Sunteți pe pagina 1din 10

低加系统 LP heater system

METTUR BGR 签字 DEC 签字


序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
1 #5、6#低加解列条件检查
Inspection of #5 LP heater quitting conditions
1、汽机跳闸
1. Steam turbine tripping
2、发电机解列
2. Generator quitting
3、#5 低加水位高高高
3. 5# LP heater water level HHH(280mm)
4、手动解列
4. Manual quitting
5、OPC 动作
5. OPC action
2 5#、6#低加抽汽电动门开允许
5#、6# LP heater steam-extraction electric valve open permit
1、汽机挂闸
1、turbine latching
2、低加进出口门全开
2、5#、6# LPH inlet/outlet valve fully open
3、逆止门已开
3、NRV leave close position
4、无故障信号
4、no fault
3 5#低加抽汽电动门保护关
5# LP heater steam-extraction electric valve closed in manner of protection
1、汽机跳闸 1.Steam turbine tripping

1
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
2、发电机解列 2.Generator quitting

3、#5 低加解列 3. #5 LP heater quitting


4、#5 低加进水门或出水门关
4. #5 LP heater inlet valve or outlet valve closed
5、#5 LP 低加水位 HHH 5、#5 LP heater water level HHH

6、OPC 动作 6、 OPC action


4 6#低加抽汽电动门保护关
6# LP heater steam-extraction electric valve closed in manner of protection
1、汽机跳闸
1. Steam turbine tripping
2、发电机解列
2. Generator quitting
3、#6 低加解列
3. #6 LP heater quitting
4、#6 低加进水门或出水门关
4. #6 LP heater inlet valve or outlet valve closed
5、#6 LP 低加水位 HHH 5、#6 LP heater water level HHH
6、OPC 动作
6. OPC action
5 #5 低加抽汽逆止阀保护关
#5 LP heater check valve closed in manner of protection
1、汽机跳闸
1. Steam turbine tripping
2、发电机解列 2. Generator quitting

2
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
3、#5 低加解列 3. #5 LP heater quitting
4、#5 低加进水门或出水门关
4. #5 LPH inlet MOV or discharge MOV closed
5、OPC 动作 5. OPC action
6、本级抽汽电动门已关(联关)
6. Steam extraction electric valve of this stage closed (closed in manner
of interlock)
6 #6 低加抽汽逆止阀保护关
#6LP heater check valve closed in manner of protection
1、汽机跳闸
1、Steam turbine tripping
2、发电机解列
2、Generator quitting
3、#6 低加解列
3、#6 LP heater quitting
4、#6 低加进水门或出水门关
4、#6 LPH inlet MOV or discharge MOV closed
5、OPC 动作
5、OPC action
6、本级抽汽电动门已关(联关)
6、Steam extraction electric valve of this stage closed (closed in manner
of interlock)
7 #5 低加抽汽疏水门保护开
#5 LP heater steam extraction drain valve opened in manner of protection
1、汽机跳闸
1. Steam turbine tripping

3
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
2、发电机解列
2. Generator quitting
3、#5 低加解列
3. #5 LP heater quitting
4、#5抽汽电动门关或逆止门关
4. #5 steam extraction electric valve or check valve closed
5、OPC 动作
5. OPC action
6、本级抽汽管道管顶与管底壁温差超过 50℃
6. The temperature difference at tube top and the tube wall of the steam-
extraction tube in this stage exceeds 50℃
7、汽机负荷<30% ,联开,汽机负荷>30%延时 30s ,联关
7. Steam turbine load<30%, opened in manner of interlock, Steam
turbine load>30% delay 30s, closed in manner of interlock
8 #6 低加抽汽疏水门保护开
#6 LP heater steam extraction drain valve opened in manner of protection
1、汽机跳闸
1. Steam turbine tripping
2、发电机解列
2. Generator quitting
3、#6 低加解列 3. #6 LP heater quitting
4、#6抽汽电动门关或逆止门关
4. #6 steam extraction electric valve or check valve closed
5、OPC 动作
5. OPC action
6、本级抽汽管道管顶与管底壁温差超过 50℃
6. The temperature difference at tube top and the tube wall of the steam-
extraction tube in this stage exceeds 50℃

4
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
7、汽机负荷<30% ,联开,汽机负荷>30% ,联关
7. Steam turbine load<30%, opened in manner of interlock, Steam
turbine load>30% delay 30s, closed in manner of interlock
9 #5 低加入口电动门
#5 LP heater inlet electric valve
1、开允许:出口门已全开,可手操开
1. open permit :Outlet valve fully opened, possible to open manually
2、关允许:旁路门全开,允许关
2. By-pass valve fully opened ,allowed to close
3、本级低加解列且旁路门已全开,保护关
3. This stage LP heater quitting and bypass valve fully opened, protect to
close
10 #6 低加入口电动门
#6 LP heater inlet electric valve
1、开允许:出口门已全开,可手操开
1. open permit : Outlet valve fully opened, possible to open manually
2、关允许:旁路门全开,允许关
2. close permit:By-pass valve fully opened closed, allowed to close
3、本级低加解列且旁路门已全开,保护关
3. This stage LP heater quitting and bypass valve fully opened,
protect to close
11 #5 低加出口电动门
#5 LP heater outlet electric valve
1、开允许:无故障条件
1. open permit : no failure conditions
2、关允许:旁路门全开且入口门全关允许关
2. close permit: By-pass valve fully open and inlet valve fully closed,
allowed to close

