Item No Particulars of items and Details of works

1 Exavation of lsolated & combine Footing in Black cotton soil or expensive soil

foundation F1
Foundation F2
Foundation F3
Foundation F4

2 laying of Lime Concrete


foundation F1
Foundation F2
Foundation F3
Foundation F4

3 Supplying Materials for Lime Concrete with ratio 1:2:4


foundation F1
Foundation F2
Foundation F3
Foundation F4

4 Supplying Materials for Lime Concrete with ratio 1:2:4


Cement

Kanjar Sand
Aggregates

3 Cost of filling excavated foundation with rocks and


sand filling in two layer not exceed 35cm in depth

a) Short wall foundation


1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing

b) Long wall foundation

1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
The excavation of Fourth Ty

Type No Length Breadth Depth & Thickness QTY

pensive soil

F1 9.00 2.20 2.20 3.00 14.52


F2 2.00 2.40 2.60 3.00 18.72
F3 2.00 2.50 4.50 3.00 33.75
F4 1.00 2.50 8.90 3.00 66.75

F1 9.00 2.20 2.20 0.15 0.73


F2 2.00 2.40 2.60 0.15 0.94
F3 2.00 2.50 4.50 0.15 1.69
F4 1.00 2.50 8.90 0.15 3.34

F1 9.00 2.20 2.20 0.15 0.73


F2 2.00 2.40 2.60 0.15 0.94
F3 2.00 2.50 4.50 0.15 1.69
F4 1.00 2.50 8.90 0.15 3.34
36.00 36.00

2.00 4.00 0.55 0.80 8.00 8.00


2.00 2.50 0.55 0.80 5.00 5.00
2.00 3.00 0.55 0.80 6.00 6.00
1.00 2.00 0.55 0.80 2.00 2.00
1.00 2.50 0.55 0.80 2.50 2.50
1.00 3.00 0.55 0.80 3.00 3.00
2.00 4.00 0.55 0.80 8.00 8.00
2.00 4.00 0.55 0.80 8.00 8.00
2.00 4.00 0.55 0.80 8.00 8.00
2.00 2.00 0.55 0.80 4.00 4.00

2.00 7.00 0.55 0.80 14.00 14.00


1.00 2.00 0.55 0.80 2.00 2.00
1.00 4.00 0.55 0.80 4.00 4.00
1.00 4.00 0.55 0.80 4.00 4.00
1.00 4.00 0.55 0.80 4.00 4.00
1.00 4.00 0.55 0.80 4.00 4.00
2.00 4.00 0.55 0.80 8.00 8.00
2.00 2.00 0.55 0.80 4.00 4.00
1.00 4.00 0.55 0.80 4.00 4.00
of Fourth Types of Foundation

Total QTy Rate SP Rate Per Amount total Amount SP

130.68 70, 150, 150 Cu -m 1790.80 16117.20


37.44 70, 150, 150 Cu-m 2308.80 4617.60
67.50 70, 150, 150 Cu-m 4162.50 8325.00
66.75 70, 150, 150 Cu-m 8232.50 8232.50

6.53 350.00 Cu - m 254.10 2286.90


1.87 300.00 Cu -m 280.80 561.60
3.38 300.00 Cu -m 506.25 1012.50
3.34 300.00 Cu -m 1001.25 1001.25

1.20
1.55
2.79
5.51
Cu-M 80.00 Cu-M 2880.00 2880.00

L-M 30.00 L-M 240.00


L-M 30.00 L-M 150.00
L-M 30.00 L-M 180.00
L-M 30.00 L-M 60.00
L-M 30.00 L-M 75.00
L-M 30.00 L-M 90.00
L-M 30.00 L-M 240.00
L-M 30.00 L-M 240.00
L-M 30.00 L-M 240.00
L-M 30.00 L-M 120.00
1635.00

L-M 30.00 L-M 420.00


L-M 30.00 L-M 60.00
L-M 30.00 L-M 120.00
L-M 30.00 L-M 120.00
L-M 30.00 L-M 120.00
L-M 30.00 L-M 120.00
L-M 30.00 L-M 240.00
L-M 30.00 L-M 120.00
L-M 30.00 L-M 120.00 1440.00
Explanatory Notes

