Sunteți pe pagina 1din 137

This document is the property of L&T Construction, B&F IC and must not be passed on to any third person or firm

not authorised by us, nor be


copied/made use of in full or part by such person or firm without our prior permission writing

16.01.2013 A BVM RJS SB


DATE REV.No. Submitted for 65% Design Approval DESIGNED CHECKED APPROVED
REVISIONS

PRIME CONTRACTOR CLIENT


BOEING USACE

PROJECT :
C-17 BEDDOWN FACILITIES - HINDAN AFS GHAZIABAD
SUPPLIER / CONTRACTOR:
LARSEN & TOUBRO LIMITED - B&F IC
JOB No. O12205
TOTAL NO. OF PAGES TITLE
NAME SIGN DATE SQUADRON OPERATIONS /AMU
DGND BY. BVM 15-01-13

CHKD BY. RJS 15-01-13 Load Calculations, Model, Analysis Results & Design Calculations

APPD BY. SB 15-01-13


CODE REV.
DOC. No. O 1 2 2 0 5 - C - D P - 0 6 - D C - 1 0 0 2
IS A

RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL CONSTRUCTION


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
BVM RJS/KPP

CONTENT
Chapter
Particulars Page No
No.
1.0 INTRODUCTION

2.0 LOAD CALCULATIONS


2.1 Dead Load Calculations (North Block)
2.2 Dead Load Calculations (South Block)
2.3 Live Load Calculations
2.4 Wind Load Calculations
2.5 Seismic Load Calculations (North Block)
2.6 Seismic Load Calculations (South Block)
2.7 Temperature Load Calculation
2.8 Load Combinations

3.0 MODELLING
3.1 3D-View

4.0 ANALYSIS
4.1 STAAD input editor (North Block)
4.2 STAAD input editor (South Block)

DESIGN
5.0 Footing
6.0 Column
7.0 Plinth Beam
8.0 Tie Beam (Ground Floor)
9.0 Tie Beam(First Floor)
10.0 Floor Beam
11.0 Sill Beam
12.0 Slab
13.0 Staircase
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
BVM RJS/KPP

List of Figures

Figure No. Particulars Page No

1.1.1 Location of Squadron Operation Building 4

1.1.2 3D View of Squadron Operation Building 4

2.3.1 Force Coefficient for Rectangular Clad Building in uniform flow 9

2.4.1 Response Spectra of Medium soil for 5 percent Damping 10


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
BVM RJS/KPP

List of Tables

Table No Particulars Page No

2.2.1 Live Load based on occupancy classification 8

2.3.1 Terrain Height and structure size factor k2 9

2.3.2 Wind load along X direction 9

2.3.3 Terrain Height and structure size factor k2 9

2.3.4 Wind Load along Z direction 9

2.6.1 Servicability Limit State 10

2.6.2 Ultimate Limit Sate 10


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP

1.0 INTRODUCTION
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP

1.0 INTRODUCTION

The proposed Squadron Operation Facility Building is located beside Two Hangar Building. It consists of
various functions and facility such as AMU spaces support squadron maintenance operations, Maintenance
Administration, Tool box storage, Boeing field service representative (FSR) spaces support.It is a two storied
building of built up area 5420m2 approximately, with floor to floor height of 4.95m from ground floor and 4.9m
from first floor.The building has an dimension of 73.5m in length and 54.55m in width.

Figure No. 1.1.1 : Location of Squadron Operation Building-06


Structural System

The structural system consists of R.C.C Moment-resisting frame (Beams & column) with slab.Structural system
has been divided into two blocks by provoiding expansion joint. The foundation system consists of isolated and
combined footing at the junction of two seperated building. The safe bearing capacity of soil is considered as
20.0T/m2 at 2m below FGL (Final report on geotechnical investigation for proposed Beddown facilities Vol.2).
The Reinforced concrete grade slab is designed as non-structural element support on soil with a separation
gap at its periphery to ensure isolation from the building structure.

The structural analysis of the building would incorporate the 3D framimg method using STAAD-Pro version
V8i (SELECT Series 3). Beams and columns are modeled as frame elements. Appropriate loads and
combinations are taken as per (O12205-C-DP-06-DC-1001) Design Basis Report. The static lateral force
procedure is carried out in accordance with IS:1893-2002 Part 1.
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP

This building is located in Seismic zone-1V as per IS:1893-2002 Part 1, Ductile detailing is followed for all
structural members as per IS:13920-1993.

The structural stability of whole building and each structural member shall be designed for the most severe
combination of loading conditions including the Earthquake, Wind loads and Temperature Load.

This doocument contains detailed design calculation and design results of of structural elements such as footings,
columns, beam, slab and parapet wall.
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP
2.2 DEAD LOAD CALCULATION (South Block) BASED ON IS 875 (Part 1)-1987
* -Value entered in staad model
Self Weight of members is calculated by
STAAD-Pro Software as per their volume (SW) = BXDXL
Unit weight of Reinforced cement concrete = 25 kN/m³
Unit weight of Plain cement concrete = 24 kN/m³
Unit weight of solid block work = 17.65 kN/m³
Unit weight of Plastering = 20.40 kN/m³
Cement concrete screed = 24 kN/m³
BJCC = 20 kN/m³
Granite Tile = 27.45 kN/m³

Ground floor:
age/ vehicle dispatch
clear height of the block wall considered from the top of PB to bottom of TB
including projections = 4.20 m
200 mm thk block wall with the ht of 4.2 m =
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP

2. Load Calculations
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1

DEAD LOAD CALCULATION BASED ON IS 875 (Part 1)-1987


* -Value entered in staad model
Self Weight of members is calculated by
STAAD-Pro Software as per their volume (SW) = BXDXL
Unit weight of Reinforced cement concrete = 25 kN/m³
Unit weight of Plain cement concrete = 24 kN/m³
Unit weight of solid block work = 17.65 kN/m³
Unit weight of Plastering = 20.40 kN/m³
Cement concrete screed = 24 kN/m³
BJCC = 20 kN/m³
Granite Tile = 27.5 kN/m³

Ground Floor:

Maintenance control & analysis and age vehicle dispatch @ 2.4 lvl
Clear Height of Block wall considered from top of PB to bottom of TB
including projections = 3.15 m
200mm thk Block work, Height of 3.15 m = 11.1195 kN/m
18 mm thk External Plastering = 1.157 kN/m
12 mm thk Internal Plastering = 0.771 kN/m
Total Wall load on PB* = 13.0473 kN/m

Clear Height of Block wall considered from top of TB to bottom RB


including projections = 1.2 m
200mm thk Block work, Height of 1.2 m = 4.236 kN/m
18 mm thk External Plastering = 0.441 kN/m
12 mm thk Internal Plastering = 0.294 kN/m
Total Wall load on TB* = 4.970 kN/m

Clear Height of Block wall considered from top of PB to bottom TB


including projections = 3.15 m
100mm thk Block work, Height of 3.15 m = 5.560 kN/m
12 mm thk Internal Plastering = 1.542 kN/m
Total Wall load on PB* = 7.102 kN/m

Clear Height of Block wall considered from top of TB to bottom RB


including projections = 1.20 m
100 mm width and 1.20 m height = 3.0 kN/m
12 mm thk Internal Plastering = 0.588 kN/m
Total Wall load on TB* = 3.588 kN/m
Administration customer service and age vehicle dispatch @ 2.1 lvl
including projections = 2.85 m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1
200mm thk Block work, Height of 2.85 m = 10.0605 kN/m
18 mm thk External Plastering = 1.047 kN/m
12 mm thk Internal Plastering = 0.698 kN/m
Total Wall load on PB* = 11.8047 kN/m

Clear Height of Block wall considered from top of TB to bottom RB


including projections = 1.5 m
200mm thk Block work, Height of 1.5 m = 5.295 kN/m
18 mm thk External Plastering = 0.551 kN/m
12 mm thk Internal Plastering = 0.367 kN/m
Total Wall load on TB* = 6.213 kN/m

Clear Height of Block wall considered from top of PB to bottom TB


including projections = 2.85 m
100mm thk Block work, Height of 2.85 m = 5.030 kN/m
12 mm thk Internal Plastering = 1.395 kN/m
Total Wall load on PB* = 6.426 kN/m

Clear Height of Block wall considered from top of TB to bottom RB


including projections = 1.50 m
100 mm width and 1.50 m height = 2.6 kN/m
12 mm thk Internal Plastering = 0.734 kN/m
Total Wall load on TB* = 3.382 kN/m

slab load @ 4.95 m lvl


150 thick floor slab = 3.750 kN/m2

Parapet wall load on RB


Wall height = 0.6 m
100 mm width and 0.6 m height = 1.059 kN/m
25 mm thk External plastering = 0.306 kN/m
25 mm thk Internal plastering = 0.306 kN/m
Total load* = 1.671 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

Introduction:

Following loads are considered in line with the DBR Doc. No: O12205-C-DP-06-DC-1001

a. Dead load:
As per IS:875(Part 1)-1987, Dead loads are calculated for the floor finishes, false ceiling and services (MEP)
are applied as line load (UDL), surface area loads (floor loads) appropriately. Self weight of the structural
Member has been taken care by STAAD-Pro software itself as per size and weight of all elements.

b. Live load:
As per IS:875(Part 2)-1987, Based on the functionality of rooms and roofs, live loads are applied
appropriately.

c. Wind load:
As per IS:875(Part 3)-1987, based on the basic wind speed and considering the various factors, Design
wind pressure is calculated. Depending upon the building location, orientation, plan dimension and height,
wind load has been calculated and applied as a area load along X & Z directions at appropriate locations.

d. Seismic loads
Importance factor, Seismic coefficients and soil type details are given as inputs in STAAD-Pro model.
Based on IS:1893-2002 Part 1, the seismic forces are calculated by Response Spectrum Method by
STAAD-Pro software and applied over the structure.

e. Temperature Load
The building is designed for its Maximum and Mean daily Temperature as given in RFP. As per IS 875 (Part 5),
temperature load is caluculated and applied in the model.

f. Load combination
The building shall be designed for the most critical Ulimate/Servicability load combination. The servicable load
combination shall be used to check the crack width and deflections.
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
2.1 DEAD LOAD CALCULATION (North Block) BASED ON IS 875 (Part 1)-1987
* -Value entered in staad model
Self Weight of members is calculated by
STAAD-Pro Software as per their volume (SW) = BXDXL
Unit weight of Reinforced cement concrete = 25 kN/m³
Unit weight of Plain cement concrete = 24 kN/m³
Unit weight of solid block work = 17.65 kN/m³
Unit weight of Plastering = 20.40 kN/m³
Cement concrete screed = 24 kN/m³
BJCC = 20 kN/m³
Granite Tile = 27.5 kN/m³

Ground Floor:

Wall Load: (External)


Clear Height of Block wall considered from top of PB to bottom of TB
including projections = 3.15 m
200mm thk Block work, Height of 3.15 m = 11.1195 kN/m
18 mm thk External Plastering = 1.157 kN/m
12 mm thk Internal Plastering = 0.771 kN/m
Total Wall load on PB* = 13.0473 kN/m

Clear Height of Block wall considered from top of TB to bottom RB


including projections = 1.45 m
200mm thk Block work, Height of 1.45 m = 5.119 kN/m
18 mm thk External Plastering = 0.532 kN/m
12 mm thk Internal Plastering = 0.355 kN/m
Total Wall load on TB* = 6.006 kN/m

Clear Height of Block wall considered from top of TB to bottom RB


at projections (at architectural mullions) = 1.5 m
200mm thk Block work, Height of 1.5 m = 5.295 kN/m
18 mm thk External Plastering = 0.551 kN/m
12 mm thk Internal Plastering = 0.367 kN/m
Total Wall load on TB at projections* = 6.213 kN/m

RCC Arch. Feature Mullion Load on projections at Plinth Level


RCC Mullinons height = 4.65 m
200 mm width and 4.65 m height = 23.3 kN/m
25 mm thk External plastering = 2.372 kN/m
25 mm thk Internal Plastering = 2.372 kN/m
Total load* = 27.993 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Slab Load on projections at +2.4m tie Lvl and projections at stair case
and also on precast cover slab at PHE cutout
125 mm thk slab = 3.125 kN/m2
50 mm thk screed = 1.200 kN/m2
Weight of Plastering (internal) of 6 mm thick = 0.122 kN/m2
Total Slab Load* = 4.447 kN/m2

