Sunteți pe pagina 1din 8

Bharat Heavy Electricals Limited Doc No.

BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

JOB HAZARD ANALYSIS

For

RADIOGRAPHY TEST
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

Document Acceptance Note

Procedure No.: BHEL/JHA 09

Name of Procedure: JHA for Radiography Test

Submitted by: BHEL

Work Order No: CMM/MEQ/23-40-2-1024/PO-6055 DT- 31/03/2011

Name of Work: TG Plant Package

Name & Designation Signature


Reviewed by:
B.R. Chaudhari

Engineer SO/E (TG)


Reviewed by:
Umesh V. Patel

Safety Officer (NPCIL)


Concurred by:
Ajay S. Naranje

Head (IS & F)


Approved by:
B.L. Sahu

Engineer SO/G (TG)


Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

JHA on Radiography Test

Work Order No: CMM/MEQ/23-40-2-1024/PO-6055 DT-31/03/2011

BHEL DOCUMENT NO: BHEL/JHA 09

NPCIL PROCEDURE REG. NO. :

DATE:

PREPARED BY:

ENGINEER (BHEL)

REVIEWED BY:

SO (BHEL)

APPROVED BY:

CM (BHEL)
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

JHA for Radiography Test

Tools and tackles required : Radiography source, RT caution tape, Manila rope
PPE required : Safety Helmet, Safety Shoes, Hand Gloves, dosimeter, etc.
Authorization required : Safe Work permit to radiographers

Sl. Sequence of Potential Protective measures to be taken


No. the job Hazards Action By

 The manpower like supervision staff,


operator and helper deployed for this job
should be qualified, experienced, trained
and certified before commencement of
work.
 Before start of the work, the supervisor of Site
the work shall discuss the complete work Engineer/
plan with the workers engaged in the work. CM
Deployment of Unauthorized
1  A pep talk/ pre job briefing and precaution
man powers manpower
measure to be taken is done.
 All stipulated AERB safety guidelines for
open field industrial radiography shall be
followed.
 The radiographer shall be well conversant
with the safety practices and shall have
valid BARC certificate for source handling.

Radiation  Storage area should be properly barricaded


Hazard with a caution board.
 Entry of unauthorized person should be
restricted
2 Storage of  Leakage field should be measured to ensure Site
Radiography that the same is within the limits Engineer/
source CM
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

Sl. Sequence of Potential Protective measures to be taken


No. the job Hazards Action By

Removal of  A good quality manila rope/ wire sling Site


Fall of
3 Radiography should be used for lifting / removing. engineer/
radiography
source from CM
source
storage pit
 The radiography source should be
transported in a licensed radiography van.
 Prior to on site transport of the camera with
source from one place to another in a
vehicle, it shall be ensured that the source
Storage area pencil is securely immobilized and locked in
4 Transportation camera. This will avoid any accidental Site
of Radiation opening of the shutter and falling of source engineer/
Radiography hazard pencil from the camera. CM
source to  In case of unusual occurrences like damage
work site to the camera during transport, non-receipt
of consignment in the reasonable time,
inform BARC, Mumbai.
 Leakage field should be measured and
ensure that it is within the prescribed limit
of 0.1 mr/hr.
Handling of 1. Radiation  Area should be barricaded with RT caution
radiography hazard tape
source  Unauthorized entry of person should not be
allowed
 Radiography camera should be in proper
working condition so that source is not
stuck in between the operation
5  Radiographer who is on job should restrict Site
unauthorized entry at all possible entry engineer/
points to the radiography area CM
 Radiographic personnel should use
personnel Thermo-Luminescent Dosimeter
(TLD) for record of personal dose.
 Radiation survey meter should be used for
area monitoring
 Field radiography should be carried out
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

Sl. Sequence of Potential Protective measures to be taken


No. the job Hazards Action By

during night time or holidays when there is


little or no occupancy around
 Red warning lights should be displayed
during night along the cordon boundaries.
 The source pencil must never be touched or
handled directly with hands
 Suitable advance notice to be issued to
concerned department so that no other
activity is planned at the time of
radiography
 The certified radiographer who was on the
job shall report the matter immediately to
the radiography site-in charge.
 The radiography site-in charge shall visit the
necessary corrective actions. The suspected
area shall be cordoned off and entry into
the area shall be prohibited.
 If it is suspected that the loss of Site
2. Radiation radiography source/ damaged camera might engineer/
emergency have exposed some persons, the persons CM
who are exposed to higher radiation levels
present in the area shall be sent for
necessary monitoring/ examination.
 In case the accident of lesser magnitude,
necessary corrective action shall be taken to
shield the radiography source/ damaged
camera as per instruction of the
radiography site in charge.
6 Transportation  Leakage field should be measured to ensure Site
of radiography Radiation that it is less than 0.1 mr/hr engineer/
source back to hazard CM
storage
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

Check List for JHA for Radiography Test


Date:

SL.
DESCRIPTION STATUS REMARKS
NO
Is the storage area properly barricaded with cautin tape
1 YES NO
whether all the workmen wearing required PPE’s
2 YES NO
Is experienced and qualified manpower is deployed
3 YES NO
Check whether leakage field should be measured to ensure that the
4 YES NO
same is within the prescribed limits
Check whether good quality manila rope/ slings are used for lifting/
5 YES NO
removing source.
Check whether working area is barricaded as per the survey meter
6 YES NO
reading; warning tag, danger board & flags placed
Check whether the radiographer is well conversant with the safety
7 YES NO
practices and had valid BARC certificate for source handling
Proper illumination- 100-150lux is available
8 YES NO
Is the survey meter calibrated
9 YES NO
Check whether unauthorized entry is not permitted at all possible
10 entry points of radiography area YES NO

Check whether the radiography camera should be in proper working


11 condition so that source is not struck in between the operation YES NO

No worker is allowed to work for more than 12 hrs


12 YES NO

Position of cylinder whether it is in upward or not


13 YES NO
Intimation letter submitted to ENC for carrying out RT with time
14 mentioned YES NO

See whether the personnel involved in the work should use


15 dosimeter device such as TLD YES NO
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR

Whether the radiography team is security concerned about the loss


16 of source / camera YES NO

Checked by Authorized by

Signature :
Name :
Date :

S-ar putea să vă placă și