any changing in price should be taken into consideration

The total cost of digging foundation is approximately

37292.30

any changing in price should be taken into consideration

The total cost of laying Lime Concrete is approximately

4862.25
The cost of stiffense sand for
guping is

2880.00

the ost of filling the dug with roks

the ost of filling the dug with roks

3075.00
The total cost of this stage is

5955.00
Bricks work in foundation with lime mortar and Supply

Item No Particulars of items and Details of works No Length

1 Cost of Labours for Bricks work for load bearing foundation

a) Short wall foundation

1- Sitting Room 2.00 4.00

2- Familiy hall 2.00 2.50

3- Familily hall 2.00 3.00

4- Familiy hall 1.00 2.00

5- Kitchen 1.00 2.50

6- Bedroom (1) 1.00 3.00

7- Bedroom (2) 2.00 4.00

8- Bedroom (3) 2.00 4.00

9- Bedroom (4) 2.00 4.00

10- Stairing 2.00 2.00


b) Long wall foundation

1- Sitting Room 2.00 7.00

2- Familiy hall 1.00 2.00

3- Kitchen 1.00 4.00

4- Bedroom (1) 1.00 4.00

5- Bedroom (2) 1.00 4.00

6- Bedroom (3) 1.00 4.00

7- Bedroom (4) 2.00 4.00

8- WC 2.00 2.00

9- Stairing 1.00 4.00

2 Supplying Materials for bricks work foundation

1- Supplying Bricks for short walls foundation

a) Short wall foundation


1- Sitting Room 2.00 4.00

2- Familiy hall 2.00 2.50

3- Familily hall 2.00 3.00

4- Familiy hall 1.00 2.00

5- Kitchen 1.00 2.50

6- Bedroom (1) 1.00 3.00

7- Bedroom (2) 2.00 4.00

8- Bedroom (3) 2.00 4.00

9- Bedroom (4) 2.00 4.00

10- Stairing 2.00 2.00

b) Long wall foundation

1- Sitting Room 2.00 7.00

2- Familiy hall 1.00 2.00

3- Kitchen 1.00 4.00

4- Bedroom (1) 1.00 4.00

5- Bedroom (2) 1.00 4.00

6- Bedroom (3) 1.00 4.00


7- Bedroom (4) 2.00 4.00

8- WC 2.00 2.00

9- Stairing 1.00 4.00

3 Supplying Cement for mortar with ratio 1 : 6

a) Short wall foundation

1- Sitting Room 2.00 4.00

2- Familiy hall 2.00 2.50

3- Familily hall 2.00 3.00

4- Familiy hall 1.00 2.00

5- Kitchen 1.00 2.50

6- Bedroom (1) 1.00 3.00

7- Bedroom (2) 2.00 4.00

8- Bedroom (3) 2.00 4.00

9- Bedroom (4) 2.00 4.00

10- Stairing 2.00 2.00


b) Long wall foundation

1- Sitting Room 2.00 7.00

2- Familiy hall 1.00 2.00

3- Kitchen 1.00 4.00

4- Bedroom (1) 1.00 4.00

5- Bedroom (2) 1.00 4.00

6- Bedroom (3) 1.00 4.00

7- Bedroom (4) 2.00 4.00

8- WC 2.00 2.00

9- Stairing 1.00 4.00

4 Supplying mortar Sand for short wall foundation

a) Short wall foundation

1- Sitting Room 2.00 4.00

2- Familiy hall 2.00 2.50


3- Familily hall 2.00 3.00

4- Familiy hall 1.00 2.00

5- Kitchen 1.00 2.50

6- Bedroom (1) 1.00 3.00

7- Bedroom (2) 2.00 4.00

8- Bedroom (3) 2.00 4.00

9- Bedroom (4) 2.00 4.00

10- Stairing 2.00 2.00

b) Long wall foundation

1- Sitting Room 2.00 7.00

2- Familiy hall 1.00 2.00

3- Kitchen 1.00 4.00

4- Bedroom (1) 1.00 4.00

5- Bedroom (2) 1.00 4.00

6- Bedroom (3) 1.00 4.00

7- Bedroom (4) 2.00 4.00

8- WC 2.00 2.00
9- Stairing 1.00 4.00
mortar and Supplying Materials for Load Bearing Foundation

Breadth Heigh Qty Total Qty Unit Rate SP Rate Per Amount

0.45 0.50 8.00 8.00 Sq-M 80.00 Sq-M 640.00

0.45 0.50 5.00 5.00 Sq-M 80.00 Sq-M 400.00

0.45 0.50 6.00 6.00 Sq-M 80.00 Sq-M 480.00

0.45 0.50 2.00 2.00 Sq-M 80.00 Sq-M 160.00

0.45 0.50 2.50 2.50 Sq-M 80.00 Sq-M 200.00

0.45 0.50 3.00 3.00 Sq-M 80.00 Sq-M 240.00

0.45 0.50 8.00 8.00 Sq-M 80.00 Sq-M 640.00

0.45 0.50 8.00 8.00 Sq-M 80.00 Sq-M 640.00

0.45 0.50 8.00 8.00 Sq-M 80.00 Sq-M 640.00

0.45 0.50 4.00 4.00 Sq-M 80.00 Sq-M 320.00


0.45 0.50 14.00 14.00 Sq-M 80.00 Sq-M 1120.00

0.45 0.50 2.00 2.00 Sq-M 80.00 Sq-M 160.00

0.45 0.50 4.00 4.00 Sq-M 80.00 Sq-M 320.00

0.45 0.50 4.00 4.00 Sq-M 80.00 Sq-M 320.00

0.45 0.50 4.00 4.00 Sq-M 80.00 Sq-M 320.00

0.45 0.50 4.00 4.00 Sq-M 80.00 Sq-M 320.00

0.45 0.50 8.00 8.00 Sq-M 80.00 Sq-M 640.00

0.45 0.50 4.00 4.00 Sq-M 80.00 Sq-M 320.00

0.45 0.50 4.00 4.00 Sq-M 80.00 Sq-M 320.00


0.45 0.50 4.00 1800.00 no 0.83 L-M 1494.00

0.45 0.50 2.50 1125.00 no 0.83 L-M 933.75

0.45 0.50 3.00 1350.00 no 0.83 L-M 1120.50

0.45 0.50 1.00 450.00 no 0.83 L-M 373.50

0.45 0.50 1.25 562.50 no 0.83 L-M 466.88

0.45 0.50 1.50 675.00 no 0.83 L-M 560.25

0.45 0.50 4.00 1800.00 no 0.83 L-M 1494.00

0.45 0.50 4.00 1800.00 no 0.83 L-M 1494.00

0.45 0.50 4.00 1800.00 no 0.83 L-M 1494.00

0.45 0.50 2.00 900.00 no 0.83 L-M 747.00

0.45 0.50 7.00 3150.00 no 0.83 L-M 2614.50

0.45 0.50 1.00 450.00 no 0.83 L-M 373.50

0.45 0.50 2.00 900.00 no 0.83 L-M 747.00

0.45 0.50 2.00 900.00 no 0.83 L-M 747.00

0.45 0.50 2.00 900.00 no 0.83 L-M 747.00

0.45 0.50 2.00 900.00 no 0.83 L-M 747.00


0.45 0.50 4.00 1800.00 no 0.83 L-M 1494.00

0.45 0.50 2.00 900.00 no 0.83 L-M 747.00

0.45 0.50 2.00 900.00 no 0.83 L-M 747.00

0.45 0.50 1.80 4.68 kg 100.00 bag 468.00

0.45 0.50 1.13 2.93 kg 100.00 bag 292.50

0.45 0.50 1.35 3.51 kg 100.00 bag 351.00

0.45 0.50 0.45 1.17 kg 100.00 bag 117.00

0.45 0.50 0.56 1.46 kg 100.00 bag 146.25

0.45 0.50 0.68 1.76 kg 100.00 bag 175.50

0.45 0.50 1.80 4.68 kg 100.00 bag 468.00

0.45 0.50 1.80 4.68 kg 100.00 bag 468.00

0.45 0.50 1.80 4.68 kg 100.00 bag 468.00

0.45 0.50 0.90 2.34 kg 100.00 bag 234.00


0.45 0.50 3.15 8.19 kg 100.00 bag 819.00

0.45 0.50 0.45 1.17 kg 100.00 bag 117.00

0.45 0.50 0.90 2.34 kg 100.00 bag 234.00

0.45 0.50 0.90 2.34 kg 100.00 bag 234.00

0.45 0.50 0.90 2.34 kg 100.00 bag 234.00

0.45 0.50 0.90 2.34 kg 100.00 bag 234.00

0.45 0.50 1.80 4.68 kg 100.00 bag 468.00

0.45 0.50 0.90 2.34 kg 100.00 bag 234.00

0.45 0.50 0.90 2.34 kg 100.00 bag 234.00

0.45 0.50 1.80 3.78 cu-m 115.00 cu-m 434.70

0.45 0.50 1.13 2.36 cu-m 115.00 cu-m 271.69


0.45 0.50 1.35 2.84 cu-m 115.00 cu-m 326.03

0.45 0.50 0.45 0.95 cu-m 115.00 cu-m 108.68

0.45 0.50 0.56 1.18 cu-m 115.00 cu-m 135.84

0.45 0.50 0.68 1.42 cu-m 115.00 cu-m 163.01

0.45 0.50 1.80 3.78 cu-m 115.00 cu-m 434.70

0.45 0.50 1.80 3.78 cu-m 115.00 cu-m 434.70

0.45 0.50 1.80 3.78 cu-m 115.00 cu-m 434.70

0.45 0.50 0.90 1.89 cu-m 115.00 cu-m 217.35

0.45 0.50 3.15 6.62 cu-m 115.00 cu-m 760.73

0.45 0.50 0.45 0.95 cu-m 115.00 cu-m 108.68

0.45 0.50 0.90 1.89 cu-m 115.00 cu-m 217.35

0.45 0.50 0.90 1.89 cu-m 115.00 cu-m 217.35

0.45 0.50 0.90 1.89 cu-m 115.00 cu-m 217.35

0.45 0.50 0.90 1.89 cu-m 115.00 cu-m 217.35

0.45 0.50 1.80 3.78 cu-m 115.00 cu-m 434.70

0.45 0.50 0.90 1.89 cu-m 115.00 cu-m 217.35


0.45 0.50 0.90 1.89 cu-m 115.00 cu-m 217.35
total Amount SP Explanatory Notes
4360.00

