Breadth (b) (mm) -80

Depth (d) (mm) -80

Height (h) - (mm) 3500 Dia


Spacing of ties (mm) 160 8mm
No.of ties 25 10mm
12mm
Total length of tie -160 16mm
Dia of bar 20mm
25mm

Total length of eachstraight 3800


Total No.of straights
Weight per meter Total length (m) Total weight(kg)
0.3950617284 0
0.6172839506 0
0.8888888889 0
1.5802469136 0
2.4691358025 0
3.8580246914 0
Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

FOOTING REINFORCEMENT QUANTITY

SIZE (m) STEEL Length & No's


DEPTH
SL.NO DESCRIPTION No.s
(m) BOT (ALONG X BOT (ALONG Y TOP (ALONG X TOP (ALONG Y SKIN RFT - BOT (ALONG X BOT (ALONG Y TOP (ALONG X
L B
DIR) -(1) DIR) - (2) DIR) - (3) DIR) - (4) (5) DIR) -(1) DIR) - (2) DIR) - (3)

1 F1 4.500 3.500 0.600 2 16 @ 150 16 @ 150 10 @ 170 10 @ 170 10 2 4.950 24 3.950 30 4.950 21

2 F2 4.000 2.400 0.650 1 12 @ 100 12 @ 100 10 @ 170 10 @ 170 10 3 4.450 24 2.850 40 4.450 15

3 F3 4.300 3.200 0.600 2 16 @ 120 16 @ 120 10 @ 170 10 @ 170 10 2 4.750 27 3.650 36 4.750 19

4 F4 4.300 3.800 0.600 1 16 @ 120 16 @ 120 10 @ 170 10 @ 170 10 2 4.750 32 4.250 36 4.750 23

5 F5 4.200 3.200 0.650 1 16 @ 140 16 @ 140 10 @ 170 10 @ 170 10 3 4.650 23 3.650 30 4.650 19

6 F6 4.700 4.600 0.600 4 16 @ 100 16 @ 100 10 @ 170 10 @ 170 10 2 5.150 46 5.050 47 5.150 28

7 F7 5.200 5.100 0.650 1 20 @ 120 20 @ 120 10 @ 120 10 @ 120 10 3 5.650 43 5.550 44 5.650 43

8 F8 4.700 4.200 0.600 3 20 @ 120 20 @ 120 10 @ 120 10 @ 120 10 2 5.150 35 4.650 39 5.150 35

9 F9 5.400 5.000 0.600 1 20 @ 120 20 @ 120 10 @ 120 10 @ 120 10 2 5.850 42 5.450 45 5.850 42

10 F10 5.900 5.900 0.750 2 25 @ 140 25 @ 140 12 @ 120 12 @ 120 10 4 6.350 43 6.350 43 6.350 49

11 F11 4.700 4.300 0.600 3 16 @ 120 16 @ 120 10 @ 120 10 @ 120 10 2 5.150 36 4.750 39 5.150 36

12 F12 5.200 4.800 0.600 1 16 @ 100 16 @ 100 10 @ 150 10 @ 150 10 2 5.650 48 5.250 52 5.650 32

13 F13 3.200 2.600 0.600 2 12 @ 150 12 @ 150 10 @ 170 10 @ 170 10 2 3.650 18 3.050 22 3.650 16

14 F14 3.400 2.600 0.600 4 12 @ 150 12 @ 150 10 @ 170 10 @ 170 10 2 3.850 18 3.050 23 3.850 16

15 CF1 6.800 5.000 0.600 1 12 @ 100 12 @ 100 12 @ 100 12 @ 100 10 2 7.250 50 5.450 68 7.250 50

16 CF2 7.500 5.800 0.600 1 16 @ 150 16 @ 150 16 @ 150 16 @ 150 10 3 7.950 39 6.250 50 7.950 39

17 CF3 5.000 6.500 0.600 1 12 @ 100 12 @ 100 12 @ 100 12 @ 100 10 2 5.450 65 6.950 50 5.450 65

18 CF4 6.000 5.000 0.600 2 12 @ 100 12 @ 100 12 @ 100 12 @ 100 10 2 6.450 50 5.450 60 6.450 50

19 CF5 6.500 5.600 0.600 1 12 @ 100 12 @ 100 12 @ 100 12 @ 100 10 2 6.950 56 6.050 65 6.950 56

20 EF1 3.000 2.000 0.450 4 12 @ 120 12 @ 120 10 @ 200 10 @ 200 10 2 3.450 17 2.450 25 3.450 11

21 EF2 2.600 1.500 0.450 4 12 @ 140 12 @ 140 10 @ 200 10 @ 200 10 2 3.050 11 1.950 19 3.050 8

22 EF3 2.100 1.400 0.450 8 12 @ 200 12 @ 200 10 @ 200 10 @ 200 10 2 2.550 8 1.850 11 2.550 8

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

No's Quantity

TOP (ALONG Y SKIN ROD BOT (ALONG X BOT (ALONG Y TOP (ALONG X TOP (ALONG Y SKIN ROD
DIR) - (4) -(5) DIR) -(1) DIR) - (2) DIR) - (3) DIR) - (4) -(5)

