Sunteți pe pagina 1din 4

Department of Civil Engineering

Survey Lab – Current Status

Working
Name of the Name of the Available
S. No. Condition Required Repair
Experiment Equipment (Y/N)
(Y/N)
Survey of an area
by chain survey Chain/Tape, Cross Unable to fit both
1
(Closed traverse) Staff, Ranging Rods, pieces & Painting
& plotting Pegs/Arrows Y Y
Chain/Tape, Cross
2 Chaining across Staff, Ranging Rods,
obstacles Pegs/Arrows Y Y
Determination of Service required for
distance between Compass, Tripod
Compass. Needle is
3 two inaccesible stand, Plumb Bob,
points using Ranging Rods, not functioning.
compass Arrows, Chain/Tape Y Y Prism is to be fitted.
Surveying of a
given area by
prismatic
4 compass (Closed Compass, Tripod
traverse) and stand, Plumb Bob,
plotting after Ranging Rods,
adjustment. Arrows, Chain/Tape Y Y
Radiation method, Screws are required
intersection Plane table with stand,
5
methods by plane Instrument box, Plumb
to connect table and
Table survey Bob Y Y tripod.
Two point and
three point Plane table with stand,
6
problems in plane Instrument box, Plumb
table survey. Bob Y Y
Plane table with stand,
7 Traversing by Instrument box, Plumb
plane table survey Bob Y Y
Dumpy level, Tripod
stand, Ranging rods,
Repair of tripod stand
8 Fly leveling Levelling staff,
to be done.
(differential Chain/Tape, Plumb
leveling) bob Y Y
Dumpy level, Tripod
stand, Ranging rods,
9 An exercise of Levelling staff,
L.S. and C.S. and Chain/Tape, Plumb
plotting. bob Y Y
Dumpy level, Tripod
stand, Ranging rods,
10 Levelling staff,
Two exercises on Chain/Tape, Plumb
contouring. bob Y Y
Study of
theodolite in detail
– practice for Theodolite, Tripod Multiple problems
11 Y Y
measurement of stand, Plumb Bob with the Theodolite
horizontal and
vertical angles
Measurement of
Theodolite, Tripod
horizontal angles
stand, Plumb Bob,
12 by method of Y Y
Chain/Tape, Levelling
repetition and
Staff, Ranging rods
reiteration
Trigonometric
Theodolite, Tripod
Leveling –
stand, Plumb Bob,
13 Heights and Y Y
Chain/Tape, Levelling
distance problem
Staff, Ranging rods
(Two Exercises)
Heights and
distance using Tacheometer, Tripod
Principles of stand, Plumb Bob,
14 Y Y
tachometric Chain/Tape, Levelling
surveying (Two Staff, Ranging rods
Exercises)
Theodolite,
Curve setting –
Chain/Tape, Cross
different methods. Y Y
staff, Arrows, Ranging
(Two Exercises)
rods
Setting out works Cross staff, Arrows,
15 for buildings & Ranging rods, Y Y
pipe lines Chain/Tape
Total station, Tripod
Determination of
stand, Prism, Prism
16 area using total Y Y
rod, Chain,Tape,
station
Ranging rods
Total station, Tripod
Traversing using stand, Prism, Prism
17 Y Y
total station rod, Chain,Tape,
Ranging rods
Total station, Tripod
Contouring using stand, Prism, Prism
18 Y Y
total station rod, Chain,Tape,
Ranging rods
Total station, Tripod
Determination of
stand, Prism, Prism
19 remote height Y Y
rod, Chain,Tape,
using Total station
Ranging rods
Distance,
gradient, Diff. Total station, Tripod
height between stand, Prism, Prism
20 Y Y
too inaccesible rod, Chain,Tape,
points using total Ranging rods
station

Study of
theodolite in detail
– practice for Theodolite, Tripod
21 Y Y
measurement of stand, Plumb Bob
horizontal and
vertical angles
Department of Civil Engineering

Survey Lab – New Purchase (Including Furniture)

Name of the
S. No. Quantity Unit Rate Amount
Equipment

Measuring Tapes (30


1 2 750 1500.00
m)

2 Pegs 20 200 4000.00

3 Ceiling Fans 2 1500 3000.00

4 Tube Light 1 1000 1000.00

Total (Rs) 9500.00

S-ar putea să vă placă și