Documente Academic
Documente Profesional
Documente Cultură
Volume 3 2014
www.st.gov.my
Volume 3
KDN: PP 18540/08/2014(033966)
Energy
Smart
Empowering Consumers,
Enhancing Energy Delivery
www.st.gov.my
CONTENTS
Features
08 ELEVATING METERING ACCURACY
Energy Malaysia explores how the
Guidelines for Electricity Meters assists with the
installation, maintenance and checking of meters.
13 PERFORMANCE GUARANTEED
Criteria underlined in the Guaranteed Service Levels help to
ensure that electricity supply and its associated services are
reliable, dependable and up to world-class standards.
18 EMPOWERED!
46
We look at a number of campaigns – such as the Energy
Label and SAVE – in Malaysia to encourage and empower
customers to optimise their energy use.
Guidelines
28 RELIABLE distribution
Through the implementation of the
Guidelines on Domestic Gas Piping Installations,
the Energy Commission ensures the safety and
security of the public while setting standards
for proper design and maintenance.
Views
30 DATUK DR RAHAMAT BIVI YUSOFF
EPU Director General on Encouraging Efficiency, Green
Growth and Cost-Effectiveness
Innovations
38 MONEY SAVING MEASURES
The advancement of technology and rapid adoption
of big data is being implemented in the energy sector Editorial Board
with smart meters that help monitor and track electricity Advisor
consumption, and can help reduce it. Datuk Ir Ahmad Fauzi Hasan
Members
by
Printed by
Percetakan Skyline Sdn. Bhd.
(135134-V)
2
News
Taking place at Putrajaya International Convention Over 250 participants from government
Centre, the event was attended by the Minister of agencies and departments as well as private
Energy, Green Technology and Water, Datuk Seri enterprises took par t in the discussions.
Panglima Dr Maximus Johnity Ongkili, his Deputy Dato’ Issues canvassed centred on new policies
Seri Mahdzir Khalid, and representatives from public and initiatives that have been introduced to
bodies such as the Energy Commission, National Water empower the growth of the three industries
Services Commission (SPAN), the Sustainable Energy mentioned, which have been identified as
Development Authority (SEDA) and GreenTech Malaysia. essential to national development.
3
Taming The Tariff
Following concerns about the welfare of the people during subsidy
rationalisation and fluctuating fuel prices worldwide, the Ministry of Energy,
Green Technology and Water (KeTTHA) has announced that the current
electricity tariff will be maintained until June 2015.
SMART SAVINGS
tariff every six months. The ICPT system, which is based
To ensure the tariff can be maintained, the government will on similar ones adopted by developed and developing
use the savings generated through the renegotiated Power countries such as Australia, the United Kingdom and
Purchase Agreements (PPA) with Independent Power Singapore, allows a tariff to reflect the true cost of
Producers, and also by maintaining the current price of electricity in a transparent manner.
piped gas supplied by Petronas to the Electricity Sector.
SUPERVISING ENERGY
In January 2014, Peninsular Malaysia implemented the
Imbalance Cost Pass Through (ICPT) mechanism and the ICPT tracks the changes in the price of generation
Incentive-Based Regulation (IBR) framework to determine costs, including piped gas, coal, liquefied natural gas
the electricity tariff, and allow the government to review the and medium fuel oil, as well as the taking into account
4
News
SAFEGUARDING WELL-BEING
According to Datuk Seri Mahdzir Khalid, the reserve level. “Meeting energy demand is an area of national
power that can be generated for the needs of Peninsular importance because it supports our daily lives and
Malaysia, Sabah and Sarawak are at a comfortable economic growth. Government is always monitoring
both the current and long-term needs,” he told reporters
after opening the ASEAN Power Week 2014 on the
10th of September in PWTC.
6
News
The new 10.3MW facility is located in Gemas, Negeri where Malaysia has benefitted from an ongoing tariff
Sembilan and integrates more than 40,000 units of war between panel makers in China and the United
multi-crystalline solar PV modules that were imported States, and is a vital step towards the achievement of
from China. The panels are spread out over a total the 11% RE generation target set by the Ministry of
area of nearly 14 hectares. Energy, Green Technology and Water (KeTTHA).
7
Empowered!
Encouraging Efficiency Through
Creating Energy Smart Consumers
As part of its mission to ensure energy supply, security and
efficiency in Malaysia, the Energy Commission regularly engages
with stakeholders in the sector to help it fulfil its goals. It advises
the government on policies related to the energy sector, and
– in its role as a regulator – sets guidelines and oversees the
performance of power produce rs and the electricity utilities. The
Commission’s efforts, however, are not just limited to the supply
side, as it also reaches out to consumers and educates them on
how to empower themselves to make informed decisions that will
keep their energy prices low, and efficiency high.
A Balancing Act
With just five years to go before addition, it is hindering the goal of
the 2020 deadline for Malaysia achieving a 40% reduction in carbon
to become a fully-industrialised intensity by 2020, as announced by
economy, the government is stepping Prime Minister Dato’ Seri Najib Tun
up efforts to bring that about, and Abdul Razak in 2009.
this has been encapsulated in the
Economic Transformation Programme The two goals seem to be dichotomous.
