Sunteți pe pagina 1din 1

HACIA EL DESAGUE

TUBERIA DE 4"
S= 1.5 %
PLANTA DE CANCHA DEPORTIVA
ESCALA: 1 / 125

PLANTA DE CANCHA DEPORTIVA


ESCALA: 1 / 125

36.35
CAJA DE REGISTRO CAJA DE REGISTRO CAJA DE REGISTRO CAJA DE REGISTRO
DE CONCRETO 24" X 24": DE CONCRETO 24" X 24": DE CONCRETO 24" X 24": DE CONCRETO 24" X 24": 2.97 2.97 2.97 2.97 3.85 3.93 3.84 2.97 2.97 2.97 2.97
N.T. 0.00 M. N.T. 0.00 M. N.T. 0.00 M. N.T. 0.00 M. 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
DESARENADOR DESARENADOR
NF= -0.60 M. NF= -0.73 M. NF= -0.86 M. NF= -0.73 M.

S= 1.5 % S= 1.5 % S= 1.5 % 0.30


TUBERIA PVC SAL DE 4" TUBERIA PVC SAL DE 4" TUBERIA PVC SAL DE 4" 0.82 0.82 0.85
3.07
L= 9.30M L= 9.30M L= 9.30M 0.85 1.06
0.75 0.75 0.75 0.75 0.75 0.75
2.38 1.16 2.38 0.85

A 0.40
0.85 CAMERINO I 3.59 3.18 CAMERINO II 0.40 A
0.40 0.41
LINEA DE DEMARCACION DE LA CANCHA LINEA DE DEMARCACION DE LA CANCHA
2.97 2.97 2.97 3.59 3.22 3.22 2.97 2.97 3.59 2.98
1.71 1.71
S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 %
L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M LINEA DE DEMARCACION DE LA CANCHA LINEA DE DEMARCACION DE LA CANCHA

DEMARCACION DE CANCHA

DEMARCACION DE CANCHA
4.17 3.77 3.77 4.17

4.00 4.85 4.85 4.85 4.85 4.85 4.85 4.00

DEMARCACION DE CANCHA

DEMARCACION DE CANCHA
B 0.40 0.40 B

S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 %


L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M

4.17 3.77 3.77 4.17


TUBERIA DE 3" CRIBADA

TUBERIA DE 3" CRIBADA

TUBERIA DE 3" CRIBADA

TUBERIA DE 3" CRIBADA


EJE DE CAMBIO DE PENDIENTE

EJE DE CAMBIO DE PENDIENTE

EJE DE CAMBIO DE PENDIENTE


C 0.40 0.40 C
L= 30.00M

L= 30.00M

L= 30.00M

L= 30.00M
S= 1.5 %

S= 1.5 %

S= 1.5 %

S= 1.5 %

PORTERIA DE FUTBOL

PORTERIA DE FUTBOL
23.15

CANCHA DE CESPED
21.25 4.17 3.77 SINTETICO 3.77 4.17 21.25
20.65

D 0.40 0.40 D

S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 %


L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M

DEMARCACION DE CANCHA

DEMARCACION DE CANCHA
REVISIONES:
DEMARCACION DE CANCHA

DEMARCACION DE CANCHA
4.17 3.77 3.77 4.17

4.00 4.85 4.85 4.85 4.85 4.85 4.85 4.00

E 0.40 0.40 E

LINEA DE DEMARCACION DE LA CANCHA LINEA DE DEMARCACION DE LA CANCHA

S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % S= 1.00 % 4.17 3.77 3.77 4.17
L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M L= 4.45M LINEA DE DEMARCACION DE LA CANCHA LINEA DE DEMARCACION DE LA CANCHA
0.40

