This test also used as a primary injection test for HV & LV side BCT's.
PRIMARY SIDE : -
HV side full load current = Power / √3 x Voltage = 100×10^3 = 100000000 = 251 Amps
√3 × 230× 1000 399050
HV side Impedence/ Phase = HV side Impedence X % Impedence = 916 X 12.24 = 112 Ohms
100
LV side SIDE : -
Test connection: Three phase short circuit outside protected zone on 34.5kV side. Three phase
voltage injected on HV side = 380V
Note : -
To make this condition open any one of CT FT fingers and short by insert the FT jack.
0.00 21.985
0.00 22.226
0.00 22.265
Test connection: Three phase short circuit outside protected zone on LV side. Three phase voltage
injected on HV side = 380V
Test connection : The shorting and grounding bar was removed from the Delta winding and current
was injected with Severker Test Kit and secondary currents were measured in the Transformer LCP
panel.