(ETP). Introduced in 2010, the ETP After all, increasing productivity and
identifies several sectors as National energy usage will likely mean burning
Key Economic Areas (NKEAs) and a more fossil fuels, thus running counter
number of projects have been lined to the government’s environmental and
up with the aim of enhancing their fiscal aims. It is such dilemmas that
contribution to the economy. the Energy Commission was set up to
manage, and it has already mastered
These Entry Point Projects (EPPs) are the art of juggling the different needs of
expected to boost the gross national different stakeholders.
income (GNI) to US$523b and per
capita income to US$15,000 by the Efficiency The Key
year 2020. However, in order to
reach these targets, productivity will One thing that the Energy Commission
have to be increased, thus leading has highlighted is that energy efficiency
to a rise in power usage. Already, does not mean having to compromise
energy demand and consumption on the quality of supply. After all, the
has surged over the last decade, with goal of efficiency is to enable the same
maximum demand rising from more or even higher level of performance
than 10,000MW in 2003 to above with less consumption.
15,000MW in 2013.
On the supply side, initiatives have
At the same time, the government been advanced to better manage
realises that dependency on fossil the generation and transmission of
fuels, particularly imported coal and electricity. This includes the introduction
subsidised natural gas, is putting the Incentive-Based Regulation (IBR)
a strain on national finances. In framework at the start of 2014, which
8
Feature
9
Every household needs lighting,
and savvy consumers should invest
in energy saving bulbs which last
longer and have lower wattages,
thus reducing electricity costs.
lays out rewards and penalties of the fact that bringing about efficiency so reduce the level of demand and
regulating the performance of the and sustainability requires action from consequent strain on the sector.
electricity utility, namely Tenaga both the supply and demand side.
Nasional Berhad (TNB). Showing The Way
In other words, it is not enough to just
In addition, the Commission continues focus on ensuring better performance It does this through several measures.
to work with power producers to bring in terms of electricity generation, For instance, it publishes guidelines
about more efficient and sustainable supply, and transmission, but also to that help highlight to consumers –
ways of generating electricity, such bring about more awareness among both industrial and individual – the
as adopting the latest technologies consumers of how they can better methods they can employ to optimise
and best practices to improve manage their utilisation of electricity. their power usage.
performance.
The aim is to create ‘energy One example is the Guidelines on
Energy Smart Consumers smart’ consumers, who are more No-Cost and Low-Cost Measures for
knowledgeable about what they Efficient Use of Electricity in Buildings.
While such efforts are important, the can do to increase efficiency in their Available for download from the
Energy Commission is also cognisant everyday consumption, and in doing Energy Commission’s website, the
10
Feature
58%
Air-Conditioning
20%
Lighting
19%
Office Equipment
3%
Others
ENERGY-SAVING INITIATIVES
11
Feature
Guidelines highlight how building and refrigerators is graded according It is also wor th noting that the
owners and occupants can carry out to a star-rating. Thanks to this system, Malaysian government, through the
an energy audit of their premises and people know the energy consumption Sustainable Energy Development
identify ways to reduce electricity rate and performance of the appliance Authority of Malaysia (SEDA),
wastage. They also offer advice and they want to buy and can compare formulated the SAVE programme
hints on building management so that and contrast these figures to others. which gave rebates for the
lighting and cooling systems are used purchase of five-star energy efficient
to their best effect. Furthermore, the programme resulted appliances. Because of this, more
in the establishment of the Minimum than 141 million tonnes of CO2
In addition to that, it also came Energy Performance Standards were prevented from being emitted
up with the Energy Rating and (MEPS). This was made mandatory from 2011 to 2013, as consumers
Labelling Programme for Household for refrigerators, air conditioners, opted for the more environmentally-
Appliances in 2009. televisions, electric fans and lamps on friendly choice of refrigerators and
the 3rd of May 2013. air conditioners.
This led to the development of the
Energy Label where the energy
efficiency of cer tain household
appliances such as air-conditioners
12
Feature
Performance
Guaranteed
Ensuring Reliable Electricity
Supply and Service
13
Fewer Supply Disruptions cleared by the relevant parties to supply, TNB is also required to
receive cabling, the installation should monitor its own performance and
The agreed standards provide be completed within five working its compliance with the GSL and the
guaranteed performance levels and days. This applies to low voltage established minimum service levels
applicable penalties for not meeting cable installation works for overhead in Schedules 1 and 2. Within three
them. Over five sections and two line installations. months of the end of every calendar
schedules (one dealing with supply year, the utility is mandated to submit
issues and the other, associated For those that require underground a report to the Energy Commission.
ser vices), the GSLs cover TNB’s cables, the maximum time taken is
electricity supply and its service delivery. 14 working days. The penalty for The report includes details from TNB
not meeting the standard is RM50 on the number – and amount – of
GSL 1 and 2 encompass the in rebates paid to the affected rebates issued by category, claims
availability of electricity, providing customer. Further underlining this, received and rejected (and reasons for
f o r f r e q u e n c y o f interruptions GSL4 specifies a three-day period to rejection), descriptions of interruptions
and restoration time. Both service connect a new domestic customer after and major incidents and reasons for
level will become operational on 1st payment of a deposit, with a RM50 exceeding service levels, if applicable.
