Sunteți pe pagina 1din 5

sappi Ngodwana

COMPLETION REPORT

Project No: SAPPI Ngodwana – Project Eagle


Contract Affected: Evaporators
Issued By: Lovemore Bros Transport
Issued To: SAPPI
Report number: CRPT-EVAP 180321-01
Date: 26 Mar 2018

BUILDING SECTION TYPE OF STRUCTURE LOCATION


EVAPS #3 Vessel Installation EVAPS #3

SURFACE CONDENSER
The 5th Vessel Rigged into position; was located with minimal manipulation;
vessel bases re-worked as follows:
C2 C3
 C1 = 3mm shim required; Zero (0) holes drilled.
 C2 = No Shim required; Zero (0) holes drilled.
 C3 = 2mm shim required; Zero (0) holes drilled.
 C4 = 2mm shim required; Zero (0) holes drilled.

C1 C4

The Vessel was plumbed as follows:


 In North /South direction using the edge of vessel as reference; leaning as-
built 5mm to North.
 In West / East direction using the edge of vessel as reference; vertically
plumb.
SURFACE COND

1 of 5
EFFECT 6
The 6th Vessel Rigged into position; was located with minimal manipulation;
vessel bases re-worked as follows:
C6 C7
 C5 = No Shim required; Zero (0) holes drilled.
 C6 = No Shim required; Zero (0) holes drilled.
 C7 = 2mm shim required; Zero (0) holes drilled.
 C8 = 2mm shim required; Zero (0) holes drilled.

C5 C8

The Vessel was plumbed as follows:


 In North /South direction using the edge of vessel as reference; leaning as-
built 15mm to South.
 In West / East direction using the edge of vessel as reference; vertically
plumb.

EFFECT 6
EFFECT 5
The 8th Vessel Rigged into position; was located with a major amount of
manipulation; vessel bases re-worked as follows:
C1 C1
 C9 = No Shim required; Four (4) holes drilled.
 C10 = No Shim required; Zero (0) holes drilled.
 C11 = 3mm shim required; One (1) hole drilled.
 C12 = 3mm shim required; Four (4) holes drilled.

C9 C1

The Vessel was plumbed as follows:


 In North /South direction using the edge of vessel as reference; vertically
plumb.
 In West / East direction using the edge of vessel as reference; leaning as-
built 5mm to East.
EFFECT 5
EFFECT 4
The 10th & last Vessel Rigged into position; was located with minimal amount
of manipulation; vessel bases re-worked as follows:
C1 C1
 C13 = No Shim required; Zero (0) holes drilled.
 C14 = No Shim required; Zero (0) holes drilled.
 C15 = No Shim required; Zero (0) holes drilled.
 C16 = No Shim required; Zero (0) holes drilled.

C1 C1

The Vessel was plumbed as follows:


 In North /South direction using the edge of vessel as reference; vertically
plumb.
 In West / East direction using the edge of vessel as reference; vertically
plumb.
EFFECT 4

2 of 5
EFFECT 3
The 9th Vessel Rigged into position; was located with minimal manipulation;
vessel bases re-worked as follows:
C1 C1
 C17 = 1mm shim required; No holes drilled.
 C18 = 3mm shim required; No holes drilled.
 C19 = No Shim required; No holes drilled.
 C20 = No Shim required; No holes drilled.

C1 C2

The Vessel was plumbed as follows:


 In North /South direction using the edge of vessel as reference; leaning as-
built 10mm to South.
 In West / East direction using the edge of vessel as reference; vertically
plumb.
EFFECT 3
EFFECT 2
The 7th Vessel Rigged into position; was located with a moderate amount of
manipulation; vessel bases re-worked as follows:
C2 C2
 C21 = 2mm shim required; No holes drilled.
 C22 = 2mm shim required; No holes drilled.
 C23 = 1mm shim required; Four (4) holes drilled.
 C24 = 2mm shim required; No holes drilled.

C2 C2

The Vessel was plumbed as follows:


 In North /South direction using the edge of vessel as reference; leaning as-
built 10mm to South.
 In West / East direction using the edge of vessel as reference; leaning as-
built 7mm to West.
EFFECT 2
EFFECT 1D
The 4th Vessel Rigged into position; was located with minimal manipulation;
vessel bases were re-worked as follows:
C2 C2
 C25 = 1mm shim required; No holes drilled.
 C26 = No Shim required; No holes drilled.
 C27 = 9mm shim required; No holes drilled.
 C28 = 11mm shim required; No holes drilled.

C2 C2

The Vessel was plumbed as follows:


 In North /South direction using the 270 deg centre line as reference;
vertically plumb.
 In West / East direction using the 0 deg centre line as reference; vertically
plumb.

EFFECT 1D

3 of 5
EFFECT 1C
The 3rd Vessel Rigged into position; was located with minimal manipulation;
vessel bases were re-worked as follows:
C3 C3
 C29 = 7mm shim required; No holes drilled.
 C30 = No Shim required; No holes drilled.
 C31 = 4mm shim required; No holes drilled.
 C32 = 12mm shim required; No holes drilled.

C2 C3

The Vessel was plumbed as follows:


 In North /South direction using the 270 deg centre line as reference;
vertically plumb.
 In West / East direction using the 0 deg centre line as reference; vertically
plumb.
EFFECT 1C
EFFECT 1B
The 2nd Vessel Rigged into position; was located with minimal manipulation,
vessel bases were re-worked as follows:
C3 C3
 C33 = 6mm shim required; No holes drilled.
 C34 = No Shim required; No holes drilled.
 C35 = 6mm shim required; No holes drilled.
 C36 = 9mm shim required; No holes drilled.

C3 C3

The Vessel was plumbed as follows:


 In North /South direction using the 270 deg centre line as reference; leaning
as-built 10mm to South.
 In West / East direction using the 0 deg centre line as reference; vertically
plumb.
EFFECT 1B
EFFECT 1A
The 1st Vessel Rigged into position; was located with a moderate amount of
manipulation; vessel bases re-worked as follows:
C3 C3
 C37 = No Shim required; No holes drilled.
 C38 = 5mm shim required; No holes drilled.
 C39 = 5mm shim required; No holes drilled.
 C40 = 2mm shim required; No holes drilled.

C3 C4

The Vessel was plumbed as follows:


 In North /South direction using the 270 deg centre line as reference; leaning
as-built 20mm to North.
 In West / East direction using the 0 deg centre line as reference; vertically
plumb.

EFFECT 1A

4 of 5
DESIGNATION SIGNATURE DATE

SAPPI Project Manager

SAPPI Project Engineer

Contractor Project Leader

Contractor Site Manager

5 of 5

S-ar putea să vă placă și