CALENDARIO DE AVANCE DE OBRA ACTUALIZADO MODIFICADO

Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17


ITEM DESCRIPCION PARTIDA Und. Unitario METRADO PARCIAL DURACIÓN
DEL 20 AL 31 DEL 1 AL 30 DEL 1 AL 25 DEL 25 AL 31 DEL 1 AL 30 DEL 1 AL 31 DEL 1 AL 31 DEL 1 AL 15

01 PAVIMENTACION
1.01 OBRASPRELIMINARES
01.01.01 ALMACEN GUARDIANIA Y RESIDENCIA mes 501.19 6.00 3007.14 1.00 3007.14

01.01.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA glb 25750.83 1.00 25750.83 4.00 12,875.42
12875.42

01.01.03 CARTEL DE IDENTIFICACION DE OBRA 3.60x 7.20 und 594.70 1.00 594.70 2.00 594.70

01.01.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION m2 0.96 30762.37 29531.88 60.00 5906.38 14765.94 8859.56

01.01.05 TRANQUERAS DE MADERA EN OBRA und 67.53 17.00 1148.01 2.00 574.01 574.01

PARALIZACION
1.02 MOVIMIENTO DE TIERRAS
01.02.01 RETIRO DE ADOQUINADO EXISTENTE m2 4.53 350.68 1588.58 6.00 1,588.58

01.02.02 CORTE DE TERRENO EN MATERIAL COMPACTADO CON MAQUINARIA T m3 4.93 18291.09 90175.07 28.00 35425.92 54749.15

01.02.03 TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO m3 4.60 22863.86 105173.76 60.00 5258.69 52586.88 47328.19

1.03 PAVIMENTOS
01.03.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 3.30 30762.37 101515.82 20.00 65,985.28 35530.54

01.03.02 SUB BASE E=0.20 M m3 35.71 6152.47 219704.70 12.00 219,704.70

01.03.03 MEJORAMIENTO DE LA SUB RASANTE E=0.20M m3 42.30 6152.47 260249.48 12.00 260249.48

01.03.04 PAVIMENTO RIGIDO CONCRETO F'c=210kg/cm2 DOSIFICADO m3 308.77 6152.47 1899698.16 90.00 633232.72 654340.48
612124.96

01.03.05 PAVIMENTO RIGIDO ENCOFRADO Y DESENCOFRADO m2 22.66 2312.79 52407.82 75.00 20963.13 21661.9
9782.79

01.03.06 ACERO DE REFUERZO fy=4200 kg/cm2 EN PAVIMENTO RIGIDO kg 3.00 14709.42 44128.26 75.00 17651.3 18239.68
8237.28

01.03.07 JUNTAS ASFALTICAS EN PAVIMENTO RIGIDO m 1.59 11563.97 18386.71 30.00 13,483.59 4903.12

2.00 VEREDAS
2.01 OBRAS PROVISIONALES
02.01.01 TRAZO Y REPLANTEO EN VEREDAS m2 0.87 6880.44 5985.98 15.00 3,990.65 1995.33

2.02 MOVIMIENTO DE TIERRAS


02.02.01 EXCAVACION SUPERFICIAL DE TERRENO PARA VEREDAS m3 22.42 1720.11 38564.87 45.00 24852.92 13711.95

02.02.02 ELIMINACION Y TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO m3 4.60 2150.14 9890.64 15.00 9890.64

02.02.03 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 54.50 688.04 37498.18 45.00 11666.1 25832.08

02.02.04 NIVELADO Y COMPACTADO CON EQUIPO m2 2.62 6880.44 18026.75 30.00 9013.38 9013.38

2.03 OBRAS DE CONCRETO SIMPLE


02.03.01 VEREDAS ENCOFRADO Y DESENCOFRADO m2 23.33 851.10 19856.16 20.00 145639.15 48546.38

02.03.02 VEREDAS CONCRETO SIMPLE FC=175KG/CM2 E=0.10CM DOSIFICADO I m3 282.23 688.04 194185.53 45.00 6618.72 13237.44

02.03.03 VEREDAS SARDINEL ENCOFRADO Y DESENCOFRADO m2 21.98 3280.47 72104.73 30.00 36052.37 36052.37

02.03.04 VEREDAS SARDINEL FC=175 DOSIFICADO INCLUYE ACABADOS m3 282.10 246.03 69405.06 45.00 23135.02 46270.04

02.03.05 VERDEDAS SARDINEL JUNTA ASFALTICA m 5.93 1171.60 6947.59 20.00 5210.69 1736.9

4.00 SEÑALIZACION
4.01 PINTADO EN SARDINELES DE VEREDAS m 5.17 7099.05 36702.09 30.00 26914.87 9787.22

4.02 PINTADO EN PAVIMENTO m2 4.59 1243.50 5707.67 20.00 3709.99

4.03 SEÑALIZACION VERTICAL und 261.63 6.00 1569.78 1569.78

6.00 VARIOS
6.01 NIVELACION DE BUZONES EN GENERAL und 174.36 57.00 9938.52 10.00 1,997.68 7950.82

6.02 LIMPIEZA FINAL DE OBRA m2 1.64 30762.37 50450.29 7.00 50450.29

7.00 FLETE TERRESTE 60.00


7.01 FLETE TERRESTRE CIUDAD DE JULIACA -CRUCERO (LUGAR DE OBRA) glb 148562.93 1.00 148562.93 29712.59 76757.51 42092.83
1987.7

COSTO DIRECTO 3,578,457.70 69221.49 256314.1876 707452.04 939609.31 840085.19 674528.87 91246.64

GASTOS GENERALES 8% 286,276.62 5537.7192 20505.135008 56596.1632 75168.7448 67206.8152 53962.3096 7299.7312

UTILIDAD 7% 250,492.04 4845.5043 17941.993132 49521.6428 65772.6517 58805.9633 47217.0209 6387.2648

SUB TOTAL 4,115,226.35 79604.7135 294761.31574 813569.846 1080550.7065 966097.9685 775708.2005 104933.636

FACTOR DE RELACION=0.95 3,909,465.03 75624.477825 265285.184166 732212.8614 972495.63585 869488.17165 698137.38045 94440.2724