January 2015. rebate if the agreed time is exceeded. However, the utility may be asked to
Also, wrongful disconnection of submit reports outside the scheduled
GSLs 3 to 5 have been in effect since the power supply warrants a RM100 annual summary.
1st of January 2012 and cover providing rebate under GSL5.
supply and customer contact.
Internal Benchmarking
Faster Service Delivery
In addition to reimbursing customers
For new customers, GSL3 stipulates for failing to meet set standards for
that for premises that have been reliable and effective electricity
ELECTRICITY SUPPLY
Commercial
& Industrial
Power Plants
Sub Station
Control
Center
Sub Station
Rooftop
Solar
Electric
Vehicle
Residential
Distributed Generation
14
Feature
Domestic consumers
Frequency of Supply Interruption 1% of average monthly bill amount or
minimum RM10, whichever is higher
Guaranteed Service Level: GSL1
Maximum number of unplanned electricity supply Commercial consumers
interruptions allowed in the following regions: 1% of average monthly bill amount,
up to a maximum of RM300
s +UALA ,UMPUR #ITY AND 0UTRAJAYA 4 times per year Industrial consumers
s /THER AREAS 5 times per year 0.5% of average monthly bill amount,
up to a maximum of RM1,000
Disconnections
Guaranteed Service Level: GSL 5
Disconnection must only be undertaken No wrongful RM100
according to applicable legislation and disconnection
disconnection procedures
15
MINIMUM SERVICE LEVELS
The second schedule of the Performance Standard of Electricity Supply Services of TNB ensures that the utility’s
services are up to par with the quality of electricity distribution in the country and stipulates the minimum service and
performance levels that have to be met.
Performance
Service Scope Service Indicator
Level
• Time frame taken to fix voltage complaints or limit violation, 180 days
as well as correction to complaints about voltage that require
reinforcement to the network.
Quality
of Supply • Investigation duration, beginning from date of complaint receipt, 30 working
for complaints about over-voltage. days
• Maximum amount of time allowed to complete investigation and 14 days
provide report about voltage-dip complaints from the date
complaint was received.
• Response time for appointments, visits or testing for issues 2 working days
pertaining to meters after official notification or request by
customers
Metering • The response period in case of replacement or relocation of 3 working days
Services meters following official notification
• Interval between successive billings 1 month
16
Feature
The implementation of the GSLs and the associated penalties, which are agreed on by TNB
and the Energy Commission, is in line with meeting the functions specified under Section 4b
of the Electricity Supply Act 1990. Complaints and rebate requests should be made at TNB
offices, and if no action is taken by the power utility, the public may request further checks
by the Energy Commission. This ensures that customers’ rights are protected and the quality
of power supply and the associated services in the country support the development and
industrialisation of the economy.
17
In Our
Next Issue
Energy Malaysia explores the Energy
Commission’s efforts to protect the interests of the
public through comprehensive enforcement measures.
And more…
...in Malaysia’s Energy Sector
Thought Leadership Magazine
Feature
Ensuring
Quality of Supply
Raising Standards on Power Quality
In order to successfully and effectively power the nation’s
continuous development, it is not only essential to ensure that
sufficient fuel sources and energy generation capabilities
are in place, but that the quality of electricity
available conforms to the highest international
standards. Energy Malaysia closely inspects the finer
points of power quality, its potential effects and the Energy
Commission’s endeavours to continue raising the bar.
19
Understanding Voltage Sags
100%
2 4
80%
1
Voltage
50% 6 3
0% 5
0.1s 1s
Duration
20
Feature
21
Voltage Sag Characteristics
The duration of voltage sags
typically last from half a cycle
to one minute, while voltage
1.0 Duration (4 Cycles) magnitude drops to between 10%
and 90% of the nominal value.
0.5
22
Feature
23
Elevating Metering
Accuracy
Maintaining the Reliability of Electricity Meters
Modernised Meters
At the start of 2003, the vast majority units, out of the estimated 7.8 million measures – and its subsidiar y
of electricity meters being used in electricity meters in operation overall. SIRIM QAS International – one of the
Malaysia were conventional electro- country’s leading quality assurance
mechanical devices which have a Probing a Problem firms – as independent third parties
number of known technical limitations, tasked with ensuring that inspections
such as the inability to produce From the earliest stages of TNB’s and tests were carried out in a thorough
accurate readings after prolonged electricity meter replacement and transparent manner. As a result,
use. This has been attributed to a programme, the Energy Commission it was found that all of the meters
range of external factors, including began receiving complaints from being produced were in compliance
the weather, temperature and humidity energy consumers across the with relevant technical requirements,
where each meter is installed. country, who were experiencing a s set ou t by t he Mala y s ia n
rising monthly electricity bills, even Standards (MS) and International
That year, electricity utility Tenaga though their estimated energy use Electrotechnical Commission (IEC)
Nasional Berhad (TNB) began to matched the months prior to the meter accreditation schemes.