Roof/Terrace at 4.85 m LVL:


Load on Roof beam of AHU room
External wall height = 2.45 m
200mm thk Block work, Height of 2.45 m = 8.649 kN/m
18 mm thk External plastering = 0.778 kN/m
12 mm thk Internal plastering = 0.519 kN/m
Total Wall load on RB* = 9.946 kN/m

RCC parapet load on projections


Wall height = 1.8 m
150 mm width and 1.8 m height = 6.750 kN/m
25 mm thk External plastering = 0.918 kN/m
25 mm thk Internal plastering = 0.918 kN/m
Total load* = 8.586 kN/m

RCC parapet load on External Roof Beam


Wall height = 1.2 m
150 mm width and 1.2 m height = 4.5 kN/m
25 mm thk External plastering = 0.612 kN/m
25 mm thk Internal Plastering = 0.612 kN/m
Total load* = 5.724 kN/m

RCC drop load on projections (at arch. Mullions)


RCC drop height = 0.85 m
150 mm width and 0.85 m height = 3.188 kN/m
25 mm thk External plastering = 0.434 kN/m
25 mm thk Internal plastering = 0.434 kN/m
Total load* = 4.055 kN/m

PHE CutOut
Wall Load
Height of the wall considered = 1 m
150 thk RC parapat Wall = 3.75 kN/m
25 thk Plastering on both sides = 1.02 kN/m
Total wall Load* = 4.77 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Terrace Slab Load at +4.95m Lvl:
Slab Load including Roof screed and insulation
125 mm thk roof slab = 3.125 kN/m2
Roof screed Min 50 to Max 210mm (1:120) is required for roof slope.
Average of 130 mm thick screed is provided = 3.12 kN/m2
Roof Insulation = 0.04 kN/m2
40 mm paver block including mortar = 0.96 kN/m2
TPO 1.2mm Thick membrane = 0.0015 kN/m2
Geotextile as separation = 0.0015 kN/m2
wt of plastering (internal) of 6 mm thk = 0.122 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2
Total Load considered on terrace* = 7.87 kN/m2

Mechanical Room Floor Slab Load +4.95m Lvl:


125 mm thk floor slab = 3.125 kN/m2
wt of plastering (internal) of 6 mm thk = 0.1224 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2
250 mm thk BJCC = 5 kN/m2
50 mm thk Floor finish = 1.2 kN/m2
Total load on slab* = 9.947 kN/m2

Mechanical Room Terrace Slab Load at +9.85 m Lvl:


and at Head Room Terrace level
Slab Load including Roof screed and insulation
125 mm thk roof slab = 3.125 kN/m2
Roof screed Min 50 to Max 100mm (1:120) is required for roof slope.
Average of 75 mm thick screed is provided = 1.8 kN/m2
Roof Insulation = 0.04 kN/m2
40 mm paver block including mortar = 0.96 kN/m2
TPO 1.2mm Thick membrane = 0.0015 kN/m2
Geotextile as separation = 0.0015 kN/m2
wt of plastering (internal) of 6 mm thk = 0.122 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2
Total Load considered on Roof Slab* = 6.55 kN/m2

Terrace Level @ 12.6m (Head Room)


Height of Block wall considered on head room external roof beam = 0.3
200mm thk Block work, Height of 0.3 m = 1.059 kN/m
18 mm thk External Plastering = 0.220 kN/m
Total Wall load on ground floor Roof Beam* = 1.279 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Stair Case
Staircase landing slab
200 mm thk slab = 5.000 kN/m2
50 mm thk floor finish = 1.200 kN/m2
Weight of Plastering (internal) of 6 mm thick = 0.122 kN/m2
Total Slab Load* = 6.322 kN/m2

Load on stair case supporting/surrounding beams


Height of wall = 2.85 m
200mm thk Block wall,Height of 2.85 m = 10.0605 kN/m
12 mm thk Internal Plastering = 0.698 kN/m
18 mm thk External Plastering = 1.047 kN/m
Total wall load on stair beam* = 11.805 kN/m

Height of wall (Ties) = 1.2 m


200mm thk Block wall, Height of 1.2 m = 4.236 kN/m
12 mm thk Internal Plastering = 0.294 kN/m
18 mm thk External Plastering = 0.441 kN/m
Total wall load on stair beam* = 4.970 kN/m

Height of wall (Head Room) = 2.6 m


200mm thk Block wall,Height of 2.6 m = 9.178 kN/m
12 mm thk Internal Plastering = 0.636 kN/m
18 mm thk External Plastering = 0.955 kN/m
Total Wall Load on stair beam* = 10.769 kN/m

Load on projections at stair case (Windows)


Height of wall = 0.4 m
200mm thk Block wall,Height of 0.4 m = 1.412 kN/m
12 mm thk Internal Plastering = 0.09792 kN/m
18 mm thk External Plastering = 0.14688 kN/m
Total wall load on stair beam* = 1.657 kN/m

Height of wall = 2 m
200mm thk Block wall,Height of 2m = 7.06 kN/m
12 mm thk Internal Plastering = 0.4896 kN/m
18 mm thk External Plastering = 0.7344 kN/m
Total wall load on stair beam* = 8.284 kN/m

Height of wall = 1.75 m


200mm thk Block wall,Height of 1.75 m = 6.1775 kN/m
12 mm thk Internal Plastering = 0.4284 kN/m
18 mm thk External Plastering = 0.6426 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Total wall load on stair beam* = 7.249 kN/m

Stair Case
Load on Stair Case Landing Slab
200 mm thk floor slab = 5.0 kN/m
Load on Stair Case Waist Slab
200 mm thk floor slab (Inclined Portion) = 5.6 kN/m

Tread = 0.3 m
Riser = 0.15 m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
20 mm thk granite tile = 0.55 kN/m
30 mm thk cement mortar = 0.612 kN/m
Hand Rail = 0.5 kN/m
Self weight of step = 1.88 kN/m

Total load on Landing Portion = 6.162 kN/m


Total load on Inclined portion = 9.13 kN/m

9.13 kN/m
6.162 kN/m

A 1.85 m 3.3 m B

Reaction on Beam A* = 23.10 kN/m


Reaction on Beam B* = 18.42 kN/m

RC Sunshade

Door

0.1 0.075

0.3 0.9

Load due to Sunshade above window = 1.969 kN/m


18 mm thk plastering on both sides = 0.661 kN/m
Total Load = 2.630 kN/m
Shear applied on the beam* = 2.630 kN/m
Moment applied on the beam* = 0.886 kNm

Steel Fazard Load


Load acting on the steel projection = 0.25 kN/m2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Length of Projection = 1.2 m
Shear applied to the TB @ 2.4m level* = 0.3 kN/m
Moment acting on TB@ 2.4m level* = 0.18 kNm
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
2.2 DEAD LOAD CALCULATION (South Block) BASED ON IS 875 (Part 1)-1987
* -Value entered in staad model
Self Weight of members is calculated by
STAAD-Pro Software as per their volume (SW) = BXDXL
Unit weight of Reinforced cement concrete = 25 kN/m³
Unit weight of Plain cement concrete = 24 kN/m³
Unit weight of solid block work = 17.65 kN/m³
Unit weight of Plastering = 20.40 kN/m³
Cement concrete screed = 24 kN/m³
BJCC = 20 kN/m³
Granite Tile = 27.5 kN/m³

ii) Ground Floor: [+4.95m lvl]


a) Wall Load on PB: (External)
Height of Block wall considered from top of PB to bottom of TB = 3.15 m
200mm thk Block work, Height of 3.15 m = 11.1195 kN/m
18 mm thk External Plastering = 1.157 kN/m
12 mm thk Internal Plastering = 0.771 kN/m
Total Wall load on PB* = 13.05 kN/m

Wall Load on PB: (External)


Height of Block wall considered from top of PB to bottom of TB = 3.6 m
200mm thk Block work, Height of 3.6 m = 12.708 kN/m
18 mm thk External Plastering = 1.322 kN/m
12 mm thk Internal Plastering = 0.881 kN/m
Total Wall load on PB* = 14.91 kN/m

Wall Load on PB: (External)


Height of Block wall considered from top of PB to bottom of TB = 5.1 m
200mm thk Block work, Height of 5.1 m = 18.003 kN/m
18 mm thk External Plastering = 1.873 kN/m
12 mm thk Internal Plastering = 1.248 kN/m
Total Wall load on PB* = 21.12 kN/m

Wall Load on TB: (External)


Height of Block wall considered from top of TB to bottom FB-1 = 1.45 m
200mm thk Block work, Height of 1.45 m = 5.119 kN/m
18 mm thk External Plastering = 0.532 kN/m
12 mm thk Internal Plastering = 0.355 kN/m
Total Wall load on TB* = 6.01 kN/m

b) Projection
Projection @ PB Level:
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Height of Block wall considered from top of PB to bottom of TB = 3.15 m
200mm thk Block work, Height of 3.15 m = 11.1195 kN/m
18 mm thk External Plastering = 1.157 kN/m
12 mm thk Internal Plastering = 0.771 kN/m
Total Wall load on PB* = 13.05 kN/m

Projection @ Ground Floor TB Level:


Height of Block wall considered from top of TB to bottom FB-1 = 1.45 m
200mm thk Block work, Height of 1.45 m = 5.119 kN/m
18 mm thk External Plastering = 0.532 kN/m
12 mm thk Internal Plastering = 0.355 kN/m
Total Wall load on TB* = 6.01 kN/m

Height of Block wall considered: = 1 m


200mm thk Block work, Height of 1m = 3.53 kN/m
18 mm thk External Plastering = 0.367 kN/m
12 mm thk Internal Plastering = 0.245 kN/m
300 mm thk RC Kerb = 1.5 kN/m
25 mm thk plastering on both sides = 0.306 kN/m
Total Wall Load = 5.948 kN/m
150 mm thk RC slab = 3.75 kN/m2
Moment acting on TB* = 5.06 kNm
Shear acting on TB* = 8.20 kN

iii First Floor: [+9.85m lvl]


c) Wall Load on FB-1: (External)
Height of Block wall considered from top of FB-1 to bottom of TB = 2.4
200mm thk Block work, Height of 2.4 m = 8.472 kN/m
18 mm thk External Plastering = 0.881 kN/m
12 mm thk Internal Plastering = 0.588 kN/m
Total Wall load ground FB-1* = 9.94 kN/m

Wall Load on FB-1: (External)


Height of Block wall considered from top of FB-1 to Bottom of SB = 0.4
200mm thk Block work, Height of 0.4 m = 1.412 kN/m
18 mm thk External Plastering = 0.147 kN/m
12 mm thk Internal Plastering = 0.098 kN/m
Total Wall load ground FB-1* = 1.66 kN/m

Wall Load on SB: (External)


Height of Block wall considered from top of SB to Bottom of TB = 1.5 m
200mm thk Block work, Height of 1.5 m = 5.295 kN/m
18 mm thk External Plastering = 0.551 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
12 mm thk Internal Plastering = 0.367 kN/m
Total Wall load on SB* = 6.21 kN/m

Wall Load on TB: (External)


Height of Block wall considered from top of TB to bottom of FB-2 = 1.5
200mm thk Block work, Height of 1.5 m = 5.295 kN/m
18 mm thk External Plastering = 0.551 kN/m
12 mm thk Internal Plastering = 0.367 kN/m
Total Wall load on TB* = 6.21 kN/m

d) Projection
Projection @ 4.95m Level
Height of Block wall considered from top of FB-1 to bottom of TB = 2.4
200mm thk Block work, Height of 2.4 m = 8.472 kN/m
18 mm thk External Plastering = 0.881 kN/m
12 mm thk Internal Plastering = 0.588 kN/m
Total Wall load ground FB-1* = 9.94 kN/m

