FTCO

AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.


Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE : HOT WATER DEMAND CALCULATION
From ASPE Data Book Table 4-6 page 4-15

Occupancy : Office Building


All Buildings
ROOM NAME:
ROOM NO. All Buildings
Fixture Demand UNIT NO. 2 No. OF EWH 1
TYPE L/H No.Of Fix. Total L/H
Private Lavatory 7.6 15 114.00
public Lavatory 22.7 87 1974.90
shower 113.6 4 454.40
kitchen sink 75.7 21 1589.70
jointer sink 37.9 17 644.30
DISHWASHER 378.6 2 757.20
Possible Max.Demand ( = 5534.50
Demand factor = 0.30
Storage factor = 2.00
Pro. max. demand (LPH)=D. factor*po. max.Demand 1660.35
Possible Max.Demand (LPH)=
C
Tempreture Out Tout= 60

Tempreture in Tin = 20
Tempreture Diff. T rise= 40 40.00 C

m= Probable max.Demand in L/s 0.46 L/S


P= Density of water = 1 kg/L 1 1.00 Kg/L
n= Thermal efficiency = 95 0.95
Cp=specific heat of water = 4.18 4.18 kj/(kg.k)
pi(kw )= (m*cp*p*trise)/n 81.17 KW

storage tank capacity(Litters)=Prob.Max.Demand*storage factor 3320.70 Liters


FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department
PROJECT NAME :GRAIN SOILS
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. All Building
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 1 34 34
Western WC 1 69 69
Bedit 1 25 25
Lavatory 1 114 114
Shower 2 4 8
Kitchen sink 1.5 21 31.5
Service sink 3 17 51
Hose Bibb 1 20 20
Faucet 1 9 9
SUB- TOTAL FU Total 361.5
DEMAND GPM 115
PIPE VELOCITY(FPS) 7.5
PIPE FRICTION LOSS(psi/100) 4
PIPE SIZE (in) 2.5
Legend :
C W = Cold water
FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 1
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 1 0 0
Western WC 1 3 3
Bedit 1 3 3
Lavatory 1 5 5
Shower 2 0 0
Kitchen sink 1.5 0 0
Service sink 3 0 0
Hose Bibb 1 10 10
Faucet 2 0 0
SUB- TOTAL FU Total 21
DEMAND GPM 15
PIPE VELOCITY(FPS) 5.5
PIPE FRICTION LOSS(psi/100) 6.5
PIPE SIZE (in) 1
Legend :
C W = Cold water
FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 2
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW

type FU QTY FU
Estern WC 1 11 11
Western WC 1 23 23
Bedit 1 5 5
Lavatory 1 44 44
Shower 2 4 8
Kitchen sink 1.5 11 16.5
Service sink 3 1 3
Hose Bibb 1 0 0
Faucet 2 9 18
SUB- TOTAL FU Total 128.5
DEMAND GPM 50
PIPE VELOCITY(FPS) 8.2
PIPE FRICTION LOSS(psi/100) 8
PIPE SIZE (in) 1.5

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 3
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 1 5 5

Western WC 1 11 11
Bedit 1 5 5
Lavatory 1 17 17
Shower 2 0 0
Kitchen sink 1.5 2 3
Service sink 1.5 0 0
Hose Bibb 1 10 10
Faucet 2 0 0
SUB- TOTAL FU Total 51
DEMAND GPM 40
PIPE VELOCITY(FPS) 6.5
PIPE FRICTION LOSS(psi/100) 5.5
PIPE SIZE (in) 1.5
Legend :
C W = Cold water
FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE : COLD WATER LOAD CALCULATION
From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 4
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 1 18 18
Western WC 1 21 21
Bedit 1 1 1
Lavatory 1 36 36
Shower 2 0 0
Kitchen sink 1.5 8 12
Service sink 3 16 48
Hose Bibb 1 0 0
Faucet 2 0 0
SUB- TOTAL FU Total 136
DEMAND GPM 60
PIPE VELOCITY(FPS) 10
PIPE FRICTION LOSS(psi/100) 12
PIPE SIZE (in) 1.5
Legend :
C W = Cold water
FU =fixture unit
FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. All Building
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 5 34 170
Western WC 2.5 69 172.5
SUB- TOTAL FU Total 342.5
DEMAND GPM 115
PIPE VELOCITY(FPS) 7.5
PIPE FRICTION LOSS(psi/100) 4
PIPE SIZE (in) 2.5 (63mm)
Legend :
G W =gray water
FU =fixture unit
(63mm)
FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.

Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 1
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 5 0 0
Western WC 2.5 3 7.5
SUB- TOTAL FU Total 7.5
DEMAND GPM 15
PIPE VELOCITY(FPS) 5.7
PIPE FRICTION LOSS(psi/100) 6.5
PIPE SIZE (in) 1 (25mm)

Legend :
G W =gray water
FU =fixture unit
FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department
(25mm)
PROJECT NAME :GRAIN SOILS
PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 2
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 5 11 55
Western WC 2.5 23 57.5
SUB- TOTAL FU Total 112.5
DEMAND GPM 55
PIPE VELOCITY(FPS) 9.5
PIPE FRICTION LOSS(psi/100) 10
PIPE SIZE (in) 1.5 (40mm)

Legend :
G W =gray water
FU =fixture unit
FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 3
(40mm) TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 5 5 25
Western WC 2.5 11 27.5
SUB- TOTAL FU Total 52.5
DEMAND GPM 40
PIPE VELOCITY(FPS) 7
PIPE FRICTION LOSS(psi/100) 6
PIPE SIZE (in) 1.5 (40mm)

Legend :
G W =gray water
FU =fixture unit
FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATION


From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 4
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NO. All Building
(40mm)
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTAL
Fixture CW Fixture CW
type FU QTY FU
Estern WC 5 18 90
Western WC 2.5 21 52.5

SUB- TOTAL FU Total 142.5


DEMAND GPM 60
PIPE VELOCITY(FPS) 10
PIPE FRICTION LOSS(psi/100) 12
PIPE SIZE (in) 1.5 (40mm)

Legend :
G W =gray water
FU =fixture unit
(40mm)
FTCO
AL-FOUZAN TRADING AND GENERAL CON
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : PLUMBING FIXTURE LOAD CALCULATION


From UPC Table A-2&7-3 & CHART A-5 RISER NO All Build
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM All Build
NAME All Build
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC ROOM NO TOTA
Fixture CW D Fixture
type FU FU QTY
Estern WC 1 8 2
Western WC 1 5.5 1
Bedit 1 1 0
Lavatory 1 1 4
Shower 2 2 3
Kitchen sink 1.5 2 1
Service sink 1.5 2 1
washing machine 4 4 1
D.F. 0.75 1 1
SUB- TOTAL FU Total
DEMAND GPM
PIPE VELOCITY(FPS)
PIPE FRICTION LOSS(psi/100)
PIPE SIZE (mm)

Legend :

WS = water sup D = Drain

CW = Cold Water
FTCO
NG AND GENERAL CONSTRUCTION CO. AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE : HOT WATER DEMAND CALCULATION
From ASPE Data Book Table 4-6 page 4-15

All Building Occupancy : Office Building


All Building First Basemant Floor
All Building ROOM NAME: ClinicToilet Guard Toilet
TOTAL ROOM NO. B 03 B 56
CW D Fixture Demand UNIT NO. EWH 1 EWH 2
FU FU L/H No.Of Fix. Total L/H No.Of Fix.
2 16 Private Lavatory 7.6 0 0 1
1 5.5 public Lavatory 22.7 1 22.7 0
0 0 shower 113.6 0 0 0
4 4 kitchen sink 75.7 0 0 0
6 6 jointer sink 37.9 1 37.9 0
1.5 2
1.5 2 Possible Max.Demand (LPH)= 60.6 L/H
4 4 Demand facto= 0.3
0.75 1 Storage facto= 2
20.75 40.5 Pro. max. demand (LPH)=D. factor*po. max.Demand 18.18 L
35 47
2.5
0.6 C
50 100 Tempretur Tout= 55