introduce digital meters. These replacement. As the statutory body
overcame the limitations of earlier responsible for regulating the energy The Energy Commission’s Metering
models, allowing for more precise sector and ensuring the delivery of a Taskforce was also established
a n d co ns is t e nt m e asure m e n t reliable, safe and affordable electrical and eq u i p p ed wi t h 1 0 portable
of electricity consumption, and supply, the Energy Commission electricity meter test sets, in
enabling more reliable calculation immediately commenced efforts order to conduct comprehensive
of energy consumers’ monthly to verify and guarantee the analyses of electricity meter accuracy
electricity bills. metrology aspect of both newly- in the Klang Valley, drawing sample
installed electricity meters, as well readings from nearly 200 domestic,
Following this, the utility instituted a as those that would be produced in commercial and industrial premises.
broad-ranging installation campaign the future. The findings of this survey indicated
from 2010 to 2012, resulting in that all of the meters tested were
the replacement of up to 1.2 million In early 2012, the Commission began performing within the permissible
electro-mechanical meters with digital conducting inspections of electricity 3% margin of error, as stipulated by
versions, in domestic, commercial meter manufacturers in Malaysia. Article 12(2) of the Licensee Supply
and industrial premises across the It engaged the expertise of the Regulations 1990. In addition, it
country. This brought the number of National Metrology Laborator y was determined that the meters
digital electricity meters being used (NML), SIRIM Berhad – which is the studied were also in compliance
in Malaysia up to a total of 4 million national custodian of weights and wi t h t he Ma la ysi a La b orat or y
24
Feature
NEW LOOK
25
Accreditation Scheme (SAMM), which “Meters that have satisfied
is supervised by the Department
of Standards Malaysia under the
the stipulated testing and
Ministry of Science, Technology and verification requirements are
Innovation (MOSTI). given approval to feature the
new Energy Commission-
Creating a Lasting Impact SIRIM quality assurance label
on each unit. The Commission
In-depth consultations were also
conducted between the Energy will also continue to ensure that
Commission and public bodies inaccurate digital meters found
such as the Ministry of Domestic to be in operation are replaced
Trade, Cooperatives & Consumerism immediately.”
(MDTCC), the Department of
Standards Malaysia, the NML, SIRIM – Datuk Ir Ahmad Fauzi Hasan
Berhad, SIRIM QAS International, CEO of the Energy Commission
TNB a nd e l e c tric ity m e te r
manufacturers registered with
the utility, in order to develop the
Guideline for Electricity Meters:
Ap p r o v a l , Te s t i n g an d Initial
SIRIM QAS International, as well as Requirements for the Competence of
Verification Requirements, which
other relevant parties. Testing and Calibration Laboratories)
strengthens and streamlines the
accreditation under the Malaysia
regulatory mechanism for electricity
Apart from regulating the meters Laboratory Accreditation Scheme
meter accuracy.
themselves, the Guideline also requires (SAMM), which is offered by the
that meter manufacturers obtain MS Department of Standards Malaysia.
The Guideline, which came into effect
ISO/IEC 17025:2005 (General Additionally, the laboratories operated
in the first half of 2013, establishes a
number of new criteria that electricity
meters must fulfil, such as attaining
pattern approval from the NML and
SIRIM Berhad, as well as product Composition of Electricity Meters in Malaysia
certification from SIRIM QAS (in millions)
International. Aside from this, it is now
compulsory for all electricity meters
installed in new premises or replacing
older meters to undergo a set of
rigorous testing and verification
processes, in order to earn a new
quality assurance label which is jointly-
accredited by SIRIM QAS International
and the Energy Commission, and is Electro-Mechanical Digital
attached to every approved meter. 3.8 4
26
Feature
“The Energy
Commission has
carried out random
inspections of new
digital meters,
prioritising those
consumers who have
lodged complaints. At
least three readings
are recorded for
each meter and the
final result is derived
by calculating their
average.”
– Ir Othman Omar
Director of the Enforcement
and Regional Coordination
Department
27
Reliable Distribution
Creating a Safe Domestic Gas Piping System
While pipes offer convenience to those using gas, its flammable nature means that
such installations can be dangerous if planned improperly. Therefore, it is important
that they be designed, maintained and repaired according to set standards. The
Energy Commission of Malaysia has published the Guidelines on Domestic Gas
Piping Installations to protect the integrity of the buildings and ensure public safety.
The piping system must be To protect an installation from damage, Pipelines should be routed close to walls,
designed in such a way that pipes should not pass through dangerous not cut into load veering walls and be at
the gas meter provided by the areas such as near high-voltage wires, least 50mm away from other services.
supplier can be easily located. sources of excessive external stress There should also be enough clearance to
For example, in Malaysia, vibration or corrosion, or areas with high permit the use of a pipe wrench without
gas pipes are painted yellow, traffic. They should also not be laid under straining or bending the pipe. If electrical
allowing for instant recognition. or through load-bearing foundations or services are used in the same duct, the
walls, and outlet fittings or piping should gas riser must be separated from them
not be placed behind doors. using a gas tight partition.
Secured Outlets
Isolation valves need to be Each outlet, including pipes with It is unlawful to remove or
accessible to users, as they allow valves, should be securely closed disconnect any gas equipment
gas to be confined to certain areas with an approved threaded cap or without plugging or capping
during an emergency, such as a fire plug, to ensure they are airtight, the outlet from which the gas
or a leak. These should be located and should be left closed until an equipment is removed. For safety
on each floor and section of the appliance is connected. reasons, capping the outlet is best
building, where gas is piped. done using a screwed joint fitting.
