** ON A/C ALL
TASK 27-96-00-740-001-A
BITE Test of the EFCS (Ground Scanning)
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External Power
(Ref. 24-41-00-861-002-A-01). Energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-861-002-A-02). Energize the Aircraft Electrical Circuits from Engine 1(2)
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from the External
Power
(Ref. 24-41-00-862-002-A-01). De-energize the Aircraft Electrical Circuits Supplied from the APU
(Ref. 24-41-00-862-002-A-02). De-energize the Aircraft Electrical Circuits Supplied from the Engine
1(2)
(Ref. 31-32-00-860-006-A). Procedure to Get Access to the SYSTEM REPORT/TEST F/CTL Page
(Ref. 34-10-00-860-004-A). IR Alignment Procedure
** ON A/C 027-100, 103-109, 111-150, 208-208, 212-214, 219-220, 223-226, 301-349, 351-450
(Ref. 34-10-00-860-004-A-01). Automatic IR Alignment Procedure
** ON A/C ALL
(Ref. 34-10-00-860-004-A-02). IR Alignment Procedure to do a Check of the Links between each
FMGC and the three Air Data/Inertial Reference Units (ADIRUs)
(Ref. 34-10-00-860-005-A). ADIRS Stop Procedure
3. Job Set-up
Subtask 27-96-00-860-087-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002) .
(2) Do the IR Alignment Procedure (Ref. AMM TASK 34-10-00-860-004) .
** ON A/C 401-450
49VU FLIGHT CONTROLS/ELAC1/NORM/ 15CE1 B06
SPLY
49VU FLIGHT CONTROLS/FCDC1/SPLY 20CE1 B05
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B03
** ON A/C ALL
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02
105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01
105VU FLT CTL/SEC1/STBY SPLY 22CE B01
121VU FLIGHT CONTROLS/FCDC2/SPLY 20CE2 Q20
121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19
121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/ 15CE2 R20
SPLY
** ON A/C 401-450
121VU CFDS/CFDIU/SPLY 2TW J41
121VU CFDS/CFDIU/BACK/UP 8TW J40
** ON A/C ALL
4. Procedure
NOTE: During the test, the ECAM display unit shows the FAULT of the FCDC 1 or the FCDC2. Ignore this in-
dication.
Subtask 27-96-00-740-050-C
A. Do this test:
ACTION RESULT
1.Push the line key adjacent to the EFCS 1(2). The EFCS1(2) page comes into view.
2.Push the line key adjacent to the GROUND SCAN The EFCS1(2)/GROUND SCAN page comes into
indication. view.
3.Push the line key adjacent to the START
GROUND SCAN indication.
4.After two minutes, push the line key adjacent to
the GROUND SCAN STOP indication.
5.Push the line key adjacent to the GROUND RE- NO FAULTS RECORDED comes into view.
PORT indication.
6.On the MCDU, push the line select key adjacent The MCDU shows the CFDS menu page.
to the RETURN indication until the CFDS menu
page comes into view.
5. Close-up
Subtask 27-96-00-410-051-A
A. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
** ON A/C 022-022, 024-100, 103-109, 111-150, 208-208, 212-214, 223-225, 301-349, 351-450
Subtask 27-96-00-860-088-B
B. Put the aircraft back to its initial configuration.
(1) On the overhead panel 41VU, on the ADIRS MSU:
· Set the 3 OFF/NAV/ATT selector switches to OFF (Ref. AMM TASK 34-10-00-860-005) .
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002) .
End of document