Projection @ TB Level
Height of Block wall considered from top of TB to bottom of FB-2 = 1.5
200mm thk Block work, Height of 1.5 m = 5.295 kN/m
18 mm thk External Plastering = 0.551 kN/m
12 mm thk Internal Plastering = 0.367 kN/m
Total Wall load on TB* = 6.21 kN/m

Projection @ SB Level
Height of Block wall considered from top of SB to bottom of TB = 1.5
200mm thk Block work, Height of 1.5 m = 5.295 kN/m
18 mm thk External Plastering = 0.551 kN/m
12 mm thk Internal Plastering = 0.367 kN/m
Total Wall load on SB* = 6.21 kN/m

Projection along Grid-16 (Between Grid-A to E)


Height of Block wall considered from FB-1 = 1.3 m
300 mm thk RC Kerb = 1.5 kN/m
25 mm thk plastering on both sides 0.204 kN/m
200mm thk Block work, Height of 1m = 3.53 kN/m
18 mm thk External Plastering = 0.367 kN/m
12 mm thk Internal Plastering = 0.245 kN/m
Total Wall load on Arch.Projection* = 5.85 kN/m

Height of Block wall considered from FB-1 = 1.3 m


200mm thk Block work, Height of 1.3 m = 4.589 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
18 mm thk External Plastering = 0.48 kN/m
12 mm thk Internal Plastering = 0.32 kN/m
Total Wall load on Arch.Projection* = 5.37 kN/m
150 mm thk slab = 3.75 kN/m2
Moment acting on TB* = 4.66 kNm
Shear acting on TB* = 7.620 kN

Sill Beam Projection:


Thickness of projection = 125 mm
Self weight of Projection = 3.125 kN/m2/m
Length of projection = 0.20 mm
Moment acting on sill beam* = 0.14063 kNm/m
Shear on sill beam* = 0.94 kNm/m

Slab Load on Projection:@ 4.95m level


125 mm thk floor slab = 3.125 kN/m2

e) Wall Load on FB-1: (Internal)


Height of wall considered from top of FB-1 to bottom of FB-2 = 4.4 m
200mm thk Block wall,Height of 4.4 m = 15.532 kN/m
12 mm thk Internal Plastering on both sides = 2.154 kN/m
Total Wall load on FB-1* = 17.69 kN/m

f) Slab Load on FB-1:


125 mm thk floor slab = 3.125 kN/m2
50 mm thk floor screed = 1.20 kN/m2
wt of plastering (internal) of 6 mm thk = 0.1224 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2
Total slab load* = 4.95 kN/m2

Slab load at Terrace @ 4.95m level


125 mm thk floor slab = 3.125 kN/m2
Roof screed Min 50 to Max 150mm (1:120) is required for roof slope.
Average of 100 mm thick screed is provided = 2.4 kN/m2
Roof Insulation = 0.04 kN/m2
40 mm paver block including mortar = 0.96 kN/m2
TPO 1.2mm Thick membrane = 0.0015 kN/m2
Geotextile as separation = 0.0015 kN/m2
wt of plastering (internal) of 6 mm thk = 0.122 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2
Total Load considered on Roof Slab* = 7.15 kN/m2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

400mm Sunken portion:


Floor Load
350 mm thk BJCC = 7 kN/m2
50 mm thk screed = 1.2 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2
Total load on floor slab* = 8.70 kN/m2

iv) Terrace Floor:


g) Slab Load including Roof screed and insulation
125 mm thk roof slab = 3.125 kN/m2
Roof screed Min 50 to Max 210mm (1:120) is required for roof slope.
Average of 130 mm thick screed is provided = 3.12 kN/m2
Roof Insulation = 0.04 kN/m2
40 mm paver block including mortar = 0.96 kN/m2
TPO 1.2mm Thick membrane = 0.0015 kN/m2
Geotextile as separation = 0.0015 kN/m2
wt of plastering (internal) of 6 mm thk = 0.122 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2

Total Load considered on Roof Slab* = 7.87 kN/m2

h) Parapet wall load:


Parapet wall load of Height 1.2m on External FB-2:
150mm thk RC Parapet Wall = 4.5 kN/m
25 mm thk Plastering on both sides = 1.224 kN/m
Total Wall load acting on the roof beam pheriphery = 5.72 kN/m

Parapet wall load of Height 1.2m on External FB-2:


150mm thk RC Parapet Wall = 6.75 kN/m
25 mm thk Plastering on both sides = 1.836 kN/m
Total Wall load acting on the roof beam pheriphery* = 8.59 kN/m

v) Staircase Load:

i) Level @ 1.65m
Height of Wall considered = 1.2 m
200mm thk Block wall, Height of 1.2 m = 4.236 kN/m
12 mm thk Internal Plastering on both sides = 0.588 kN/m
Total wall load on Tie Beam* = 4.82 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Height of Wall considered = 2.85 m
200mm thk Block wall, Height of 2.85 m = 10.061 kN/m
12 mm thk Internal Plastering on both sides = 1.395 kN/m
Total wall load on Tie Beam* = 11.46 kN/m

j) Level @ 3.3m
Height of Wall considered = 1.15 m
200mm thk Block wall, Height of 1.15 m = 4.060 kN/m
12 mm thk Internal Plastering on both sides = 0.563 kN/m
Total wall load on Tie Beam* = 4.62 kN/m

Height of Wall considered = 1.15 m


200mm thk Block wall, Height of 1.15 m = 4.060 kN/m
12 mm thk Internal Plastering on both sides = 0.563 kN/m
Total wall load on Tie Beam* = 4.62 kN/m

k) Level @ 4.9m
Height of Block wall considered from top of TB to bottom of FB-2 = 1.25
200mm thk Block work, Height of 1.25 m = 4.413 kN/m
18 mm thk External Plastering = 0.459 kN/m
12 mm thk Internal Plastering = 0.306 kN/m
Total Wall load on ground floor Roof Beam* = 5.18 kN/m

Height of Wall considered = 1.25 m


200mm thk Block wall, Height of 1.25 m = 4.413 kN/m
12 mm thk Internal Plastering on both sides = 0.612 kN/m
Total wall load on Tie Beam* = 5.02 kN/m

Height of Wall considered = 2.85 m


200mm thk Block wall, Height of 2.85 m = 10.061 kN/m
12 mm thk Internal Plastering on both sides = 1.395 kN/m
Total wall load on Tie Beam* = 11.46 kN/m

l) Level @ 6.6m
Height of Block wall considered from top of TB to bottom of FB-2 = 2.85
200mm thk Block work, Height of 2.85 m = 10.061 kN/m
18 mm thk External Plastering = 1.047 kN/m
12 mm thk Internal Plastering = 0.698 kN/m
Total wall load on Tie Beam* = 11.80 kN/m

Height of Wall considered = 1.20 m


200mm thk Block wall, Height of 1.2 m = 4.236 kN/m
12 mm thk Internal Plastering on both sides = 0.588 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Total wall load on Tie Beam* = 4.82 kN/m

m) Level @ 8.25m
Height of Wall considered = 1.15 m
200mm thk Block wall, Height of 1.15 m = 4.060 kN/m
12 mm thk Internal Plastering on both sides = 0.563 kN/m
Total wall load on Tie Beam* = 4.62 kN/m

Height of Wall considered = 1.15 m


200mm thk Block wall, Height of 1.15 m = 4.060 kN/m
12 mm thk Internal Plastering on both sides = 0.563 kN/m
Total wall load on Tie Beam* = 4.62 kN/m

n) Level @ 9.85m
Height of Block wall considered from top of TB to bottom of FB-2 = 2.25
200mm thk Block work, Height of 2.25 m = 7.943 kN/m
18 mm thk External Plastering = 0.826 kN/m
12 mm thk Internal Plastering = 0.551 kN/m
Total Wall load on ground floor Roof Beam* = 9.32 kN/m

Height of Block wall considered from top of TB to bottom of FB-2 = 2.25


200mm thk Block work, Height of 2.25 m = 7.943 kN/m
18 mm thk External Plastering = 0.826 kN/m
12 mm thk Internal Plastering = 0.551 kN/m
Total Wall load on ground floor Roof Beam* = 9.32 kN/m

Level @ 12.6m
Height of Block wall considered from top of TB to bottom of FB-2 = 0.3
200mm thk Block work, Height of 0.3 m = 1.059 kN/m
18 mm thk External Plastering = 0.110 kN/m
12 mm thk Internal Plastering = 0.073 kN/m
Total Wall load on ground floor Roof Beam* = 1.24 kN/m

o) Slab Load:
200 mm thk floor slab = 5.0 kN/m2
50 mm thk screed = 1.2
wt of plastering (internal) of 6 mm thk = 0.1224 kN/m2
20mm thk granite tile = 0.549 kN/m2
30mm thk cement mortar = 0.612 kN/m2
Total slab load* = 7.48 kN/m2

p) Landing Beam Load:


200 mm thk floor slab = 5.0 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Tread = 0.3 m
Riser = 0.2 m
200 mm thk floor slab (Inclined Portion) = 5.6 kN/m
20 mm thk granite tile = 0.55 kN/m
30 mm thk cement mortar = 0.612 kN/m
Hand Rail = 0.5 kN/m
Self weight of step = 1.88 kN/m

Total load on Landing Portion = 6.161 kN/m


Total load on Inclined portion = 9.13 kN/m

9.13 kN/m
6.161 kN/m

A 1.475 3.3 B

Reaction on Beam A* = 18.31 kN/m


Reaction on Beam B* = 20.90 kN/m

q) Head Room
Slab Load:
Slab Load including Roof screed and insulation
125 mm thk roof slab = 3.125 kN/m2
Roof screed Min 50 to Max 210mm (1:120) is required for roof slope.
Average of 130 mm thick screed is provided = 3.12 kN/m2
Roof Insulation = 0.04 kN/m2
40 mm paver block including mortar = 0.96 kN/m2
TPO 1.2mm Thick membrane = 0.0015 kN/m2
Geotextile as separation = 0.0015 kN/m2
wt of plastering (internal) of 6 mm thk = 0.122 kN/m2
Services (Electrical,Water etc.) installation suspended from
underside of the slab = 0.5 kN/m2
Total Load considered on Roof Slab* = 7.87 kN/m2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
v) RC Cutout:@ Terrace
Wall load
Height of the wall considered = 1.00 m
150 mm thk RC Parapet Wall = 3.75 kN/m2/m
25 mm thk Plastering on both sides = 1.020 kN/m
Total Wall load on FB-2* = 4.77 kN/m

vi) RC Sunshade
r) Window

0.075 0.05

0.3 0.5

load due to 50mm projection = 0.625 kN/m


load due to 25mm projection = 0.15625 kN/m
18 mm thk plastering on both sides = 0.3672 kN/m
Total Load = 1.14845 kN/m
Shear applied on the beam* = 1.15 kN/m
Moment applied on the beam* = 0.42 kNm

s) Door

0.1 0.075

0.3 0.9
load due to 50mm projection = 1.69 kN/m
load due to 25mm projection = 0.28 kN/m
18 mm thk plastering on both sides = 0.66 kN/m
Total Load = 2.63 kN/m
Shear applied on the beam* = 2.63 kN/m
Moment applied on the beam* = 1.44 kNm

vii) Steel Fazard Load


Load acting on the steel projection = 0.25 kN/m2
Length of Projection = 1.2 m
Shear applied to the TB @ 4.95m level* = 0.3 kN/m
Moment acting on TB@ 4.95m level* = 0.18 kNm

viii) Light Well


Precast slab load = 2.5 kN/m2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1

LIVE LOAD CALCULATION BASED ON IS 875 (Part 2)-1987

Live Load based on occupancy classification:

Location Occupancy Classification Udl in kN/m2


office areas Rooms without separate storage 4.0
Lobby Area Staircase,corridors and passages 4.0
Floor Area Bath and Toilet Room 2.0
storage areas tire repair & flammable rooms 7.5
All Roof Access Provided 1.5
Library Library without separate Storage 4.0
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