the total cost for Bricks work in

3840.00 load bearing foundation is

8200.00
10177.88
the cost of supplying Bricks for short

foundation is

8964.00

19141.88
3188.25

the cost of Cement for mortar is

2808.00 5996.25
2961.39

the cost for mortar sand or clean sand


2608.20 5569.59
Item No

1
2
3
4
5
6
7
Particulars of items and Details of works

The Cost of Supplying Steel Bar for Grid Beams

a) Short wall foundation

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing
b) Long wall foundation

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

The cost of supplying coars Aggergates for Grid Beam

1- Supplying coarse Aggergates for Grid Beams with ration mix 1:2:4

a) Short grid beams


1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long grid beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)
7- Bedroom (4)

8- WC

9- Stairing

The cost of supplying concrete sand for Grid Beam

1- Supplying concrete sand for Grid Beams with ration mix 1:2:4

a) Short grid beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)
7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long grid beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing
The cost of supplying cement for Grid Beam

1- Supplying cement for Grid Beams with ration mix 1:2:4

a) Short grid beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long grid beam

1- Sitting Room
2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

The cost of supplying Stirrups bars 6mm for Grid Beam

The cost of supplying Stirrups bars 6mm for Grid Beam

a) Short grid beams


1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long grid beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)
7- Bedroom (4)

8- WC

9- Stairing

The cost of supplying Binding wire

1- Supplying binding wire

a) Short grid beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)
9- Bedroom (4)

10- Stairing

b) Long grid beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing
The cost of RCC work 1:2:4 excluding steel and its bending & including

Centering and shultering and binding of steel & cast of fresh concrete

1- Supplying binding wire

a) Short grid beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long grid beam

1- Sitting Room
2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing
Grid Beams work and Supplying Materials for Grid Beams

No Length Breadth Heigh Qty Total Qty Unit # Steel Bar

2.00 4.00 0.35 0.40 8.00 8.00 no 6.00

2.00 2.50 0.35 0.40 5.00 5.00 no 6.00

2.00 3.00 0.35 0.40 6.00 6.00 no 6.00

1.00 2.00 0.35 0.40 2.00 2.00 no 6.00

1.00 2.50 0.35 0.40 2.50 2.50 no 6.00

1.00 3.00 0.35 0.40 3.00 3.00 no 6.00

2.00 4.00 0.35 0.40 8.00 8.00 no 6.00

2.00 4.00 0.35 0.40 8.00 8.00 no 6.00

2.00 4.00 0.35 0.40 8.00 8.00 no 6.00

2.00 2.00 0.35 0.40 4.00 4.00 no 6.00


2.00 7.00 0.35 0.40 14.00 14.00 no 6.00

1.00 2.00 0.35 0.40 2.00 2.00 no 6.00

1.00 4.00 0.35 0.40 4.00 4.00 no 6.00

1.00 4.00 0.35 0.40 4.00 4.00 no 6.00

1.00 4.00 0.35 0.40 4.00 4.00 no 6.00

1.00 4.00 0.35 0.40 4.00 4.00 no 6.00

2.00 4.00 0.35 0.40 8.00 8.00 no 6.00

2.00 2.00 0.35 0.40 4.00 4.00 no 6.00

1.00 4.00 0.35 0.40 4.00 4.00 no 6.00


2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.50 0.35 0.40 0.77 0.17 cu-m

2.00 3.00 0.35 0.40 0.92 0.20 cu-m

1.00 2.00 0.35 0.40 0.31 0.07 cu-m

1.00 2.50 0.35 0.40 0.39 0.08 cu-m

1.00 3.00 0.35 0.40 0.46 0.10 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.00 0.35 0.40 0.62 0.13 cu-m

2.00 7.00 0.35 0.40 2.16 0.46 cu-m

1.00 2.00 0.35 0.40 0.31 0.07 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m


2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.50 0.35 0.40 0.77 0.17 cu-m

2.00 3.00 0.35 0.40 0.92 0.20 cu-m

1.00 2.00 0.35 0.40 0.31 0.07 cu-m

1.00 2.50 0.35 0.40 0.39 0.08 cu-m

1.00 3.00 0.35 0.40 0.46 0.10 cu-m


2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.00 0.35 0.40 0.62 0.13 cu-m

2.00 7.00 0.35 0.40 2.16 0.46 cu-m

1.00 2.00 0.35 0.40 0.31 0.07 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m


2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.50 0.35 0.40 0.77 0.17 cu-m

2.00 3.00 0.35 0.40 0.92 0.20 cu-m

1.00 2.00 0.35 0.40 0.31 0.07 cu-m

1.00 2.50 0.35 0.40 0.39 0.08 cu-m

1.00 3.00 0.35 0.40 0.46 0.10 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.00 0.35 0.40 0.62 0.13 cu-m

2.00 7.00 0.35 0.40 2.16 0.46 cu-m


1.00 2.00 0.35 0.40 0.31 0.07 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m

2.00 4.00 0.35 0.40 1.23 0.26 cu-m

2.00 2.00 0.35 0.40 0.62 0.13 cu-m

1.00 4.00 0.35 0.40 0.62 0.13 cu-m


2.00 4.00 0.35 0.40 8.00 47.06 no 9.41

2.00 2.50 0.35 0.40 5.00 29.41 no 5.88

2.00 3.00 0.35 0.40 6.00 35.29 no 7.06

1.00 2.00 0.35 0.40 2.00 11.76 no 2.35

1.00 2.50 0.35 0.40 2.50 14.71 no 2.94

1.00 3.00 0.35 0.40 3.00 17.65 no 3.53

2.00 4.00 0.35 0.40 8.00 47.06 no 9.41

2.00 4.00 0.35 0.40 8.00 47.06 no 9.41

2.00 4.00 0.35 0.40 8.00 47.06 no 9.41

2.00 2.00 0.35 0.40 4.00 23.53 no 4.71

2.00 7.00 0.35 0.40 14.00 82.35 no 16.47

1.00 2.00 0.35 0.40 2.00 11.76 no 2.35

1.00 4.00 0.35 0.40 4.00 23.53 no 4.71

1.00 4.00 0.35 0.40 4.00 23.53 no 4.71

1.00 4.00 0.35 0.40 4.00 23.53 no 4.71

1.00 4.00 0.35 0.40 4.00 23.53 no 4.71


2.00 4.00 0.35 0.40 8.00 47.06 no 9.41

2.00 2.00 0.35 0.40 4.00 23.53 no 4.71

1.00 4.00 0.35 0.40 4.00 23.53 no 4.71

2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 2.50 0.35 0.40 5.00 0.42 kg

2.00 3.00 0.35 0.40 6.00 0.50 kg

1.00 2.00 0.35 0.40 2.00 0.17 kg

1.00 2.50 0.35 0.40 2.50 0.21 kg

1.00 3.00 0.35 0.40 3.00 0.25 kg

2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 4.00 0.35 0.40 8.00 0.67 kg


