L&T-STEC JV MUMBAI

MUMBAI METRO RAIL PROJECT/UGC-01

WEEKLY EHS REPORT

TO,
CEHSM INCHARGE,

Weekly EHS Inspecton Report - 12-07-2018- OVAL & Church Gate

Total No. of Total No. of No. of Pre Task


Total No. of Observation No. of First Aid
Observation for the Observation Briefing Conducted No. of Training Conducted
closed Cases
week Pending (PSTVB)

20 15 5 Nil 75 6

List of Out standing Issues are given below: (Current week observations which are not closed)

No. of Outstanding SL.No. Details of out standing observations (List out the pending issues)
Pending Issues

1 Khau gali Scrap removal near toilet not ensured.

2 GIC,Ram Mahal- Steel cages stored along access ,muck spread


inside. No safe movement inside.

3 Khau gali exit blocked due to plunge column activity.

Moti Mahal site wheel wash blocked and area untidy for safe
4 access.Noise panel support rebar provided on piling which is bent
and may collapse anytime.
5 Kasturi Building exit no temporary wheel wash arrangement
available.
SL.No. Details of long pending observations (List out the out standing pending issues here
No.of Long pending 1
Stacking of Materials not as per standard practices @ National
issues Insurance@Khau Gali @GIC @Kasturi building.

2 Slush & Muck removal from site and public roads

CUMULATIVE
Total No. Observed Total No. Closed Total No. Pending

1569 1562 7

STATION EHS INCHARGE

Remarks:-
NOTE: All the details furnished above are sent along with the inspection reports /checklists for Central Records.

CC: DPM / CEHSM


L&T-STEC JV MUMBAI L&T/UGC-01/WEK Rev 00
METRO RAIL PROJECT/UGC-01
Report No: 65
WEEKLY EHS REPORT

Report for the week: 6/07/18 to 12/7/18

New Initiatives / New


No.Of Nearmiss REMARKS
Activity Started

Decking area
Nil excavation at Lotus
Court, Moti Mahal

Action By Action By Date REMARKS

Mr.Abhijit Chakarborti/Mr
7/6/2018
Yogesh S /Mr.Brajesh K

Mr.Abhijit Chakarborti/Mr
7/8/2018
Yogesh S /Mr.Brajesh K

Mr.Abhijit Chakarborti/Mr
Immediate
Yogesh S /Mr.Brajesh K

Mr.Abhijit Chakarborti/Mr
Immediate
Yogesh S /Mr.Brajesh K
Mr.Abhijit Chakarborti/Mr
7/10/2018
Yogesh S /Mr.Sai Suneel
Action By Original Action By Date
Mr.Abhijit Chakarborti/Mr
3/8/2018
sai sunil./Mr.Harsh

Mr.Abhijit Chakarborti/Mr
6/27/2018
Yogesh S /Mr.Manoj singh

CUMULATIVE
% of Closing
99.55%

STATION INCHARGE