2.3 LIVE LOAD CALCULATION BASED ON IS 875 (Part 2)-1987

2.3.1 Live Load based on occupancy classification:

Location Occupancy Classification Udl in kN/m2


office areas Rooms without separate storage 4.0
Canteen Areas Cafeterias and Dining room 4.0
Kitchen Pantry and Kitchen 3.0
Lobby Area Staircase,corridors and passages 4.0
Floor Area Bath and Toilet Room 2.0
Floor&Roof Area AHU,Electrical and server room 5.0
All Roof Access Provided 1.5
Library Library without separate Storage 4.0
Parapet - 2.25 kN/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1

WIND LOAD CALCULATION BASED ON IS 875 (Part 3)-1987


* -Value entered in staad model
INPUTS
a) Basic Wind Speed Vb = 47 m/sec APPENDIX A

b) Probability factor (Risk Coefficient) k1 = 1.0 Table 1,Clause 5.3.1

c) Terrain Category = 2.0 Clause 5.3.2.1

d) Structure Class = B Clause 5.3.2.2

d) Terrain, Height and structure size factor k2 = Varies with Height Table 2, Clause 5.3.2

e) Topogaphy Factor k3 = 1.0 Clause 5.3.3.1

f) Length of the Building = 39.90 m

g) Width of the Building = 33.86 m

h) Height of the Building = 4.95 m

i) Design Wind Speed Vz = Vb x k1 x k2 x k3 Clause 5.3

j) Design Wind Pressure Pz = 0.6 Vz


2
Clause 5.4

Wind Force in X-Direction


a= 39.9

a= 39.9

h= 4.95
b = 33.86

Plan Elevation
a/b = 1.178

h/b = 0.15 > 1


Force coefficients/Drag coefficients,Cf = 1.2 Figure 4A
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1

Figure 2.3.1 Force coefficients for Rectangular Clad Buildings in Uniform Flow
Table No. 2.3.1 - Terrain Height & Structure size Factor k2

S.No Floor Details Elevation (m) K2


1 Ground Floor 4.95 0.98

Wind Forece in X-Direction = Cf Pz Ae Clause 6.2.1

Table No. 2.3.2- Wind Force along X Direction

Design Wind Design Wind Exposed


Wind Force in X
S.No Level Speed in Pressure Cf Height
Direction in kN/m2
m/sec kN/m 2 in m
1 GF 46.06 1.273 1.2 4.95 1.53

Wind Force in Z-Direction


b= 39.90

b= 39.9

h= 4.95
a = 33.86

Plan Elevation
a/b = 0.849

h/b = 0.146 < 1


Force coefficients/Drag coefficients = 1.2 Figure 4B

Table No. 2.3.3 - Terrain Height & Structure size Factor k2


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1
S.No Floor Details Elevation (m) K2
1 Ground Floor 4.95 0.98

Wind Forece in Y-Direction = Cf Pz Ae Clause 6.2.1

Table No. 2.3.4 - Wind Force along Z Direction

Design Wind Design Wind Exposed


Wind Force in X
S.No Level Speed in Pressure Cf Height
Direction in kN/m2
m/sec kN/m 2 in m
1 GF 46.06 1.273 1.2 4.95 1.53
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP

2.4 WIND LOAD CALCULATION BASED ON IS 875 (Part 3)-1987


* -Value entered in staad model
INPUTS
a) Basic Wind Speed Vb = 47 m/sec APPENDIX A

b) Probability factor (Risk Coefficient) k1 = 1.0 Table 1,Clause 5.3.1

c) Terrain Category = 2.0 Clause 5.3.2.1

d) Structure Class = C Clause 5.3.2.2

d) Terrain, Height and structure size factor k2 = Varies with Height Table 2, Clause 5.3.2

e) Topogaphy Factor k3 = 1.0 Clause 5.3.3.1

f) Length of the Building = 76.10 m

g) Width of the Building = 54.10 m

h) Height of the Building = 11.05 m

i) Design Wind Speed Vz = Vb x k1 x k2 x k3 Clause 5.3

j) Design Wind Pressure Pz = 0.6 Vz


2
Clause 5.4

Wind Force in X-Direction


a= 76.1

a= 76.1

h= 11.05
b = 54.10

Plan Elevation
a/b = 1.407

h/b = 0.20 < 1


Force coefficients/Drag coefficients,Cf = 1.2 Figure 4B
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP

Figure 2.3.1 Force coefficients for Rectangular Clad Buildings in Uniform Flow
Table No. 2.3.1 - Terrain Height & Structure size Factor k2

S.No Floor Details Elevation (m) K2


1 Ground Floor 4.95 0.93
2 First Floor 9.85 0.93
3 Terrace 12.9 0.953

Wind Forece in X-Direction = Cf Pz Ae Clause 6.2.1

Table No. 2.3.2- Wind Force along X Direction

Design Wind Design Wind Exposed


Wind Force in X
S.No Level Speed in Pressure Cf Height
Direction in kN/m2
m/sec kN/m2 in m
1 GF 43.71 1.146 1.2 4.95 1.38
2 FF 43.71 1.146 1.2 9.85 1.38
3 TF 44.79 1.204 1.2 12.9 1.44

Wind Force in Z-Direction


b= 76.10

b= 76.1

h= 11.05
a = 54.10

Plan Elevation
a/b = 0.711

h/b = 0.204 < 1


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
BVM RJS/KPP
Force coefficients/Drag coefficients = 1.2 Figure 4A

Table No. 2.3.3 - Terrain Height & Structure size Factor k2

S.No Floor Details Elevation (m) K2


1 Ground Floor 4.95 0.93
2 First Floor 9.85 0.93
3 Terrace 12.9 0.953

Wind Forece in Y-Direction = Cf Pz Ae Clause 6.2.1

Table No. 2.3.4 - Wind Force along Z Direction

Design Wind Design Wind Exposed


Wind Force in X
S.No Level Speed in Pressure Cf Height
Direction in kN/m2
m/sec kN/m2 in m
1 GF 43.71 1.146 1.2 4.95 1.38
2 FF 43.71 1.146 1.2 9.85 1.38
3 TF 44.79 1.204 1.2 12.9 1.44

Moment on Roof Beam due to Wind Load on Parapet at (+9.85mlvl)

Wind load on beam due to Parapet wall (1.2m)*= kN/m2


Moment on Roof Beam along X & Z direction* = kNm/m

Wind load on beam due to Parapet wall (1.2m)*= kN/m2


Moment on Roof Beam along X & Z direction* = kNm/m
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1

SEISMIC LOAD

Time period & Acceleration for medium soil


Time period Accelaration
0.0 0.235
0.1 0.589
0.2 0.589
0.3 0.589
0.4 0.589
Time period Accelaration
0.5 0.589
0.6 0.589
0.6 0.534
0.7 0.457
0.8 0.400
0.9 0.356
1.0 0.320
1.1 0.291
1.2 0.267
1.3 0.246
1.4 0.229
1.5 0.213
1.6 0.200
1.7 0.188
1.8 0.178
1.9 0.169
2.0 0.160
2.1 0.152
2.2 0.146
2.3 0.139
2.4 0.133
2.5 0.128
2.6 0.123
2.7 0.119
2.8 0.114
2.9 0.110
3.0 0.107
3.1 0.103
3.2 0.100
3.3 0.097
3.4 0.094
3.5 0.091
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1
3.6 0.089
3.7 0.087
3.8 0.084
3.9 0.082
4.0 0.080
SEISMIC LOAD CALCULATION BASED ON IS 1893:2002 (PART -1)

Base Shear Calculation Along X direction

Seismic Zone of the Building = IV Annexure-E

Type of the Building = RCC

Type of Frame = RCC-SMRF

Height of the Building in 'm' H = 4.95

Width of the Building in 'm' D = 33.86

Seismic Zone Factor Z = 0.24 Table 2 (Clause 6.4.2)

Importance Factor I = 1 Table 6 (Clause 6.4.2)

Response Reduction Factor for RCC-SMRF = 5 Table 7 (Clause 6.4.2)

Soil Type = Medium

Fundamental Time Period, T = 0.09h Clause 7.6.2


(d)0.50
= 0.077 sec

Sa/g = 2.5 (1+15T) Clause 6.4.5

Design horizontal seismic coefficient Ah = Z Sa I Clause 6.4.2


2 g R
= 0.06

Seismic weight of the Building, W (approx) = 16161.6 kN Table 8 (Clause 7.3.1)


(DL+0.5LL)

Design Base Shear VB = Ah W kN Clause 7.5.3


= 970 kN
Design Base Shear (Model) =
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1

Scale Factor =

Fig 2.4.1 Response Spectra of Medium soil for 5 percent Damping


Base Shear Calculation Along Z direction

Seismic Zone of the Building = IV Annexure-E

Type of the Building = RCC-WITH INFILL

Type of Frame = RCC-SMRF

Height of the Building in 'm' H = 4.95

Width of the Building in 'm' D = 39.90

Seismic Zone Factor Z = 0.24 Table 2 (Clause 6.4.2)

Importance Factor I = 1 Table 6 (Clause 6.4.2)

Response Reduction Factor for RCC-SMRF = 5 Table 7 (Clause 6.4.2)

Soil Type = Medium

Fundamental Time Period, T = 0.09h Clause 7.6.2


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan
Age vehicle maintenance facility & Age PREPARED CHECKED SHEET
TITLE :
covered storage - 1
(d)0.50
= 0.071 sec

Sa/g = 2.5 Clause 6.4.5

Design horizontal seismic coefficient Ah = Z S I Clause 6.4.2


x a x
2 g R
= 0.06

Seismic weight of the Building, W (approx) = 16161.6 kN Table 8 (Clause 7.3.1)


(DL+0.5LL)

Design Base Shear VB = Ah W kN Clause 7.5.3


= 970 kN
Design Base Shear (Moadel) =

Scale factor =
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

2.5 SEISMIC LOAD


Application of Joint load in Staad

At the Roof slab level -wherever beam connects with column, pinned support is assigned.
Staad model is analyzed once to get the reaction Fy at the pinned support. The analytical value of reaction
(Fy) is appiled as joint load in Global X and Z direction ( Fx and Fz ) in the STAAD model.

