Documente Academic
Documente Profesional
Documente Cultură
01 PAVIMENTACION
1.01 OBRASPRELIMINARES
01.01.01 ALMACEN GUARDIANIA Y RESIDENCIA mes 501.19 6.00 3007.14 1.00 3007.14
01.01.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA glb 25750.83 1.00 25750.83 4.00 12,875.42
12875.42
01.01.03 CARTEL DE IDENTIFICACION DE OBRA 3.60x 7.20 und 594.70 1.00 594.70 2.00 594.70
01.01.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION m2 0.96 30762.37 29531.88 60.00 5906.38 14765.94 8859.56
01.01.05 TRANQUERAS DE MADERA EN OBRA und 67.53 17.00 1148.01 2.00 574.01 574.01
PARALIZACION
1.02 MOVIMIENTO DE TIERRAS
01.02.01 RETIRO DE ADOQUINADO EXISTENTE m2 4.53 350.68 1588.58 6.00 1,588.58
01.02.02 CORTE DE TERRENO EN MATERIAL COMPACTADO CON MAQUINARIA T m3 4.93 18291.09 90175.07 28.00 35425.92 54749.15
01.02.03 TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO m3 4.60 22863.86 105173.76 60.00 5258.69 52586.88 47328.19
1.03 PAVIMENTOS
01.03.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 3.30 30762.37 101515.82 20.00 65,985.28 35530.54
01.03.03 MEJORAMIENTO DE LA SUB RASANTE E=0.20M m3 42.30 6152.47 260249.48 12.00 260249.48
01.03.04 PAVIMENTO RIGIDO CONCRETO F'c=210kg/cm2 DOSIFICADO m3 308.77 6152.47 1899698.16 90.00 633232.72 654340.48
612124.96
01.03.05 PAVIMENTO RIGIDO ENCOFRADO Y DESENCOFRADO m2 22.66 2312.79 52407.82 75.00 20963.13 21661.9
9782.79
01.03.06 ACERO DE REFUERZO fy=4200 kg/cm2 EN PAVIMENTO RIGIDO kg 3.00 14709.42 44128.26 75.00 17651.3 18239.68
8237.28
01.03.07 JUNTAS ASFALTICAS EN PAVIMENTO RIGIDO m 1.59 11563.97 18386.71 30.00 13,483.59 4903.12
2.00 VEREDAS
2.01 OBRAS PROVISIONALES
02.01.01 TRAZO Y REPLANTEO EN VEREDAS m2 0.87 6880.44 5985.98 15.00 3,990.65 1995.33
02.02.02 ELIMINACION Y TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO m3 4.60 2150.14 9890.64 15.00 9890.64
02.02.03 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 54.50 688.04 37498.18 45.00 11666.1 25832.08
02.02.04 NIVELADO Y COMPACTADO CON EQUIPO m2 2.62 6880.44 18026.75 30.00 9013.38 9013.38
02.03.02 VEREDAS CONCRETO SIMPLE FC=175KG/CM2 E=0.10CM DOSIFICADO I m3 282.23 688.04 194185.53 45.00 6618.72 13237.44
02.03.03 VEREDAS SARDINEL ENCOFRADO Y DESENCOFRADO m2 21.98 3280.47 72104.73 30.00 36052.37 36052.37
02.03.04 VEREDAS SARDINEL FC=175 DOSIFICADO INCLUYE ACABADOS m3 282.10 246.03 69405.06 45.00 23135.02 46270.04
02.03.05 VERDEDAS SARDINEL JUNTA ASFALTICA m 5.93 1171.60 6947.59 20.00 5210.69 1736.9
4.00 SEÑALIZACION
4.01 PINTADO EN SARDINELES DE VEREDAS m 5.17 7099.05 36702.09 30.00 26914.87 9787.22
6.00 VARIOS
6.01 NIVELACION DE BUZONES EN GENERAL und 174.36 57.00 9938.52 10.00 1,997.68 7950.82
COSTO DIRECTO 3,578,457.70 69221.49 256314.1876 707452.04 939609.31 840085.19 674528.87 91246.64
GASTOS GENERALES 8% 286,276.62 5537.7192 20505.135008 56596.1632 75168.7448 67206.8152 53962.3096 7299.7312
SUB TOTAL 4,115,226.35 79604.7135 294761.31574 813569.846 1080550.7065 966097.9685 775708.2005 104933.636
FACTOR DE RELACION=0.95 3,909,465.03 75624.477825 265285.184166 732212.8614 972495.63585 869488.17165 698137.38045 94440.2724
PORCENTAJE DE AVANCE 100.00% 1.93% 7.16% 19.77% 26.26% 23.48% 18.85% 2.55%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 1.93% 9.10% 28.87% 55.12% 78.60% 97.45% 100.00%
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE LOS PRINCIPALES JIRONES DE LA CIUDAD DE CRUCERO PROVINCIA DE CARABAYA - PUNO
PROPIETARIO: DISTRITO DE CRUCERO - CARABAYA - PUNO
0 0 0 0 0 0 0 0 0 0
0.4
0.2
0
0 ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE
0
RESUMEN DE VALORIZACION
Monto del MARZO ABRIL
DESCRIPCION
Contrato S/IGV Monto Monto
VALORIZACION MENSUAL S/. 3,909,465.03 S/. 103,983.56 S/. 285,271.34
TOTAL CONTRACTUAL S/. 3,909,465.03 S/. 103,983.56 S/. 285,271.34
REAJUSTES(S)
REAJUSTE MARZO S/. (15,181.60) S/. (42,220.16)
DEDUCTIVO POR AD. DIREC. S/. 17.34 S/. -
VALORIZACION BRUTA (VB= V+S) S/. 88,801.96 S/. 243,051.18
AMORTIZACIONES (A)
AMORTIZACION ADELANTO DIRECTO S/. 390,946.50 S/. 10,398.36 S/. 28,527.13
AMORTIZACION DE MATERIALES S/. 281,402.03 S/. - S/. 281,402.03
TOTAL AMORTIZACIONES S/. 10,398.36 S/. 309,929.16
VALORIZACION NETA(VN= VB-A) S/. 78,403.60 S/. (66,877.98)
EFECTIVO(VN-M) S/IGV S/. 3,909,465.03 S/. 78,403.60 S/. (66,877.98)
INTERESES POR DEMORA EN EL PAGO DE
VALORIZACIONES
IMPUESTO GENRAL VENTAS 18% S/. 703,703.71 S/. 14,112.65 S/. (12,038.04)
MONTO TOTAL CON IGV S/. 4,613,168.74 S/. 92,516.25 S/. (78,916.02)
TOTAL COMPROMISO A SOLICITAR S/. 4,613,168.74 S/. 92,516.25 S/. (78,916.02)
N DE VALORIZACION
MAYO JUNIO JULIO SALDO
% %
Monto Monto Monto Monto
### ### ### 79.01% S/. 820,571.47 ###
### ### ###
FORMULA POLINOMICA
K = 0.135*(Mr/Mo)+0.293(Cr/Co)+0.192(Aah/Aao)+0.173(M/Mo)+0.207(Ir/Io)
20 % AL
SALDO BRUTO POR Imo Ima MONTO MÁXIMO ADELANTO DE MONTO
VALORIZAR SOLICITADO
COEFICIENTE DE MATERIALES
IU DESCRIPCIÓN % DE INCIDENCIA F.R.
INCIDENCIA
(SIN IGV) (SIN IGV) (SIN IGV) (SIN IGV)
Aug-16 Apr-17
47.00 Mano de obra Inc. leyes sociales 0.135 1.00 3,578,457.697 0.90 562.24 563.25 435563.65 87,112.73
21.00 Cemento portland Tipo I 0.293 1.00 3578457.6965 0.9 851.6 410.96 455,375.77 91,075.15 91,075.15
03 Acero de Construcción corrugado. 0.293 0.06 3578457.6965 0.9 461.45 431.87 55,196.87 11,039.37 11,039.37
05 Agregado grueso. 0.293 0.94 3578457.6965 0.9 648.34 656.97 896,437.50 179,287.50 179,287.50
49 Maquinaria y equipo importado 0.29 1.00 3578457.6965 0.90 298.91 292.48 923,340.21 184,668.04
39 Indice general de precios al consumidor 0.29 1.00 3578457.6965 0.9 430.96 443.37 970,812.50 194,162.50