5
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
3、本级低加解列且旁路门已全开,保护关
3. This stage LP heater quitting and bypass valve fully opened, protect to
close
12 #6 低加出口电动门
#6 LP heater outlet electric valve
1、开允许:无故障条件
1. open permit : no failure conditions
2、关允许:旁路门全开且入口门全关允许关
2. close permit: By-pass valve fully open and inlet valve fully closed,
allowed to close
3、本级低加解列且旁路门已全开,保护关
3. This stage LP heater quitting and bypass valve fully opened, protect to
close
13 #5,6#低加旁路电动门
#5,6# LP heater bypass electric valve
1、开允许:无故障条件
1. open permit : no failure conditions
2、关允许:入口出口电动门全开
2. close permit: inlet and outlet valve fully opend allowed to close
3、本级低加解列,保护开
3. This stage LP heater quitting, protect to open
14 #7,8#低加出口门
#7 LP heater outlet valve
1、开允许:无故障条件
1. open permit : no failue conditions

6
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
2、关允许:旁路门全开且入口门全关允许关
2. close permit: By-pass valve fully open and inlet valve fully closed,
allowed to close
3、本级低加解列且旁路门已全开,保护关
3. This stage LP heater quitting and bypass valve fully opened, protect to
close
15 #7,8#低加入口门
#7 LP inlet valve
1、开允许:出口门已全开,可手操开
1. open permit :Outlet valve fully opened, possible to open manually
2、关允许:旁路门全开,允许关
2. close permit:By-pass valve fully opened closed, allowed to close
3、本级低加解列且旁路门已全开,保护关
3. This stage LP heater quitting and bypass valve fully opened, protect to
close
#7、8 低加旁路门开允许条件: 无故障条件
#7 & 8 LP heater bypass valve opening permissive conditions:no failure conditions
16
3、本级低加解列,保护开
3. This stage LP heater quitting , protect to pen
#7、8 低加旁路门关允许条件
17
#7 & 8 LP heater bypass valve closing permissive conditions
1、#7低加入口门已全开
1. #7 LP heater inlet valve fully opened
2、#8低加入口门已全开
2. #8 LP heater inlet valve fully opened
3、#7低加出口门已全开
3. #7 LP heater outlet valve fully opened
4、#8 低加出口门已全开
4. #8 LP heater outlet valve fully opened

7
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
18 #5 低加事故疏水门#5 LP heater emergency drain valve
1、水位 HH,保护开
1. water level HH opened in manner of protection
19 #5 低加事故疏水门前电动门 MOV before #5 LPH emergency drain CV
1、水位 HH,保护开
1. water level HH opened in manner of protection
19 #6 低加事故疏水门
#6 LP heater emergency drain valve
1、水位 HH,保护开
1. water level HH, opened in manner of protection
20 #6 低加事故疏水门前电动门 MOV before #6 LPH emergency drain CV
1、水位 HH,保护开
1、water level HH, opened in manner of protection
21 #7 低加事故疏水门
#7 LP heater emergency drain valve
1、水位 HH,保护开
1. water level HH opened in manner of protection
22 #7 低加事故疏水门前电动门 MOV before #7 LPH emergency drain CV
1、水位 HH,保护开
1、water level HH, opened in manner of protection
23 #8 低加事故疏水门
#8 LP heater emergency drain valve
1、水位 HH,保护开
1. water level HH, opened in manner of interlock
24 #7 低加事故疏水门前电动门 MOV before #7 LPH emergency drain CV
1、水位 HH,保护开
1、water level HH, opened in manner of protection
25 #5 低加正常疏水门
#5 LP heater normal drain valve

8
METTUR BGR 签字 DEC 签字
序 检查日期 试验结果
号 试 验 内 容 Inspection Inspection 签字
Test Content Signing by Signing by Signing by
No. date result BGR DEC
METTUR
#6 低加水位 HHH,联关本级正常疏水门
Water level of 6# LP heater is HHH, normal drain valve of this stage is
closed in a manner of interlock
26 #5 低加正常疏水门前电动门 MOV before #5LPH normal drain CV
#6 低加水位 HHH,联关本级正常疏水门前电动门
Water level of 6# LP heater is HHH, MOV before normal drain CV of this
stage is closed in a manner of interlock
27 #6 低加正常疏水门#6 LP heater normal drain valve
#6 低加水位 H,全开#6 低加至#7 低加正常疏水门
#6 LP heater water level H, normal drain fully opened from #6 LPH to #7
LPH
#7 低加水位 HHH,联关本级正常疏水门
Water level of #7 LP heater is HHH, normal drain valve of this stage is
closed in a manner of interlock
28 #6 低加正常疏水门前电动门 MOV before #6 LPH normal drain CV
#6 低加水位 H,全开#6 低加至#7 低加正常疏水门
#6 LP heater water level H, MOV before #6LPH normal drain CV fully
opened from #6 LPH to #7 LPH
#7 低加水位 HHH,联关本级正常疏水门前电动门
Water level of #7 LP heater is HHH, MOV before #6LPH normal drain
CV of this stage is closed in a manner of interlock
29 #7 低加正常疏水门
#7 LP heater normal drain valve
#8 低加水位 HHH,联关
#8 LP heater water level HHH, closed in manner of interlock
30 #7 低加正常疏水门前电动门 MOV before #7 LP heater normal drain CV
#8 低加水位 HHH,联关
#8 LP heater water level HHH, closed in manner of interlock

9
10

S-ar putea să vă placă și