Project No.

: HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

1 17/06/15 B-C/11-12 3 B1-PF3 4.8 6 15


2 17/06/15 C-F/11-12 29 TX-PF1 6.9 9 3 18

3 22/06/15 B-C/11-12 10 B2-PF2 5.1 6


4 22/06/15 B-C/11-12 9 B2-PF2 6 9 3 10
5 22/06/15 B-C/11-12 8 B2-PF2 4.9 6 10
6 22/06/15 B-C/11-12 7 B2-PF2 4.8 6 14
7 22/06/15 B-C/11-12 6 B2-PF2 4.8 6 16
8 22/06/15 B-C/11-12 5 B2-PF2 5.4 6 12
9 22/06/15 B-C/11-12 4 B1-PF3 5.1 6 14
Project No. : HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

10 22/06/15 B-C/11-12 2 B1-PF3 5.7 6 15


11 22/06/15 B-C/11-12 1 B1-PF3 5.1 6 15

12 23/06/15 C-F/11-12 23 B1-PF1 5.4 6 14


13 23/06/15 C/11-12 22 B1-PF1 5 6 14
14 23/06/15 C/11-12 21 B1-PF1 5.3 6 12
15 23/06/15 B-C/11-12 20 B1-PF1 5.35 6 12
16 23/06/15 B-C/11-12 19 B1-PF1 4.65 6 12
17 23/06/15 B-C/11-12 18 B4-PF1 5.4 6 14
18 23/06/15 B-C/11-12 17 B4-PF1 4.95 6 11
19 23/06/15 B-C/11-12 16 B4-PF1 5.65 6 12
20 23/06/15 B-C/11-12 15 B4-PF1 5.1 6 13

21 8/8/2015 F/10a-12a 59 B2-PF1 7.8 9 3 16


22 8/8/2015 F/10a-12a 54 B2-PF1 5.1 6 16
23 8/8/2015 F/10a-12a 55 B2-PF1 4.5 6 16
24 8/8/2015 F/10a-12a 56 B2-PF1 6.75 9 3 16
25 8/8/2015 F/10a-12a 57 B2-PF1 5.75 9 3 14
26 8/8/2015 F/10a-12a 58 B2-PF1 4.7 6 12
Project No. : HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

27 10/22/2015 C/11-12 22(a) B1-PF1 4.5 6 12


28 10/22/2015 C/11-12 21(a) B1-PF1 5.1 6 12
29 10/22/2015 C/11-12 23(a) B1-PF1 4.8 6 14
30 10/22/2015 C/11-12 24(a) B1-PF1 5.1 6 13
31 10/22/2015 B-C/11-12 10(a) B2-PF2 5.7 6 13
32 10/22/2015 B-C/11-12 10(b) B2-PF2 5.5 6 12
33 10/22/2015 C/11 60 B3-PF1(A) 5 6 10
34 10/22/2015 C/11 65 B3-PF1(A) 5 6 13
35 10/22/2015 C/11 64 B3-PF1(A) 4.6 6 17
36 10/22/2015 C/11 67 B3-PF1(A) 5.4 6 14
37 10/22/2015 C/11 66 B3-PF1(A) 5 6 12
38 10/22/2015 C/11 77 B3-PF1(A) 5.6 6 12
39 10/22/2015 C/11 76 B3-PF1(A) 5.1 6 10
40 10/22/2015 C/11 63 B3-PF1(A) 5.4 6 12
41 10/22/2015 C/11 62 B3-PF1(A) 5.4 6 11
42 10/22/2015 C/11 61 B3-PF1(A) 5 6 10

43 10/24/2015 D-E/1-2 83 B2-B5/PF1 5.4 6 18


44 10/24/2015 D-E/1-2 84 B2-B5/PF1 5.1 6 10
45 10/24/2015 D-E/1-2 86 B2-B5/PF1 5.1 6 18
46 10/24/2015 D-E/1-2 85 B2-B5/PF1 5.15 6 16
Project No. : HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

47 10/24/2015 D-E/1-2 108 CT 450W X 600D 5.4 6 18


48 10/24/2015 D-E/1-2 107 CT 450W X 600D 5.7 6 18
49 10/24/2015 D-E/1-2 105 CT 450W X 600D 5.5 6 14
50 10/24/2015 D-E/1-2 106 CT 450W X 600D 4.8 6 17

51 10/26/2015 D-E/1-2 87 B2-B5/PF1 5.7 6 12


52 10/26/2015 D-E/1-2 88 B2-B5/PF1 5.7 6 13
53 10/26/2015 D-E/1-2 93 B2-B5/PF1 5 6 11
54 10/26/2015 D-E/1-2 94 B2-B5/PF1 4.7 6 12
55 10/26/2015 D-E/1-2 91 B2-B5/PF1 4.7 6 12
56 10/26/2015 D-E/1-2 92 B2-B5/PF1 4.9 6 12
57 10/26/2015 D-E/1-2 90 B2-B5/PF1 5.1 6 12
58 10/26/2015 D-E/1-2 89 B2-B5/PF1 4.8 6 11
59 10/26/2015 D-E/1-2 103 CT 450W X 600D 5 6 12
60 10/26/2015 D-E/1-2 104 CT 450W X 600D 5.3 6 12
61 10/26/2015 D-E/1-2 100 CT750W X 600D 5.1 6 10
62 10/26/2015 D-E/1-2 101 CT750W X 600D 5.2 6 12
63 10/26/2015 D-E/1-2 102 CT750W X 600D 5.1 6 13
64 10/26/2015 D-E/1-2 99 CT750W X 600D 4.7 6 12
Project No. : HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

65 10/27/2015 E/1 97 B2/PF3 5.1 6 10


67 10/27/2015 E/1 96 B2/PF3 5.3 6 12
68 10/27/2015 E/1 95 B2/PF3 5.1 6 13
69 10/27/2015 E/1 98 B2/PF3 5.4 6 12

70 11/7/2015 C/12 68 B3/PF1(B) 5.2 6 14


71 11/7/2015 C/12 69 B3/PF1(B) 5.1 6 14
72 11/7/2015 C/12 71 B3/PF1(B) 5.1 6 12
73 11/7/2015 C/12 70 B3/PF1(B) 5.1 6 12
74 11/7/2015 C/12 82 B3/PF1(B) 5.4 6 12
75 11/7/2015 C/12 78 B3/PF1(B) 5.5 6 12
76 11/7/2015 C/12 72 B3/PF1(B) 5.4 6 14
77 11/7/2015 C/12 73 B3/PF1(B) 4.65 6 13
78 11/7/2015 C/12 74 B3/PF1(B) 4.5 6 13
79 11/7/2015 C/12 75 B3/PF1(B) 4.8 6 12

80 11/19/2015 C-F/11-12 33 TX-PF1 7.6 9 3 12


81 11/19/2015 C-F/11-12 29 TX-PF1 5.7 6 12
82 11/19/2015 C-F/11-12 32 TX-PF1 5.6 6 12
83 11/19/2015 C-F/11-12 31 TX-PF1 5.7 6 12
Project No. : HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

84 11/19/2015 C-F/11-12 30 TX-PF1 6 6 10


85 11/19/2015 C-F/11-12 25 TX-PF1 6.9 9 3 12
86 11/20/2015 C-F/11-12 39 TX-PF1 5.5 6 14
87 11/20/2015 C-F/11-12 38 TX-PF1 5.7 6 12
88 11/20/2015 C-F/11-12 27 TX-PF1 5 6 14
89 11/20/2015 C-F/11-12 36 TX-PF1 4.3 6 14
90 11/20/2015 C-F/11-12 35 TX-PF1 4.9 6 12
91 11/20/2015 C-F/11-12 28 TX-PF1 5.7 6 15
92 11/20/2015 C-F/11-12 27 TX-PF1 5.3 6 11
93 11/20/2015 C-F/11-12 34 TX-PF1 4.8 6 14
94 11/20/2015 C-F/11-12 26 TX-PF1 4.6 6 14

95 8/8/2015 F/10a-12a 79 B8/B2-PF1 4.3 6 12


96 8/8/2015 F/10a-12a 80 B8/B2-PF1 4.5 6 14
97 8/8/2015 F/10a-12a 81 B8/B2-PF1 6.3 9 3 14