IGV 703,703.71 13612.4060085 47751.33314988 131798.315052 175049.214453 156507.870897 125664.728481 16999.249032

TOTAL 4,613,168.74 89236.8838335 313036.51731588 864011.176452 1147544.850303 1025996.042547 823802.108931 111439.521432

PORCENTAJE DE AVANCE 100.00% 1.93% 7.16% 19.77% 26.26% 23.48% 18.85% 2.55%

PORCENTAJE DE AVANCE ACUMULADO 100.00% 1.93% 9.10% 28.87% 55.12% 78.60% 97.45% 100.00%
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE LOS PRINCIPALES JIRONES DE LA CIUDAD DE CRUCERO PROVINCIA DE CARABAYA - PUNO
PROPIETARIO: DISTRITO DE CRUCERO - CARABAYA - PUNO

VALORIZACION MENSUAL N° 01 ABRIL - 2017


PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR
ITEM DESCRIPCION UND
PUNIT METRADO PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
01 PAVIMENTACION
1.01 OBRASPRELIMINARES
01.01.01 ALMACEN GUARDIANIA Y RESIDENCIA 501.19 6.00 3,007.14 1.00 501.19 1.00 501.19 5.00 2,505.95
01.01.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA 25,750.83 1.00 25,750.83 0.50 12,875.42 0.50 12,875.42 0.50 12,875.41
01.01.03 CARTEL DE IDENTIFICACION DE OBRA 3.60x 7.20 594.70 1.00 594.70 1.00 594.70 1.00 594.70 0.00 0.00
01.01.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION 0.96 30,762.37 29,531.88 10,000.00 9,600.00 10,000.00 9,600.00 20,762.37 19,931.88
01.01.05 TRANQUERAS DE MADERA EN OBRA 67.53 17.00 1,148.01 0.00 0.00 0.00 0.00 17.00 1,148.01
1.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
01.02.01 RETIRO DE ADOQUINADO EXISTENTE 4.53 350.68 1,588.58 0.00 0.00 350.68 1,588.58
01.02.02 CORTE DE TERRENO EN MATERIAL COMPACTADO CON MAQUINARIA TRACTOR 4.93 18,291.09 90,175.07 8,000.00 39,440.00 8,000.00 39,440.00 10,291.09 50,735.07
01.02.03 TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO 4.60 22,863.86 105,173.76 5,000.00 23,000.00 5,000.00 23,000.00 17,863.86 82,173.76
1.03 PAVIMENTOS 0.00 0.00 0.00
01.03.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE 3.30 30,762.37 101,515.82 0.00 0.00 0.00 30,762.37 101,515.82
01.03.02 SUB BASE E=0.20 M 35.71 6,152.47 219,704.70 0.00 0.00 0.00 6,152.47 219,704.70
01.03.03 MEJORAMIENTO DE LA SUB RASANTE E=0.20M 42.30 6,152.47 260,249.48 0.00 0.00 0.00 6,152.47 260,249.48
01.03.04 PAVIMENTO RIGIDO CONCRETO F'c=210kg/cm2 DOSIFICADO 308.77 6,152.47 1,899,698.16 0.00 0.00 0.00 6,152.47 1,899,698.16
01.03.05 PAVIMENTO RIGIDO ENCOFRADO Y DESENCOFRADO 22.66 2,312.79 52,407.82 0.00 0.00 0.00 2,312.79 52,407.82
01.03.06 ACERO DE REFUERZO fy=4200 kg/cm2 EN PAVIMENTO RIGIDO 3.00 14,709.42 44,128.26 0.00 0.00 0.00 14,709.42 44,128.26
01.03.07 JUNTAS ASFALTICAS EN PAVIMENTO RIGIDO 1.59 11,563.97 18,386.71 0.00 0.00 0.00 11,563.97 18,386.71
2.00 VEREDAS 0.00 0.00 0.00
2.01 OBRAS PROVISIONALES 0.00 0.00 0.00
02.01.01 TRAZO Y REPLANTEO EN VEREDAS 0.87 6,880.44 5,985.98 2,000.00 1,740.00 2,000.00 1,740.00 4,880.44 4,245.98
2.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
02.02.01 EXCAVACION SUPERFICIAL DE TERRENO PARA VEREDAS 22.42 1,720.11 38,564.87 0.00 0.00 0.00 1,720.11 38,564.87
02.02.02 ELIMINACION Y TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO 4.60 2,150.14 9,890.64 0.00 0.00 0.00 2,150.14 9,890.64
02.02.03 RELLENO MANUAL CON MATERIAL DE PRESTAMO 54.50 688.04 37,498.18 0.00 0.00 0.00 688.04 37,498.18
02.02.04 NIVELADO Y COMPACTADO CON EQUIPO 2.62 6,880.44 18,026.75 0.00 0.00 0.00 6,880.44 18,026.75
2.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00
02.03.01 VEREDAS ENCOFRADO Y DESENCOFRADO 23.33 851.10 19,856.16 0.00 0.00 0.00 851.10 19,856.16
02.03.02 VEREDAS CONCRETO SIMPLE FC=175KG/CM2 E=0.10CM DOSIFICADO INCLUYE 282.23 688.04 194,185.53 0.00 0.00 0.00 688.04 194,185.53
02.03.03 VEREDAS SARDINEL ENCOFRADO Y DESENCOFRADO 21.98 3,280.47 72,104.73 0.00 0.00 0.00 3,280.47 72,104.73
02.03.04 VEREDAS SARDINEL FC=175 DOSIFICADO INCLUYE ACABADOS 282.10 246.03 69,405.06 0.00 0.00 0.00 246.03 69,405.06
02.03.05 VERDEDAS SARDINEL JUNTA ASFALTICA 5.93 1,171.60 6,947.59 0.00 0.00 0.00 1,171.60 6,947.59
4.00 SEÑALIZACION 0.00 0.00 0.00
4.01 PINTADO EN SARDINELES DE VEREDAS 5.17 7,099.05 36,702.09 0.00 0.00 0.00 7,099.05 36,702.09
4.02 PINTADO EN PAVIMENTO 4.59 1,243.50 5,707.67 0.00 0.00 0.00 1,243.50 5,707.67
4.03 SEÑALIZACION VERTICAL 261.63 6.00 1,569.78 0.00 0.00 0.00 6.00 1,569.78
6.00 VARIOS 0.00 0.00 0.00
6.01 NIVELACION DE BUZONES EN GENERAL 174.36 57.00 9,938.52 0.00 0.00 0.00 57.00 9,938.52
6.02 LIMPIEZA FINAL DE OBRA 1.64 30,762.37 50,450.29 0.00 0.00 0.00 30,762.37 50,450.29
7.00 FLETE TERRESTE 0.00 0.00 0.00
7.01 FLETE TERRESTRE CIUDAD DE JULIACA -CRUCERO (LUGAR DE OBRA) 148,562.93 1.00 148,562.93 0.05 7,428.15 0.05 7,428.15 0.95 141,134.78
COSTO DIRECTO 3,578,457.70 0.00 95,179.46 95,179.46 3,483,278.24
GASTOS GENERALES 8% 286,276.62 0.00 7,614.36 7,614.36 278,662.26
UTILIDAD 7% 250,492.04 0.00 6,662.56 6,662.56 243,829.48
SUB TOTAL 4,115,226.35 0.00 109,456.38 109,456.38 4,005,769.97
FACTOR DE RELACION=0.95 3909465.0334 0 103983.56005 103983.56005 3805481.47338
PORCENTAJE DE AVANCE DE OBRA 100.00% 0.00% 2.66% 2.66% 97.34%
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE LOS PRINCIPALES JIRONES DE LA CIUDAD DE CRUCERO PROVINCIA DE CARAVAYA - PUNO
PROPIETARIO: DISTRITO DE CRUCERO - CARABAYA - PUNO

