Presupuesto 0102004 VIVIENDA UNIFAMILIAR DEL CURSO DE COSTOS Y PRESUPUESTOS UNC 2018-I
Subpresupuesto 001 ESTRUCTURAS
Partida 01.01 EXCAVACION DE ZANJAS
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02050700020006 TUBERIA PVC SAP C-10 S/P DE 1" X 5 m m 1.03 40.0000
0207020001 ARENA m3 0.01 110.0000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.12 17.5000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301100001 COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 0.1100 30.0000
Equipos
0301160001 CARGADOR FRONTAL hm 0.0320 150.0000
0301220004 CAMION VOLQUETE hm 0.1280 100.0000
Materiales
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 60 1.6000
0204120001 CLAVOS PARA MADERA CON CABEZA kg 5 2.5000
0207010001 PIEDRA CHANCADA m3 1.5 40.0000
0207020001 ARENA m3 0.75 40.0000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.2 17.5000
0231010001 MADERA TORNILLO p2 30 1.9000
Equipos
0301290003 MEZCLADORA DE CONCRETO hm 1.6000 16.0000
Equipos
03010400010004 BOMBA PARA PRUEBA DE AGUA hm 0.0400 20.0000
03012200050004 CISTERNA EMULSION Y AGUA 3540 gl 178-2 hm 0.0040 60.0000
Materiales
02050700020006 TUBERIA PVC SAP C-10 S/P DE 1" X 5 m m 8.24 25.0000
0207010001 PIEDRA CHANCADA m3 0.02 40.0000
0207020001 ARENA m3 0.18 40.0000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.24 17.5000
0219090002 CASA Y TAPA DE CONCRETO und 1 30.0000
Fecha :
Página : 1
1.47 37
1.47
43.70
41.20 69
0.40 4
2.10 21
0.51
0.51 37
3.30
3.30 49
17.60
4.80 49
12.80 48
416.50
96.00 3
12.50 2
60.00 5
30.00 4
161.00 21
57.00 43
25.60
25.60 48
80.00
1.04
0.80 48
0.24 48
80.00
Parcial S/.
228.93
14.10 47
45.77 47
169.07 47
248.44
206.00 69
0.96 5
7.28 4
4.20 21
30.00 31
22/07/2018 06:30:17 PM
ITEM DESCRIPCION U.M METRADO P.U
COSTO DIRECTO
COSTO INDIRECTO(25%CD)
TOTAL
LEYENDA
SIMBOLO DESCRIPCION % INCIDENCIA
J M.O 100
MH MAQ/EQUIPO 100
MAQ. NACIONAL 49.46
MAQ. IMPORTADA 37.10
HERRAMIENTAS 13.44
T TUBERIA 100
C CEMENTO 100
GGU GASTOS GENERALES 100
47 49 69 4 21 5
PARCIAL
M.O MAQ. IMPORTADA TCSN AF CEMENTO AG
I.U.
47
48
49
37
69
21
39
43 2 3 37 48 31 39
ACERO
MADERA ACERO LISO HERRAMIENTAS MAQ. NACIONAL DUCTO IGPC
CORRUGADO
0.00 0.00 0.00 4695.55 0.00 0.00
0.00 0.00 0.00 1636.87 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 18432.00 0.00
3420.00 750.00 5760.00 0.00 1536.00 0.00
0.00 0.00 0.00 0.00 3328.00 0.00
0.00 0.00 0.00 0.00 0.00 12000.00
3420.00 750.00 5760.00 6332.42 23296.00 12000.00 184585.12
0.004 0.001 0.006 0.007 0.025 0.013 0.200
0.004 0.019
0.001 0.007
0.011 0.051
EJEMPLO Realizar la valorizacion correspondiente
I. DATOS: LEYENDA
F.P: K= SIMBOLO FACTOR PARCIALES SIMBOLO
J 0.352 J
L 0.079 L
C 0.255 C
P 0.113 1.0 P/M
0.743 0.743 P
0.257 0.257 M
H 0.071 H
GGU 0.13 GGU
FECHA VALOR
FECHA DEL PRESUPUESTO: ENERO 2011
VALORIZACION: ABRIL 2011 100,000.00
FECHA DE REAJUSTE: MAYO 2011
AREA GEOGRAFICA: 2
K= 1.019
DESCRIPCION % I.U
MANO DE OBRA 100
LADRILLO 100
CEMENTO 100
PIEDRA Y MADERA
PIEDRA 74.3
MADERA 25.7
HORMIGON 100