Tempreture Tin = 10
Tempreture T rise= 45 45

D = Drain m= Probable max.Demand in L/s 0.00505 L/S


P= Density of water =1 k 1 1 Kg/L
CW = Cold Water n= Thermal efficiency= 95 0.95
Cp=specific heat of water 4.18 4.18
pi(kw)=(m*cp*p*trise)/n 0.9999
storage tank capacity(Gallons)=Prob.Max.Demand*storage factor
storage tank capacity(Litters)=Prob.Max.Demand*storage factor 36.36

Heaters selection based on A.O.Smith catalogue

Model No.
Available storage tank capacity (Gallons)
Recovery rate (GPH)
Elemant Power
Dimensions (Diameter.Height) mm
FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE : HOT WATER DEMAND CALCULATION
From ASPE Data Book Table 4-6 page 4-15

Occupancy : Office Building


First Floor All Buildings
Guard Toilet Tr.Manager Toilet ROOM NAME:
B 56 106 ROOM NO.
EWH 2 EWH3 Fixture Demand UNIT NO. 2 No. OF EWH 1
Total L/H No.Of Fix. Total L/H L/H No.Of Fix. Total L/H
7.6 1 7.6 Private Lavatory 7.6 13 98.80
0 0 0 public Lavatory 22.7 75 1702.50
0 0 0 shower 113.6 2 227.20
0 0 0 kitchen sink 75.7 21 1589.70
0 0 0 jointer sink 37.9 17 644.30

7.6 L/H 7.6 L/H Possible Max.Demand (LPH)= 4262.50


0.3 0.3 Demand factor = 0.30
2 2 Storage factor = 2.00
2.28 L 2.28 L Pro. max. demand (LPH)=D. factor*po. max.Demand 639.38
C
Tempreture Ou Tout= 65

Tempreture Tin = 20
C 45 C 45 C Tempreture T rise= 45 45.00

0.000633 L/S 0.000633 L/S m= Probable max.Demand in L/s 0.09 L/S


1 Kg/L 1 Kg/L P= Density of water =1 kg/L 1 1.00 Kg/L
0.95 0.95 n= Thermal efficiency= 95 0.95
kj/(kg.k) 4.18 kj/(kg.k) 4.18 kj/(kg.k) Cp=specific heat of water 4.18 4.18
KW 0.1254 KW 0.1254 KW pi(kw)=(m*cp*p*trise)/n 17.58
storage tank capacity(Gallons)=Prob.Max.Demand*storage factor
Liters 4.56 Liters 4.56 Liters storage tank capacity(Litters)=Prob.Max.Demand*storage factor 1278.75

Heaters selection based on A.O.Smith catalogue

Model No.
Available storage tank capacity (Gallons)
Recovery rate (GPH)
Elemant Power
Dimensions (Diameter.Height) mm
FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department

PROJECT NAME :GRAIN SOILS


PROJECT NO :
PREPARED BY : ENGR. SALLAM
CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : PLUMBING FIXTURE LOAD CALCULATION (W.SUPPLY&DRIANGE)


From UPC Table A-2&7-3 & CHART A-5 BUILDING NO. 62
TYPE OF FIXTURE PUBLIC & PRIVATE ROOM All Building
NAME All Building
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC S ROOM NO. TOTAL
Fixture CW D Fixture CW D
type FU FU QTY FU FU
Estern WC 1 8 4 4 32
Western WC 1 5.5 8 8 44
WASHING MACH. 4 4 8 32 32
Lavatory 1 1 16 16 16
Shower 2 2 12 24 24
Kitchen sink 1.5 2 4 6 8
D.F. 0.75 0.75 4 3 3
SUB- TOTAL FU Total 90 156
DEMAND GPM 65 80
PIPE VELOCITY(FPS) 7
PIPE FRICTION LOSS(psi/100) 3.5
PIPE SIZE (mm) 50 100
Legend :

C WS = water supply D = Drain

CW = Cold Water

kj/(kg.k)
KW

Liters

S-ar putea să vă placă și