VALORIZACION MENSUAL N° 02 MAYO 2017


PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR
ITEM DESCRIPCION UND
PUNIT METRADO PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
01 PAVIMENTACION
1.01 OBRASPRELIMINARES
01.01.01 ALMACEN GUARDIANIA Y RESIDENCIA 501.19 6.00 3,007.14 1.00 501.19 1.00 501.19 2.00 1,002.38 4.00 2,004.76
01.01.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA 25,750.83 1.00 25,750.83 0.50 12,875.42 0.00 0.00 0.50 12,875.42 0.50 12,875.41
01.01.03 CARTEL DE IDENTIFICACION DE OBRA 3.60x 7.20 594.70 1.00 594.70 1.00 594.70 0.00 0.00 1.00 594.70 0.00 0.00
01.01.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION 0.96 30,762.37 29,531.88 10,000.00 9,600.00 5,000.00 4,800.00 15,000.00 14,400.00 15,762.37 15,131.88
01.01.05 TRANQUERAS DE MADERA EN OBRA 67.53 17.00 1,148.01 0.00 0.00 10.00 675.30 10.00 675.30 7.00 472.71
1.02 MOVIMIENTO DE TIERRAS 0.00
01.02.01 RETIRO DETERRENO
CORTE DE ADOQUINADO EXISTENTE
EN MATERIAL COMPACTADO CON MAQUINARIA 4.53 350.68 1,588.58 0.00 0.00 0.00 0.00 0.00 350.68 1,588.58
01.02.02 TRACTOR 4.93 18,291.09 90,175.07 8,000.00 39,440.00 5,000.00 24,650.00 13,000.00 64,090.00 5,291.09 26,085.07
01.02.03 TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO 4.60 22,863.86 105,173.76 5,000.00 23,000.00 5,000.00 23,000.00 10,000.00 46,000.00 12,863.86 59,173.76
1.03 0.00
01.03.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE 3.30 30,762.37 101,515.82 0.00 0.00 15,000.00 49,500.00 15,000.00 49,500.00 15,762.37 52,015.82
01.03.02 SUB BASE E=0.20 M 35.71 6,152.47 219,704.70 0.00 0.00 0.00 0.00 0.00 0.00 6,152.47 219,704.70
01.03.03 MEJORAMIENTO DE LA SUB RASANTE E=0.20M 42.30 6,152.47 260,249.48 0.00 0.00 2,500.00 105,750.00 2,500.00 105,750.00 3,652.47 154,499.48
01.03.04 PAVIMENTO RIGIDO CONCRETO F'c=210kg/cm2 DOSIFICADO 308.77 6,152.47 1,899,698.16 0.00 0.00 0.00 0.00 0.00 0.00 6,152.47 1,899,698.16
01.03.05 PAVIMENTO RIGIDO ENCOFRADO Y DESENCOFRADO 22.66 2,312.79 52,407.82 0.00 0.00 0.00 0.00 0.00 0.00 2,312.79 52,407.82
01.03.06 ACERO DE REFUERZO fy=4200 kg/cm2 EN PAVIMENTO RIGIDO 3.00 14,709.42 44,128.26 0.00 0.00 0.00 0.00 0.00 0.00 14,709.42 44,128.26
01.03.07 JUNTAS ASFALTICAS EN PAVIMENTO RIGIDO 1.59 11,563.97 18,386.71 0.00 0.00 0.00 0.00 0.00 0.00 11,563.97 18,386.71
2.00 VEREDAS 0.00
2.01 OBRAS PROVISIONALES 0.00
02.01.01 TRAZO Y REPLANTEO EN VEREDAS 0.87 6,880.44 5,985.98 2,000.00 1,740.00 2,000.00 1,740.00 4,000.00 3,480.00 2,880.44 2,505.98
2.02 MOVIMIENTO DE TIERRAS 0.00
02.02.01 EXCAVACION SUPERFICIAL
ELIMINACION DE TERRENO
Y TRANSPORTE PARAEXCEDENTE
DE MATERIAL VEREDAS CON 22.42 1,720.11 38,564.87 0.00 0.00 350.00 7,847.00 350.00 7,847.00 1,370.11 30,717.87
02.02.02 CARGUIO 4.60 2,150.14 9,890.64 0.00 0.00 350.00 1,610.00 350.00 1,610.00 1,800.14 8,280.64
02.02.03 RELLENO MANUAL CON MATERIAL DE PRESTAMO 54.50 688.04 37,498.18 0.00 0.00 200.00 10,900.00 200.00 10,900.00 488.04 26,598.18
02.02.04 NIVELADO Y COMPACTADO CON EQUIPO 2.62 6,880.44 18,026.75 0.00 0.00 3,000.00 7,860.00 3,000.00 7,860.00 3,880.44 10,166.75
2.03 OBRAS DE CONCRETO SIMPLE 0.00
02.03.01 VEREDAS CONCRETO
VEREDAS ENCOFRADOSIMPLE
Y DESENCOFRADO
FC=175KG/CM2 E=0.10CM DOSIFICADO 23.33 851.10 19,856.16 0.00 0.00 0.00 0.00 0.00 0.00 851.10 19,856.16
02.03.02 INCLUYE ACABADOS 282.23 688.04 194,185.53 0.00 0.00 0.00 0.00 0.00 688.04 194,185.53
02.03.03 VEREDAS SARDINEL ENCOFRADO Y DESENCOFRADO 21.98 3,280.47 72,104.73 0.00 0.00 0.00 0.00 0.00 3,280.47 72,104.73
02.03.04 VEREDAS SARDINEL FC=175 DOSIFICADO INCLUYE ACABADOS 282.10 246.03 69,405.06 0.00 0.00 0.00 0.00 0.00 246.03 69,405.06
02.03.05 VERDEDAS SARDINEL JUNTA ASFALTICA 5.93 1,171.60 6,947.59 0.00 0.00 0.00 0.00 0.00 1,171.60 6,947.59
4.00 SEÑALIZACION 0.00
4.01 PINTADO EN SARDINELES DE VEREDAS 5.17 7,099.05 36,702.09 0.00 0.00 0.00 0.00 0.00 0.00 7,099.05 36,702.09
4.02 PINTADO EN PAVIMENTO 4.59 1,243.50 5,707.67 0.00 0.00 0.00 0.00 0.00 0.00 1,243.50 5,707.67
4.03 SEÑALIZACION VERTICAL 261.63 6.00 1,569.78 0.00 0.00 0.00 0.00 0.00 6.00 1,569.78
6.00 VARIOS 0.00 0.00
6.01 NIVELACION DE BUZONES EN GENERAL 174.36 57.00 9,938.52 0.00 0.00 0.00 0.00 0.00 0.00 57.00 9,938.52
6.02 LIMPIEZA FINAL DE OBRA 1.64 30,762.37 50,450.29 0.00 0.00 0.00 0.00 0.00 0.00 30,762.37 50,450.29
7.00 FLETE TERRESTE 0.00 0.00
7.01 FLETE TERRESTRE CIUDAD DE JULIACA -CRUCERO (LUGAR DE OBRA) 148,562.93 1.00 148,562.93 0.05 7,428.15 0.15 22,284.44 0.20 29,712.59 0.80 118,850.34
COSTO DIRECTO 3,578,457.70 95,179.46 261,117.93 356,297.39 3,222,160.31
GASTOS GENERALES 8% 286,276.62 7,614.36 20,889.43 28,503.79 257,772.82
UTILIDAD 7% 250,492.04 6,662.56 18,278.26 24,940.82 225,551.22
SUB TOTAL 4,115,226.35 109,456.38 300,285.62 409,742.00 3,705,484.35
FACTOR DE RELACION=0.95 3909465.0334 103983.56005 285271.338525 389254.898575 3520210.13485
PORCENTAJE DE AVANCE DE OBRA 100.00% 2.66% 7.30% 9.96% 90.04%
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE LOS PRINCIPALES JIRONES DE LA CIUDAD DE CRUCERO PROVINCIA DE CARAVAYA - PUNO
PROPIETARIO: DISTRITO DE CRUCERO - CARABAYA - PUNO

