flow Rate- 1500 GPM
c) Subject to the existing network capable to work with the updated pressure