Sunteți pe pagina 1din 24

Mix350

ESSAIS POUR LA FORMULATION DU BETON


Tamisats

Firstmix® Ref. Mix design: 99.5

Agrégats:
Ciment: CPJ-42.5 ACC
Adjuvant: Glenium 51 Laboratoire:
Pois unitaire Mélange des Granulats
sans air Tamis 0.080 0.160 0.315 0.630 1.250 2.500 5.000 6.30 8.00 10.00 12.5 16 20 25
1 2 3 4 5 6 7 8 9 10 11 12 13 14

0.70 33.50 88.30 99.50 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
TAMISATS EN %

fin

roulé 0.00 33.20 27.40 38.90 50.30 67.90 100.00 100.0 100.0 100.0 100.0 100.0 100.0 100.0
3-8 0.00 0.00 0.00 0.00 0.20 2.40 25.40 60.50 67.00 100.0 100.0 100.0 100.0 100.0
SUIVANTL'ANALYGERANULOMETRIQUE

0.00 0.00 0.00 0.00 0.00 0.00 0.50 0.80 2.60 46.60 72.20 97.1 100.0 100.0
KN/m3

8-15

15-25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.50 16.60 67.00 97.30 100.0
0 3 4 6 12 20 32 40 50 60 69 75 95 100
0 10 18 22 35 40 60 70 75 80 95 100 100 100
0 0 0 0 0 0 0 0 0
0.02 13.62 13.06 17.77 22.14 29.11 44.42 49.05 50.54 65.29 74.42 91.74 99.38 100.00
0.00 0.00 0.00 0.00 0.03 M.F. (#4) 0.00
PROPORTIONS GRANULAIRES

3% fin 0.02 1.01 2.65 2.99 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
38% 0.00 12.62 10.41 14.78 19.11 25.80 38.00 38.00 38.00 38.00 38.00 38.00 38.00 38.00
vol. %

roulé

13% '3-8 0.00 0.00 0.00 0.00 0.03 0.31 3.30 7.87 8.71 13.00 13.00 13.00 13.00 13.00
23% 8-15 0.00 0.00 0.00 0.00 0.00 0.00 0.12 0.18 0.60 10.72 16.61 22.33 23.00 23.00
23% 15-25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.23 0.58 3.82 15.41 22.38 23.00
100%

100 vol. % 0.02 13.62 13.06 17.77 22.14 29.11 44.42 49.05 50.54 65.29 74.42 91.74 99.38 100.0
MF(1)= 0.787 MF(2)= 2.823
ANALYSE GRANULOMETRIQUE ET PROPORTIONS DES GRANULATS
N.B. MF1 considere comme sable le tamisat au tamis #4(5 mm) (voir calcul)
M.F. total 6= M.F.= MF1(melange)-#4= 2.671 <2.8 MF2(melange)= 2.674 <2.8
fin 0.02 1.26 0.787 66.50 11.70 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
roulé 1.07 6.29 2.823 66.80 72.60 61.10 49.70 32.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
'3-8 0.84 6.445 100.00 100.00 100.00 99.80 97.60 74.60 39.50 33.00 0.00 0.00 0.00 0.00 0.00
8-15 2.02 5.04 8.802 100.00 100.00 100.00 100.00 100.00 99.50 99.20 97.40 53.40 27.80 2.90 0.00 0.00
15-25 2.34 pompable<6.3 10.156 100.00 100.00 100.00 100.00 100.00 100.00 100.00 99.00 97.50 83.40 33.00 2.70 0.00

Row 12 sable dune 'sable oued '4-8 8-15 norme norme Row 20 combinason Power (combinason)
'15-25
100.00
f(x) = 9.5036756186 x^0.8953294435
R² = 0.6208280337
90.00

80.00

70.00

10

60.00

50.00 9
8
superficie de
pompabilité
7
selon ACI458-9

40.00

30.00
6

5
20.00
4

2 3

10.00

0.00
0.010 0.100 1.000 10.000 100.000

Laboratoire:
ESSAIS POUR LA FORMULATION DU BÉTON
Firstmix®

Laboratoire:
CONSULTANTS Normes:
A.S.T.M. N.F.
U.N.I. B.S.I
DONNÉES DU BETON

J.U.S. J.A.S.
DIN I.S.I.