VALORIZACION MENSUAL N° 03 JUNIO 2017


PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR
ITEM DESCRIPCION UND
PUNIT METRADO PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
01 PAVIMENTACION
1.01 OBRASPRELIMINARES
01.01.01 ALMACEN GUARDIANIA Y RESIDENCIA 501.19 6.00 3,007.14 2.00 1,002.38 1.00 501.19 3.00 1,503.57 3.00 1,503.57
01.01.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA 25,750.83 1.00 25,750.83 0.50 12,875.42 0.00 0.00 0.50 12,875.42 0.50 12,875.41
01.01.03 CARTEL DE IDENTIFICACION DE OBRA 3.60x 7.20 594.70 1.00 594.70 1.00 594.70 0.00 1.00 594.70 0.00 0.00
01.01.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION 0.96 30,762.37 29,531.88 15,000.00 14,400.00 5,000.00 4,800.00 20,000.00 19,200.00 10,762.37 10,331.88
01.01.05 TRANQUERAS DE MADERA EN OBRA 67.53 17.00 1,148.01 10.00 675.30 7.00 472.71 17.00 1,148.01 0.00 0.00
1.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
01.02.01 RETIRO DE ADOQUINADO EXISTENTE 4.53 350.68 1,588.58 0.00 0.00 200.00 200.00 150.68 1,588.58
01.02.02 CORTE DE TERRENO EN MATERIAL COMPACTADO CON MAQUINARIA TRACTOR 4.93 18,291.09 90,175.07 13,000.00 64,090.00 5,291.09 26,085.07 18,291.09 90,175.07 0.00 0.00
01.02.03 TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO 4.60 22,863.86 105,173.76 10,000.00 46,000.00 7,863.86 36,173.76 17,863.86 82,173.76 5,000.00 23,000.00
1.03 PAVIMENTOS 0.00 0.00 0.00
01.03.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE 3.30 30,762.37 101,515.82 15,000.00 49,500.00 10,000.00 33,000.00 25,000.00 82,500.00 5,762.37 19,015.82
01.03.02 SUB BASE E=0.20 M 35.71 6,152.47 219,704.70 0.00 0.00 5,000.00 178,550.00 5,000.00 178,550.00 1,152.47 41,154.70
01.03.03 MEJORAMIENTO DE LA SUB RASANTE E=0.20M 42.30 6,152.47 260,249.48 2,500.00 105,750.00 2,500.00 105,750.00 5,000.00 211,500.00 1,152.47 48,749.48
01.03.04 PAVIMENTO RIGIDO CONCRETO F'c=210kg/cm2 DOSIFICADO 308.77 6,152.47 1,899,698.16 0.00 0.00 2,500.00 771,925.00 2,500.00 771,925.00 3,652.47 1,127,773.16
01.03.05 PAVIMENTO RIGIDO ENCOFRADO Y DESENCOFRADO 22.66 2,312.79 52,407.82 0.00 0.00 312.79 7,087.82 312.79 7,087.82 2,000.00 45,320.00
01.03.06 ACERO DE REFUERZO fy=4200 kg/cm2 EN PAVIMENTO RIGIDO 3.00 14,709.42 44,128.26 0.00 0.00 1,200.00 3,600.00 1,200.00 3,600.00 13,509.42 40,528.26
01.03.07 JUNTAS ASFALTICAS EN PAVIMENTO RIGIDO 1.59 11,563.97 18,386.71 0.00 0.00 0.00 0.00 0.00 11,563.97 18,386.71
2.00 VEREDAS 0.00 0.00 0.00
2.01 OBRAS PROVISIONALES 0.00 0.00 0.00
02.01.01 TRAZO Y REPLANTEO EN VEREDAS 0.87 6,880.44 5,985.98 4,000.00 3,480.00 1,000.00 870.00 5,000.00 4,350.00 1,880.44 1,635.98
2.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
02.02.01 EXCAVACION SUPERFICIAL DE TERRENO PARA VEREDAS 22.42 1,720.11 38,564.87 350.00 7,847.00 350.00 7,847.00 700.00 15,694.00 1,020.11 22,870.87
02.02.02 ELIMINACION Y TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO 4.60 2,150.14 9,890.64 350.00 1,610.00 450.00 2,070.00 800.00 3,680.00 1,350.14 6,210.64
02.02.03 RELLENO MANUAL CON MATERIAL DE PRESTAMO 54.50 688.04 37,498.18 200.00 10,900.00 200.00 10,900.00 400.00 21,800.00 288.04 15,698.18
02.02.04 NIVELADO Y COMPACTADO CON EQUIPO 2.62 6,880.44 18,026.75 3,000.00 7,860.00 2,000.00 5,240.00 5,000.00 13,100.00 1,880.44 4,926.75
2.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00
02.03.01 VEREDAS ENCOFRADO Y DESENCOFRADO 23.33 851.10 19,856.16 0.00 0.00 500.00 11,665.00 500.00 11,665.00 351.10 8,191.16
02.03.02 VEREDAS CONCRETO SIMPLE FC=175KG/CM2 E=0.10CM DOSIFICADO INCLUYE 282.23 688.04 194,185.53 0.00 0.00 300.00 84,669.00 300.00 84,669.00 388.04 109,516.53
02.03.03 VEREDAS SARDINEL ENCOFRADO Y DESENCOFRADO 21.98 3,280.47 72,104.73 0.00 0.00 1,500.00 32,970.00 1,500.00 32,970.00 1,780.47 39,134.73
02.03.04 VEREDAS SARDINEL FC=175 DOSIFICADO INCLUYE ACABADOS 282.10 246.03 69,405.06 0.00 0.00 100.00 28,210.00 100.00 28,210.00 146.03 41,195.06
02.03.05 VERDEDAS SARDINEL JUNTA ASFALTICA 5.93 1,171.60 6,947.59 0.00 0.00 0.00 0.00 0.00 1,171.60 6,947.59
4.00 SEÑALIZACION 0.00 0.00 0.00
4.01 PINTADO EN SARDINELES DE VEREDAS 5.17 7,099.05 36,702.09 0.00 0.00 0.00 0.00 0.00 0.00 7,099.05 36,702.09
4.02 PINTADO EN PAVIMENTO 4.59 1,243.50 5,707.67 0.00 0.00 0.00 0.00 0.00 0.00 1,243.50 5,707.67
4.03 SEÑALIZACION VERTICAL 261.63 6.00 1,569.78 0.00 0.00 0.00 0.00 0.00 6.00 1,569.78
6.00 VARIOS 0.00 0.00 0.00 0.00
6.01 NIVELACION DE BUZONES EN GENERAL 174.36 57.00 9,938.52 0.00 0.00 20.00 3,487.20 20.00 3,487.20 37.00 6,451.32
6.02 LIMPIEZA FINAL DE OBRA 1.64 30,762.37 50,450.29 0.00 0.00 0.00 0.00 0.00 30,762.37 50,450.29
7.00 FLETE TERRESTE 0.00 0.00 0.00 0.00
7.01 FLETE TERRESTRE CIUDAD DE JULIACA -CRUCERO (LUGAR DE OBRA) 148,562.93 1.00 148,562.93 0.20 29,712.59 0.20 29,712.59 0.40 59,425.17 0.60 89,137.76
COSTO DIRECTO 3,578,457.70 356,297.39 1,385,586.34 1,741,883.72 1,836,573.98
GASTOS GENERALES 8% 286,276.62 28,503.79 110,846.91 139,350.70 146,925.92
UTILIDAD 7% 250,492.04 24,940.82 96,991.04 121,931.86 128,560.18
SUB TOTAL 4,115,226.35 409,742.00 1,593,424.29 2,003,166.28 2,112,060.07
FACTOR DE RELACION=0.95 3909465.03343 389254.898575 1513753.07645 1903007.9641 2006457.06933
PORCENTAJE DE AVANCE DE OBRA 100.00% 9.96% 38.72% 48.68% 51.32%
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE LOS PRINCIPALES JIRONES DE LA CIUDAD DE CRUCERO PROVINCIA DE CARAVAYA - PUNO
PROPIETARIO: DISTRITO DE CRUCERO - CARABAYA - PUNO