TRIBUNA PARA ESPECTADORES TRIBUNA PARA ESPECTADORES

SARDINEL PERDIDO PARA EVACUACION DE AGUAS PLUVIALES


F 0.40 0.40 F

38.40
0.40 3.61 0.40 3.61 0.40 3.61 0.40 3.61 0.40 3.61 0.40 3.61 0.40 3.61 0.40 3.61 0.40 3.61 0.40
PLANTA DE SISTEMA DE DRENAJE
ESCALA: 1 / 125 4.01 4.01 4.01 4.01 4.01 4.01 4.01 4.01 4.01
1 2 3 4 5 6 7 8 9 10
36.50

6.08

0.50 5.58 0.50

COBERTURA:
B POLICARBONATO MACIZO E= 8 MM
TRANSPARENTE INC/ ACCESORIOS
0.50 DE FIJACION
6.00 0.45 2.61 0.45

DADO DE CONCRETO: TRANSVERSAL: CORREAS:


F'C: 175 KG/CM2 TUBO F° G° Ø 2 1/2" TUBO F° G° Ø 1 1/2"
DADO DE CONCRETO:
F'C: 175 KG/CM2
0.45 1 F
0.4
0.4
DADO DE CONCRETO: DADO DE CONCRETO:
0
0
F'C= 140 KG/CM2 F'C= 140 KG/CM2
PARANTE: 4.0 4.1
1.23 TUBO F° G° Ø 2 1/2" 1 7
PROYECCION DE 1
3.6 3.7
7
PORTERIA DE FUTBOL
2 E
0.75 BANCA DE MADERA 0.4 0.4 0.4
0 0 0
BANCA DE MADERA:

A
A MADERA AGUANO 2" X 10" X 10'
1
4.0
3.6 3.7
7
4.1
1 7
DADO DE CONCRETO: DE
F'C: 175 KG/CM2 3 M AR D
0.50 0.45 DADO DE CONCRETO: 0.4 CA
0 CIO 0.4
21.2
F'C: 175 KG/CM2 N
0
DE
5
PLANTA DE PORTERIA B 1
4.0 LIN CA 4.1
ESC : 1 / 50
3.6 TR EA NC 7
DADO DE CONCRETO: 1 IBU DE HA 3.7
7
F'C: 175 KG/CM2 NA DE
PLANTA DE BANCA DE SUPLENTES
4 PA MA
PORTERIA: 0.4 RA RC C
AC
TUBO F° G° Ø 3" ESC : 1 / 50 0 ES
ION 0.4
CT
PE PO 0
6.15 AD DE RT
ER
4.0 LA
1 OR
0.075 6.00 0.075
3.6 CA IA 4.1
1 S E N DE 3.7
7
CH FU 7
0.08
5 A TB
SECCION TRANVERSAL 0
0.4
OL
B
ESC : 1 / 50 36.5
0
0.4
0
TRANSVERSAL: TRANSVERSAL: 4.0
DE
1 0.0
TUBO F° G° Ø 2 1/2" TUBO F° G° Ø 2 1/2" 1
3.6
MA 7
4.1 0
R CA 7
3.7
PORTERIA:
6 CIO
0.4 N
TUBO F° G° Ø 3" PORTERIA: 0 DE A
TUBO F° G° Ø 3" CA
NC
0.4
PORTERIA: 0
COBERTURA:
4.0 H A
MALLA DE 10 X 10 CM PARANTE:
1
3.6
POLICARBONATO MACIZO E= 8 MM 1
TUBO F° G° Ø 2 1/2"
TRANSPARENTE INC/ ACCESORIOS
2.00 7
DE FIJACION 2.9
7
0.4 0.8
0 5
BANCA DE MADERA: 4.0 0.8
2.3 5
REFUERZO: MADERA AGUANO 2" X 10" X 10'
1 3.6 8 0.7 0.3
1 0
TUBO F° G° Ø 2 1/2" TR 2.9
7 0.4
5
IBU 0 0.7
8 NA LIN 5
2.9
0.7
1.50 MAXIMO 0
0.4
RA
PA
CA EA
CA 5 7
DE
ES NC SIN DE 0.3
1
4.0 CT
PE
HA TE MA
R 7
2.9
ER M 1.0
6
0
3.6 AD LIN CA
1 RE O
DE
EA DE TIC ND
CIO IN 3.0 2.9
DADO DE CONCRETO: DADO DE CONCRETO: AREA DE ESQUINA S
DE CE O O 7 7
9 MA LA E
F'C: 175 KG/CM2 F'C: 175 KG/CM2 0.4 R SP CA I 0.3
ELEVACION DE PORTERIA 0 CA NC 0
CIO D E HA 3.5
9
ND 0.3
ESC : 1 / 50 LINEA DE BANDA 1
4.0 EL 3.5
0
2.9
3.6 CA A 9 7
1
1.00 NC 0.3
10 HA 0
0.4 3.2
SECCION FRONTAL 0.10
0 2
3.1 7
2.9
ESC : 1 / 50 8
0.3
0
PORTERIA: 0.4 1.7 1.1
1 6
TUBO F° G° Ø 3" 0.10 0 DE
6.15 F M AR
0.08
3.8
6.00 0.50 CA 1.7 0.8 5
0.075 0.075 3.7 CIO 1 2
7 N
4.1 DE 0.3
0.08
7 CA 0
PORTERIA: N
TUBO F° G° Ø 3" PORTERIA:
PORTERIA:
TUBO F° G° Ø 3"
AREA DE ESQUINA, 0
0.4 CH
A
2
3.2 0.8
TUBO F° G° Ø 3"
BANDEROLA Y E 2
3
3.9
36.3
5
3.7 PO
RT
7 0.3
ER
4.1 0
ESC : 1 / 50 7
IA 2.9
DE
7