STAAD Inputs for Seismic Loading in (X direction ) EQX


138 FX 129.273
139 FX 176.444
140 FX 169.638
141 FX 88.27
142 FX 70.548
143 FX 199.125
144 FX 179.917
145 FX 154.53
146 FX 135.059
147 FX 107.364
148 FX 173.685
149 FX 171.097
150 FX 231.628
151 FX 216.345
152 FX 176.841
153 FX 208.885
154 FX 193.165
155 FX 154.152
156 FX 267.766
157 FX 423.708
158 FX 44.837
212 FX 696.647
213 FX 536.273
237 FX 262.46
238 FX 250.323
244 FX 238.556
247 FX 532.653
248 FX 568.843
249 FX 251.583
252 FX 151.422
253 FX 470.176
254 FX 214.326
255 FX 202.593
256 FX 73.058
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP
257 FX 65.078
262 FX 71.655
263 FX 67.42
266 FX 147.477
267 FX 137.138
270 FX 129.609
271 FX 320.49
272 FX 88.247
273 FX 270.044
274 FX 89.044
275 FX 93.512
276 FX 84.375
277 FX 80.584
280 FX 144.158
281 FX 291.101
282 FX 272.276
283 FX 130.959
284 FX 313.522
285 FX 346.452
286 FX 780.826
287 FX 308.682
288 FX 585.016
289 FX 136.792
290 FX 318.08
291 FX 292.869
292 FX 442.115
293 FX 434.85
294 FX 335.579
295 FX 374.094
296 FX 430.339
297 FX 630.567
298 FX 626.819
299 FX 700.888
300 FX 201.652
301 FX 487.03
302 FX 481.419
303 FX 547.136
304 FX 480.428
305 FX 682.452
306 FX 530.069
307 FX 448.299
308 FX 465.993
309 FX 693.858
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP
310 FX 695.527
311 FX 535.748
312 FX 527.062
313 FX 448.688
314 FX 232.231
315 FX 171.05
316 FX 603.757
527 FX 191.699
528 FX 170.823
529 FX 82.069
530 FX 82.21
531 FX 36.827
532 FX 43.37
604 FX 95.276
609 FX 93.623
614 FX 62.52
615 FX 59.349
747 FX 48.986
750 FX 51.311
757 FX 50.754
762 FX 50.5
STAAD Inputs for Seismic Loading in (Z direction ) EQZ
138 FZ 129.273
139 FZ 176.444
140 FZ 169.638
141 FZ 88.27
142 FZ 70.548
143 FZ 199.125
144 FZ 179.917
145 FZ 154.53
146 FZ 135.059
147 FZ 107.364
148 FZ 173.685
149 FZ 171.097
150 FZ 231.628
151 FZ 216.345
152 FZ 176.841
153 FZ 208.885
154 FZ 193.165
155 FZ 154.152
156 FZ 267.766
157 FZ 423.708
158 FZ 44.837
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP
212 FZ 696.647
213 FZ 536.273
237 FZ 262.46
238 FZ 250.323
244 FZ 238.556
247 FZ 532.653
248 FZ 568.843
249 FZ 251.583
252 FZ 151.422
253 FZ 470.176
254 FZ 214.326
255 FZ 202.593
256 FZ 73.058
257 FZ 65.078
262 FZ 71.655
263 FZ 67.42
266 FZ 147.477
267 FZ 137.138
270 FZ 129.609
271 FZ 320.49
272 FZ 88.247
273 FZ 270.044
274 FZ 89.044
275 FZ 93.512
276 FZ 84.375
277 FZ 80.584
280 FZ 144.158
281 FZ 291.101
282 FZ 272.276
283 FZ 130.959
284 FZ 313.522
285 FZ 346.452
286 FZ 780.826
287 FZ 308.682
288 FZ 585.016
289 FZ 136.792
290 FZ 318.08
291 FZ 292.869
292 FZ 442.115
293 FZ 434.85
294 FZ 335.579
295 FZ 374.094
296 FZ 430.339
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP
297 FZ 630.567
298 FZ 626.819
299 FZ 700.888
300 FZ 201.652
301 FZ 487.03
302 FZ 481.419
303 FZ 547.136
304 FZ 480.428
305 FZ 682.452
306 FZ 530.069
307 FZ 448.299
308 FZ 465.993
309 FZ 693.858
310 FZ 695.527
311 FZ 535.748
312 FZ 527.062
313 FZ 448.688
314 FZ 232.231
315 FZ 171.05
316 FZ 603.757
527 FZ 191.699
528 FZ 170.823
529 FZ 82.069
530 FZ 82.21
531 FZ 36.827
532 FZ 43.37
604 FZ 95.276
609 FZ 93.623
614 FZ 62.52
615 FZ 59.349
747 FZ 48.986
750 FZ 51.311
757 FZ 50.754
762 FZ 50.5

Table 2.4.1 Time period & Acceleration for medium soil


Time period Accelaration
0.0 0.235
0.1 0.589
0.2 0.589
0.3 0.589
0.4 0.589
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP
Time period Accelaration
0.5 0.589
0.6 0.589
0.6 0.534
0.7 0.457
0.8 0.400
0.9 0.356
1.0 0.320
1.1 0.291
1.2 0.267
1.3 0.246
1.4 0.229
1.5 0.213
1.6 0.200
1.7 0.188
1.8 0.178
1.9 0.169
2.0 0.160
2.1 0.152
2.2 0.146
2.3 0.139
2.4 0.133
2.5 0.128
2.6 0.123
2.7 0.119
2.8 0.114
2.9 0.110
3.0 0.107
3.1 0.103
3.2 0.100
3.3 0.097
3.4 0.094
3.5 0.091
3.6 0.089
3.7 0.087
3.8 0.084
3.9 0.082
4.0 0.080
2.5.1 SEISMIC LOAD CALCULATION BASED ON IS 1893:2002 (PART -1)

Base Shear Calculation Along X direction

Seismic Zone of the Building = IV Annexure-E


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

Type of the Building = RCC-WITH INFILL

Type of Frame = RCC-SMRF

Height of the Building in 'm' H = 12.25

Width of the Building in 'm' D = 54.55

Seismic Zone Factor Z = 0.24 Table 2 (Clause 6.4.2)

Importance Factor I = 1 Table 6 (Clause 6.4.2)

Response Reduction Factor for RCC-SMRF = 5 Table 7 (Clause 6.4.2)

Soil Type = Medium

Fundamental Time Period, T = 0.09h Clause 7.6.2


(d)0.50
= 0.149 sec

Sa/g = 2.5 (1.36/T) Clause 6.4.5

Design horizontal seismic coefficient Ah = Z Sa I Clause 6.4.2


2 g R
= 0.06

Seismic weight of the Building, W = 26910.6 kN Table 8 (Clause 7.3.1)


(DL+0.5LL)

Design Base Shear VB = Ah W kN Clause 7.5.3


= 1615 kN
Design Base Shear (Model) = 1016

Scale Factor = 1.6


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

Fig 2.4.1 Response Spectra of Medium soil for 5 percent Damping


Base Shear Calculation Along Z direction

Seismic Zone of the Building = IV Annexure-E

Type of the Building = RCC-WITH INFILL

Type of Frame = RCC-SMRF

Height of the Building in 'm' H = 12.25

Width of the Building in 'm' D = 73.50

Seismic Zone Factor Z = 0.24 Table 2 (Clause 6.4.2)

Importance Factor I = 1 Table 6 (Clause 6.4.2)

Response Reduction Factor for RCC-SMRF = 5 Table 7 (Clause 6.4.2)

Soil Type = Medium

Fundamental Time Period, T = 0.09h Clause 7.6.2


(d)0.50
= 0.129 sec

Sa/g = 2.5 Clause 6.4.5

Design horizontal seismic coefficient Ah = Z S I Clause 6.4.2


x a x
2 g R
= 0.06

Seismic weight of the Building, W = 26910.6 kN Table 8 (Clause 7.3.1)


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP
(DL+0.5LL)

Design Base Shear VB = Ah W kN Clause 7.5.3


= 1615 kN
Design Base Shear (Moadel) = 834.8

Scale factor = 1.93


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

2.6 SEISMIC LOAD


Application of Joint load in Staad

At the levels of RCC slab-wherever beam connects with column, pinned support is assigned.
Staad model is analyzed once to get the reaction Fy at the pinned support. The analytical value of reaction
(Fy) is appiled as joint load in Global X and Z direction ( Fx and Fz ) in the STAAD model.

STAAD Inputs for Seismic Loading in (X direction ) EQX & (Z direction) EQZ
181 FX 68.561 FZ 68.561
182 FX 84.03 FZ 84.03
183 FX 121.805 FZ 121.805
184 FX 114.806 FZ 114.806
185 FX 117.843 FZ 117.843
186 FX 93.717 FZ 93.717
187 FX 33.227 FZ 33.227
189 FX 115.029 FZ 115.029
190 FX 109.945 FZ 109.945
191 FX 58.551 FZ 58.551
195 FX 107.482 FZ 107.482
196 FX 56.475 FZ 56.475
202 FX 146.056 FZ 146.056
209 FX 192.525 FZ 192.525
210 FX 160.329 FZ 160.329
214 FX 193.749 FZ 193.749
215 FX 198.004 FZ 198.004
216 FX 161.883 FZ 161.883
217 FX 148.391 FZ 148.391
218 FX 180.859 FZ 180.859
219 FX 165.984 FZ 165.984
220 FX 157.631 FZ 157.631
221 FX 184.909 FZ 184.909
224 FX 135.007 FZ 135.007
225 FX 118.603 FZ 118.603
226 FX 121.462 FZ 121.462
230 FX 168.064 FZ 168.064
231 FX 118.693 FZ 118.693
232 FX 686.001 FZ 686.001
233 FX 788.861 FZ 788.861
234 FX 916.573 FZ 916.573
235 FX 804.008 FZ 804.008
237 FX 810.531 FZ 810.531
302 FX 82.943 FZ 82.943
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
303 FX 246.11 FZ 246.11
304 FX 335.111 FZ 335.111
305 FX 401.268 FZ 401.268
306 FX 339.793 FZ 339.793
307 FX 474.387 FZ 474.387
308 FX 231.326 FZ 231.326
309 FX 331.97 FZ 331.97
310 FX 345.219 FZ 345.219
311 FX 228.765 FZ 228.765
312 FX 491.651 FZ 491.651
313 FX 724.966 FZ 724.966
314 FX 996.718 FZ 996.718
315 FX 989.688 FZ 989.688
316 FX 418.65 FZ 418.65
317 FX 353.207 FZ 353.207
318 FX 513.926 FZ 513.926
319 FX 561.629 FZ 561.629
320 FX 630.652 FZ 630.652
321 FX 912.971 FZ 912.971
322 FX 1034.37 FZ 1034.37
323 FX 398.71 FZ 398.71
324 FX 326.501 FZ 326.501
325 FX 564.292 FZ 564.292
326 FX 797.57 FZ 797.57
327 FX 891.592 FZ 891.592
328 FX 1033.68 FZ 1033.68
329 FX 1247.67 FZ 1247.67
330 FX 555.706 FZ 555.706
331 FX 462.173 FZ 462.173
332 FX 974.34 FZ 974.34
333 FX 951.218 FZ 951.218
334 FX 979.459 FZ 979.459
335 FX 520.701 FZ 520.701
336 FX 292.985 FZ 292.985
337 FX 452.081 FZ 452.081
338 FX 395.179 FZ 395.179
339 FX 456.527 FZ 456.527
340 FX 419.067 FZ 419.067
341 FX 421.306 FZ 421.306
342 FX 253.503 FZ 253.503
343 FX 233.097 FZ 233.097
345 FX 194.445 FZ 194.445
346 FX 339.204 FZ 339.204
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
347 FX 138.759 FZ 138.759
348 FX 413.353 FZ 413.353
349 FX 566.477 FZ 566.477
350 FX 826.258 FZ 826.258
351 FX 452.694 FZ 452.694
352 FX 443.614 FZ 443.614
426 FX 316.977 FZ 316.977
569 FX 542.584 FZ 542.584
570 FX 467.788 FZ 467.788
571 FX 660.837 FZ 660.837
572 FX 618.505 FZ 618.505
573 FX 338.589 FZ 338.589
574 FX 640.186 FZ 640.186
575 FX 252.619 FZ 252.619
576 FX 405.672 FZ 405.672
577 FX 366.675 FZ 366.675
578 FX 359.879 FZ 359.879
579 FX 357.702 FZ 357.702
581 FX 268.529 FZ 268.529
582 FX 252.34 FZ 252.34
583 FX 335.737 FZ 335.737
584 FX 482.488 FZ 482.488
585 FX 515.703 FZ 515.703
586 FX 569.285 FZ 569.285
587 FX 337.295 FZ 337.295
588 FX 205.106 FZ 205.106
589 FX 575.795 FZ 575.795
590 FX 694.064 FZ 694.064
591 FX 399.678 FZ 399.678
592 FX 407.861 FZ 407.861
593 FX 413.945 FZ 413.945
594 FX 281.076 FZ 281.076
595 FX 316.464 FZ 316.464
596 FX 910.959 FZ 910.959
597 FX 948.976 FZ 948.976
598 FX 536.286 FZ 536.286
599 FX 619.755 FZ 619.755
600 FX 646.485 FZ 646.485
601 FX 319.84 FZ 319.84
602 FX 341.779 FZ 341.779
603 FX 602.24 FZ 602.24
604 FX 622.087 FZ 622.087
605 FX 647.559 FZ 647.559
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
606 FX 323.058 FZ 323.058
607 FX 231.53 FZ 231.53
608 FX 381.399 FZ 381.399
609 FX 361.077 FZ 361.077
610 FX 382.509 FZ 382.509
611 FX 386.71 FZ 386.71
612 FX 385.704 FZ 385.704
613 FX 232.001 FZ 232.001
614 FX 224.389 FZ 224.389
615 FX 702.807 FZ 702.807
616 FX 356.019 FZ 356.019
617 FX 353.948 FZ 353.948
624 FX 131.026 FZ 131.026
625 FX 128.84 FZ 128.84
626 FX 125.519 FZ 125.519
627 FX 113.972 FZ 113.972
628 FX 108.347 FZ 108.347
629 FX 76.805 FZ 76.805
630 FX 63.282 FZ 63.282
631 FX 124.451 FZ 124.451
632 FX 105.21 FZ 105.21
634 FX 112.6 FZ 112.6
635 FX 81.28 FZ 81.28
639 FX 92.402 FZ 92.402
645 FX 78.361 FZ 78.361
646 FX 124.041 FZ 124.041
651 FX 146.769 FZ 146.769
652 FX 126.65 FZ 126.65
653 FX 129.743 FZ 129.743
654 FX 134.303 FZ 134.303
656 FX 130.135 FZ 130.135
657 FX 127.652 FZ 127.652
660 FX 120.487 FZ 120.487
661 FX 120.763 FZ 120.763
792 FX 116.805 FZ 116.805
794 FX 72.947 FZ 72.947
796 FX 67.835 FZ 67.835
798 FX 109.159 FZ 109.159
799 FX 120.759 FZ 120.759
806 FX 54.713 FZ 54.713
807 FX 131.173 FZ 131.173
808 FX 62.065 FZ 62.065
809 FX 132.977 FZ 132.977
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
812 FX 117.45 FZ 117.45
814 FX 123.361 FZ 123.361
820 FX 87.561 FZ 87.561
821 FX 95.546 FZ 95.546
822 FX 92.129 FZ 92.129
823 FX 94.128 FZ 94.128
837 FX 147.106 FZ 147.106
838 FX 164.812 FZ 164.812
849 FX 86.099 FZ 86.099
850 FX 74.197 FZ 74.197
902 FX 120.279 FZ 120.279
1146 FX 108.577 FZ 108.577
1147 FX 99.708 FZ 99.708
1148 FX 94.506 FZ 94.506
1149 FX 94.021 FZ 94.021
1150 FX 81.12 FZ 81.12
1151 FX 19.928 FZ 19.928
1152 FX 81.387 FZ 81.387
1153 FX 53.954 FZ 53.954
1154 FX 97.111 FZ 97.111
1155 FX 34.723 FZ 34.723
1214 FX 79.456 FZ 79.456