VALORIZACION MENSUAL N° 04 JULIO - 2017


PRESUPUESTADO ACUMULADO ANTERIOR ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR
ITEM DESCRIPCION UND PUNIT METRADO PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
01 PAVIMENTACION
1.01 OBRASPRELIMINARES
01.01.01 ALMACEN GUARDIANIA Y RESIDENCIA 501.19 6.00 3,007.14 3.00 1,503.57 1.00 501.19 4.00 2,004.76 2.00 1,002.38
01.01.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA 25,750.83 1.00 25,750.83 0.50 12,875.42 0.00 0.00 0.50 12,875.42 0.50 12,875.41
01.01.03 CARTEL DE IDENTIFICACION DE OBRA 3.60x 7.20 594.70 1.00 594.70 1.00 594.70 0.00 1.00 594.70 0.00 0.00
01.01.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION 0.96 30,762.37 29,531.88 20,000.00 19,200.00 5,000.00 4,800.00 25,000.00 24,000.00 5,762.37 5,531.88
01.01.05 TRANQUERAS DE MADERA EN OBRA 67.53 17.00 1,148.01 17.00 1,148.01 0.00 17.00 1,148.01 0.00 0.00
1.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00
01.02.01 RETIRO DE ADOQUINADO EXISTENTE 4.53 350.68 1,588.58 200.00 150.00 350.00 0.68 1,588.58
01.02.02 CORTE DE TERRENO EN MATERIAL COMPACTADO CON MAQUINARIA TRACTOR 4.93 18,291.09 90,175.07 18,291.09 90,175.07 0.00 0.00 18,291.09 90,175.07 0.00 0.00
01.02.03 TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO 4.60 22,863.86 105,173.76 17,863.86 82,173.76 5,000.00 23,000.00 22,863.86 105,173.76 0.00 0.00
1.03 PAVIMENTOS 0.00 0.00 0.00 0.00
01.03.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE 3.30 30,762.37 101,515.82 25,000.00 82,500.00 2,000.00 6,600.00 27,000.00 89,100.00 3,762.37 12,415.82
01.03.02 SUB BASE E=0.20 M 35.71 6,152.47 219,704.70 5,000.00 178,550.00 1,000.00 35,710.00 6,000.00 214,260.00 152.47 5,444.70
01.03.03 MEJORAMIENTO DE LA SUB RASANTE E=0.20M 42.30 6,152.47 260,249.48 5,000.00 211,500.00 1,100.00 46,530.00 6,100.00 258,030.00 52.47 2,219.48
01.03.04 PAVIMENTO RIGIDO CONCRETO F'c=210kg/cm2 DOSIFICADO 308.77 6,152.47 1,899,698.16 2,500.00 771,925.00 2,500.00 771,925.00 5,000.00 1,543,850.00 1,152.47 355,848.16
01.03.05 PAVIMENTO RIGIDO ENCOFRADO Y DESENCOFRADO 22.66 2,312.79 52,407.82 312.79 7,087.82 700.00 15,862.00 1,012.79 22,949.82 1,300.00 29,458.00
01.03.06 ACERO DE REFUERZO fy=4200 kg/cm2 EN PAVIMENTO RIGIDO 3.00 14,709.42 44,128.26 1,200.00 3,600.00 5,000.00 15,000.00 6,200.00 18,600.00 8,509.42 25,528.26
01.03.07 JUNTAS ASFALTICAS EN PAVIMENTO RIGIDO 1.59 11,563.97 18,386.71 0.00 0.00 0.00 0.00 0.00 11,563.97 18,386.71
2.00 VEREDAS 0.00 0.00 0.00 0.00
2.01 OBRAS PROVISIONALES 0.00 0.00 0.00 0.00
02.01.01 TRAZO Y REPLANTEO EN VEREDAS 0.87 6,880.44 5,985.98 5,000.00 4,350.00 880.44 765.98 5,880.44 5,115.98 1,000.00 870.00
2.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00