28
Guidelines
To prevent the distribution of If such areas cannot be avoided, As often as possible, gas pipes should run
gas leaks through the building, gas detectors must be installed outside a building. This is especially true when
piping should not be laid in to detect any leaks. Also, pipes the operating pressures exceed 35kPa (5psi).
escape routes, shafts, chimneys, passing through a cavity must take For maintenance purposes, pipe risers should
gas vents, ducts and other the shortest route possible, and also be installed at easily accessible locations
unventilated spaces. be properly encased in sleeves. If such as corridors or dedicated shafts. Such ducts
there is no other route available, must have 2-hour fire-rated doors, with one side
pipes should run above a ceiling, an external wall with fixed louvres or ventilation
and drop down to appliances. blocks, so that any leak will dissipate into the
atmosphere. Additionally, such pipes should
enter the building above-ground to ensure that
they remain in well-ventilated locations.
Maintaining the safe operation of the system in accordance with the manufacturer’s specifications is the duty of the
owner – or occupant of the premises.
1. Ensuring that the 2. Immediately taking all 3. Informing the energy 4. Taking all reasonable steps to
gas pipeline can be reasonable steps to shut commission or gas utility ensure that gas can be re-supplied
identified continuously. off supply when a gas leak licensee if gas continues to without causing any danger after
is suspected or known. escape after supply has been supply is shut off for
shut off. safety reasons.
5. Ensuring that the 6. Ensuring that safety is 7. Attending and assisting any 8. Keeping a maintenance
gas installation is observed at all times so as to inspection on the gas installation record detailing when any
well-maintained. prevent danger from arising at carried out by the energy maintenance or repairs are
the gas installation. commission or any carried out.
authorised officers.
9. Being informed of any 10. Being notified of any 11. Taking adequate precautions preventing
alteration or repairs carried necessary or emergency repairs a gas installation or equipment from being
out on the supply system by done by a competent person. accidentally or inadvertently made unsafe
a competent person. during maintenance.
The person in charge of the gas pipeline/installation is also responsible for proper maintenance programmes and safety
measures. This includes steps for regular leak surveillance of the system and emergency procedures, which have to be
established in advance and rehearsed regularly, for an orderly implementation during emergencies involving gas
leaks or fires.
The piping system must be subjected to a thorough inspection and be tested by registered competent persons at least
once every three years. Pressure vessels must comply with the Department of Occupational Safety and Health (DOSH)
requirements, and maintenance and repair work on the system must similarly be performed by competent persons.
While uncommon, pipeline failures can and do occur. While there are many hazards
associated with gas leaks, proper design, maintenance and repair can mitigate them.
The Energy Commission’s guidelines aim to reduce such incidents, and ensure a safe
and convenient gas supply for those having domestic piping system.
29
Datuk Dr
Rahamat Bivi
Yusoff
EPU Director General on
Encouraging Efficiency, Green
Growth and Cost-Effectiveness
In its role as the main agency concerned with economic planning and policy
formulation in Malaysia, the Economic Planning Unit (EPU) aspires to maintain the
nation’s long-term trend of economic growth, while balancing these targets with
the need to sustainably leverage energy resources. Energy Malaysia speaks with
Datuk Dr Rahamat Bivi Yusoff, Director General of the EPU, who shares her thoughts
on the nation’s efforts to improve energy use, and the steps that are still to come.
30
Views
The main function of the EPU is to promote the efficient and effective
management of the economy, which also extends to energy policy.
How do you ensure the implementation of these initiatives and how
effective have they been in the last few years?
EPU’S main function is economic planning and policy Equipment with MEPS labelling will discourage inefficient
formulation. It set the macro policy directions, including energy energy equipment from entering the Malaysian market.
policy; it does not involve directly in the implementation of
these policies, but is part of the committee that oversees this In the building sector, a revision of the Uniform Building By-
implementation. In the case of Energy Efficiency (EE), the Laws has been incorporated in the Malaysian Standard Code
Ministry of Energy, Green Technology and Water (KeTTHA) of Practice on Energy Efficiency and Renewable Energy for
and its agencies – particularly the Malaysian Green Non-Residential Buildings or Malaysia Standards 1525 (MS
Technology Corporation – have been tasked with carrying 1525). Its objective is to spur design, construction, operation
out the necessary initiatives. On the whole, promoting and maintenance of new and existing buildings that reduce
efficient energy use is one of the pillars of the New Energy the use of energy.
Policy (2011-2015) under the Tenth Malaysia Plan.
The Building Sector Energy Efficiency Project (BSEEP) is also
The Sustainability Achieved Via Energy Efficiency (SAVE) being undertaken in collaboration with the United Nations
programme came into effect in 2011, offering rebates for Development Programme (UNDP), to improve EE utilisation
energy efficient electrical appliances such as refrigerators, in commercial and government buildings. This involves
air-conditioners and chillers. The government’s allocation policy and capacity developments, regulatory frameworks,
of RM44.28 million in 2011 was fully utilised and as EE financing capacity improvements and information and
of end-2012, the market share of refrigerators, air- awareness efforts, as well as demonstration buildings.
conditioners and chillers promoted under SAVE climbed to
40.8%, 21.6% and 39.2% respectively, surpassing their Additionally, there are currently 436 energy managers
original targets. who have been trained and registered by the Energy
Commission to facilitate energy efficiency measures in
Minimum Energy Performance Standards (MEPS) were also Malaysia. These professionals are appointed for installations
gazetted by the Energy Commission in May 2013 and fully that use more than three million kWh of electricity for six
enforced in 2014, covering five types of electronic goods: consecutive months, in order to ensure that EE measures
fans, air-conditioners, lamps, refrigerators and televisions. are implemented.