Table 2.4.1 Time period & Acceleration for medium soil


Time period Accelaration
0.0 0.235
0.1 0.589
0.2 0.589
0.3 0.589
0.4 0.589
0.5 0.589
0.6 0.589
0.6 0.534
0.7 0.457
0.8 0.400
0.9 0.356
1.0 0.320
1.1 0.291
1.2 0.267
1.3 0.246
1.4 0.229
1.5 0.213
1.6 0.200
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP
Time period Accelaration
1.7 0.188
1.8 0.178
1.9 0.169
2.0 0.160
2.1 0.152
2.2 0.146
2.3 0.139
2.4 0.133
2.5 0.128
2.6 0.123
2.7 0.119
2.8 0.114
2.9 0.110
3.0 0.107
3.1 0.103
3.2 0.100
3.3 0.097
3.4 0.094
3.5 0.091
3.6 0.089
3.7 0.087
3.8 0.084
3.9 0.082
4.0 0.080

2.6.1 SEISMIC LOAD CALCULATION BASED ON IS 1893:2002 (PART -1)

Base Shear Calculation Along X direction

Seismic Zone of the Building = IV Annexure-E

Type of the Building = RCC-WITH INFILL

Type of Frame = RCC-SMRF

Height of the Building in 'm' H = 12.25

Width of the Building in 'm' D = 52.50

Seismic Zone Factor Z = 0.24 Table 2 (Clause 6.4.2)

Importance Factor I = 1 Table 6 (Clause 6.4.2)


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

Response Reduction Factor for RCC-SMRF = 5 Table 7 (Clause 6.4.2)

Soil Type = Medium

Fundamental Time Period, T = 0.09h Clause 7.6.2


(d)0.50
= 0.152 sec

Sa/g = 2.5 Clause 6.4.5

Design horizontal seismic coefficient Ah = Z Sa I Clause 6.4.2


2 g R
= 0.06

Seismic weight of the Building, W = 61605.8 kN Table 8 (Clause 7.3.1)


(DL+0.5LL)

Design Base Shear VB = Ah W kN Clause 7.5.3


= 3696 kN
Design Base Shear (Model) = 1657

Scale Factor = 2.2

Fig 2.4.1 Response Spectra of Medium soil for 5 percent Damping


Base Shear Calculation Along Z direction

Seismic Zone of the Building = IV Annexure-E


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

Type of the Building = RCC-WITH INFILL

Type of Frame = RCC-SMRF

Height of the Building in 'm' H = 12.25

Width of the Building in 'm' D = 34.50

Seismic Zone Factor Z = 0.24 Table 2 (Clause 6.4.2)

Importance Factor I = 1 Table 6 (Clause 6.4.2)

Response Reduction Factor for RCC-SMRF = 5 Table 7 (Clause 6.4.2)

Soil Type = Medium

Fundamental Time Period, T = 0.09h Clause 7.6.2


(d)0.50
= 0.188 sec

Sa/g = 2.5 Clause 6.4.5

Design horizontal seismic coefficient Ah = Z S I Clause 6.4.2


x a x
2 g R
= 0.06

Seismic weight of the Building, W = 61605.8 kN Table 8 (Clause 7.3.1)


(DL+0.5LL)

Design Base Shear VB = Ah W kN Clause 7.5.3


= 3696 kN
Design Base Shear (Moadel) = 1318

Scale factor = 2.8


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

2.7 TEMPERATURE LOAD CALCULATION BASED ON IS 875-(PART 5)-1987


* -Value entered in staad model
Temperature Load is considered based on the inputs given in RFP

Maximum mean dailyTemperature = 45.c


Minimum mean daily Temperature = 13.9.c

Temperature Load = 45  13.9 


2

= 15.55
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
PAKR RJS/KPP

LOAD COMBINATION
Document No DATE
PROJECT : C-17 Beddown Facilities Airforce Station at Hindan
O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

2.8 LOAD COMBINATIONS FOR CONCRETE STRUCTURES

1) DL - Dead Load ( Which Includes)


a) SW - Self Weight
b) FF- Floor Finish
c) WL- Wall Load
d) FCS- False Ceiling & MEP Services

2) LL - Live / Imposed Load, LL=LL(F)+LL(T)


a) LL(F) - Floor Live Load
b) LL(T) - Terrace Live Load

3) WL- Wind Load


a) WL(+X)- Wind Load at Positive X-Direction Pressure
b) WL(-X)- Wind Load at Negative X-Direction Pressure
c) WL(+Z)- Wind Load at Positive Z-Direction Pressure
d) WL(-Z)- Wind Load at Negative Z-Direction Pressure

4) EQ - Earthquake Load
a) EQ(+X) -Earthquake Load at X-Direction-Positive
b) EQ(-X) -Earthquake Load at X-Direction-Negative
c) EQ(+Z) -Earthquake Load at Z-Direction-Positive
d) EQ(-Z) -Earthquake Load at Z-Direction-Negative

5) TL-Temperature Load
a) TL(+)
b) TL(-)

Table No. 2.6.1 - Serviceability Limit State - SLS

1 COMB 101 1.0 DL + 1.0 LL + - - + - - + - -


2 COMB 102 1.0 DL + - - + 1.0 WL (+X) + - - + - -
3 COMB 103 1.0 DL + - - + 1.0 WL (-X) + - - + - -
4 COMB 104 1.0 DL + - - + 1.0 WL (+Z) + - - + - -
5 COMB 105 1.0 DL + - - + 1.0 WL (+Z) + - - + - -
6 COMB 106 1.0 DL + - - + - - + 1.0 EQ (+X) + - -
7 COMB 107 1.0 DL + - - + - - + 1.0 EQ (-X) + - -
8 COMB 108 1.0 DL + - - + - - + 1.0 EQ (+Z) + - -
9 COMB 109 1.0 DL + - + - - + 1.0 EQ (-Z) + - -
10 COMB 110 1.0 DL + 0.8 LL + 0.8 WL (+X) + - - + - -
11 COMB 111 1.0 DL + 0.8 LL + 0.8 WL (-X) + - - + - -
Document No DATE
PROJECT : C-17 Beddown Facilities Airforce Station at Hindan
O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

12 COMB 112 1.0 DL + 0.8 LL + 0.8 WL (+Z) + - - + - -


13 COMB 113 1.0 DL + 0.8 LL + 0.8 WL (+Z) + - - + - -
14 COMB 114 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (+X) + - -
15 COMB 115 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (-X) + - -
16 COMB 116 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (+Z) + - -
17 COMB 117 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (-Z) + - -
18 COMB 118 1.0 DL + - - + - - + - - + 1.0 TL(+)
19 COMB 119 1.0 DL + - - + - - + - - + 1.0 TL(-)
20 COMB 120 1.0 DL + 1.0 LL + - - + - - + 1.0 TL(+)
21 COMB 121 1.0 DL + 1.0 LL + - - + - - + 1.0 TL(-)
22 COMB 122 1.0 DL + - - + 1.0 WL (+X) + - - + 1.0 TL(+)
23 COMB 123 1.0 DL + - - + 1.0 WL (-X) + - - + 1.0 TL(+)
24 COMB 124 1.0 DL + - - + 1.0 WL (+Z) + - - + 1.0 TL(+)
25 COMB 125 1.0 DL + - - + 1.0 WL (-Z) + - - + 1.0 TL(+)
26 COMB 126 1.0 DL + - - + 1.0 WL (+X) + - - + 1.0 TL(-)
27 COMB 127 1.0 DL + - - + 1.0 WL (-X) + - - + 1.0 TL(-)
28 COMB 128 1.0 DL + - - + 1.0 WL (+Z) + - - + 1.0 TL(-)
29 COMB 129 1.0 DL + - - + 1.0 WL (-Z) + - - + 1.0 TL(-)
30 COMB 130 1.0 DL + - - + - - + 1.0 EQ (+X) + 1.0 TL(+)
31 COMB 131 1.0 DL + - - + - - + 1.0 EQ (-X) + 1.0 TL(+)
32 COMB 132 1.0 DL + - - + - - + 1.0 EQ (+Z) + 1.0 TL(+)
33 COMB 133 1.0 DL + - - + - - + 1.0 EQ (-Z) + 1.0 TL(+)
34 COMB 134 1.0 DL + - - + - - + 1.0 EQ (+X) + 1.0 TL(-)
35 COMB 135 1.0 DL + - - + - - + 1.0 EQ (-X) + 1.0 TL(-)
36 COMB 136 1.0 DL + - - + - - + 1.0 EQ (+Z) + 1.0 TL(-)
37 COMB 137 1.0 DL + - - + - - + 1.0 EQ (-Z) + 1.0 TL(-)
38 COMB 138 1.0 DL + 0.8 LL + 0.8 WL (+X) + - - + 1.0 TL(+)
39 COMB 139 1.0 DL + 0.8 LL + 0.8 WL (-X) + - - + 1.0 TL(+)
40 COMB 140 1.0 DL + 0.8 LL + 0.8 WL (+Z) + - - + 1.0 TL(+)
41 COMB 141 1.0 DL + 0.8 LL + 0.8 WL (-Z) + - - + 1.0 TL(+)
42 COMB 142 1.0 DL + 0.8 LL + 0.8 WL (+X) + - - + 1.0 TL(-)
43 COMB 143 1.0 DL + 0.8 LL + 0.8 WL (-X) + - - + 1.0 TL(-)
44 COMB 144 1.0 DL + 0.8 LL + 0.8 WL (+Z) + - - + 1.0 TL(-)
45 COMB 145 1.0 DL + 0.8 LL + 0.8 WL (-Z) + - - + 1.0 TL(-)
46 COMB 146 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (+X) + 1.0 TL(+)
47 COMB 147 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (-X) + 1.0 TL(+)
48 COMB 148 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (+Z) + 1.0 TL(+)
49 COMB 149 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (-Z) + 1.0 TL(+)
50 COMB 150 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (+X) + 1.0 TL(-)
51 COMB 151 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (-X) + 1.0 TL(-)
52 COMB 152 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (+Z) + 1.0 TL(-)
53 COMB 153 1.0 DL + 0.8 LL(F) + - - + 0.8 EQ (-Z) + 1.0 TL(-)
Document No DATE
PROJECT : C-17 Beddown Facilities Airforce Station at Hindan
O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

