DEPT:-ELECTRONICS & TELE ENGINEERING SUB : - BASIC ELECTRICAL ENGINEERING ( “ I “) , SECOND SEMISTER BRANCH --- E J-2 I /C M-2 I REQUIREMENT OF EQUIPMENT AND MATERIALS Sr. Name of equipment Quantity No 1 Loading Rheostat: 7.5 kw,230v,3ph,4 wire, balance load (Each branch having 1 Nos equal load),Load: Wire Wound Fixed Registers
2 Lamp Bank-230v,0-20A 2 Nos
3 Single Phase Induction Motor- ½ H.P,230v,50hz,,A.C.Supply 2 Nos 4 Universal Motor- ¼ H.P. 2 Nos 5 Techometer: - Non Contact Type 1 Nos 6 Techometer: Digital Type 1 Nos 7 Techometer: -Analogue Type 1 Nos 8 Rectifier: - Solid State,Input-415v,3ph, A.C. Output 230v,D.C Regulated 1 Nos 20Amp
9 4-Point Starter 2 Nos
10 Miniature Circuit Breaker(MCB) 2 Nos 11 Metal Clade Circuit Meter 2 Nos 12 ELCB 2 Nos 13 Earth Tester 2 Nos 14 Insulation Tester 2 Nos 15 Different Types of digital clamp-On Meter’s 2 Nos
Note:- Three Phase Supply(3-ph Supply) must be required and compulsory in Lab No.06,Electrical Lab at second Floor, Amba Mata Mandir Building.
G. Pulla Reddy Engineering College (Autonomous) : Kurnool Department of Electrical & Electronics Engineering Power Electronics (PEP) Laboratory (Scheme-2013)