2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 2.00 0.35 0.40 4.00 0.33 kg

2.00 7.00 0.35 0.40 14.00 1.17 kg

1.00 2.00 0.35 0.40 2.00 0.17 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 2.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg


2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 2.50 0.35 0.40 5.00 5.00 L-M

2.00 3.00 0.35 0.40 6.00 6.00 L-M

1.00 2.00 0.35 0.40 2.00 2.00 L-M

1.00 2.50 0.35 0.40 2.50 2.50 L-M

1.00 3.00 0.35 0.40 3.00 3.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 2.00 0.35 0.40 4.00 4.00 L-M

2.00 7.00 0.35 0.40 14.00 14.00 L-M


1.00 2.00 0.35 0.40 2.00 2.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 2.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M


id Beams

Size (mm) Qyt Required Extra Length for Bent up Total QtyRequied Rate SP

15.70 4.00 4.40 300.00

15.70 2.50 2.75 300.00

15.70 3.00 3.30 300.00

15.70 1.00 1.10 300.00

15.70 1.25 1.38 300.00

15.70 1.50 1.65 300.00

15.70 4.00 4.40 300.00

15.70 4.00 4.40 300.00

15.70 4.00 4.40 300.00

15.70 2.00 2.20 300.00

29.98
15.70 7.00 7.70 300.00

15.70 1.00 1.10 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

15.70 4.00 4.40 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

26.40
20.00 1.06 185.00

20.00 0.66 185.00

20.00 0.79 185.00

20.00 0.26 185.00

20.00 0.33 185.00

20.00 0.40 185.00

20.00 1.06 185.00

20.00 1.06 185.00

20.00 1.06 185.00

20.00 0.53 185.00

7.19

20.00 1.85 185.00

20.00 0.26 185.00

20.00 0.53 185.00

20.00 0.53 185.00

20.00 0.53 185.00

20.00 0.53 185.00


20.00 1.06 185.00

20.00 0.53 185.00

20.00 0.53 185.00

6.34

0.53 135.00

0.33 135.00

0.40 135.00

0.13 135.00

0.17 135.00

0.20 135.00
0.53 135.00

0.53 135.00

0.53 135.00

0.26 135.00

3.60

0.92 135.00

0.13 135.00

0.26 135.00

0.26 135.00

0.26 135.00

0.26 135.00

0.53 135.00

0.26 135.00

0.26 135.00

3.17
7.60 100.00

4.75 100.00

5.70 100.00

1.90 100.00

2.38 100.00

2.85 100.00

7.60 100.00

7.60 100.00

7.60 100.00

3.80 100.00

51.80

13.31 100.00
1.90 100.00

3.80 100.00

3.80 100.00

3.80 100.00

3.80 100.00

7.60 100.00

3.80 100.00

3.80 100.00

45.62
9.41 20.00

5.88 20.00

7.06 20.00

2.35 20.00

2.94 20.00

3.53 20.00

9.41 20.00

9.41 20.00

9.41 20.00

4.71 20.00

64.12

16.47 20.00

2.35 20.00

4.71 20.00

4.71 20.00

4.71 20.00

4.71 20.00
9.41 20.00

4.71 20.00

4.71 20.00

56.47

0.67 25.00

0.42 25.00

0.50 25.00

0.17 25.00

0.21 25.00

0.25 25.00

0.67 25.00

0.67 25.00
0.67 25.00

0.33 25.00

4.54

1.17 25.00

0.17 25.00

0.33 25.00

0.33 25.00

0.33 25.00

0.33 25.00

0.67 25.00

0.33 25.00

0.33 25.00

4.00
8.00 80.00

5.00 80.00

6.00 80.00

2.00 80.00

2.50 80.00

3.00 80.00

8.00 80.00

8.00 80.00

8.00 80.00

4.00 80.00

54.50

14.00 80.00
2.00 80.00

4.00 80.00

4.00 80.00

4.00 80.00

4.00 80.00

8.00 80.00

4.00 80.00

4.00 80.00

48.00
Rate Per Amount Total Amount SP

no 1320.00

no 825.00

no 990.00

no 330.00

no 412.50

no 495.00

no 1320.00

no 1320.00

no 1320.00

no 660.00
8992.50

no 2310.00

no 330.00

no 660.00

no 660.00

no 660.00

no 660.00

no 1320.00

no 660.00

no 660.00

7920.00
cu-m 195.36

cu-m 122.10

cu-m 146.52

cu-m 48.84

cu-m 61.05

cu-m 73.26

cu-m 195.36

cu-m 195.36

cu-m 195.36

cu-m 97.68

1330.89

cu-m 341.88

cu-m 48.84

cu-m 97.68

cu-m 97.68

cu-m 97.68

cu-m 97.68
cu-m 195.36

cu-m 97.68

cu-m 97.68 the total cost for Supplying the coarse Aggergates

1172.16

cu-m 71.28

cu-m 44.55

cu-m 53.46

cu-m 17.82

cu-m 22.28

cu-m 26.73
cu-m 71.28

cu-m 71.28

cu-m 71.28

cu-m 35.64

485.60

cu-m 124.74

cu-m 17.82

cu-m 35.64

cu-m 35.64

cu-m 35.64

cu-m 35.64

cu-m 71.28

cu-m 35.64

cu-m 35.64

427.68
cu-m 760.32

cu-m 475.20

cu-m 570.24

cu-m 190.08

cu-m 237.60

cu-m 285.12

cu-m 760.32

cu-m 760.32

cu-m 760.32

cu-m 380.16

5179.68

cu-m 1330.56
cu-m 190.08

cu-m 380.16

cu-m 380.16

cu-m 380.16

cu-m 380.16

cu-m 760.32

cu-m 380.16

cu-m 380.16

4561.92
no 188.24

no 117.65

no 141.18

no 47.06

no 58.82

no 70.59

no 188.24

no 188.24

no 188.24

no 94.12

1282.35

no 329.41

no 47.06

no 94.12

no 94.12

no 94.12

no 94.12
no 188.24

no 94.12

no 94.12

1129.41

kg 16.67

kg 10.42

kg 12.50

kg 4.17

kg 5.21

kg 6.25

kg 16.67

kg 16.67
kg 16.67

kg 8.33

113.54

kg 29.17

kg 4.17

kg 8.33

kg 8.33

kg 8.33

kg 8.33

kg 16.67

kg 8.33

kg 8.33

100.00
L-M 640.00

L-M 400.00

L-M 480.00

L-M 160.00

L-M 200.00

L-M 240.00

L-M 640.00

L-M 640.00

L-M 640.00

L-M 320.00

L-M 4360.00

L-M

L-M

L-M 1120.00
L-M 160.00

L-M 320.00

L-M 320.00

L-M 320.00

L-M 320.00

L-M 640.00

L-M 320.00

L-M 320.00

3840.00
Explanatory Notes
the total cost for Supplying the Steel Bar for Grid Beams is

16912.50
the total cost for Supplying the coarse Aggergates for Grid Beams is

2503.05
the total cost for Supplying concrete sand for Grid Beams is

913.28
The total cost for Supplying Cement for Grid Beams is

9741.60
the total cost for Supplying Stirrups bars for Grid Beams is

2411.76
the total cost for Supplying Stirrups bars for Grid Beams is

213.54
the total cost for RCC Work is

8200.00
The operation cost for Backfilling and Supplying 05 fine Materials fr

Item No Particulars of items and Details of works