Table No. 2.6.2 - Ultimate Limit State - ULS


54 COMB 201 1.5 DL + 1.5 LL + - - + - - + - -
55 COMB 202 1.5 DL + - - + 1.5 WL (+X) + - - + - -
56 COMB 203 1.5 DL + - - + 1.5 WL (-X) + - - + - -
57 COMB 204 1.5 DL + - - + 1.5 WL (+Z) + - - + - -
58 COMB 205 1.5 DL + - - + 1.5 WL (+Z) + - - + - -
59 COMB 206 1.5 DL + - - + - - + 1.5 EQ (+X) + - -
60 COMB 207 1.5 DL + - - + - - + 1.5 EQ (-X) + - -
61 COMB 208 1.5 DL + - - + - - + 1.5 EQ (+Z) + - -
62 COMB 209 1.5 DL + - + - - + 1.5 EQ (-Z) + - -
63 COMB 210 0.9 DL + + 1.5 WL (+X) + - - + - -
64 COMB 211 0.9 DL + + 1.5 WL (-X) + - - + - -
65 COMB 212 0.9 DL + + 1.5 WL (+Z) + - - + - -
66 COMB 213 0.9 DL + + 1.5 WL (+Z) + - - + - -
67 COMB 214 0.9 DL + + - - + 1.5 EQ (+X) + - -
68 COMB 215 0.9 DL + + - - + 1.5 EQ (-X) + - -
69 COMB 216 0.9 DL + + - - + 1.5 EQ (+Z) + - -
70 COMB 217 0.9 DL + + - - + 1.5 EQ (-Z) + - -
71 COMB 218 1.2 DL + 1.2 LL + 1.2 WL (+X) + - - + - -
72 COMB 219 1.2 DL + 1.2 LL + 1.2 WL (-X) + - - + - -
73 COMB 220 1.2 DL + 1.2 LL + 1.2 WL (+Z) + - - + - -
74 COMB 221 1.2 DL + 1.2 LL + 1.2 WL (+Z) + - - + - -
75 COMB 222 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (+X) + - -
76 COMB 223 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (-X) + - -
77 COMB 224 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (+Z) + - -
78 COMB 225 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (-Z) + - -
79 COMB 226 1.5 DL + - - + - - + - - + 1.2 TL(+)
80 COMB 227 1.5 DL + - - + - - + - - + 1.2 TL(-)
81 COMB 228 1.5 DL + 1.2 LL + - - + - - + 1.2 TL(+)
82 COMB 229 1.5 DL + 1.2 LL + - - + - - + 1.2 TL(-)
83 COMB 230 1.5 DL + - - + 1.5 WL (+X) + - - + 1.2 TL(+)
84 COMB 231 1.5 DL + - - + 1.5 WL (-X) + - - + 1.2 TL(+)
85 COMB 232 1.5 DL + - - + 1.5 WL (+Z) + - - + 1.2 TL(+)
86 COMB 233 1.5 DL + - - + 1.5 WL (+Z) + - - + 1.2 TL(+)
87 COMB 234 1.5 DL + - - + 1.5 WL (+X) + - - + 1.2 TL(-)
88 COMB 235 1.5 DL + - - + 1.5 WL (-X) + - - + 1.2 TL(-)
89 COMB 236 1.5 DL + - - + 1.5 WL (+Z) + - - + 1.2 TL(-)
90 COMB 237 1.5 DL + - - + 1.5 WL (+Z) + - - + 1.2 TL(-)
91 COMB 238 1.5 DL + - - + - - + 1.5 EQ (+X) + 1.2 TL(+)
92 COMB 239 1.5 DL + - - + - - + 1.5 EQ (-X) + 1.2 TL(+)
93 COMB 240 1.5 DL + - - + - - + 1.5 EQ (+Z) + 1.2 TL(+)
Document No DATE
PROJECT : C-17 Beddown Facilities Airforce Station at Hindan
O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

94 COMB 241 1.5 DL + - - + - - + 1.5 EQ (-Z) + 1.2 TL(+)


95 COMB 242 1.5 DL + - - + - - + 1.5 EQ (+X) + 1.2 TL(-)
96 COMB 243 1.5 DL + - - + - - + 1.5 EQ (-X) + 1.2 TL(-)
97 COMB 244 1.5 DL + - - + - - + 1.5 EQ (+Z) + 1.2 TL(-)
98 COMB 245 1.5 DL + - - + - - + 1.5 EQ (-Z) + 1.2 TL(-)
99 COMB 246 1.2 DL + 1.2 LL + 1.2 WL (+X) + - - + 1.2 TL(+)
100 COMB 247 1.2 DL + 1.2 LL + 1.2 WL (-X) + - - + 1.2 TL(+)
101 COMB 248 1.2 DL + 1.2 LL + 1.2 WL (+Z) + - - + 1.2 TL(+)
102 COMB 249 1.2 DL + 1.2 LL + 1.2 WL (-Z) + - - + 1.2 TL(+)
103 COMB 250 1.2 DL + 1.2 LL + 1.2 WL (+X) + - - + 1.2 TL(-)
104 COMB 251 1.2 DL + 1.2 LL + 1.2 WL (-X) + - - + 1.2 TL(-)
105 COMB 252 1.2 DL + 1.2 LL + 1.2 WL (+Z) + - - + 1.2 TL(-)
106 COMB 253 1.2 DL + 1.2 LL + 1.2 WL (-Z) + - - + 1.2 TL(-)
107 COMB 254 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (+X) + 1.2 TL(+)
108 COMB 255 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (-X) + 1.2 TL(+)
109 COMB 256 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (+Z) + 1.2 TL(+)
110 COMB 257 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (-Z) + 1.2 TL(+)
111 COMB 258 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (+X) + 1.2 TL(-)
112 COMB 259 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (-X) + 1.2 TL(-)
113 COMB 260 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (+Z) + 1.2 TL(-)
114 COMB 261 1.2 DL + 1.2 LL(F) + - - + 1.2 EQ (-Z) + 1.2 TL(-)
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT :
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE : Squadron Operations/AMU
MVS RJS/KPP

Modelling
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
BVM RJS/KPP

3.1 3D-Rendered View

Figure No. 3.1 : 3D-View of Squadron Operations/AMU-(North Block)


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
BVM RJS/KPP

Figure No. 3.2 : 3D-View of Squadron Operations/AMU (South Block)


