Stage 1 - Application for ABS

S/N Documents required by BCA (where applicable)

1 Request for site inspection date under the advance booking system (Form BCA-CSC-RQSI)
2 Certificate of Supervision of Building Works (Form BCA-CSC-CSPBW or BPD_CSC02)
3 As-built Plans, Test Reports and Certificate of Supervision of Lightning Protection System
4 Certificate of Supervision of Installation of Escalators/ Lifts/ Stair lift/ Platform lift
5 Certificate of Supervision of Mechanical Ventilation/ Air-conditioning System
6 Declaration by Qualified Person (Form BCA-CSC-TOPCSCDQP or BPD_CSC07)
7 Form BCA-BFAChecklist.doc
8 QP's declaration on compliance with daylight reflectance for external surfaces

Stage 2 - Application for TOP/CSC

S/N Documents required by BCA (where applicable)

1 The application form (Form BCA-CSC-TOPCSC01)


2 Certificate of Supervision of Piling Works and Notice of Completion (Form BCA-BE-QPCTPW
3 Certificate of Supervision of Structural Works (Form BCA-BE-QPCTSSW or BEV C2)
4 Certificate of Record Structural Plans/Calculations (Form BCA-BE-CTASST or BEV C3)
5 A copy of “Annex A” (listing of safety barrier submissions) of BCA circular BC 15.0.03 dated 0
6 Builder's Certificate of Completion of Building Works (Form BCA-BE-BRCTBW or BC-BC)
7 Certificate of Lift Maintenance and Testing to be submitted and lodged with Commissioner of
8 Submission of Record Plan (Form BCA-BP-BPRP01)
9 Compliance to Written Advice issued after site inspection
10 Clearance on the as-built Buildability/ Constructability score (Form BCA-BP-BS03 or BPD_BS

11 Clearance on the as-built GM score (Forms BPD_GM02 + BPD_GM02_Appendix 2)

12 Commissioning approval for the CD shelters (Form BCA-CD-COMM01)

S/N Clearances required from the other technical departments (where applicable)

Technical departments
1 PUB(Sanitary) & NEA(Environmental Health)
2 PUB (drainage)
3 FSSD - Fire Safety
4 LTA - Road & Transport
5 LTA - Vehicle Parking
6 LTA - MRTC line
7 NPARKS - Greenery
8 Cable Readiness Certificate
9 CAAS and DSTA - Height Control
10 URA - Planning (for conservation projects)
11 URA - Planning (for foreshore works)
12 Any other clearances specified in the WP from URA
m (Form BCA-CSC-RQSI)
BW or BPD_CSC02)
ning Protection System (Form BCA-CSC-CSPLP or BPD-CSC03)
t/ Platform lift (Form BCA-CSC-CSPLE or BPD-CSC04)
g System (Form BCA-CSC-CSPACMVS or BPD_CSC05)
r BPD_CSC07)

nal surfaces

n (Form BCA-BE-QPCTPW or BEV C1)


TSSW or BEV C2)
-CTASST or BEV C3)
ircular BC 15.0.03 dated 04/08/2011
E-BRCTBW or BC-BC)
ged with Commissioner of Buildings (Form BPMV_BMD_BMS/C1)

BCA-BP-BS03 or BPD_BS03, Form BEV-CS01)

M02_Appendix 2)

here applicable)

for TOP application for CSC application


TOP CSC
BP CSC
TFP FSC
BP CSC
BP CSC
BP CSC
BP CSC
Yes
Yes
TOP CSC
BP CSC

S-ar putea să vă placă și