Données : Rapport eau/ciment 0.48


Abrams 20 cm
mot de passe: gico air entrappée 1.3 %

Components: Agregats: sables Tazmelt - Bousada


gravier ENG
NOTA BENE: L'étude est menée selon la Ciment CEM II 42,5
méthode Dreux Gorisse Adjuvants (par utilage) Pozzolith 105 Xr
Optima 220

Dosage pour 1 m3 du béton frais


Ciment: 400 Kg 3.050 g/cc 131.148 dm3
Eau + adj. 194.4 Kg E/C 0.48 194.373 dm3
Air occl. : 1.1% 11.0 dm3
CALCUL DE LA FORMULATION

Eau comp. 193 litres E/C réel 0.489 336.52 dm3

Agrégats: 1870 fin/roulé Précision 693.035 dm3


7.32% -3.193% 1031.928 dm3
Granulats: p.s. A.C.I. eua
(v mm) sable fin 56 Kg (*1) 2.650 G/S= 21.170 dm3
sable roulé 711 2.692 1.251 263.967 dm3
3-8 243 2.692 90.305 dm3
8-15 430 2.706 MF(1)= 158.943 dm3
15-25 430 2.711 mélange 158.650 dm3
2.674
Pois rendu -gs.b. 2464.4 Kg/m3 MF(2)=
Facteur du pois spec. 2.742 2.671
Ajutées 1 0.000 0.00% sur FC adj. air dm3 0.00 0.00
2 2.800 0.7% sur FC adj. fluid. dm3 2.373 1.18 2.8 Kg
% en poids

(*1): sable de Bou Saada Val. obs.


Abrams=Kp(cm) 16+ ou - 2 cm Kv = Affaissement (Slump)
RESULTATS

Abrams2=Kp(cm) Kp = 16 +ou - 2 cm
Pois rendu -gs.b. gs.b.= 2421 kg/mc

Air occluée >1.3% P = 1.3 %


Pois un..du béton frais 2412 Kg/mc gs.b.= 2411 kg/mc
MixDesign
Date

Nota Bene:
FEUIL DE CALCUL

Firstmix®
100.00
51
90.00
46
80.00
45
70.00
45
60.00
10%
40%
50.00
5%
27%
40.00
18%

*
30.00

20.00

10.00
#
0.00 7.3%
0.010 0.100 1.000 10.000 100.000 92.7%
MF(melange) = 2.67 <2,8 et >2,5 G/S= 1.251 >1,2 MF1(melange)-#4= 2.671 <2,8 et >2,5 fin/(fin+roul) 7.32%
%tot.sable N.B. MF1 on considere comme sable le tamisat au tamis #4(5 mm)
41% 0 5 10 15 20 25 30 35 40 45 50 %
0-2 3% ###
0-6 38% ###
4-8 13% ###
8-16 23% ###
16-25 23% ###
100% ### 0 5 10 15 20 25 30 35 40 45 50 %

G/S= 1.251 44% 56% 0.078947 12.66667 MF2(melange)= 2.67


FEUIL DE CALCUL

>1.2 sable dune + sable oued de 2.5 a 2.8


Tracé de la courbe granulaire de reférénce (example) selon G.Dreux - Nouveau guide du béton - Eyrolles
Y = 50- V D + K A= Point de brisure
Firstmix®
Tracé de la courbe granulaire de reférénce selon G.Dreux - Nouveau guide du béton - Eyrolles Firstmix®
___
Y = 50- V D + K+Kp Y= 50 avec K=-2 et Kp=+7 A= Point de brisure
X=5mm

100.00
f(x) = 9.5036756186 x^0.8953294435
R² = 0.6208280337 B
90.00

Row 12
80.00
sable dune
'sable oued
70.00
'4-8
10
8-15
60.00
A norme
norme
50.00 9
8
Row 20
7
combinason
40.00
Power (combinason)

30.00 6

5
20.00
4
2 3
10.00

0.00
0.010 0 0.100 1.000 10.000 100.000

100

90

80

70

60

50
44.42
40

30

20

10

0
Marge des fines pour la pompabilité 1.000
Brisure expon. 10.000 100.000
Essailabo
ESSAI LABO Firstmix®
Poids en Kg

humidité sable 400.0 Ciment:

6432.768 5.0% 9.378 194.4 Eau + adj.

