Why Subsea?
Pipeline to shore Riser Platform / Production Platform / FPSO / Pipeline Subsea to Shore
Dual Infield
Pipeline
PLETs
6-slot manifold
Economics
Advantages
Eliminate CAPEX of platform
Cost burden transferred from CAPEX to OPEX
Construction cycle is conducive to fast-track projects
Suitable to phased projects – future expansion
No visual impact
Under ice in Arctic conditions
Disadvantages
Complex hardware
Inaccessible for maintenance and repair
Intervention is expensive and complex
Components of Subsea Systems
SCARAB/SAFFRON DEVELOPMENT
GENERAL ARRANGEMENT
4” MEG PIPELINE
AND PLET H-UTA
SDA E-UTA
INFIELD
UMBILICAL DUAL 20”/24”/36”
EXPORT PIPELINES
UTA WITH FLYING PLETS AND PLEM
LEADS
10” FLOWLINES
1155-01.ppt
Wellhead and Xmas Tree
XMAS TREE
WELLHEAD ASSEMBLY
.
Wellhead
Horizontal Tree
The completion programme often
involves flowing the well via the landing
string.
In deepwater, the string must incorporate
a primary well control barrier and an
emergency disconnect function.
BOP Stack
Subsea Test Tree
Emergency Disconnect Package
Templates and Manifolds
.
MANIFOLD
Templates and Manifolds
RISERS
. INFIELD FLOWLINE
INFIELD FLOWLINE
. .
. FLEXIBLE FLOWLINE
Flowlines and Risers
Flowlines Risers
Rigid or flexible (also bundles, etc.) Driven by water depth and
Transport of product, injection gas, and type of facilities
injection chemicals Flexible flowlines or steel
Selection driven by product service catenary risers
(temperature / composition), water depth,
economics, installation vessels, insulation
requirements, etc.
Vessels, Risers and Moorings
Vessels, Risers and Moorings
Tie-in and Connection Systems
Tie-In and Connection Systems
Subsea Connections
Diver / Diverless
Types of Subsea
Connectors
Flange
Collet
Mandrel
Clamp
Alignment and Connection
Methods
Horizontal stab type
connectors
Vertical stab type connectors
Vertical stab and hinge over
type connectors
Control Systems
Umbilical configurations
Lines to transport hydraulic fluid
and injection chemicals
Electrical power and signal cores
Steel versus thermoplastic lines
Terminations and connectors
Manufacturing methods
Installation
Installation Tooling
PazFlor, Gas/Water Separator Potential Ormen Lange Single Subsea Compression Train
(FMCTI) (Aker Solutions)
Developing Subsea Technology
System Design
Concept, Front End Engineering (FEED), Detail
Reservoir engineering and flow assurance
Subsea System Development
Risk, Reliability and Availability
Fabrication and Testing
Component
Qualification
Factory Acceptance Testing (FAT)
System Integration Testing (SIT)
Installation and Operation
Inspection, Maintenance and Repair (IMR)
Decommissioning
System Design
Semi-submersible FPS
FPSO
Spar FPS
Subsea to Beach
Host facilities
Fixed Platform Tieback
Taut moored
Most wells are surface trees from central drilling center
Use subsea to produce reservoir areas outside SPAR drilling
reach
Oil and gas are exported by pipeline
Satellites and well clusters may be used
Subsea to Beach
Satellite
Cluster
Template
Daisy-chain
Subsea Well Arrangements
Satellite Wells
Cluster Manifold
28-mile tieback to
Viosca Knoll 900
3-well cluster
Template Manifold
Daisy-Chain Tie-in
Risk
Risk = [Frequency or Likelihood] x
Consequence
ALARP - As Low As Reasonably
Practicable
Project Risk Management
Integrating risk with project
economics
Reliability of subsea equipment
Influence of equipment reliability
on system availability
Risk, Reliability and Availability
Risk
Subsea Development Phases
System Design
Concept, Front End Engineering (FEED), Detail
