1 Exavation of lsolated & combine Footing in Black cotton soil or expensive soil
foundation F1
Foundation F2
Foundation F3
Foundation F4
Kanjar Sand
Aggregates
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
The excavation of Fourth Ty
pensive soil
1.20
1.55
2.79
5.51
Cu-M 80.00 Cu-M 2880.00 2880.00
37292.30
4862.25
The cost of stiffense sand for
guping is
2880.00
3075.00
The total cost of this stage is
5955.00
Bricks work in foundation with lime mortar and Supply
8- WC 2.00 2.00
8- WC 2.00 2.00
8- WC 2.00 2.00
8- WC 2.00 2.00
9- Stairing 1.00 4.00
mortar and Supplying Materials for Load Bearing Foundation
Breadth Heigh Qty Total Qty Unit Rate SP Rate Per Amount
8200.00
10177.88
the cost of supplying Bricks for short
foundation is
8964.00
19141.88
3188.25
2808.00 5996.25
2961.39
1
2
3
4
5
6
7
Particulars of items and Details of works
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
b) Long wall foundation
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
1- Supplying coarse Aggergates for Grid Beams with ration mix 1:2:4
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
1- Supplying concrete sand for Grid Beams with ration mix 1:2:4
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
The cost of supplying cement for Grid Beam
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
The cost of RCC work 1:2:4 excluding steel and its bending & including
Centering and shultering and binding of steel & cast of fresh concrete
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
Grid Beams work and Supplying Materials for Grid Beams
Size (mm) Qyt Required Extra Length for Bent up Total QtyRequied Rate SP
29.98
15.70 7.00 7.70 300.00
26.40
20.00 1.06 185.00
7.19
6.34
0.53 135.00
0.33 135.00
0.40 135.00
0.13 135.00
0.17 135.00
0.20 135.00
0.53 135.00
0.53 135.00
0.53 135.00
0.26 135.00
3.60
0.92 135.00
0.13 135.00
0.26 135.00
0.26 135.00
0.26 135.00
0.26 135.00
0.53 135.00
0.26 135.00
0.26 135.00
3.17
7.60 100.00
4.75 100.00
5.70 100.00
1.90 100.00
2.38 100.00
2.85 100.00
7.60 100.00
7.60 100.00
7.60 100.00
3.80 100.00
51.80
13.31 100.00
1.90 100.00
3.80 100.00
3.80 100.00
3.80 100.00
3.80 100.00
7.60 100.00
3.80 100.00
3.80 100.00
45.62
9.41 20.00
5.88 20.00
7.06 20.00
2.35 20.00
2.94 20.00
3.53 20.00
9.41 20.00
9.41 20.00
9.41 20.00
4.71 20.00
64.12
16.47 20.00
2.35 20.00
4.71 20.00
4.71 20.00
4.71 20.00
4.71 20.00
9.41 20.00
4.71 20.00
4.71 20.00
56.47
0.67 25.00
0.42 25.00
0.50 25.00
0.17 25.00
0.21 25.00
0.25 25.00
0.67 25.00
0.67 25.00
0.67 25.00
0.33 25.00
4.54
1.17 25.00
0.17 25.00
0.33 25.00
0.33 25.00
0.33 25.00
0.33 25.00
0.67 25.00
0.33 25.00
0.33 25.00
4.00
8.00 80.00
5.00 80.00
6.00 80.00
2.00 80.00
2.50 80.00
3.00 80.00
8.00 80.00
8.00 80.00
8.00 80.00
4.00 80.00
54.50
14.00 80.00
2.00 80.00
4.00 80.00
4.00 80.00
4.00 80.00
4.00 80.00
8.00 80.00
4.00 80.00
4.00 80.00
48.00
Rate Per Amount Total Amount SP
no 1320.00
no 825.00
no 990.00
no 330.00