Numéro des éprouvettes 6 donnée 0.0 Air occl. :


193.0 Eau comp.
Volume éprouvette 6433 cc 118.896 0.0 0
donnée 1870.0 Agrégats:
Béton nécessaire + 25% (Kg)= 118.896 0.0 0
0.0 Granulats:
plus 25% Kg 56.1 (v mm)

2.707 sable fin 2.707 56.1 0

35.998 sable roulé 34.283 710.6 0

11.729 3-8 11.729 243.1 0

Perc. du m3. 4.825% 20.751 8-15 20.751 430.1 0

20.751 15-25 20.751 430.1 0


2464.4 Pois rendu -gs.b.

EAU 8.909 90.220 2.7 Facteur du pois spec.

0.000

CIMENT 19.298 9.378

99.597
ADJ 0.135 kilogrammes

120.276 0.048805893
Temp

Abaque automathique pur calculer la Temperature du beton


chaleur specifique
Total Ta Kg °C C.S.[J/kg/°C] 0 10 20 30 40 50 60 70 80 90 100 °C
31 800 sable 36 0.2
Total Pa 1000 pierre 26
1800 400 ciment 31
200 eau 22
beton 28.19
Cs(TaPa+TcPc)+TePe
T(beton)= ----------------------------- 0 °C
Cs(Pa+Pc)+Pe
100

Legenda: Cs= pois spec.


T=temp.
°C
a= agregat (sable+pierre)
c=ciment
e=eau air
10

T(beton)= 28.19 °C
theorique

T(air)= 35 °C
60 °C
1
Hum.(air)= 80 %
sable pierre ciment eau beton

T(beton)= 33.38 °C 0 revolutiones 100 200 300 350 Firstmix®

après 151 revolutions


43 108 param. emp. Temperatures des materiaux au moment de l'essai laboen date ………….

Page 10
Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²
Firstmix®
% d'eau dans la sable 0-3

0% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 767 1,421 1,533 2,132 2,300 2,842 3,067 3,553 3,834 4,264 4,600 4,974 5,367 5,685 6,134

GRAVIER 3 - 8 Kg 243 1,010 486 2,020 729 3,029 972 4,039 1,216 5,049 1,459 6,059 1,702 7,069 1,945 8,078

GRAVIER 8 - 15 Kg 430 1,440 860 2,880 1,290 4,320 1,720 5,760 2,151 7,200 2,581 8,639 3,011 10,079 3,441 11,519

GRAVIER 15 - 25 Kg 430 1,870 860 3,740 1,290 5,610 1,720 7,480 2,151 9,350 2,581 11,220 3,011 13,090 3,441 14,960

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 193 386 579 772 965 1158 1351 1544

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

Signature Date
Tableau(1%)

Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²

% d'eau dans la sable 0-3

1% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 774 1,421 1,548 2,132 2,321 2,842 3,095 3,553 3,869 4,264 4,643 4,974 5,417 5,685 6,190

GRAVIER 3 - 8 Kg 243 1,017 486 2,034 729 3,051 972 4,068 1,216 5,085 1,459 6,101 1,702 7,118 1,945 8,135

GRAVIER 8 - 15 Kg 430 1,447 860 2,894 1,290 4,341 1,720 5,788 2,151 7,235 2,581 8,682 3,011 10,129 3,441 11,576

GRAVIER 15 - 25 Kg 430 1,877 860 3,754 1,290 5,631 1,720 7,508 2,151 9,386 2,581 11,263 3,011 13,140 3,441 15,017

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 186 372 558 744 929 1115 1301 1487

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

Signature Date

Page 12
Ste. GICO COSTRUZIONI S. p. A.
Autoroute Est-Ouest Tronçon Lakhdaria R.N.5
Laboratoire: GI-CO Aîn Turk
NORM.
FORMULATION DU BÉTON 27 N / mm²
LABO GI CO BETON RN35 e ng 06

% d'eau dans le sable 0-3

2% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 781 1,421 1,562 2,132 2,343 2,842 3,124 3,553 3,905 4,264 4,685 4,974 5,466 5,685 6,247

GRAVIER 3 - 8 Kg 243 1,024 486 2,048 729 3,072 972 4,096 1,216 5,120 1,459 6,144 1,702 7,168 1,945 8,192

GRAVIER 8 - 15 Kg 430 1,454 860 2,908 1,290 4,362 1,720 5,816 2,151 7,271 2,581 8,725 3,011 10,179 3,441 11,633

GRAVIER 15 - 25 Kg 430 1,884 860 3,768 1,290 5,653 1,720 7,537 2,151 9,421 2,581 11,305 3,011 13,189 3,441 15,074

CIMENT CPJ 42.5 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 179 358 536 715 894 1073 1252 1430

ADJUVANT (n200) Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

Signature Date
Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²

% d'eau dans le sable 0-3

3% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 788 1,421 1,576 2,132 2,364 2,842 3,152 3,553 3,940 4,264 4,728 4,974 5,516 5,685 6,304

GRAVIER 3 - 8 Kg 243 1,031 486 2,062 729 3,093 972 4,124 1,216 5,156 1,459 6,187 1,702 7,218 1,945 8,249

GRAVIER 8 - 15 Kg 430 1,461 860 2,922 1,290 4,384 1,720 5,845 2,151 7,306 2,581 8,767 3,011 10,229 3,441 11,690

GRAVIER 15 - 25 Kg 430 1,891 860 3,783 1,290 5,674 1,720 7,565 2,151 9,457 2,581 11,348 3,011 13,239 3,441 15,131

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 172 343 515 687 858 1030 1202 1373

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

Signature Date
Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²
LABO GI CO BETON RN35 e ng 06

% d'eau dans le sable 0-3

4% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 795 1,421 1,590 2,132 2,385 2,842 3,180 3,553 3,976 4,264 4,771 4,974 5,566 5,685 6,361

GRAVIER 3 - 8 Kg 243 1,038 486 2,076 729 3,115 972 4,153 1,216 5,191 1,459 6,229 1,702 7,268 1,945 8,306

GRAVIER 8 - 15 Kg 430 1,468 860 2,937 1,290 4,405 1,720 5,873 2,151 7,342 2,581 8,810 3,011 10,278 3,441 11,747

GRAVIER 15 - 25 Kg 430 1,898 860 3,797 1,290 5,695 1,720 7,594 2,151 9,492 2,581 11,391 3,011 13,289 3,441 15,187

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 165 329 494 658 823 987 1152 1317

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

1% 1.90 3.80 5.69 7.59 9.49 11.39 13.29 15.19


Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²

% d'eau dans le sable 0-3

5% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 802 1,421 1,604 2,132 2,407 2,842 3,209 3,553 4,011 4,264 4,813 4,974 5,616 5,685 6,418

GRAVIER 3 - 8 Kg 243 1,045 486 2,091 729 3,136 972 4,181 1,216 5,227 1,459 6,272 1,702 7,317 1,945 8,363

GRAVIER 8 - 15 Kg 430 1,475 860 2,951 1,290 4,426 1,720 5,902 2,151 7,377 2,581 8,853 3,011 10,328 3,441 11,803

GRAVIER 15 - 25 Kg 430 1,906 860 3,811 1,290 5,717 1,720 7,622 2,151 9,528 2,581 11,433 3,011 13,339 3,441 15,244

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 157 315 472 630 787 945 1102 1260

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

sa 38.704 eau 7.597 ou Signature Date


Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²
LABO GI CO BETON RN35 e ng 06

% d'eau dans le sable 0-3

6% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 809 1,421 1,619 2,132 2,428 2,842 3,237 3,553 4,047 4,264 4,856 4,974 5,665 5,685 6,475

GRAVIER 3 - 8 Kg 243 1,052 486 2,105 729 3,157 972 4,210 1,216 5,262 1,459 6,315 1,702 7,367 1,945 8,419

GRAVIER 8 - 15 Kg 430 1,483 860 2,965 1,290 4,448 1,720 5,930 2,151 7,413 2,581 8,895 3,011 10,378 3,441 11,860

GRAVIER 15 - 25 Kg 430 1,913 860 3,825 1,290 5,738 1,720 7,651 2,151 9,563 2,581 11,476 3,011 13,388 3,441 15,301

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 150 301 451 601 752 902 1053 1203

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

Signature Date
Laboratoire:
MXLC 350/1 NORM.
FORMULATION DU BÉTON 27 N / mm²

% d'eau dans le sable 0-3

7% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 816 1,421 1,633 2,132 2,449 2,842 3,266 3,553 4,082 4,264 4,899 4,974 5,715 5,685 6,532

GRAVIER 3 - 8 Kg 243 1,060 486 2,119 729 3,179 972 4,238 1,216 5,298 1,459 6,357 1,702 7,417 1,945 8,476

GRAVIER 8 - 15 Kg 430 1,490 860 2,979 1,290 4,469 1,720 5,959 2,151 7,448 2,581 8,938 3,011 10,427 3,441 11,917

GRAVIER 15 - 25 Kg 430 1,920 860 3,839 1,290 5,759 1,720 7,679 2,151 9,599 2,581 11,518 3,011 13,438 3,441 15,358

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 143 287 430 573 716 860 1003 1146

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

Signature Date
Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²
LABO GI CO BETON RN35 e ng 06

% d'eau dans la sable 0-3

8% m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
SABLE Bou Saada Kg 56 56 112 112 168 168 224 224 281 281 337 337 393 393 449 449

SABLE 0 - 3 Kg 711 824 1,421 1,647 2,132 2,471 2,842 3,294 3,553 4,118 4,264 4,941 4,974 5,765 5,685 6,588

GRAVIER 3 - 8 Kg 243 1,067 486 2,133 729 3,200 972 4,267 1,216 5,333 1,459 6,400 1,702 7,467 1,945 8,533

GRAVIER 8 - 15 Kg 430 1,497 860 2,993 1,290 4,490 1,720 5,987 2,151 7,484 2,581 8,980 3,011 10,477 3,441 11,974

GRAVIER 15 - 25 Kg 430 1,927 860 3,854 1,290 5,781 1,720 7,707 2,151 9,634 2,581 11,561 3,011 13,488 3,441 15,415

CIMENT CPJ 45 Kg 400 400 800 1200 1600 2000 2400 2800 3200

EAU Lt 193 136 272 408 545 681 817 953 1089

ADJUVANT Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

Signature Date
Laboratoire:
NORM. essai de convenance
FORMULATION DU BÉTON 27 N / mm² date: ……………………..
‫ت فتجُوو ف‬
‫ف‬ ‫العأمال بالسإمن ت‬ Firstmix®

% d'eau dans les agrégats m3 m3 m3 m3 m3 m3 m3 m3

COMPOSANTS U 1 2 3 4 5 6 7 8
1.5% SABLE Bou Saada Kg 56 57 112 114 168 171 224 228 281 285 337 342 393 399 449 456