31
Energy plays a key role in the national economy.
How does the EPU complement the Energy
Commission to ensure that Malaysia’s energy
efficiency goals are met?
As mentioned, the EPU provides overall policy direction Management to government buildings in order to reduce
on energy matters. While the Energy Commission is the cost of utilities and maintenance, phasing out the Special
the dedicated statutory regulator entrusted to establish Tariff by 2017, and incentivising industries to utilise energy
guidelines, enforcement measures and penalties, the efficient equipment.
EPU is also represented in most committees established
by the Commission. Also, we are preparing the blueprint for the Sustainable
Consumption and Production (SCP) programme, which
Moving forward, the government is focusing on implementing seeks to decouple economic growth and environmental
several energy efficiency practices in Malaysia. These degradation along the entire life cycle of products
include reviewing energy prices towards market price and and services. It takes a holistic approach that calls for
ensuring consumers use energy efficient products, increasing sustainable production and consumption patterns at all
the number of electronic goods to be registered under stages, including extraction, production, marketing, use
the MEPS, expanding the Energy Performance Contract and end-of-life.
32
Views
How effective have the EPU’s energy What is your outlook for the energy sector in
efficiency programmes been in Malaysia this year? What is the EPU aiming to
cutting electricity cost in government achieve this year, on the journey towards the
buildings? overall goal of energy efficiency?
A number of the government’s initiatives have helped The energy sector has faced a number of challenges in 2014,
reduce electricity use and costs in government buildings. with regards to energy supply and demand fluctuations that
For example, in line with savings measures announced by are related to energy security, fuel supply and pricing, energy
the government, public agencies were asked to reduce their efficiency and resource conservation.
monthly electricity bill at least by 10%. The government also
announced in 2011 that all public buildings in Malaysia Factors such as population growth, economic growth, energy
must set air-conditioning units at a minimum of 24ºC, which prices and technological advancement raise critical concerns
has resulted in lower energy bills at government facilities. on energy demand. With economic growth forecast at 5-5.5%
this year, energy demand is expected to grow in tandem
Aside from that, EPU’s buildings have been fitted with as well. On the other hand, supply concerns are related to
energy efficient T5 lamps, which has helped to further cut ensuring continuous supply to the nation at affordable prices.
electricity bills by approximately 10-15% per month. Between the months of January and May, 2014, electricity
utilities experienced a series of severe disruptions in Sabah,
Sarawak and Peninsular Malaysia.
33
Monitoring Power
Performance in 2013
Pursuing Continued Improvement
Aside from being a public utility, the electricity industry has a
comprehensive infrastructure, delivering energy to residential,
commercial and industrial sectors and promoting economic
growth within the country. It is thus important to keep track of
the adequacy and reliability of systems and allow consumers to
be more aware of their options based on availability. Energy
Malaysia examines and analyses information related to the
energy supply industry in 2013.
Combined Cycle 41.20 44.80 41.00 44.30 41.20 41.90 40.84 43.98 44.34 43.96 43.30 43.97
Open Cycle 25.60 26.10 17.40 27.40 22.60 27.30 22.30 27.09 26.29 26.77 26.70 27.38
Conventional (Oil/Gas) 18.30 32.20 n/a 31.90 25.60 32.30 27.27 30.58 26.6 32.34 27.03 32.68
Creating Efficiency
Electricity generation facilities margin, and this is something all plants owned by Tenaga Nasional
derive their revenue from selling power producers aim to achieve. (TNB), the largest utility company in
power at a set price, while Malaysia. However, in plants owned
offsetting the operating cost and Thanks to frequent scheduled by Independent Power Producers,
the cost of raw fuel required for maintenance throughout 2013, as efficiency saw a slight decline overall.
their processes. It follows that well as a high average capacity factor,
reliable operation and efficiency average thermal efficiency improved In Sabah, the average thermal
are crucial in ensuring a profit in combined and open-cycle power efficiency showed consistent gain,
34
Analysis
Minutes
7
6.6
6
0.80
0.70
0.70 0.64
0.62
0.60 0.52
0.49
0.50
0.38
0.40
0.31
0.28
0.30 0.26
0.19
0.20
0.12
0.10
0.00 0.06 0.07 0.07 0.07 0.02 0.03 0.07 0.10 0.03 0.09 0.03 0.05
Sep 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mar 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
Year 2012-2013
Monthly Cumulative
35
NUMBER OF ELECTRICITY SUPPLY INTERRUPTIONS
Tenaga
Tenaga Nasional
Nasional Berhad
Berhad
(Per
(Per 1000
1000 Consumers)
Consumers)
15.98
15.98
2008
2008 0.76
0.76
15.01
15.01
2009
2009
0.86
0.86
12.68
12.68
2010
2010
0.71
0.71
10.60
10.60
2011
2011
0.19
0.19
On average, the number of supply
9.45
9.45 interruptions in Peninsular Malaysia
2012
2012
has declined, as efficiency improves.