1 The Cost of Supplying 05 fine Materials from crusher

a) Long Span for Backfilling

b) Short Span for backfilling

2 The Cost of Operation for Backfilling 05 Materials


a) Long Span for Backfilling

b) Short Span for backfilling


ng 05 fine Materials from Crusher

No Length Breadth Heigh Qty Total Qty Unit Qyt Required

18.70

0.90 168.30 208.69 Cu-m 208.69

10.00
18.70

0.90 168.30 208.69 Cu-m 208.69

10.00
Total QtyRequied Rate SP Rate Per Amount Total Amount SP

The total cost for supplying 0.5 Fine Mat

208.69 30.00 Cu-m 6260.76 6260.76


The total cost of Operation Backfillig Mat
208.69 10.00 Cu-m 2086.92 2086.92
Explanatory Notes

The total cost for supplying 0.5 Fine Materials for back filling is

6260.76
The total cost of Operation Backfillig Materials for Foundation is

2086.92
Operation cost for Build 1and 1/2 Bricks wall and Supplying B

Item No Particulars of items and Details of works

1 The Operation cost for Built 1 and 1/2 Bricks wall

a) Short wall foundation

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing
b) Long wall foundation

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

2 The cost of Supplying Bricks

a) Short wall foundation

1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing

b) Long wall foundation

1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing

3 The Cost of Supplying Mud Mortar for 1 and 1/2 Brick Bonds Join
wall and Supplying Bricks and Mud Mortar

No Length Breadth Heigh Qty Total Qty Unit Rate SP

2.00 4.00 0.30 2.80 22.40 L-M 75.00

2.00 2.50 0.30 2.80 14.00 L-M 75.00

2.00 3.00 0.30 2.80 16.80 L-M 75.00

1.00 2.00 0.30 2.80 5.60 L-M 75.00

1.00 2.50 0.30 2.80 7.00 L-M 75.00

1.00 3.00 0.30 2.80 8.40 L-M 75.00

2.00 4.00 0.30 2.80 22.40 L-M 75.00

2.00 4.00 0.30 2.80 22.40 L-M 75.00

2.00 4.00 0.30 2.80 22.40 L-M 75.00

2.00 2.00 0.30 2.80 11.20 152.60 L-M 75.00


2.00 7.00 0.30 2.80 39.20 L-M 75.00

1.00 2.00 0.30 2.80 5.60 L-M 75.00

1.00 4.00 0.30 2.80 11.20 L-M 75.00

1.00 4.00 0.30 2.80 11.20 L-M 75.00

1.00 4.00 0.30 2.80 11.20 L-M 75.00

1.00 4.00 0.30 2.80 11.20 L-M 75.00

2.00 4.00 0.30 2.80 22.40 L-M 75.00

2.00 2.00 0.30 2.80 11.20 L-M 75.00

1.00 4.00 0.30 2.80 11.20 134.40 L-M 75.00

2.00 4.00 0.30 2.80 5600.00 L-M 0.83


2.00 2.50 0.30 2.80 3500.00 L-M 0.83
2.00 3.00 0.30 2.80 4200.00 L-M 0.83
1.00 2.00 0.30 2.80 1400.00 L-M 0.83
1.00 2.50 0.30 2.80 1750.00 L-M 0.83
1.00 3.00 0.30 2.80 2100.00 L-M 0.83
2.00 4.00 0.30 2.80 5600.00 L-M 0.83
2.00 4.00 0.30 2.80 5600.00 L-M 0.83
2.00 4.00 0.30 2.80 5600.00 L-M 0.83
2.00 2.00 0.30 2.80 2800.00 38150.00 L-M 0.83

2.00 7.00 0.30 2.80 9800.00 L-M 0.83


1.00 2.00 0.30 2.80 1400.00 L-M 0.83
1.00 4.00 0.30 2.80 2800.00 L-M 0.83
1.00 4.00 0.30 2.80 2800.00 L-M 0.83
1.00 4.00 0.30 2.80 2800.00 L-M 0.83
1.00 4.00 0.30 2.80 2800.00 L-M 0.83
2.00 4.00 0.30 2.80 5600.00 L-M 0.83
2.00 2.00 0.30 2.80 2800.00 L-M 0.83
1.00 4.00 0.30 2.80 2800.00 33600.00 L-M 0.83

36.00 Cu-M 80.00


Rate Per Amount Total Amount SP

L-M 1680.00

L-M 1050.00

L-M 1260.00

L-M 420.00

L-M 525.00

L-M 630.00

L-M 1680.00

L-M 1680.00

L-M 1680.00

L-M 840.00
11,445.00

L-M 2940.00

L-M 420.00

L-M 840.00

L-M 840.00

L-M 840.00

L-M 840.00

L-M 1680.00

L-M 840.00

L-M 840.00 The total opertion cost for building walls is

10,080.00

L-M 4648.00
L-M 2905.00
L-M 3486.00
L-M 1162.00
L-M 1452.50
L-M 1743.00
L-M 4648.00
L-M 4648.00
L-M 4648.00
L-M 2324.00

31,664.50

L-M 8134.00
L-M 1162.00
L-M 2324.00
L-M 2324.00
L-M 2324.00
L-M 2324.00
L-M 4648.00
L-M 2324.00
L-M 2324.00
27,888.00

Cu-M 2,880.00 2,880.00


Explanatory Notes
The total opertion cost for building walls is

21,525.00
The total cost for Supplying Bricks

59,552.50

The Cost for Mud Mortar

2,880.00
Ring Beams operation cost and Supplying

Item No Particulars of items and Details of works

1 The Cost of Supplying Steel Bar for Ring Beams

a) Short Ring Beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long Ring Beams


1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

10- Cantaliver

2 The cost of supplying coars Aggergates for Ring Beam

1- Supplying coarse Aggergates for Ring Beams with ration mix 1:2:4

a) Short Ring beams

1- Sitting Room
2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long Ring beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)
8- WC

9- Stairing

10- Cantaliver

3 The cost of supplying concrete sand for Ring Beams

1- Supplying concrete sand for Ring Beams with ration mix 1:2:4

a) Short Ring beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)
8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long Ring beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

10- Cantaliver
4 The cost of supplying cement for Ring Beam

1- Supplying cement for Ring Beams with ration mix 1:2:4

a) Short Ring beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long Ring beam

1- Sitting Room

2- Familiy hall
3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

10.Cantaliver

5 The cost of supplying Stirrups bars 6mm for Ring Beam

The cost of supplying Stirrups bars 6mm for Ring Beam

a) Short Ring beams

1- Sitting Room
2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long Ring beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)
8- WC