Reservoir engineering and flow assurance
Subsea System Development
Risk, Reliability and Availability
Fabrication and Testing
Component
Qualification
Factory Acceptance Testing (FAT)
Site Integration Testing (SIT)
Installation and Operation
Inspection, Maintenance and Repair (IMR)
Decommissioning
Fabrication
Component Testing
Ensure the component functions reliably
within specified limits, i.e. is fit for purpose
Qualification Testing
Prove a component or assembly is fit for
the intended application
Factory Acceptance Testing (FAT)
Demonstrate the correct functionality and
integrity of an assembly FAT testing of SCMs
System Design
Concept, Front End Engineering (FEED), Detail
Reservoir engineering and flow assurance
Subsea System Development
Risk, Reliability and Availability
Fabrication and Testing
Component
Qualification
Factory Acceptance Testing (FAT)
System Integration Testing (SIT)
Installation and Operation
Inspection, Maintenance and Repair (IMR)
Decommissioning
Subsea Field Operations
Tasks include
Monitoring of equipment condition
Retrieval of modules (chokes, control pods)
Operation of valves
Methods
Divers - saturation and hardsuits
Remotely operated vehicles (ROV)
Remotely operated tools (ROT)
Direct Hydraulic
Subsea Heat Exchangers Multiplexed Electrohydraulic Thermoplastic Hoses
Subsea Separation/Boosting Umbilicals Steel Tube Umbilicals
Special Equipment Control System
Downhole Separation/Boosting ISU Integrated Service Umbilical
Multiphase Flow Pumps Control Buoy
VHF/UHF/Microwave Line of Sight
Pipeline HIPPS system Communications
Geostationary Satellite
LEO Low Earth Orbit Satellite
Well or Field Isolation
Fibre Optic
Tie-ins/Future Expansion
Annulus Monitoring/Venting
Gas Lift/Injection/Disposal TLP
Water Injection Facilities/Services Floating Production System Semi-sub
Hydrate Inhibition Host Facility Fixed Platform FPSO
Corrosion Inhibition Onshore Facility Spar
Paraffin Wax Removal/Inhibition
Scale Removal/Inhibition
Xmas Trees Horizontal
Conventional (Vertical)
Anchored or DP
Lay/derrick barge
Diving Support Vessel (DSV) Installation Spread Individual Flowlines/Jumpers
Infield Gathering
Multi-Service Vessel (MSV) Daisy-Chain
Drilling Rig Manifold
Supply/Work Boat Subsea System
Building Blocks Steel Catenary/Lazy-Wave
Venturi per Well Import/Export Risers Flexibles
Test Header + Test Flowline Well testing Hybrid
Single MPFM + Test Header SSIV
MPFM per Well
Diver/ROV/ROT
Protection/Anti-snagging Connection Systems
Flange
Weight Limitations for Installation
Structural Remote Tie-Ins Vertical
Transportation (Road / Ship)
Horizontal
Foundations (Pile or Mudmat)
Support for other equipment
None
Topsides Dehydration
Infield Processing
Carbon Steel vs CRA Topsides Compression
Corrosion Inhibition Subsea Dehydration
Corrosion Monitoring (eg FSM) Pipeline Corrosion Subsea Compression
Intelligent Pigging
Topsides/Subsea Pig Launcher Satellite Wells (Vertical or Deviated)
Pigging Loop/Dual Pipelines Cluster Manifold Wells (Usually Deviated)
Well arrangements
Template Manifold Wells (Deviated)
Individual Lines to each Well/Manifold Chemical Injection Distributed Tie-In
Metered Subsea Distribution System Daisy-Chain
The Present
Continuing Challenges
Changes in business practices
Marginal Field Economics
Deep waters require new
approaches
Vessel costs and availability for
installation
Market size justifies
development costs
Health, safety and the
environment
Politics! (not everything can be
solved by engineering and
technology)