0.11
0.11
9.92
9.92
2013 Unscheduled
UnscheduledInterruptions
Interruptions
2013
0.09
0.09
Scheduled
ScheduledInterruptions
Interruptions
Sabah
Sabah Electricity
Electricity Sdn Bhd ((SESB
Sdn Bhd SESB))
(per
(per 1,000
1,000 Consumers)
Consumers)
60
60 The improved average
thermal efficiency of the
combined cycle plants
50
50 48.52
48.52 51.11
51.11 led to lower supply
48.03
48.03 50.42
50.42 interruption of distribution
45.90
45.90 systems in 2013.
40 43.38
43.38
40
30
30
20
20
10
10
6.27
6.27 8.45
8.45
6.85
6.85 4.17
4.17 4.74
4.74 3.70
3.70
00
2008
2008 2009
2009 2010
2010 2011
2011 2012
2012 2013
2013 YEAR
YEAR
Unscheduled
Unscheduled Interruptions
Interruptions Scheduled
Scheduled Interruptions
Interruptions
Note:
Note:Excludes
Excludesthe
theinterruptions
interruptionsat
atgeneration
generationand
andtransmission
transmissionsystems
systems
36
Analysis
15
Scheduled Interruptions
13.51
12.49 12.55
12
11.57
11.31
10.62
9
mainly due to the gas-based power from the 15,826MW and RM32.45 Meanwhile, Sarawak Energy (SEB)
plants operating at full capacity. billion in 2012. had a total generating capacity
of 1,332MW, as there were no
Sabah Electricity (SESB) observed change in the number of generating
SUPPLY and Demand a 5.3% increase from the previous units in operation. Maximum demand
y e a r ’s m a x i m u m d e m a n d , a t in the state increased by 19.3%,
Transmission in Peninsular Malaysia 828.4MW in 2012 to 874MW to 1,466MW (from 1,229MW in
saw improvement from the previous in 2013, as wellas an increase 2012), but total electricity sales
year, with only two tripping incidents, in sales from RM 1.35 billion to increased by 21.7% to a total value of
compared to four the previous RM1.38 billion. RM2.26 billion.
year. There were also no cases of
load shedding, but there was a 11.9%
increase in unsupplied energy.
37
Money Saving
Measures
How Smart Meters Help Lower
Your Electricity Bills
38
Innovation
39
AMI NETWORK SOLUTION
How Smart Meter Data is Relayed to the Energy Provider
METER/
GATEWAY
WIRELESS MESH CONCENTRATOR
Zigbee, WiFi, Wireless Mesh, Fibre Optics, GPRS, 3G, WiMax, DSL, BPLC, RF
BPLC Broadband Power Line Communications
See your It should be noted that while all smart meters are digital, not
power all digital meters are smart. For example, in Malaysia, the
country’s largest electricity utility Tenaga Nasional Berhad
consumption
(TNB) is rolling out digital electricity meters to enhance
Source: pge.com
accuracy of readings.
40
Innovation
The signal finally reaches the HQ using wireless WAN technology. Wireless
Wide Area Network devices use a wireless distribution method and provide
a connection through an access point to the wider internet. The signal
transmission and coverage of WAN is much greater than the Local Area
Network (LAN). The various types of WWAN include WIMAX, UMTS, GPRS,
EDGE, CDMA, GSM, CDPD, 2G, 2.5G, 3G and 4G .
Fibre Optics
HEADQUARTERS
In addition, it has been carrying out remote meter reading according to Datuk Nazri Sharuddin, TNB’s Vice-President
since 2007, especially of its large customers that consume of New Business and Projects, the utility will not rush into
the most electricity. However, since this communication nationwide implementation, even if the results are positive.
between utility and meter is one-way, these meters do not Among the issues to be thrashed out is the installation cost,
qualify as smart. which is currently about RM1000 per meter.
41
Reducing Electricity
Consumption
Promoting Energy Efficiency in the Home
Electricity is a necessity, but excessive consumption results in costly bills and squandering of natural
resources. In a typical home, there are many appliances whose use can be better managed to
not only reduce their draw-down of power leading to bill reductions, but also ultimately helping to
reduce the emission of greenhouse gases by power producers. Energy Malaysia provides a few
tips for people to introduce more prudent and efficient energy practices throughout their homes.
Lights: Turn off all unnecessary lights to reduce Refrigerator: The refrigerator should not be placed next to a
unnecessary power consumption. heat source such as a stove, oven or sunlight, as this lowers its
efficiency. To reduce energy use, let food cool naturally prior to
Fans: Because a fan creates air flow in order to being refrigerated, and set the thermostat to the right temperature.
cool a room, windows and doors should be left The door should not be left open longer than necessary, to prevent
open for ventilation to enhance the cooling effect. cooled air from escaping.
Air conditioners: The air conditioner should be Microwave Oven: Use a lid with microwaveable containers to
placed in a cool area, away from heat-generating speed up cooking times by containing moisture. The microwave
sources such as the sun, to ensure that the should be used to reheat food, rather than for defrosting,
thermostat reads the temperature accurately, which can be more efficiently done by leaving the
and regular maintenance should be frozen food on the bench.
carried out to maintain efficiency.