3.950 27 15.900 375.467 374.519 128.333 131.667 39.259

2.850 24 12.700 94.933 101.333 41.204 42.222 23.519

3.650 26 14.900 405.333 415.289 111.420 117.160 36.790

4.250 26 16.100 240.198 241.778 67.438 68.210 19.877

3.650 25 14.700 169.007 173.037 54.537 56.327 27.222

5.050 28 18.500 1497.442 1500.286 356.049 349.136 91.358

5.550 44 20.500 599.877 602.963 149.969 150.741 37.963

4.650 39 17.700 1335.185 1343.333 333.796 335.833 65.556

5.450 45 20.700 606.667 605.556 151.667 151.389 25.556

6.350 49 23.500 2106.867 2106.867 553.156 553.156 116.049

4.750 39 17.900 878.933 878.222 343.333 343.056 66.296

5.250 35 19.900 428.563 431.407 111.605 113.426 24.568

3.050 19 11.500 116.800 119.289 72.099 71.543 28.395

3.050 21 11.900 246.400 249.422 152.099 158.148 58.765

5.450 68 23.500 322.222 329.422 322.222 329.422 29.012

6.250 50 26.500 489.956 493.827 489.956 493.827 49.074

6.950 50 22.900 314.889 308.889 314.889 308.889 28.272

5.450 60 21.900 573.333 581.333 573.333 581.333 54.074

6.050 65 24.100 345.956 349.556 345.956 349.556 29.753

2.450 16 9.900 208.533 217.778 93.704 96.790 48.889

1.950 14 8.100 119.289 131.733 60.247 67.407 40.000

1.850 11 6.900 145.067 144.711 100.741 100.494 68.148

Sub total 11620.917 11700.551 4927.752 4969.732 1008.395

Total Qty in kg 34227.347

Total Qty in tonne 34.3 MT

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

SIZE (m)
Bottom Top
SL.N Height
DESCRIPTION LVL. LVL. No.s MAIN STEEL - (6) &
O L B (h)
(m) (M)
Dia
1 P1
for C24 1.10 0.90 27.059 34.300 7.241 1 20
for C25 1.10 0.90 27.108 34.300 7.192 1 20
for C26 1.10 0.90 27.230 34.300 7.070 1 20

2 P2
for C18 & C19 1.20 0.85 26.623 34.300 7.677 2 25
for C20 & C21 1.20 0.85 26.697 34.300 7.603 2 25
for C22 & C23 1.20 0.85 27.056 34.300 7.244 2 25

3 P3
for C27 1.10 1.00 26.717 34.300 7.583 1 25
for C28 1.10 1.00 26.682 34.300 7.618 1 25
for C29 1.10 1.00 26.641 34.300 7.659 1 25
for C30 1.10 1.00 26.610 34.300 7.690 1 25
for C31 1.10 1.00 26.596 34.300 7.704 1 25
for C32 1.10 1.00 26.513 34.300 7.787 1 25

4 P4
for C33 1.20 1.10 26.513 34.300 7.787 1 25
for C34 1.20 1.10 26.208 34.300 8.092 1 25
for C35 1.20 1.10 26.182 34.300 8.118 1 25
for C36 1.20 1.10 26.071 34.300 8.229 1 25
for C37 1.20 1.10 25.959 34.300 8.341 1 25
for C38 1.20 1.10 26.403 34.300 7.897 1 25

5 P5
for c39 & c40 1.20 1.20 26.350 34.300 7.950 2 25

6 P6
for C41,C42,C43 &
1.10 0.90 26.300 34.300 8.000 4 20
C44

7 P7
for C1 &C2 1.00 0.75 26.677 31.300 4.623 2 20
for C3-C5 1.00 0.75 26.616 31.300 4.684 3 20

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

for C6-C8 1.00 0.75 26.616 31.300 4.684 3 20


for C9-C14 1.00 0.75 26.648 31.300 4.652 6 20
for C15-C17 1.00 0.75 26.623 31.300 4.677 3 20
for C45 & C46 1.00 0.75 27.499 31.700 4.201 2 20
for C47-C52 1.00 0.75 27.516 31.700 4.184 6 20
for C53 &C54 1.00 0.75 27.194 31.300 4.106 2 20

8 P8
EC1 & EC2 0.85 0.65 27.126 31.550 4.424 2 20
EC3 & EC4 0.85 0.65 27.074 31.550 4.476 2 20
EC5 - EC8 0.85 0.65 27.033 31.550 4.517 4 20
EC9 & EC10 0.85 0.65 27.173 31.550 4.377 2 20
EC11 - EC14 0.85 0.65 27.152 31.550 4.398 4 20
EC15 & EC16 0.85 0.65 27.098 31.550 4.452 2 20

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

STEEL WEIGHT
TIES MAIN
CONFINEMENT TIES - (8), (12) & (13)
MAIN STEEL - (6) & (7) STEEL - (6)
(9),(10)&(11)
& (7)
Nos. Length (m) Dia No.s Length (m) Dia No.s Length (m) Kg

26 7.994 16 29 10.700 10 23 10.22 513.195


26 7.945 16 29 10.700 10 22 10.22 510.049
26 7.823 16 29 10.700 10 22 10.22 502.217

20 8.430 16 19 8.196 10 24 7.836 1300.926


20 8.356 16 19 8.196 10 24 7.836 1289.506
20 7.997 16 19 8.196 10 22 7.836 1234.105

22 8.344 16 36 11.124 10 9 10.644 708.210


22 8.371 16 36 11.124 10 10 10.644 710.502
22 8.412 16 36 11.124 10 10 10.644 713.981
22 8.443 16 36 11.124 10 10 10.644 716.613
22 8.457 16 36 11.124 10 10 10.644 717.801
22 8.540 16 36 11.124 10 10 10.644 724.846

26 8.540 16 19 12.352 10 24 11.872 856.636


26 8.837 16 19 12.352 10 26 11.872 886.427
26 8.863 16 19 12.352 10 26 11.872 889.035
26 8.974 16 19 12.352 10 27 11.872 900.170
26 9.086 16 19 12.352 10 27 11.872 911.404
26 8.642 16 19 12.352 10 25 11.872 866.867

32 8.685 22 21 14.818 10 21 14.218 2144.444

26 8.753 16 21 10.700 10 26 10.220 2247.684

22 5.384 16 19 7.228 10 11 6.868 584.928


22 5.445 16 19 7.228 10 11 6.868 887.333

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

22 5.445 16 19 7.228 10 11 6.868 887.333


22 5.413 16 19 7.228 10 11 6.868 1764.237
22 5.438 16 19 7.228 10 11 6.868 886.193
22 4.962 16 19 7.228 10 9 6.868 539.081
22 4.945 16 19 7.228 10 8 6.868 1611.704
22 4.867 16 19 7.228 10 8 6.868 528.760

20 5.185 12 17 6.648 10 11 6.368 512.099


20 5.237 12 17 6.648 10 11 6.368 517.235
20 5.278 12 17 6.648 10 12 6.368 1042.568
20 5.138 12 17 6.648 10 11 6.368 507.457
20 5.159 12 17 6.648 10 11 6.368 1019.062
20 5.213 12 17 6.648 10 11 6.368 514.864
Total Qty in kg = 56359.86
Total Qty in tonne = 56.400

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

WEIGHT

TIES

Kg

635.45
629.14
629.14

724.34
724.34
704.99

691.97
698.54
698.54
698.54
698.54
698.54

546.75
561.40
561.40
568.73
568.73
554.07

2228.00

2076.42

527.31
790.96

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at km 25/6 of
Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

790.96
1581.92
790.96
510.35
1505.61
501.87

287.40
287.40
590.52
287.40
574.79
287.40
56359.86
56.400

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at
km 25/6 of Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

Deck slab

Sl.No. Description Length(m) Width (m) Area (m2)

1 Part-1 14.470 3.873 56.042

2 Part-2 44.322 5.806 257.334

3 Part-3 53.150 5.832 309.971

4 Part-4 70.280 5.832 409.873

5 Part-5 27.000 10.800 291.600

6 Part-6 31.435 4.806 151.077

7 Ramp - 4 layer 116.750 2.300 268.525

8 Ramp - 3 layer 112.198 2.300 258.055

TOTAL AREA 2002.477

STEEL FOR 1 Sqm 17.284


TOTAL STEEL REQUIRED
34610.806
kg
TOTAL STEEL REQUIRED
34.700
MT

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at
km 25/6 of Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

Kerb Beam

Main Steel Stirrups Weight


Sl.No. Description Length(m)
Dia No's Length Dia No's Length Main steel Stirrups

1 Part-1 14.470 12 2 x 4 14.420 10 2 x 98 0.900 102.542 108.889

2 Part-2 44.322 12 2 x 4 44.272 10 2 x 297 0.900 314.823 330.000

3 Part-3 53.150 12 2 x 4 53.100 10 2 x 355 0.900 377.600 394.444

4 Part-4 70.280 12 2 x 4 70.230 10 2 x 470 0.900 499.413 522.222

5 Part-5 27.000 12 2 x 4 26.950 10 2 x 181 0.900 191.644 201.111

6 Part-6 31.435 12 2 x 4 31.385 10 2 x 211 0.900 223.182 234.444

7 Ramp - 4 layer 116.750 12 2 x 4 116.700 10 2 x 779 1.100 829.867 1057.901

8 Ramp - 3 layer 112.198 12 2 x 4 112.148 10 2 x 749 1.100 797.497 1017.160

Total Steel in kg = 7202.742

Total Steel in MT = 7.300

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at
km 25/6 of Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

PLINTH BEAM STEEL QUANTITY

Dimension Steel
Weight
Sl.No. Description No's Bottom Main Top Main Top Extra Stirrups
L (m) B (m) D (m)
No's Length Dia No's Length Dia No's Length Dia No's Length Dia Main Steel Stirrups
1 PB1
C18-C19,C20-C21 & C22-C23 3 5.150 0.300 0.600 5 6.750 16 2 6.750 16 3 2.088 16 27 1.800 10 253.689 90.000
2 PB2 for
C1-C2,C45-C46 & C53-C54 3 3.250 0.300 0.450 4 4.850 16 2 4.850 16 2 1.613 16 18 1.500 10 153.244 50.000

C3-C4,C4-C5,C6-C7,C7-C8,C9-
C10,C10-C11,C12-C13,C13-
14 1.250 0.300 0.450 4 2.850 16 2 2.850 16 2 1.113 16 8 1.500 10 427.536 103.704
C14,C15-C16,C16-C17,C47-
C48,C48-C49,C50-C51 & C51-C52

EC1-EC2,EC3-EC4.EC5-EC6,EC7-
EC8,EC9-EC10,EC11-EC12,EC13- 8 3.350 0.300 0.450 4 4.950 16 2 4.950 16 2 1.638 16 18 1.500 10 416.869 133.333
EC14 & EC15-EC16
Total Steel in kg = 1628.375
Total Steel in MT = 1.700

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at
km 25/6 of Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

Median Crash Barrier


Overall length of Crash Barrier = 247.306 m
Steel Quantity

BAR UNIT
LENGTH SPACING NOS DIA AREA WEIGHT
MARK WEIGHT

1 2.025 110 2250 12 113.10 0.889 4050.000

2 0.800 110 2250 12 113.10 0.889 1600.000

3 247.306 - 11 12 113.10 0.889 2418.103

8068.103 kg
Total = 8.100 MT

CMDP, Division IV, Alandur, Chennai Musunuri and Associates


Construction of Foot over bridge and Skywalk with Escalator at
km 25/6 of Grand Southern Trunk road, Tambaram. Reinforcement Steel Quantity

Maintenance room Steel Quantity


SIZE (m) STEEL WEIGHT
SL.N MAIN
DESCRIPTION No.s MAIN STEEL TIES / STIRRUPS TIES
O LengthBreadth Depth STEEL
Dia Spacing Nos. Length Dia No.s Length Kg Kg
1 Footing
MF1 1.50 1.20 0.300 4 10 150 8 1.750 - - - 34.568 -
1.50 1.20 0.300 4 10 150 10 1.450 - - - 35.802 -
2 Column
MC1 - MC4 0.23 0.4 5.5 4 16 - 8 6.15 8 40 1.1 310.993 69.531
3 Roof & Plinth beam
RB1 & PB1
Bottom Steel 5.43 0.23 0.4 4 16 - 4 7.030 177.746
Top Steel 5.43 0.23 0.4 4 16 - 2 7.030 8 38 1.1 88.873 66.054
Top Extra 5.43 0.23 0.4 4 16 - 4 2.158 54.550
RB1 & PB1 -
Bottom Steel 2.77 0.23 0.4 4 16 - 4 4.370 110.491
Top Steel 2.77 0.23 0.4 4 16 - 2 4.370 8 20 1.1 55.245 34.765
Top Extra 2.77 0.23 0.4 4 16 - 4 1.493 37.736
4 Lintel
Y10 - 4 Nos 1.5 0.23 0.15 3 10 - 4 1.450 8 11 0.72 10.741 9.387
5 Slab
Along Shorter Span 6.23 3.23 0.125 1 10 150 43 3.230 - - - 85.735 -
Top Extra 6.23 3.23 0.125 1 10 150 43 0.808 - - - 21.434 -
Along longer span 6.23 3.23 0.125 1 10 150 23 6.230 - - - 88.451 -
Top Extra 6.23 3.23 0.125 1 10 150 23 1.558 - - - 22.113 -
### 179.74
Total Qty in kg = 1314.21
Total Qty in MT = 1.400

CMDP, Division IV, Alandur, Chennai Musunuri and Associates