9- Stairing

10- Cantaliver

6 The cost of supplying Binding wire

1- Supplying binding wire

a) Short Ring beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)
10- Stairing

b) Long Ring beam

1- Sitting Room

2- Familiy hall

3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

10-Cantaliver

7 The cost of RCC work 1:2:4 excluding steel and its bending & including
Centering and shultering and binding of steel & cast of fresh concrete

1- Supplying binding wire

a) Short grid beams

1- Sitting Room

2- Familiy hall

3- Familily hall

4- Familiy hall

5- Kitchen

6- Bedroom (1)

7- Bedroom (2)

8- Bedroom (3)

9- Bedroom (4)

10- Stairing

b) Long grid beam

1- Sitting Room

2- Familiy hall
3- Kitchen

4- Bedroom (1)

5- Bedroom (2)

6- Bedroom (3)

7- Bedroom (4)

8- WC

9- Stairing

10-Cantaliver
ost and Supplying Materials for Ring Beams

No Length Breadth Heigh Qty Total Qty Unit # Steel Bar

2.00 4.00 0.35 0.25 8.00 8.00 no 6.00

2.00 2.50 0.35 0.25 5.00 5.00 no 6.00

2.00 3.00 0.35 0.25 6.00 6.00 no 6.00

1.00 2.00 0.35 0.25 2.00 2.00 no 6.00

1.00 2.50 0.35 0.25 2.50 2.50 no 6.00

1.00 3.00 0.35 0.25 3.00 3.00 no 6.00

2.00 4.00 0.35 0.25 8.00 8.00 no 6.00

2.00 4.00 0.35 0.25 8.00 8.00 no 6.00

2.00 4.00 0.35 0.25 8.00 8.00 no 6.00

2.00 2.00 0.35 0.25 4.00 4.00 no 6.00


2.00 7.00 0.35 0.25 14.00 14.00 no 6.00

1.00 2.00 0.35 0.25 2.00 2.00 no 6.00

1.00 4.00 0.35 0.25 4.00 4.00 no 6.00

1.00 4.00 0.35 0.25 4.00 4.00 no 6.00

1.00 4.00 0.35 0.25 4.00 4.00 no 6.00

1.00 4.00 0.35 0.25 4.00 4.00 no 6.00

2.00 4.00 0.35 0.25 8.00 8.00 no 6.00

2.00 2.00 0.35 0.25 4.00 4.00 no 6.00

1.00 4.00 0.35 0.25 4.00 4.00 no 6.00

6.00 1.20 0.35 0.25 7.20 7.20 no 6.00

2.00 4.00 0.35 0.25 0.77 0.17 cu-m


2.00 2.50 0.35 0.25 0.48 0.10 cu-m

2.00 3.00 0.35 0.25 0.58 0.12 cu-m

1.00 2.00 0.35 0.25 0.19 0.04 cu-m

1.00 2.50 0.35 0.25 0.24 0.05 cu-m

1.00 3.00 0.35 0.25 0.29 0.06 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 2.00 0.35 0.25 0.39 0.08 cu-m

2.00 7.00 0.35 0.25 1.35 0.29 cu-m

1.00 2.00 0.35 0.25 0.19 0.04 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m


2.00 2.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

6.00 1.20 0.35 0.25 0.69 0.15 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 2.50 0.35 0.25 0.48 0.10 cu-m

2.00 3.00 0.35 0.25 0.58 0.12 cu-m

1.00 2.00 0.35 0.25 0.19 0.04 cu-m

1.00 2.50 0.35 0.25 0.24 0.05 cu-m

1.00 3.00 0.35 0.25 0.29 0.06 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m


2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 2.00 0.35 0.25 0.39 0.08 cu-m

2.00 7.00 0.35 0.25 1.35 0.29 cu-m

1.00 2.00 0.35 0.25 0.19 0.04 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 2.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

6.00 1.20 0.35 0.25 0.69 0.15 cu-m


2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 2.50 0.35 0.25 0.48 0.10 cu-m

2.00 3.00 0.35 0.25 0.58 0.12 cu-m

1.00 2.00 0.35 0.25 0.19 0.04 cu-m

1.00 2.50 0.35 0.25 0.24 0.05 cu-m

1.00 3.00 0.35 0.25 0.29 0.06 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 2.00 0.35 0.25 0.39 0.08 cu-m

2.00 7.00 0.35 0.25 1.35 0.29 cu-m

1.00 2.00 0.35 0.25 0.19 0.04 cu-m


1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

2.00 4.00 0.35 0.25 0.77 0.17 cu-m

2.00 2.00 0.35 0.25 0.39 0.08 cu-m

1.00 4.00 0.35 0.25 0.39 0.08 cu-m

6.00 1.20 0.35 0.25 0.69 0.15 cu-m

2.00 4.00 0.25 0.30 8.00 47.06 no 9.41


2.00 2.50 0.25 0.30 5.00 29.41 no 5.88

2.00 3.00 0.25 0.30 6.00 35.29 no 7.06

1.00 2.00 0.25 0.30 2.00 11.76 no 2.35

1.00 2.50 0.25 0.30 2.50 14.71 no 2.94

1.00 3.00 0.25 0.30 3.00 17.65 no 3.53

2.00 4.00 0.25 0.30 8.00 47.06 no 9.41

2.00 4.00 0.25 0.30 8.00 47.06 no 9.41

2.00 4.00 0.25 0.30 8.00 47.06 no 9.41

2.00 2.00 0.25 0.30 4.00 23.53 no 4.71

2.00 7.00 0.35 0.30 14.00 82.35 no 16.47

1.00 2.00 0.35 0.30 2.00 11.76 no 2.35

1.00 4.00 0.35 0.30 4.00 23.53 no 4.71

1.00 4.00 0.35 0.30 4.00 23.53 no 4.71

1.00 4.00 0.35 0.30 4.00 23.53 no 4.71

1.00 4.00 0.35 0.30 4.00 23.53 no 4.71

2.00 4.00 0.35 0.30 8.00 47.06 no 9.41


2.00 2.00 0.35 0.30 4.00 23.53 no 4.71

1.00 4.00 0.35 0.30 4.00 23.53 no 4.71

6.00 1.20 0.35 0.30 7.20 42.35 no 8.47

2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 2.50 0.35 0.40 5.00 0.42 kg

2.00 3.00 0.35 0.40 6.00 0.50 kg

1.00 2.00 0.35 0.40 2.00 0.17 kg

1.00 2.50 0.35 0.40 2.50 0.21 kg

1.00 3.00 0.35 0.40 3.00 0.25 kg

2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 4.00 0.35 0.40 8.00 0.67 kg


2.00 2.00 0.35 0.40 4.00 0.33 kg

2.00 7.00 0.35 0.40 14.00 1.17 kg

1.00 2.00 0.35 0.40 2.00 0.17 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

2.00 4.00 0.35 0.40 8.00 0.67 kg

2.00 2.00 0.35 0.40 4.00 0.33 kg

1.00 4.00 0.35 0.40 4.00 0.33 kg

6.00 1.20 0.35 0.40 7.20 0.60 kg


2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 2.50 0.35 0.40 5.00 5.00 L-M

2.00 3.00 0.35 0.40 6.00 6.00 L-M

1.00 2.00 0.35 0.40 2.00 2.00 L-M

1.00 2.50 0.35 0.40 2.50 2.50 L-M

1.00 3.00 0.35 0.40 3.00 3.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 2.00 0.35 0.40 4.00 4.00 L-M

2.00 7.00 0.35 0.40 14.00 14.00 L-M

1.00 2.00 0.35 0.40 2.00 2.00 L-M


1.00 4.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

2.00 4.00 0.35 0.40 8.00 8.00 L-M

2.00 2.00 0.35 0.40 4.00 4.00 L-M

1.00 4.00 0.35 0.40 4.00 4.00 L-M

6.00 1.20 0.35 0.40 7.20 7.20 L-M


Size (mm) Qyt Required Extra Length for Bent up Total QtyRequied Rate SP

15.70 4.00 4.40 300.00

15.70 2.50 2.75 300.00

15.70 3.00 3.30 300.00

15.70 1.00 1.10 300.00

15.70 1.25 1.38 300.00

15.70 1.50 1.65 300.00

15.70 4.00 4.40 300.00

15.70 4.00 4.40 300.00

15.70 4.00 4.40 300.00

15.70 2.00 2.20 300.00

29.98
15.70 7.00 7.70 300.00

15.70 1.00 1.10 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

15.70 4.00 4.40 300.00

15.70 2.00 2.20 300.00

15.70 2.00 2.20 300.00

15.70 3.60 3.96 30.36 300.00

20.00 0.66 185.00


20.00 0.41 185.00

20.00 0.50 185.00

20.00 0.17 185.00

20.00 0.21 185.00

20.00 0.25 185.00

20.00 0.66 185.00

20.00 0.66 185.00

20.00 0.66 185.00

20.00 0.33 185.00

4.50

20.00 1.16 185.00

20.00 0.17 185.00

20.00 0.33 185.00

20.00 0.33 185.00

20.00 0.33 185.00

20.00 0.33 185.00

20.00 0.66 185.00


20.00 0.33 185.00

20.00 0.33 185.00

20.00 0.59 4.55 185.00

0.33 135.00

0.21 135.00

0.25 135.00

0.08 135.00

0.10 135.00

0.12 135.00

0.33 135.00
0.33 135.00

0.33 135.00

0.17 135.00

2.25

0.58 135.00

0.08 135.00

0.17 135.00

0.17 135.00

0.17 135.00

0.17 135.00

0.33 135.00

0.17 135.00

0.17 135.00

0.30 2.28 135.00


4.75 100.00

2.97 100.00

3.56 100.00

1.19 100.00

1.49 100.00

1.78 100.00

4.75 100.00

4.75 100.00

4.75 100.00

2.38 100.00

32.37

8.32 100.00

1.19 100.00
2.38 100.00

2.38 100.00

2.38 100.00

2.38 100.00

4.75 100.00

2.38 100.00

2.38 100.00

4.28 32.79 100.00

9.41 20.00
5.88 20.00

7.06 20.00

2.35 20.00

2.94 20.00

3.53 20.00

9.41 20.00

9.41 20.00

9.41 20.00

4.71 20.00

64.12

16.47 20.00

2.35 20.00

4.71 20.00

4.71 20.00

4.71 20.00

4.71 20.00

9.41 20.00
4.71 20.00

4.71 20.00

8.47 64.94 20.00

0.67 25.00

0.42 25.00

0.50 25.00

0.17 25.00

0.21 25.00

0.25 25.00

0.67 25.00

0.67 25.00

0.67 25.00
0.33 25.00

4.54

1.17 25.00

0.17 25.00

0.33 25.00

0.33 25.00

0.33 25.00

0.33 25.00

0.67 25.00

0.33 25.00

0.33 25.00

0.60 4.60 25.00


8.00 80.00

5.00 80.00

6.00 80.00

2.00 80.00

2.50 80.00

3.00 80.00

8.00 80.00

8.00 80.00

8.00 80.00

4.00 80.00

54.50

14.00 80.00

2.00 80.00
4.00 80.00

4.00 80.00

4.00 80.00

4.00 80.00

8.00 80.00

4.00 80.00

4.00 80.00

7.20 55.20 80.00


Rate Per Amount Total Amount SP

no 1320.00

no 825.00

no 990.00

no 330.00

no 412.50

no 495.00

no 1320.00

no 1320.00

no 1320.00

no 660.00

8992.50
no 2310.00

no 330.00

no 660.00

no 660.00

no 660.00

no 660.00

no 1320.00

no 660.00

no 660.00

no 1188.00 9108.00

cu-m 122.10
cu-m 76.31

cu-m 91.58

cu-m 30.53

cu-m 38.16

cu-m 45.79

cu-m 122.10

cu-m 122.10

cu-m 122.10

cu-m 61.05

831.81

cu-m 213.68

cu-m 30.53

cu-m 61.05

cu-m 61.05

cu-m 61.05

cu-m 61.05

cu-m 122.10
cu-m 61.05

cu-m 61.05

cu-m 109.89 842.49

cu-m 44.55

cu-m 27.84

cu-m 33.41

cu-m 11.14

cu-m 13.92

cu-m 16.71

cu-m 44.55
cu-m 44.55

cu-m 44.55

cu-m 22.28

303.50

cu-m 77.96

cu-m 11.14

cu-m 22.28

cu-m 22.28

cu-m 22.28

cu-m 22.28

cu-m 44.55

cu-m 22.28

cu-m 22.28

cu-m 40.10 307.40


no 475.20

no 297.00

no 356.40

no 118.80

no 148.50

no 178.20

no 475.20

no 475.20

no 475.20

no 237.60

3237.30

no 831.60

no 118.80
no 237.60

no 237.60

no 237.60

no 237.60

no 475.20

no 237.60

no 237.60

no 427.68 3278.88

no 188.24
no 117.65

no 141.18

no 47.06

no 58.82

no 70.59

no 188.24

no 188.24

no 188.24

no 94.12

1282.35

no 329.41

no 47.06

no 94.12

no 94.12

no 94.12

no 94.12

no 188.24
no 94.12

no 94.12

no 169.41 1298.82

kg 16.67

kg 10.42

kg 12.50

kg 4.17

kg 5.21

kg 6.25

kg 16.67

kg 16.67

kg 16.67
kg 8.33

113.54

kg 29.17

kg 4.17

kg 8.33

kg 8.33

kg 8.33

kg 8.33

kg 16.67

kg 8.33

kg 8.33

kg 15.00 115.00
L-M 640.00

L-M 400.00

L-M 480.00

L-M 160.00

L-M 200.00

L-M 240.00

L-M 640.00

L-M 640.00

L-M 640.00

L-M 320.00

4360.00

L-M 1120.00

L-M 160.00
L-M 320.00

L-M 320.00

L-M 320.00

L-M 320.00

L-M 640.00

L-M 320.00

L-M 320.00

L-M 576.00 4416.00


Explanatory Notes
The total cost for Supplying the Steel Bar for Ring Beams is

18,100.50
The total cost for Supplying the coarse Aggergates for Ring Beams is

1,674.30
The total cost for Supplying concrete sand for Ring Beams is

610.89
The total cost for Supplying Cement for Ring Beams is

6,516.18
The total cost for Supplying Stirrups bars for Ring Beams is

2,581.18
The total cost for Supplying Binding wire for Ring Beams is

228.54
The total cost for RCC Work is

8,776.00
The operation cost for electrical Items Fix and Supplyin

Item No Particulars of items and Details of works

1 The Cost of Supplying the electrical Items for Slab

a) The Slab Area is 181.96 Square Maters

1) 90 degree Bell and Spigot

2) electrical pipe

3) motor or Square join iron box

2 The operation cost of fixing the Electrical Item for Slab


al Items Fix and Supplying the electrical Items for Slab