9.5% SABLE 0 - 3 Kg 711 835 1,421 1,670 2,132 2,505 2,842 3,340 3,553 4,175 4,264 5,010 4,974 5,845 5,685 6,680

0.2% GRAVIER 3 - 8 Kg 243 1,079 486 2,157 729 3,236 972 4,315 1,216 5,393 1,459 6,472 1,702 7,550 1,945 8,629

0.2% GRAVIER 8 - 15 Kg 430 1,510 860 3,019 1,290 4,529 1,720 6,038 2,151 7,548 2,581 9,058 3,011 10,567 3,441 12,077

0.1% GRAVIER 15 - 25 Kg 430 1,940 860 3,880 1,290 5,820 1,720 7,761 2,151 9,701 2,581 11,641 3,011 13,581 3,441 15,521

CIMENT CPA 42.5 Kg 400 400 800 1,200 2,400 2,000 2400 2800 3200

EAU Lt 193 123 246 369 492 614 737 860 983

ADJUVANT R104 Lt 2.4 2.4 4.7 7.1 9.5 11.9 14.2 16.6 19.0

2.3% % d'eau moy. dans les agrégats 0.59% % volume 0.71% % poids ADJUVANT Mapefluid N200 MAPEI
Signature Date
Laboratoire:
NORM.
FORMULATION DU BÉTON 27 N / mm²
LABO GI CO BETON RN3 5 mi c r o wa v e

% d'eau dans les agregats

microwave testing® Coulage: Date


Firstmix®

poids(g) poids(g) poids(g) poids(g)

COMPOSANTS
cont. tare hum+t hum seche+t seche %

SABLE Bou Saada SF 121.3 311.0 189.7 305.2 183.9 SF 3.2%

SABLE 0 - 3 SR 124.2 335.5 211.3 321.3 197.1 SR 7.2%

GRAVIER 3 - 8 G1 123.4 425.3 301.9 424.5 301.1 G1 0.3%

GRAVIER 8 - 15 G2 123.2 435.5 312.3 435.1 311.9 G2 0.1%

GRAVIER 15 - 25 G3 125.1 395.5 270.4 394.9 269.8 G3 0.2%

Notes
Help

Firstmix® enables anyone who has a basic knowledge of concrete to design a


concrete mix, that is to find the proportions in which cement, water, fine
aggregate and coarse aggregate must be combined in order to produce
concrete of the required workability, strength and durability.

Firstmix® permet, à n'importe qui a une connaissance de base du béton, de


concevoir une formulation de mélange; c'est à dire, trouver les proportions dans
lesquelles le ciment, l'eau, les granulats fins et l'agrégat brut doivent être
combinés afin de produire le béton de la maniabilité, de la résistance et de la
durabilité exigés.

Help:

First step is to insert to Sheet1 all the passing percentages related to aggregates
including specific gravity, absorbtions, SSD etc. Second step
is to digitize cement factor, water cement ratio, percentage of admixtures and so
on in Sheet2. Third step is to adjust aggregates percentage to match the
nearer possible the specified courbe in Sheet "Calcul". Finally in Sheet2 mix
volume should be adjusted to 1000 liters by pushing relevant button. Every
remainig sheet will be than modified automatically and Trial Mix ready to be
tested.

Feuille 1 (% tamisats) Première étape


bouton de réglage

Page 22
Help

Feuille 2 (deuxième étape)

Feuille "Calcul"
Réglage des pourcentages des agrégats selon les courbes projetées

Aide:

La première étape est d'insérer au Feuille1 tous les pourcentages de tamisat


liés aux agrégats comprenant la densité, les absorptions, SSD etc.
Deuxième étape est de digitaliser le facteur de ciment, le rapport eau/ ciment,
pourcentage des adjuvantes et ainsi de suite dans le Feuille2. La
troisième étape est d'ajuster le pourcentage d'agrégats pour assortir le plus
proche possible le courbe indiqué en Feuille " Calcul ". Enfin dans le (Feuille2)
le volume du mélange devrait être ajusté sur 1000 litres en poussant le bouton
approprié. Chaque feuille restante sera modifiée automatiquement et le
mélange d'essai prêt à être examiné.

Nota Bene: Toutes données supplémentaires sont à être ajoutées au cours de la


réalisation des essais de laboratoire ou de convenance

Page 23
Help

Table finale (pourcentages humidité agrégats et dosages cumulatives-

Page 24

S-ar putea să vă placă și