no 412.50
no 495.00
no 1320.00
no 1320.00
no 1320.00
no 660.00
8992.50
no 2310.00
no 330.00
no 660.00
no 660.00
no 660.00
no 660.00
no 1320.00
no 660.00
no 660.00
7920.00
cu-m 195.36
cu-m 122.10
cu-m 146.52
cu-m 48.84
cu-m 61.05
cu-m 73.26
cu-m 195.36
cu-m 195.36
cu-m 195.36
cu-m 97.68
1330.89
cu-m 341.88
cu-m 48.84
cu-m 97.68
cu-m 97.68
cu-m 97.68
cu-m 97.68
cu-m 195.36
cu-m 97.68
cu-m 97.68 the total cost for Supplying the coarse Aggergates
1172.16
cu-m 71.28
cu-m 44.55
cu-m 53.46
cu-m 17.82
cu-m 22.28
cu-m 26.73
cu-m 71.28
cu-m 71.28
cu-m 71.28
cu-m 35.64
485.60
cu-m 124.74
cu-m 17.82
cu-m 35.64
cu-m 35.64
cu-m 35.64
cu-m 35.64
cu-m 71.28
cu-m 35.64
cu-m 35.64
427.68
cu-m 760.32
cu-m 475.20
cu-m 570.24
cu-m 190.08
cu-m 237.60
cu-m 285.12
cu-m 760.32
cu-m 760.32
cu-m 760.32
cu-m 380.16
5179.68
cu-m 1330.56
cu-m 190.08
cu-m 380.16
cu-m 380.16
cu-m 380.16
cu-m 380.16
cu-m 760.32
cu-m 380.16
cu-m 380.16
4561.92
no 188.24
no 117.65
no 141.18
no 47.06
no 58.82
no 70.59
no 188.24
no 188.24
no 188.24
no 94.12
1282.35
no 329.41
no 47.06
no 94.12
no 94.12
no 94.12
no 94.12
no 188.24
no 94.12
no 94.12
1129.41
kg 16.67
kg 10.42
kg 12.50
kg 4.17
kg 5.21
kg 6.25
kg 16.67
kg 16.67
kg 16.67
kg 8.33
113.54
kg 29.17
kg 4.17
kg 8.33
kg 8.33
kg 8.33
kg 8.33
kg 16.67
kg 8.33
kg 8.33
100.00
L-M 640.00
L-M 400.00
L-M 480.00
L-M 160.00
L-M 200.00
L-M 240.00
L-M 640.00
L-M 640.00
L-M 640.00
L-M 320.00
L-M 4360.00
L-M
L-M
L-M 1120.00
L-M 160.00
L-M 320.00
L-M 320.00
L-M 320.00
L-M 320.00
L-M 640.00
L-M 320.00
L-M 320.00
3840.00
Explanatory Notes
the total cost for Supplying the Steel Bar for Grid Beams is
16912.50
the total cost for Supplying the coarse Aggergates for Grid Beams is
2503.05
the total cost for Supplying concrete sand for Grid Beams is
913.28
The total cost for Supplying Cement for Grid Beams is
9741.60
the total cost for Supplying Stirrups bars for Grid Beams is
2411.76
the total cost for Supplying Stirrups bars for Grid Beams is
213.54
the total cost for RCC Work is
8200.00
The operation cost for Backfilling and Supplying 05 fine Materials fr
18.70
10.00
18.70
10.00
Total QtyRequied Rate SP Rate Per Amount Total Amount SP
The total cost for supplying 0.5 Fine Materials for back filling is
6260.76
The total cost of Operation Backfillig Materials for Foundation is
2086.92
Operation cost for Build 1and 1/2 Bricks wall and Supplying B
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
b) Long wall foundation
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
3 The Cost of Supplying Mud Mortar for 1 and 1/2 Brick Bonds Join
wall and Supplying Bricks and Mud Mortar
L-M 1680.00
L-M 1050.00
L-M 1260.00
L-M 420.00
L-M 525.00
L-M 630.00
L-M 1680.00
L-M 1680.00
L-M 1680.00
L-M 840.00
11,445.00
L-M 2940.00
L-M 420.00
L-M 840.00
L-M 840.00
L-M 840.00
L-M 840.00
L-M 1680.00
L-M 840.00
10,080.00
L-M 4648.00
L-M 2905.00
L-M 3486.00
L-M 1162.00
L-M 1452.50
L-M 1743.00
L-M 4648.00
L-M 4648.00
L-M 4648.00
L-M 2324.00
31,664.50
L-M 8134.00
L-M 1162.00
L-M 2324.00
L-M 2324.00
L-M 2324.00
L-M 2324.00
L-M 4648.00
L-M 2324.00
L-M 2324.00
27,888.00
21,525.00
The total cost for Supplying Bricks
59,552.50
2,880.00
Ring Beams operation cost and Supplying
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
10- Cantaliver
1- Supplying coarse Aggergates for Ring Beams with ration mix 1:2:4
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
10- Cantaliver
1- Supplying concrete sand for Ring Beams with ration mix 1:2:4
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
10- Cantaliver
4 The cost of supplying cement for Ring Beam
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
10.Cantaliver
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
10- Cantaliver
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
10-Cantaliver
7 The cost of RCC work 1:2:4 excluding steel and its bending & including
Centering and shultering and binding of steel & cast of fresh concrete
1- Sitting Room
2- Familiy hall
3- Familily hall
4- Familiy hall
5- Kitchen
6- Bedroom (1)
7- Bedroom (2)
8- Bedroom (3)
9- Bedroom (4)
10- Stairing
1- Sitting Room
2- Familiy hall
3- Kitchen
4- Bedroom (1)
5- Bedroom (2)
6- Bedroom (3)
7- Bedroom (4)
8- WC
9- Stairing
10-Cantaliver
ost and Supplying Materials for Ring Beams
29.98
15.70 7.00 7.70 300.00
4.50
0.33 135.00
0.21 135.00
0.25 135.00
0.08 135.00
0.10 135.00
0.12 135.00
0.33 135.00
0.33 135.00
0.33 135.00
0.17 135.00
2.25
0.58 135.00
0.08 135.00
0.17 135.00
0.17 135.00
0.17 135.00
0.17 135.00
0.33 135.00
0.17 135.00
0.17 135.00
2.97 100.00
3.56 100.00
1.19 100.00
1.49 100.00
1.78 100.00
4.75 100.00
4.75 100.00
4.75 100.00
2.38 100.00
32.37
8.32 100.00
1.19 100.00
2.38 100.00
2.38 100.00
2.38 100.00
2.38 100.00
4.75 100.00
2.38 100.00
2.38 100.00
9.41 20.00
5.88 20.00
7.06 20.00
2.35 20.00
2.94 20.00
3.53 20.00
9.41 20.00
9.41 20.00
9.41 20.00
4.71 20.00
64.12
16.47 20.00
2.35 20.00
4.71 20.00
4.71 20.00
4.71 20.00
4.71 20.00
9.41 20.00
4.71 20.00
4.71 20.00
0.67 25.00
0.42 25.00
0.50 25.00
0.17 25.00
0.21 25.00
0.25 25.00
0.67 25.00
0.67 25.00
0.67 25.00
0.33 25.00
4.54
1.17 25.00
0.17 25.00
0.33 25.00
0.33 25.00
0.33 25.00
0.33 25.00
0.67 25.00
0.33 25.00
0.33 25.00
5.00 80.00
6.00 80.00
2.00 80.00
2.50 80.00
3.00 80.00
8.00 80.00
8.00 80.00
8.00 80.00
4.00 80.00
54.50
14.00 80.00
2.00 80.00
4.00 80.00
4.00 80.00
4.00 80.00
4.00 80.00
8.00 80.00
4.00 80.00
4.00 80.00
no 1320.00
no 825.00
no 990.00
no 330.00
no 412.50
no 495.00
no 1320.00
no 1320.00
no 1320.00
no 660.00
8992.50
no 2310.00
no 330.00
no 660.00
no 660.00
no 660.00
no 660.00
no 1320.00
no 660.00
no 660.00
no 1188.00 9108.00
cu-m 122.10
cu-m 76.31
cu-m 91.58
cu-m 30.53
cu-m 38.16
cu-m 45.79
cu-m 122.10
cu-m 122.10
cu-m 122.10
cu-m 61.05
831.81
cu-m 213.68
cu-m 30.53
cu-m 61.05
cu-m 61.05
cu-m 61.05
cu-m 61.05
cu-m 122.10
cu-m 61.05
cu-m 61.05
cu-m 44.55
cu-m 27.84
cu-m 33.41
cu-m 11.14
cu-m 13.92
cu-m 16.71
cu-m 44.55
cu-m 44.55
cu-m 44.55
cu-m 22.28
303.50
cu-m 77.96
cu-m 11.14
cu-m 22.28
cu-m 22.28
cu-m 22.28
cu-m 22.28
cu-m 44.55
cu-m 22.28
cu-m 22.28
no 297.00
no 356.40
no 118.80
no 148.50
no 178.20
no 475.20
no 475.20
no 475.20
no 237.60
3237.30
no 831.60
no 118.80
no 237.60
no 237.60
no 237.60
no 237.60
no 475.20
no 237.60
no 237.60
no 427.68 3278.88
no 188.24
no 117.65
no 141.18
no 47.06
no 58.82
no 70.59
no 188.24
no 188.24
no 188.24
no 94.12
1282.35
no 329.41
no 47.06
no 94.12
no 94.12
no 94.12
no 94.12
no 188.24
no 94.12
no 94.12
no 169.41 1298.82
kg 16.67
kg 10.42
kg 12.50
kg 4.17
kg 5.21
kg 6.25
kg 16.67
kg 16.67
kg 16.67
kg 8.33
113.54
kg 29.17
kg 4.17
kg 8.33
kg 8.33
kg 8.33
kg 8.33
kg 16.67
kg 8.33
kg 8.33
kg 15.00 115.00
L-M 640.00
L-M 400.00
L-M 480.00
L-M 160.00
L-M 200.00
L-M 240.00
L-M 640.00
L-M 640.00
L-M 640.00
L-M 320.00
4360.00
L-M 1120.00
L-M 160.00
L-M 320.00
L-M 320.00
L-M 320.00
L-M 320.00
L-M 640.00
L-M 320.00
L-M 320.00
18,100.50
The total cost for Supplying the coarse Aggergates for Ring Beams is
1,674.30
The total cost for Supplying concrete sand for Ring Beams is
610.89
The total cost for Supplying Cement for Ring Beams is
6,516.18
The total cost for Supplying Stirrups bars for Ring Beams is
2,581.18
The total cost for Supplying Binding wire for Ring Beams is
228.54
The total cost for RCC Work is
8,776.00
The operation cost for electrical Items Fix and Supplyin
2) electrical pipe
or Slab
Rate Per Amount Total Amount SP
no 300.00
no 1200.00
no 400.00 1900.00
1200 1200
Explanatory Notes
1900.00
1200
Item No
Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c
Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c
2
3
4
5
6
Particulars of items and Details of works
Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c
Steel bars inluding bending mild steel RCC Work Bars 15.7 mm , Straight bars 150mm c/c
s 150mm c/c
187.00 187.00 kg
10.00
18.70
40.11
10.00
18.70
0.13 24.31 26.74 cu-m
13.37
10.00 40.11
18.70
2.43
40.11
10.00
18.70
Size (mm) Qyt Required Total QtyRequied Rate SP Rate Per Amount
337.50
187.00 50.49 25.00 kg 1262.25
57375.00
1262.25
4240.36
1489.86
16503.02
22440.00
Abstract of Estimated Cost for Parts of G
d) Supplying Cement
a) Supplying Bricks
d) Supplying Cement
23062.50 no 0.83 no
2998.13 kg 2.00 kg
4870.80 kg 2.00 kg
120.59 no 20.00 no
8.54 kg 25.00 kg
60.34 no 300.00 no
3258.09 kg 2.00 kg
129.06 no 20.00 no
9.14 kg 25 kg
100.00 no 12.00 no
80.00 no 5.00 no
337.50 no 170 no
50.49 kg 25 kg
6620.13
0.00
2880.00
3075.00
12,575.13
8200.00
19141.88
5996.25
5569.59
38,907.72
16912.50
2503.05
913.28
9741.60
2411.76
213.54
8200.00
40,895.73
6260.76
2086.92
8,347.68
59552.50
2880.00
21525.00
83,957.50
18100.50
1674.30
610.89
6516.18
2581.18
228.54
8776.00
38,487.59
300.00
1200.00
400.00
1,900.00
1,200.00
3100.00
57375.00
1262.25
4240.36
1489.86
330.06
22440.00
87,137.52
313,408.87