The room can also be kept Electric stove: Keep lids on pans, pots
cooler for longer periods if and other cooking equipment to reduce
windows and doors are heat loss and lower the thermostat
closed to prevent when the contents begin to boil,
cooled air from as maintaining temperature
escaping. does not require as
much heat as
warming up.
42
Tips
Ensuring Efficiency
The top of the label will feature up to five stars, which denote the efficiency of the
unit. The more stars there are, the better. Other information on the label includes
information on the appliance, including type, energy rating, brand and model.
The energy consumption and energy savings are also listed, enabling total savings
to be calculated. To give consumers the confidence that the appliance has been
properly regulated, the testing standards are also provided.
Water Heater: The temperature should be set to a Items such as computers, laptops, chargers and other
comfortable level. electrical devices generally mean a tangle of wires.
Consider using four gang socket strips, which will
Hair dryers: If you use a hair dryer (not in the enable you to turn everything off with one switch.
bathroom), soak up excess moisture with a towel first
and set the dryer on the lowest heat setting necessary
so as to prevent waste of energy. Saving electricity in the home does not
necessarily require major physical changes.
Laundry Area Minor alterations in habits are sufficient to
lower the waste of electricity and not only
Washing machine: Try to operate the
machine only when it is full, as this
contribute to a greener environment, but
requires less energy than part-load also allow us to enjoy considerable
cycles. Avoid using a dryer, and savings. Consider applying
hang your clothes out on a these tips and relish your
sunny day to let nature do contribution to your
the work.
natural surroundings
and your wallet!
43
Sharing Strategy
Collaborating with Energy Industry
Experts from the Netherlands
The delegation comprised representatives Putrajaya included representatives efficient Diamond Building, while
from various Dutch companies, who from Aarding Thermal Acoustics, also providing an opportunity
were in Malaysia to exhibit their Sulzer Turbo Services, Euroturbine for both sides to share their
products and services at the Netherlands BV and the Dutch Gas Turbine views on the provision of energy
Pavilion, during the recent POWER- Association, as well as diplomatic and discuss issues related to
GEN Asia 2014 energy conference, officers from the Embassy of the the generation and supply
which took place in Kuala Lumpur from Kingdom of the Netherlands. of electricity. Additionally, the
the 8th to the 12th of September. session featured an exchange
The visit was organised to satisfy of information and experience
The group of 12 which paid a visit the guests’ curiosity and interest relevant to effective energy sector
to the Commission’s headquarters in in the Commission’s energy- management and regulation.
44
On-Site
Regional
Empowerment
Discussing Energy Sector Regulation
with Indonesia’s Key Players
45
Promoting
Responsible
Efficiency
In line with the Energy Commission’s effort to actively engage
and share information with members of the private sector and
the public, the Commission’s CEO, Datuk Ir Ahmad Fauzi
Hasan, recently participated in a panel discussion on energy
efficiency. This was part of the three-day Energy for Tomorrow
conference organised by the International New York Times,
and held in Kuala Lumpur.
46
On-Site
47
On-Site
All Charged Up
Energy Commission Strategy Workshop
The Energy Commission held a two-day workshop to review their existing key
performance indicators in order to balance the interests of the various players
(investors, utility operators, policy makers) and consumers amid a changing
industry. The workshop participants included Energy Commission members and
departmental staff, facilitated by Ernst & Young and featured a guest speaker,
Soh Sai Bor, from the Energy Market Authority of Singapore.
In his opening address, Dato’ Abdul transform the country into one with a evolution of the Energy Commission
Razak Abdul Majid, the chairman high income economy,” he said. and shared his vision of the future in
of the Energy Commission, said his presentation.
that the outcomes of the workshop Soh Sai Bor, a director at Singapore’s
would define its strategy for the next Energy Market Authority (EMA) Audience participation was high,
five years. shared the regulatory practices of with the presenters responding to
his department (Energy Regulation questions from the floor. The workshop
He highlighted that electricity supply and Licensing Department). He said sessions on the first day focused on
itself has progressed to become Singapore was committed to allowing identifying the Commission’s critical
a s e r v i c e t h a t promotes society tarriff rates to be market-determined, success factors based on a collective
well-being and individual lifestyle. but added that less affluent households understanding of its role and function.
“The quality of a nation’s energy were given subsidies directly. The mutually agreed upon success
supply directly impacts its economy, factors were then translated into an
and the Energy Commission can Datuk Ir Ahmad Fauzi Hasan action plan during breakout sessions,
support the government’s agenda to highlighted key developments in the with key actions prioritised.
48
WE WOULD LIKE TO
HEAR FROM YOU!
Energy Malaysia welcomes your questions, comments
and suggestions to help the Energy Commission of
Malaysia work better at safeguarding your interest.
Where to lodge complaints and how to get in touch with the Energy Commission?
Log onto our official website: www.st.gov.my for the latest updates and news.
Or visit the Malaysia Energy Information Hub, our national energy database:
http://meih.st.gov.my/
Article Feedback
Edition Number:
Article Title:
Comments:
Name:
Designation, Company:
Contact Number:
Email Address: