JISHU-HOZEN TENTATIVE STANDARDS Group: SUNSHINE Prepared: 31.01.

2011
(CLIT) Leader: Revised: 0
Location: 132kv Substation Equipment: COAL MILL FAN VCB Tag:
Part Description Standard Method Tool Action Time Interval Responsibility
if Abnormal (sec.)
I-1 PANEL DOOR NOT -- tighten 30 D JR
BOLT LOOSE KAIBARTA

I-2 CURRENT Below 90% -- Inform 10 D P DAS


of FLA Senior
I-3 INDICATION Indication as -- Inform 05 D JR
LAMP per breaker Senior KAIBARTA
HEALTHINESS operation
I-4 HEALTHINESS OF Ensure pulse -- Inform 05 D JR
ENERGY METER is blinking Senior KAIBARTA
I-5 CURRENT Should be no -- Inform 05 D P DAS
HUNTING hunting Senior
I-6 MICRO- relay -- Inform 05 D JR
PROCESSOR available Senior KAIBARTA
RELAY indication
HEALTHINESS should blink
I-7 ABNORMAL Should not -- Inform 05 D P DAS
HUMMING be any sound Senior
SOUND
I-8 TEMPERATURE Within 60 Chino Inform 10 D P DAS
OF BREAKER deg meter Senior
CHAMBER
I-9 SOROUNDING Within 40 Chino Inform to 05 D
TEMP. deg meter Senior P DAS