A4 Expressway Stip-Radovis;

Construction works on section


Interchange Stip South (Sofilari) - Bucim
(km 5+000 to km 28+560)

Oil separators

Necessary characteristics

Q (l/s) L(mm) B(mm) H(mm) Hul (mm) Hiz (mm) DN(mm) Quantity
TИП 1 50/250 4160 2000 2120 1558 1520 500 24
TИП 2 100/500 6160 2400 2100 1430 1330 600 6
TИП 3 200/1000 8160 2400 2620 1725 1625 800 5
A4 Expressway Stip-Radovis;
Construction works on section
Interchange Stip South (Sofilari) - Bucim
(km 5+000 to km 28+560)

SECTION Chainage No. Type Quantity


5+999.80 MФ 5 1
SECTION 2: from
km 5+060,00 to 6+800.00 MФ 6 1
km 7+413,09 7+220.00 MФ 7 1 3
7+541.51 MФ 1 1
8+580.00 MФ 2 1
10+140.00 MФ 3 3
11+560.00 MФ 4 2
11+180.00 MФ 5 1
12+240.00 MФ 6 1
13+760.00 MФ 7 1
14+000.00 MФ 8 1
14+680.00 MФ 9 3
15+760.00 MФ 10 2
SECTION 3: from 16+310.00 MФ 11 2
km 7+413.09 to 22
km 21+120.00 16+660.00 MФ 12 2
MФ 13 3
17+200.00 MФ 14 3
17+560.00 MФ 15 1
17+680.00 MФ 16 1
17+980.00 MФ 17 2
18+420.00 MФ 18 1
19+000.00 MФ 19 1
19+160.00 MФ 20 1
19+440.00 MФ 21 2
0+160.00 MФ 22 3
21+320.00 МФ 1 1
22+100.00 МФ 2 1
23+200.00 МФ 3 1
23+960.00 МФ 4 1
SECTION 4: from 24+740.00 МФ 5 1
km 21+120.00 - to 10
km 28+556.84 25+100.00 МФ 6 1
26+520.00 МФ 7 1
26+860.00 МФ 8 1
27+320.00 МФ 9 1
28+139.00 МФ 10 1
укупно 35 кoм
Contact:
Joković Dušan,
Graduate Civil Engineer
dusan.jokovic@strabag.com
+389 (0) 72/ 206 - 449