No Qty Total Qty Unit Qyt Required Total QtyRequied Rate SP

50.00 no 50.00 50.00 6.00

100.00 no 100.00 100.00 12.00

80.00 no 80.00 80.00 5.00

or Slab
Rate Per Amount Total Amount SP

no 300.00

no 1200.00

no 400.00 1900.00

1200 1200
Explanatory Notes

The cost for Electrical Items for Slab

1900.00

The Cost for Fixing Electrical Iteams

1200
Item No

Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c

Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c

2
3

4
5

6
Particulars of items and Details of works

The Cost of Supplying Steel Bar for Slab

a) Long Span for Slab

Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c

b) Short Span for Slab

Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c

The Cost of Supplying binding wire for Slab


a) Long Span for Slab

b) Short Span for Slab

The Cost of Supplying coarse Aggergates for Slab 1:2:4

a) Long Span for Slab

b) Short Span for Slab

The Cost of Supplying Concrete Sand for Slab 1:2:4

a) Long Span for Slab


b) Short Span for Slab

The Cost of Supplying Cement for Slab 1:2:4

a) Long Span for Slab

b) Short Span for Slab

The Cost of Operation for Slab

a) Long Span for Slab


b) Short Span for Slab
The operation cost for Slab and Supplying Materials for Slab

No Length Breadth Heigh Qty Total Qty Unit # Steel Bar

10.00 67.00 67.00 no 125.00

s 150mm c/c

s 150mm c/c 18.70 125.00 212.50 no 212.50


18.70

187.00 187.00 kg

10.00

18.70

0.13 26.74 13.37 cu-m

40.11

10.00

18.70
0.13 24.31 26.74 cu-m

13.37

10.00 40.11

18.70

2.43

0.13 26.74 5.73 cu-m

40.11

10.00

18.70

0.13 187.00 187.00 cu-m


10.00
erials for Slab

Size (mm) Qyt Required Total QtyRequied Rate SP Rate Per Amount

12.00 125.00 170.00 no 21250.00

12.00 212.50 170.00 no 36125.00

337.50
187.00 50.49 25.00 kg 1262.25

5.73 22.92 185.00 cu-m 4240.36


5.73 11.46 130.00 cu-m 1489.86

5.73 165.03 100.00 cu-m 16503.02


187.00 187.00 120.00 cu-m 22440.00
Total Amount SP Explanatory Notes

57375.00
1262.25

4240.36
1489.86

16503.02
22440.00
Abstract of Estimated Cost for Parts of G

Item No Particulars of items and Details of works

Stage 01 The Earth work in Excavation of load Bearing Foundation Cost

a) The Operation Cost for Excavation of load Bearing Foundation

b) Supplying Foundation Stones

c) Supplying Stififenese Sand

b) Cost of filling Excavated foundation with Rocks and Sand

Stage 02 The Bricks works in foundation with Lime Mortar Cost

a) the operation Cost for Bricks Work in Foudation

b) Supplying Bricks for Short wall foundation

c) Supplying Cement for Cement Mortar

d) Supplying Mortar Sand


Stage 03 The Grid Beams Cost

a) Supplying Steel Bars

b) Supplying Coarse Aggergates size 20mm

c) Supplying Concrete Sand

d) Supplying Cement

e) Supplying Stirrups Bars

f) Supplying Binding Wire

g) The operation Cost for R.C.C 1:2:4

Stage 04 The Back filling Cost

a) Supplying 05 fine Materials from Crusher

b) The Operation Cost fo Backfilling


Stage 05 Super Bricks work above Grid Beams

a) Supplying Bricks

b) Supplying Mud Mortar for 1 and 1/2 Bricks Bonds Join

c) The Operation Cost for Built 1 and 1/2 Bricks

Stage 06 Super ring Beams Cost

a) Supplying Steel Bars Size 15.7mm

b) Supplying Coarse Aggergate Size 20mm

c) Supplying Concrete Sand

d) Supplying Cement

e) Supplying Stirrups Bars

f) Supplying Binding Wire

g) The operation Cost for R.C.C 1:2:4


Stage 07 The Cost for electrical Items for Slab only

a) Supplying Electrical I tems

(a) 90 degree Bell and Spigot

(b) electrical pipe

(c) motor or Square join iron box

(b) The Cost of fixing the Electrical I tems

Stage 08 The Cost for Slab

a) Supplying Steel Bars for Slab

b) Supplying Binding Wire for Slab

c) Supplying Coarse Aggergate

d) Supplying Concrete Sand


e) Supplying Cement

f) the Operation Cost


Cost for Parts of Ground Floor

Total Qty Unit Rate SP Rate Per

147.11 L-M 45.00 L-M

0.00 Cu-M 0.00 Cu-M

36.00 Cu-M 80.00 Cu-M

102.50 L-M 30.00 L-M

102.50 Sq-M 80.00 Sq-M

23062.50 no 0.83 no

2998.13 kg 2.00 kg

48.43 Cu-M 115.00 Cu-M


56.38 no 300.00 no

13.53 Cu-M 185.00 Cu-M

6.77 Cu-M 135.00 Cu-M

4870.80 kg 2.00 kg

120.59 no 20.00 no

8.54 kg 25.00 kg

102.50 L-M 80.00 L-M

208.69 Cu-M 30.00 Cu-M

208.69 Cu-M 10.00 Cu-M


71750.00 no 0.83 no

36.00 Cu-m 80.00 Cu-m

287.00 Sq-M 75.00 Sq-M

60.34 no 300.00 no

9.05 Cu-M 185.00 Cu-M

4.53 Cu-M 135.00 Cu-M

3258.09 kg 2.00 kg

129.06 no 20.00 no

9.14 kg 25 kg

109.70 L-M 80 L-M


50.00 no 6.00 no

100.00 no 12.00 no

80.00 no 5.00 no

337.50 no 170 no

50.49 kg 25 kg

22.92 Cu-M 185 Cu-M

11.46 Cu-M 130 Cu-M


165.03 kg 2 kg

187.00 L-M 120 L-M


Total Amount SP

6620.13

0.00

2880.00

3075.00

12,575.13

8200.00

19141.88

5996.25

5569.59
38,907.72

16912.50

2503.05

913.28

9741.60

2411.76

213.54

8200.00

40,895.73

6260.76

2086.92

8,347.68
59552.50

2880.00

21525.00

83,957.50

18100.50

1674.30

610.89

6516.18

2581.18

228.54

8776.00
38,487.59

300.00

1200.00

400.00

1,900.00

1,200.00

3100.00

57375.00

1262.25

4240.36

1489.86
330.06

22440.00

87,137.52

Summary for Probable cost for Parts of Ground floor

313,408.87