98 11/27/2015 C-F/11-12 41 B6-PF1 5.7 6 14


99 11/27/2015 C-F/11-12 40 B6-PF1 5.3 6
100 11/27/2015 C-F/11-12 109 B6-PF1 6.3 9 3 12
101 11/27/2015 C-F/11-12 110 B6-PF1 4.8 6 12
Project No. : HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

102 11/27/2015 C-F/11-12 42 B6-PF1 5.1 6 12


103 11/27/2015 C-F/11-12 43 B6-PF1 5.4 6 12

104 20/01/16 C-F/11-12 122 B2/B9-PF1 6.3 9 3 13


105 20/01/16 C-F/11-12 119 B2/B9-PF1 5.8 6 12
106 20/01/16 C-F/11-12 121 B2/B9-PF1 5.4 6 12
107 20/01/16 C-F/11-12 120 B2/B9-PF1 6.6 9 3 12
108 20/01/16 C-F/11-12 113 NER-PF1 5.75 6 12
109 20/01/16 C-F/11-12 112 NER-PF1 5.4 6 10
110 20/01/16 C-F/11-12 111 NER-PF1 5.5 6 12
111 20/01/16 C-F/11-12 114 NER-PF1 5.6 6 12

112 21/01/16 C-F/11-12 123 B2-PF7 5 6 12


113 21/01/16 C-F/11-12 126 B2-PF7 4.9 6 15
114 21/01/16 C-F/11-12 124 B2-PF7 5.5 6 14
115 21/01/16 C-F/11-12 125 B2-PF7 4.7 6 12
116 21/01/16 C-F/11-12 115 B2-PF3 5.1 6 12
117 21/01/16 C-F/11-12 116 B2-PF3 5.1 6 10
118 21/01/16 C-F/11-12 117 B2-PF3 4.8 6 9
119 21/01/16 C-F/11-12 118 B2-PF3 4.8 6 12
120 21/01/16 C-F/11-12 128 E.TX-PF1 6.5 9 3 12
Project No. : HE1403
Project Title : Kemantan Transformer's Upgrading & Substation Extension
Size of Pile : 200mm x 200mm
Weight of Hammer : 1.5 Tonne
Height of Drop : 0.9 M
GFL : 0m
SUMMARY OF PILING RECORD

DEPTH OF LENGTH SUPPLY FINAL SET/ 10


NO DATE GRIDLINE POINT NO. TYPE OF FOUNDATION PENETRATION EXTENSION
(M) (M) BLOWS (MM)

121 21/01/16 C-F/11-12 129 E.TX-PF1 5.5 6 12


122 21/01/16 C-F/11-12 130 E.TX-PF1 6 6 3 12
123 21/01/16 C-F/11-12 127 E.TX-PF1 6.3 9 3 14

TOTAL 648.55 771


CUT OFF REMARKS
LEVEL (M)

1.3 PDA TEST


0.15 PDA TEST

*BROKEN PILE
0.7
0.7
0.7
0.7
0.7
1.3
CUT OFF REMARKS
LEVEL (M)

1.3
1.3

0.7
0.7
0.7
0.7
0.7
0.7
1.45
1.45
1.45

0.7
0.7
0.7
0.7
0.7
0.7
CUT OFF REMARKS
LEVEL (M)

0.7
0.7
REPLACEMENT POINT
0.7
0.7
0.7 REPLACEMENT OF BROKEN PILEFOR
0.7 POINT NO. 10
2.6
2.6
2.6
2.6
2.6
2.6
2.6
2.6
2.6
2.6

1
1
1
1
CUT OFF REMARKS
LEVEL (M)

0.4
0.4
0.4
0.4

1
1
1
1
1
1
1
1
0.4
0.4
0.4
0.4
0.4
0.4
CUT OFF REMARKS
LEVEL (M)

1.6
1.6
1.6
1.6

2.6
2.6
2.6
2.6
2.6
2.6
2.6
2.6
2.6
2.6

0.15
0.15
0.15
0.15
CUT OFF REMARKS
LEVEL (M)

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.5
0.5
0.5

1.3
1.3
1.3
0.35
CUT OFF REMARKS
LEVEL (M)

0.35
0.35

1.15
1.15
1.15
1.15
0.45
0.45
0.45
0.45

1.75
1.75
1.75
1.75
1.6
1.6
1.6
1.6
0.45
CUT OFF REMARKS
LEVEL (M)

0.45
0.45
0.45

130.5