Documente Academic
Documente Profesional
Documente Cultură
140 in Dia
Vessel № test
Depth of lean mix to Safe Bearing, for the full excaveded oversized plan area.
6 in
Grd Lvl
Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
4 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
59
1 285 461.4
40 60
7.2
2 79
79
26
3 4.2 233
17 %
item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT
NOTE:
Z dir foundations Dims Assumptions, Min 4000 psi Concrete, 60000 psi
Plinth by 36 in Re-bar, 2.5 in cover; on rock or equivalent, providing
Base by 36 in Min Safe Bearing of 2000 psf and a max plinth ht
of 12 in above ground. Pump Max Wt, N/A lbs.
Grd Lvl
46 in 45 º
angle of excavation
Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
2 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
4.1
1 323 106.7
19 81
3.4
2 13.4
55
10.2
3 3 167
20 %
item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT
31 in
Stool ht above Grd lvl
12 in Grd slab thk'ness
6 in
200 in
Grd Lvl
36 in 65 º
angle of excavation
Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
4 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
76.4
1 519 500
54 46
10.5
2 96.6
96
30.6
3 5.4 298
18 %
item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1