0.37 D
0
0.4 FU
TB
O L EA
LIN
4
3.8
2.45 DE
DE 2.9 NOTAS:
PORTERIA: 2.08 3.7 MA 7 0
0.3
2.00 MALLA DE 10 X 10 CM 4.1
7 CA R CA
7 DE CIO
21.2 M AR ND ME 2.9
PORTERIA: 5 0.4 CA EL
RI 7
0 CIO AC
MALLA DE C N NC A NO 0.3
10 X 10 CM DE HA
3.5
9 0
CA II
3.7 N CH 0.4
A
7 1 2.9
4.1 0.7 7
7
5 PROYECTO:
0.7 0.3
0.45
0.4 2.9 5 0
0 2
BANCA DE CONCRETO: B
8 0.7 .38
F'C: 140 KG/CM2 0.15
RELLENO APISONADO RELLENO APISONADO
5
0.8 2.9
7
0.05 5
0.35
0.45 0.45
3.7
7 0.8 0.3
DADO DE CONCRETO: DADO DE CONCRETO: 0.40 DADO DE CONCRETO: 0.20
7
4.1 5 0
0.50 F'C: 175 KG/CM2 F'C: 175 KG/CM2 F'C: 175 KG/CM2 0.50 SARDINEL PERDIDO: 0.10
0.05 F'C: 140 KG/CM2

5 metros 5.04
RELLENO APISONADO
0.4 2.9
0.20
0 7
0.10 0.10 0.25 0.10
A
0.3
0
SECCION A - A DE PORTERIA SECCION B - B
ESC : 1 / 50
ESC : 1 / 50

ESC: 1 / 25 PLANO:

PROYECTISTA:

CESPED SINTETICO CESPED SINTETICO


0.10 0.10
0.10 RELLENO CON MAT. SELECCIONADO
0.20 RELLENO CON MAT. SELECCIONADO
RELLENO CON GRAVA
0.15
H %= 20 CM.
RELLENO CON GRAVA Pdte= 1% Pdte= 1%
0.20 0.15
H %= 20 CM.
CADISTA:
Pdte= 1% Pdte= 1%
0.30
0.35

0.30
DETALLE DE DRENAJE 02
0.30 ESC: 1 / 25
DETALLE DE DRENAJE 01
ESC: 1 / 25

ESCALA: PLANCHA No

FECHA:

S-ar putea să vă placă și