Sunteți pe pagina 1din 6

CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Horizontal Vessel Foundation Quantities Estimate 21/07/2008 PR
Does not cover DRAINAGE!!
12 ft

140 in Dia
Vessel № test

THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL

plinth above Grd lvl


140 in 12 in
Grd slab thk'ness
6 in 39 in

36 in oversize for formwork


plinth below Grd 12 in 12 in

Z dir foundations Dims


Plinth by 50 in
36 in Base by 50 in 60 º

NOTE:- Excavations will merge, 60 in angle of excavation


Value's calculated for 1 large
4 in excavation, Consider a tied foundation!

Depth of lean mix to Safe Bearing, for the full excaveded oversized plan area.

NOTE: Note: Plinth/ pedestal


Assumptions, Min 4000 psi Concrete, 60000 psi may be the same size
Re-bar, 2.5 in cover; on rock or equivalent, providing as the base, eg if in rock!
Min Safe Bearing of 1000 psf and a max peir ht
of 48 in. Vessel Max Wt, 6000 lbs , Vessel Min Wt
5555 lbs and 7777 kip-ft Max Bending Moment.
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
7.3
1 612 221.4
17 83
5.8
2 43.4
76
36.5
3 5.7 315
11 %
item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Vertical Vessel Foundation Quantities Estimate 21/07/2008 PR
Does not cover DRAINAGE!!
NOTE:
Assumptions, Min 4000 psi Concrete, 60000 psi
Re-bar, 2.5 in cover; on rock or equivalent, providing
140 Min Safe Bearing of 1000 psf and a max plinth ht
in Dia of 48 in. Vessel Max Wt, 6000 lbs , Vessel Min Wt
5555 lbs and 7777 kip-ft Max Bending Moment.
Vessel №
test
NOTE THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL
Ves Ht 170 ft

6 in

plinth above Grd lvl


Sk/Ht 8 ft 12 in Grd slab thk'ness
6 in

Grd Lvl

plinth below Grd


36 in
152 in oversize for formwork
12 in
Z dir foundations Dims
36 in Plinth by 152 in 85 º
Base by 200 in angle of excavation

200 in Note: Plinth/ pedestal


may be the same size
as the base.

Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
4 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
59
1 285 461.4
40 60
7.2
2 79
79
26
3 4.2 233
17 %

item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Pump Foundation Quantities Estimate 23/6/2009 PR 1
Does not cover DRAINAGE!!

NOTE:
Z dir foundations Dims Assumptions, Min 4000 psi Concrete, 60000 psi
Plinth by 36 in Re-bar, 2.5 in cover; on rock or equivalent, providing
Base by 36 in Min Safe Bearing of 2000 psf and a max plinth ht
of 12 in above ground. Pump Max Wt, N/A lbs.

NOTE THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL


Pump №
P-203X A/B
Pump Size 40 in
length 20 in
width 20 in
plinth above Grd lvl
12 in Grd slab thk'ness
6 in

Grd Lvl

plinth below Grd


0 in
oversize for formwork
84 in 12 in

46 in 45 º
angle of excavation

84 in Note: Plinth/ pedestal


may be the same size
as the base.

Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
2 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
4.1
1 323 106.7
19 81
3.4
2 13.4
55
10.2
3 3 167
20 %

item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Column Foundation Quantities Estimate 21/07/2008 PR
Does not cover DRAINAGE!!
NOTE:
Assumptions, Min 4000 psi Concrete, 60000 psi
Re-bar, 2.5 in cover; on rock or equivalent, providing
Min Safe Bearing of 1000 psf and a max Stool ht
of 48 in. Max Axial load, 6000 lbs , Min Axial Load
5500 lbs and 7777 kip-ft, Max column Bending Moment.
Column on Grid
12-f
NOTE THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL

Z dir foundations Dims


Plinth by 200 in W 14 x 132
Base by 200 in

31 in
Stool ht above Grd lvl
12 in Grd slab thk'ness
6 in
200 in
Grd Lvl

plinth below Grd


36 in
oversize for formwork
12 in

36 in 65 º
angle of excavation

200 in Note: Plinth/ pedestal


may be the same size
as the base.

Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
4 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
76.4
1 519 500
54 46
10.5
2 96.6
96
30.6
3 5.4 298
18 %

item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1