02.02.01 EXCAVACION SUPERFICIAL DE TERRENO PARA VEREDAS 22.42 1,720.11 38,564.87 700.00 15,694.00 350.00 7,847.00 1,050.00 23,541.00 670.11 15,023.87
02.02.02 ELIMINACION Y TRANSPORTE DE MATERIAL EXCEDENTE CON CARGUIO 4.60 2,150.14 9,890.64 800.00 3,680.00 450.00 2,070.00 1,250.00 5,750.00 900.14 4,140.64
02.02.03 RELLENO MANUAL CON MATERIAL DE PRESTAMO 54.50 688.04 37,498.18 400.00 21,800.00 50.00 2,725.00 450.00 24,525.00 238.04 12,973.18
02.02.04 NIVELADO Y COMPACTADO CON EQUIPO 2.62 6,880.44 18,026.75 5,000.00 13,100.00 1,000.00 2,620.00 6,000.00 15,720.00 880.44 2,306.75
2.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00
02.03.01 VEREDAS ENCOFRADO Y DESENCOFRADO 23.33 851.10 19,856.16 500.00 11,665.00 100.00 2,333.00 600.00 13,998.00 251.10 5,858.16
02.03.02 VEREDAS CONCRETO SIMPLE FC=175KG/CM2 E=0.10CM DOSIFICADO INCLUY 282.23 688.04 194,185.53 300.00 84,669.00 150.00 42,334.50 450.00 127,003.50 238.04 67,182.03
02.03.03 VEREDAS SARDINEL ENCOFRADO Y DESENCOFRADO 21.98 3,280.47 72,104.73 1,500.00 32,970.00 1,000.00 21,980.00 2,500.00 54,950.00 780.47 17,154.73
02.03.04 VEREDAS SARDINEL FC=175 DOSIFICADO INCLUYE ACABADOS 282.10 246.03 69,405.06 100.00 28,210.00 80.00 22,568.00 180.00 50,778.00 66.03 18,627.06
02.03.05 VERDEDAS SARDINEL JUNTA ASFALTICA 5.93 1,171.60 6,947.59 0.00 0.00 700.00 4,151.00 700.00 4,151.00 471.60 2,796.59
4.00 SEÑALIZACION 0.00 0.00 0.00 0.00
4.01 PINTADO EN SARDINELES DE VEREDAS 5.17 7,099.05 36,702.09 0.00 0.00 0.00 0.00 0.00 0.00 7,099.05 36,702.09
4.02 PINTADO EN PAVIMENTO 4.59 1,243.50 5,707.67 0.00 0.00 0.00 0.00 0.00 0.00 1,243.50 5,707.67
4.03 SEÑALIZACION VERTICAL 261.63 6.00 1,569.78 0.00 0.00 0.00 0.00 0.00 6.00 1,569.78
6.00 VARIOS 0.00 0.00 0.00 0.00 0.00
6.01 NIVELACION DE BUZONES EN GENERAL 174.36 57.00 9,938.52 20.00 3,487.20 15.00 2,615.40 35.00 6,102.60 22.00 3,835.92
6.02 LIMPIEZA FINAL DE OBRA 1.64 30,762.37 50,450.29 0.00 0.00 10,000.00 16,400.00 10,000.00 16,400.00 20,762.37 34,050.29
7.00 FLETE TERRESTE 0.00 0.00 0.00 0.00 0.00
7.01 FLETE TERRESTRE CIUDAD DE JULIACA -CRUCERO (LUGAR DE OBRA) 148,562.93 1.00 148,562.93 0.40 59,425.17 0.25 37,140.73 0.65 96,565.90 0.35 51,997.03
COSTO DIRECTO 3,578,457.70 1,741,883.72 1,085,478.80 2,827,362.52 751,095.18
GASTOS GENERALES 8% 286,276.62 139,350.70 86,838.30 226,189.00 60,087.61
UTILIDAD 7% 250,492.04 121,931.86 75,983.52 197,915.38 52,576.66
SUB TOTAL 4,115,226.35 2,003,166.28 1,248,300.62 3,251,466.90 863,759.45
FACTOR DE RELACION=0.95 3909465.0334 1903007.9641 1185885.589 3088893.5531 820571.480326
PORCENTAJE DE AVANCE DE OBRA 100.00% 48.68% 30.33% 79.01% 20.99%
PROGRAMADO FISICO EJECUCION FISICA
MES
PROGRAMADO ACUMULADO %PROGR. %ACUMULADO EJECUTADO ACUMULADO %EJECUTADO %ACUMULADO

0 0 0 0 0 0 0 0 0 0

ABRIL 69221.49 69221.49 1.93% 1.93% 67632.91 67632.91 1.89% 1.89%


MAYO 256314.19 325535.68 7.16% 9.10% 261117.93 328750.84 7.30% 9.19%
JUNIO 707452.04 1032987.72 19.77% 28.87% 1385586.34 1714337.18 38.72% 47.91%
JULIO 939609.31 1972597.03 26.26% 55.12% 1085478.8 2799815.98 30.33% 78.24%
AGOSTO 840085.19 2812682.22 23.48% 78.60%
SETIEMBRE 674528.87 3487211.09 18.85% 97.45%
OCTUBRE 91246.64 3578457.73 2.55% 100.00%
TOTAL 3578457.73 100.00% 2799815.98 78.24%
3578457.69
3578457.69
1.2 3578457.69
3578457.69
3578457.69
3578457.69
1
3578457.69
3578457.69
3578457.69
3578457.69
0.8

0.6 PROGRAMADO FISICO


EJECUCION FISICA

0.4

0.2

0
0 ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE
0
RESUMEN DE VALORIZACION
Monto del MARZO ABRIL
DESCRIPCION
Contrato S/IGV Monto Monto
VALORIZACION MENSUAL S/. 3,909,465.03 S/. 103,983.56 S/. 285,271.34
TOTAL CONTRACTUAL S/. 3,909,465.03 S/. 103,983.56 S/. 285,271.34
REAJUSTES(S)
REAJUSTE MARZO S/. (15,181.60) S/. (42,220.16)
DEDUCTIVO POR AD. DIREC. S/. 17.34 S/. -
VALORIZACION BRUTA (VB= V+S) S/. 88,801.96 S/. 243,051.18
AMORTIZACIONES (A)
AMORTIZACION ADELANTO DIRECTO S/. 390,946.50 S/. 10,398.36 S/. 28,527.13
AMORTIZACION DE MATERIALES S/. 281,402.03 S/. - S/. 281,402.03
TOTAL AMORTIZACIONES S/. 10,398.36 S/. 309,929.16
VALORIZACION NETA(VN= VB-A) S/. 78,403.60 S/. (66,877.98)
EFECTIVO(VN-M) S/IGV S/. 3,909,465.03 S/. 78,403.60 S/. (66,877.98)
INTERESES POR DEMORA EN EL PAGO DE
VALORIZACIONES

IMPUESTO GENRAL VENTAS 18% S/. 703,703.71 S/. 14,112.65 S/. (12,038.04)
MONTO TOTAL CON IGV S/. 4,613,168.74 S/. 92,516.25 S/. (78,916.02)
TOTAL COMPROMISO A SOLICITAR S/. 4,613,168.74 S/. 92,516.25 S/. (78,916.02)
N DE VALORIZACION
MAYO JUNIO JULIO SALDO
% %
Monto Monto Monto Monto
### ### ### 79.01% S/. 820,571.47 ###
### ### ###

### ### S/. (454,248.64)


S/. 90.78 S/. 112.71 S/. 220.83
### ### ###

S/. 151,375.31 S/. 118,588.56 S/. 308,889.36 S/. 82,057.15 ###


S/. - S/. - S/. 281,402.03 S/. - 0.00%
S/. 151,375.31 S/. 118,588.56 S/. 590,291.38
### S/. 893,084.56 ###
### S/. 893,082.56 ### 52.30% ### ###
S/. 264.54
S/. 205,190.25 S/. 160,802.48 S/. 368,067.34 S/. 335,636.37
### ### ### ###
### ### ### 52.30% ### ###
VALORIZACION POR MAYORES GASTOS GENERALES
PRESPUESTO A COSTO DIRECTO S/. 3,578,457.70
MES DEL VALOR REFERENCIAL Aug-16
INDICE UNIFICADO 39 (AGOSTO- 2016) 430.96
GASTOS GENERALES 8% 8%
PLAZO CONTRACTUAL dias calendario 180
TERMINO DEL PLAZO CONTRACTUAL 8/22/2017
AMPLIACION DE PLAZO dias calendario 25
NUEVO TERMINO DEL PLAZO 9/15/2017
MES DE LA CAUSAL Apr-17
INDICE UNIFICADO 39 (20 MARZO 2017) 444.52

MGG S/. 41,011.70


IGV 18% S/. 7,382.11
MGG FACTURAR S/. 48,393.80

VALORIZACION POR PAGO DE INTERESES POR DEMORA EN PAGO DE VALORIZACION N° 01


MES DE MARZO
VALORIZACION DEL MES DE ABRIL S/. 103,983.56
REAJUSTE BRUTO S/. (15,181.60)
DEDUCTIVO DEL REAJUSTE S/. 17.34
VALORIZACION BRUTA S/. 88,819.31
AMORTIZACION DE ADELANTOS S/. 10,398.36
VALORIZACION NETA S/. 78,420.95
MES DE LA VALORIZACION Mar-17
VENCIMIENTO DEL PLAZO DE PAGO 4/30/2017
T.I.L. del 30/04/2017 1.89726
DIA DE PAGO DE LA VALORIZACION 77777.847
T.I.L. del 25/07/2017 1.90366
INTERESES S/. 264.54
IGV 18% S/. 47.62
TOTAL A PAGAR EN LA VALORIZACION DE MES DE JULIO 312.15
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE LOS PRINCIPALES JIRONES DE LA CIUDAD DE CRUCERO PROVINCIA DE CARAVAYA - PUNO
PROPIETARIO: DISTRITO DE CRUCERO - CARABAYA - PUNO

CALCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS


(según indices unificados de INEI)

FORMULA POLINOMICA

K = 0.135*(Mr/Mo)+0.293(Cr/Co)+0.192(Aah/Aao)+0.173(M/Mo)+0.207(Ir/Io)

indice ind.base ind.real


monomio elemento representativo coeficiente % particip K
INEI (AGOSTO 2016) (MARZO 2017)
M 47 Mano de obra Inc. leyes sociales 0.135 100.00% 562.24 563.25 0.135
MARZO

C 21 Cemento portland Tipo I 0.293 100.00% 851.6 410.96 0.141


03 Acero de Construcción corrugado. 6.25% 461.45 453.51
AAH
05 Agregado grueso. 0.192 93.75% 648.34 657.71 0.194
M 49 Maquinaria y equipo importado 0.173 100.00% 298.91 293.92 0.17
I 39 Indice general de precios al consumidor 0.207 100.00% 430.96 444.52 0.214
K 0.854

indice ind.base ind.real


monomio elemento representativo coeficiente % particip K
INEI (AGOSTO 2016) (ABRIL 2017)
M 47 Mano de obra Inc. leyes sociales 0.135 100.00% 562.24 563.25 0.135
C 21 Cemento portland Tipo I 0.293 100.00% 851.6 410.96 0.141
ABRIL

03 Acero de Construcción corrugado. 6.25% 461.45 431.87


AAH
05 Agregado grueso. 0.192 93.75% 648.34 656.97 0.194
M 49 Maquinaria y equipo importado 0.173 100.00% 298.91 292.48 0.169
I 39 Indice general de precios al consumidor 0.207 100.00% 430.96 443.37 0.213
K 0.852

indice ind.base ind.real


monomio elemento representativo coeficiente % particip K
INEI (AGOSTO 2016) (MAYO 2017)
M 47 Mano de obra Inc. leyes sociales 0.135 100.00% 562.24 563.25 0.135
C 21 Cemento portland Tipo I 0.293 100.00% 851.6 410.96 0.141
MAYO

03 Acero de Construcción corrugado. 6.25% 461.45 440.82


AAH
05 Agregado grueso. 0.192 93.75% 648.34 657.41 0.194
M 49 Maquinaria y equipo importado 0.173 100.00% 298.91 295.46 0.171
I 39 Indice general de precios al consumidor 0.207 100.00% 430.96 441.5 0.212
K 0.853

indice ind.base ind.real


monomio elemento representativo coeficiente % particip K
INEI (AGOSTO 2016) (JUNIO 2017)
M 47 Mano de obra Inc. leyes sociales 0.135 100.00% 562.24 563.25 0.135
C 21 Cemento portland Tipo I 0.293 100.00% 851.6 410.96 0.141
JUNIO

03 Acero de Construcción corrugado. 6.25% 461.45 448.49


AAH
05 Agregado grueso. 0.192 93.75% 648.34 654.88 0.194
M 49 Maquinaria y equipo importado 0.173 100.00% 298.91 294.92 0.171
I 39 Indice general de precios al consumidor 0.207 100.00% 430.96 440.79 0.212
K 0.853
MONTO TOTAL : S/. 4,613,168.74 C/IGV

MONTO A COSTO DIRECTO


S/. 3,578,457.70 S/IGV

20 % AL
SALDO BRUTO POR Imo Ima MONTO MÁXIMO ADELANTO DE MONTO
VALORIZAR SOLICITADO
COEFICIENTE DE MATERIALES
IU DESCRIPCIÓN % DE INCIDENCIA F.R.
INCIDENCIA
(SIN IGV) (SIN IGV) (SIN IGV) (SIN IGV)
Aug-16 Apr-17

47.00 Mano de obra Inc. leyes sociales 0.135 1.00 3,578,457.697 0.90 562.24 563.25 435563.65 87,112.73

21.00 Cemento portland Tipo I 0.293 1.00 3578457.6965 0.9 851.6 410.96 455,375.77 91,075.15 91,075.15
03 Acero de Construcción corrugado. 0.293 0.06 3578457.6965 0.9 461.45 431.87 55,196.87 11,039.37 11,039.37
05 Agregado grueso. 0.293 0.94 3578457.6965 0.9 648.34 656.97 896,437.50 179,287.50 179,287.50
49 Maquinaria y equipo importado 0.29 1.00 3578457.6965 0.90 298.91 292.48 923,340.21 184,668.04
39 Indice general de precios al consumidor 0.29 1.00 3578457.6965 0.9 430.96 443.37 970,812.50 194,162.50

SUB TOTAL S/. 3,736,726.48 S/. 747,345.30 S/. 281,402.03


IGV 672,610.77 134,522.15 50,652.36
TOTAL S/. 4,409,337.25 S/. 881,867.45 S/. 332,054.39
CALCULO DE DEDUCTIVOS POR ADELANTO DIRECTO
MES MARZO ABRIL MAYO JUNIO
MONTO SIN IGV 3703703.707 3703703.70729 3703703.707287 3703703.70729
ADELANTO DIRECTO 370370.371 370370.371 370370.371 370370.371
VALORIZACION EJECUTADA C/F.R. 73888.95 280023.5257 773432.086575 960267.1212
KMARZO 0.854 0.852 0.853 0.853
Kadelanto directo (15/03/2017) 0.852 0.852 0.852 0.852
DEDUCTIVO 17.3448249237 0 90.7784139173 112.707408592