C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
BVM RJS/KPP

4.0 ANALYSIS
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
4.1 STAAD FILE (North Block)
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 21-Dec-12
JOB NAME Design of Squadron Operations Building
JOB CLIENT C-17
JOB NO O12205
JOB REV A
ENGINEER NAME PAKR
CHECKER NAME RJS
APPROVED NAME SB
CHECKER DATE 21-Dec-12
APPROVED DATE 21-Dec-12
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 -0.15 0; 2 6.2 -0.15 0; 3 12.4 -0.15 0; 4 16.875 -0.15 0; 5 21.1 -0.15 0;
13 73.05 -0.15 0; 14 0 -0.15 -5.75; 23 61.15 -1.7 -7.125; 24 65 -1.7 -7.125;
25 73.05 -0.15 -7.125; 26 0 -0.15 -12.8; 36 73.05 -0.15 -12.8;
37 0 -0.15 -19.55; 38 6.2 -0.15 -19.55; 39 12.4 -0.15 -19.55;
40 18.9 -0.15 -19.55; 41 28.85 -0.15 -19.55; 42 36.25 -0.15 -19.55;
43 43.7 -0.15 -19.55; 44 50.5 -0.15 -19.55; 45 58.3 -0.15 -19.55;
46 64.2 -0.15 -19.55; 47 73.05 -0.15 -19.55; 48 0 -1.7 0; 49 6.2 -1.7 0;
50 12.4 -1.7 0; 51 16.875 -1.7 0; 52 21.1 -1.7 0; 53 28.85 -1.7 0;
54 36.25 -1.7 0; 55 43.7 -1.7 0; 56 50.5 -1.7 0; 57 58.3 -1.7 0;
58 61.15 -1.7 0; 59 65 -1.7 0; 60 73.05 -1.7 0; 61 0 -1.7 -5.75;
62 6.2 -1.7 -5.75; 63 12.4 -1.7 -5.75; 64 18.9 -1.7 -6.45; 65 28.85 -1.7 -6.45;
66 36.25 -1.7 -6.45; 67 43.7 -1.7 -6.45; 68 50.5 -1.7 -6.45;
69 58.3 -1.7 -6.45; 72 73.05 -1.7 -7.125; 73 0 -1.7 -12.8; 74 6.2 -1.7 -12.8;
75 12.4 -1.7 -12.8; 76 18.9 -1.7 -12.8; 77 28.85 -1.7 -12.8;
78 36.25 -1.7 -12.8; 79 43.7 -1.7 -12.8; 80 50.5 -1.7 -12.8;
81 58.3 -1.7 -12.8; 82 64.2 -1.7 -12.8; 83 73.05 -1.7 -12.8; 84 0 -1.7 -19.55;
85 6.2 -1.7 -19.55; 86 12.4 -1.7 -19.55; 87 18.9 -1.7 -19.55;
88 28.85 -1.7 -19.55; 89 36.25 -1.7 -19.55; 90 43.7 -1.7 -19.55;
91 50.5 -1.7 -19.55; 92 58.3 -1.7 -19.55; 93 64.2 -1.7 -19.55;
94 73.05 -1.7 -19.55; 95 4.9 -0.15 0; 96 6.5 -0.15 0; 97 4.9 -0.15 0.75;
98 6.5 -0.15 0.75; 99 12.95 -0.15 0; 100 12.95 -0.15 0.75; 101 14.55 -0.15 0;
102 14.55 -0.15 0.75; 111 5.375 -0.15 -19.55; 112 6.975 -0.15 -19.55;
113 5.375 -0.15 -20.3; 114 6.975 -0.15 -20.3; 115 11.675 -0.15 -19.55;
116 13.275 -0.15 -19.55; 118 11.675 -0.15 -20.3; 119 13.275 -0.15 -20.3;
120 17.875 -0.15 -19.55; 121 17.875 -0.15 -20.3; 122 19.475 -0.15 -19.55;
123 19.475 -0.15 -20.3; 128 36.25 -0.15 -20.3; 129 37.85 -0.15 -19.55;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
130 37.85 -0.15 -20.3; 131 49.7 -0.15 -19.55; 132 49.7 -0.15 -20.3;
133 51.3 -0.15 -19.55; 134 51.3 -0.15 -20.3; 138 0 3.55 0; 139 6.2 3.55 0;
140 12.4 3.55 0; 141 16.875 3.55 0; 142 73.05 3.55 0; 143 0 3.55 -5.75;
144 73.05 3.55 -7.125; 145 0 3.55 -12.8; 146 73.05 3.55 -12.8;
147 0 3.55 -19.55; 148 6.2 3.55 -19.55; 149 12.4 3.55 -19.55;
150 18.9 3.55 -19.55; 151 28.85 3.55 -19.55; 152 36.25 3.55 -19.55;
153 43.7 3.55 -19.55; 154 50.5 3.55 -19.55; 155 58.3 3.55 -19.55;
156 64.2 3.55 -19.55; 157 73.05 3.55 -19.55; 158 21.1 3.55 0; 159 4.9 3.55 0;
160 6.5 3.55 0; 161 4.9 3.55 0.75; 162 6.5 3.55 0.75; 163 12.95 3.55 0;
164 12.95 3.55 0.75; 165 14.55 3.55 0; 166 14.55 3.55 0.75;
175 5.375 3.55 -19.55; 176 6.975 3.55 -19.55; 177 5.375 3.55 -20.3;
178 6.975 3.55 -20.3; 179 11.675 3.55 -19.55; 180 13.275 3.55 -19.55;
181 11.675 3.55 -20.3; 182 13.275 3.55 -20.3; 183 17.875 3.55 -19.55;
184 17.875 3.55 -20.3; 185 19.475 3.55 -19.55; 186 19.475 3.55 -20.3;
191 36.25 3.55 -20.3; 192 37.85 3.55 -19.55; 193 37.85 3.55 -20.3;
194 49.7 3.55 -19.55; 195 49.7 3.55 -20.3; 196 51.3 3.55 -19.55;
197 51.3 3.55 -20.3; 201 43.7 3.55 -20.3; 212 28.85 5.55 -12.8;
213 36.25 5.55 -12.8; 237 28.85 5.55 0; 238 36.25 5.55 0; 244 43.7 5.55 0;
247 50.5 5.55 -12.8; 248 50.5 5.55 -6.45; 249 50.5 5.55 0; 252 61.15 5.55 0;
253 65 5.55 0; 254 61.15 2.25 0; 255 65 2.25 0; 256 61.15 3.9 -7.125;
257 65 3.9 -7.125; 262 61.15 7.2 -7.125; 263 65 7.2 -7.125; 266 61.15 8.85 0;
267 65 8.85 0; 270 61.15 10.45 -7.125; 271 65 10.45 -7.125; 272 61.15 10.45 0;
273 65 10.45 0; 274 61.15 13.5 -7.125; 275 65 13.5 -7.125; 276 61.15 13.5 0;
277 65 13.5 0; 278 61.15 10.45 -5.275; 279 65 10.45 -5.275; 280 0 5.55 0;
281 6.2 5.55 0; 282 12.4 5.55 0; 283 16.875 5.55 0; 284 73.05 5.55 0;
285 0 5.55 -5.75; 286 73.05 5.55 -7.125; 287 0 5.55 -12.8;
288 73.05 5.55 -12.8; 289 0 5.55 -19.55; 290 6.2 5.55 -19.55;
291 12.4 5.55 -19.55; 292 18.9 5.55 -19.55; 293 28.85 5.55 -19.55;
294 36.25 5.55 -19.55; 295 43.7 5.55 -19.55; 296 50.5 5.55 -19.55;
297 58.3 5.55 -19.55; 298 64.2 5.55 -19.55; 299 73.05 5.55 -19.55;
300 21.1 5.55 0; 301 6.2 5.55 -5.75; 302 12.4 5.55 -5.75; 303 6.2 5.55 -12.8;
304 12.4 5.55 -12.8; 305 18.9 5.55 -12.8; 306 43.7 5.55 -12.8;
307 58.3 5.55 -12.8; 308 64.2 5.55 -12.8; 309 18.9 5.55 -6.45;
310 28.85 5.55 -6.45; 311 36.25 5.55 -6.45; 312 43.7 5.55 -6.45;
313 58.3 5.55 -6.45; 314 58.3 5.55 0; 315 61.15 5.55 -7.125;
316 65 5.55 -7.125; 317 18.9 5.55 0; 318 18.9 5.55 -5.75; 319 12.4 5.55 -6.45;
320 61.15 5.55 -6.45; 321 64.2 5.55 -7.125; 322 61.15 5.55 -12.8;
323 61.15 5.55 -19.55; 324 0 5.55 -15.675; 325 6.2 5.55 -15.675;
326 12.4 5.55 -15.675; 327 18.9 5.55 -15.675; 328 28.85 5.55 -15.675;
329 36.25 5.55 -15.675; 330 43.7 5.55 -15.675; 331 50.5 5.55 -15.675;
332 58.3 5.55 -15.675; 333 64.2 5.55 -15.675; 334 73.05 5.55 -15.675;
335 61.15 5.55 -15.675; 336 0 5.55 -9.275; 337 6.2 5.55 -9.275;
338 12.4 5.55 -9.275; 339 18.9 5.55 -9.275; 340 28.85 5.55 -9.275;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
341 36.25 5.55 -9.275; 342 43.7 5.55 -9.275; 343 50.5 5.55 -9.275;
344 58.3 5.55 -9.27499; 345 61.15 5.55 -9.27499; 346 64.2 5.55 -9.27499;
347 73.05 5.55 -9.27499; 348 0 5.55 -2.875; 349 6.2 5.55 -2.875;
350 12.4 5.55 -2.875; 351 18.9 5.55 -2.875; 352 28.85 5.55 -2.875;
353 36.25 5.55 -2.875; 354 43.7 5.55 -2.875; 355 50.5 5.55 -2.875;
356 58.3 5.55 -2.87499; 357 61.15 5.55 -2.87499; 361 3.1 5.55 0;
362 3.1 5.55 -2.875; 363 3.1 5.55 -5.75; 364 3.1 5.55 -9.275;
365 3.1 5.55 -12.8; 366 3.1 5.55 -15.675; 367 3.1 5.55 -19.55;
368 9.3 5.55 -19.55; 369 15.65 5.55 -19.55; 370 9.3 5.55 0;
371 9.3 5.55 -2.875; 372 9.3 5.55 -5.75; 373 9.3 5.55 -9.275;
374 9.3 5.55 -12.8; 375 9.3 5.55 -15.675; 376 15.65 5.55 0;
377 15.65 5.55 -2.875; 378 15.65 5.55 -5.75; 379 15.65 5.55 -9.275;
380 15.65 5.55 -12.8; 381 15.65 5.55 -15.675; 382 15.65 5.55 -6.45;
383 22.2167 5.55 -19.55; 384 25.5333 5.55 -19.55; 385 22.2167 5.55 0;
386 22.2167 5.55 -2.875; 388 22.2167 5.55 -9.275; 389 22.2167 5.55 -12.8;
390 22.2167 5.55 -15.675; 391 25.5333 5.55 0; 392 25.5333 5.55 -2.875;
394 25.5333 5.55 -9.275; 395 25.5333 5.55 -12.8; 396 25.5333 5.55 -15.675;
397 22.2167 5.55 -6.45; 398 25.5333 5.55 -6.45; 399 32.55 5.55 -19.55;
400 39.975 5.55 -19.55; 401 47.1 5.55 -19.55; 402 54.725 5.55 -19.55;
403 32.55 5.55 0; 404 32.55 5.55 -2.875; 405 32.55 5.55 -9.275;
406 32.55 5.55 -12.8; 407 32.55 5.55 -15.675; 408 32.55 5.55 -6.45;
409 39.975 5.55 0; 410 39.975 5.55 -2.875; 411 39.975 5.55 -9.275;
412 39.975 5.55 -12.8; 413 39.975 5.55 -15.675; 414 39.975 5.55 -6.45;
415 47.1 5.55 0; 416 47.1 5.55 -2.875; 417 47.1 5.55 -9.275;
418 47.1 5.55 -12.8; 419 47.1 5.55 -15.675; 420 47.1 5.55 -6.45;
421 54.725 5.55 0; 422 54.725 5.55 -2.87499; 423 54.725 5.55 -9.27499;
424 54.725 5.55 -12.8; 425 54.725 5.55 -15.675; 426 54.725 5.55 -6.45;
427 67.15 5.55 -19.55; 428 70.1 5.55 -19.55; 429 65 5.55 -3.5625;
430 73.05 5.55 -3.5625; 431 67.15 5.55 -15.675; 432 67.15 5.55 -12.8;
433 67.15 5.55 -9.27499; 434 67.15 5.55 -7.125; 435 67.15 5.55 -3.5625;
436 67.15 5.55 0; 437 70.1 5.55 -15.675; 438 70.1 5.55 -12.8;
439 70.1 5.55 -9.27499; 440 70.1 5.55 -7.125; 441 70.1 5.55 -3.5625;
442 70.1 5.55 0; 463 61.15 13.5 -3.5625; 464 65 13.5 -3.5625; 465 4.9 5.55 0;
467 14.55 5.55 0; 473 5.375 5.55 -19.55; 475 13.275 5.55 -19.55;
477 17.875 5.55 -19.55; 482 51.3 5.55 -19.55; 515 73.05 5.55 -6.275;
518 67.15 10.45 0; 519 67.15 10.45 -7.125; 520 73.05 10.45 -3.5625;
522 65 10.45 -3.5625; 523 67.15 10.45 -3.5625; 524 70.1 10.45 -7.125;
525 70.1 10.45 -3.5625; 526 70.1 10.45 0; 527 73.05 10.45 -7.125;
528 73.05 10.45 0; 529 73.05 8.45 -7.125; 530 73.05 8.45 0; 531 65 8.45 -7.125;
532 65 8.45 0; 533 63.2 5.55 0; 534 61.15 5.55 -0.675; 535 63.2 5.55 -0.675;
536 65 5.55 -0.675; 537 6.5 5.55 0; 538 4.9 5.55 0.75; 539 6.5 5.55 0.75;
540 12.95 5.55 0; 541 12.95 5.55 0.75; 542 14.55 5.55 0.75;
549 6.975 5.55 -19.55; 550 5.375 5.55 -20.3; 551 6.975 5.55 -20.3;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
552 11.675 5.55 -19.55; 553 11.675 5.55 -20.3; 554 13.275 5.55 -20.3;
555 17.875 5.55 -20.3; 556 19.475 5.55 -19.55; 557 19.475 5.55 -20.3;
561 36.25 5.55 -20.3; 562 37.85 5.55 -19.55; 563 37.85 5.55 -20.3;
564 49.7 5.55 -19.55; 565 49.7 5.55 -20.3; 566 51.3 5.55 -20.3;
569 43.7 5.55 -20.3; 590 54.725 5.55 -22.5; 592 61.15 5.55 -22.5;
594 67.15 5.55 -22.5; 595 70.1 5.55 -22.5; 596 73.05 5.55 -22.5;
597 76 5.55 -19.55; 599 76 5.55 -12.8; 600 76 5.55 -9.27499;
602 76 5.55 -6.275; 603 76 5.55 -22.5; 604 61.15 2.25 -7.125;
606 61.15 2.25 -0.675; 607 65 2.25 -0.675; 609 65 2.25 -7.125;
612 63.2 2.25 -0.675; 613 63.2 2.25 0; 614 61.15 8.85 -7.125;
615 65 8.85 -7.125; 616 61.15 8.85 -0.675; 617 65 8.85 -0.675;
618 63.2 8.85 -0.675; 619 63.2 8.85 0; 620 0 -0.15 -1.275; 621 0 -0.15 -2.875;
622 0 -0.15 -9.75; 623 0 -0.15 -11.35; 624 -0.75 -0.15 -1.275;
625 -0.75 -0.15 -2.875; 626 -0.75 -0.15 -9.75; 627 -0.75 -0.15 -11.35;
628 0 3.55 -1.275; 629 0 3.55 -2.875; 630 0 3.55 -9.75; 631 0 3.55 -11.35;
632 -0.75 3.55 -1.275; 633 -0.75 3.55 -2.875; 634 -0.75 3.55 -9.75;
635 -0.75 3.55 -11.35; 636 0 5.55 -1.275; 637 0 5.55 -9.75; 638 0 5.55 -11.35;
639 -0.75 5.55 -1.275; 640 -0.75 5.55 -2.875; 641 -0.75 5.55 -9.75;
642 -0.75 5.55 -11.35; 651 73.05 -0.15 -7.875; 652 73.05 -0.15 -6.275;
653 73.8 -0.15 -7.875; 654 73.8 -0.15 -6.275; 655 73.05 3.55 -7.875;
656 73.05 3.55 -6.275; 657 73.8 3.55 -7.875; 658 73.8 3.55 -6.275;
678 -0.75 3.55 -5.75; 679 -0.75 5.55 -5.75; 681 76 5.55 -15.675;
682 76 3.55 -19.55; 683 73.05 3.55 -15.675; 684 76 3.55 -15.675;
686 76 3.55 -22.5; 687 73.05 3.55 -22.5; 692 67.15 3.55 -22.5;
694 70.1 3.55 -22.5; 695 63.625 3.55 -22.5; 696 63.625 3.55 -19.55;
697 58.825 5.55 -19.55; 698 58.825 5.55 -22.5; 699 54.725 -0.15 -19.55;
700 54.725 -0.15 -22.5; 704 73.05 -0.15 -9.27499; 705 76 -0.15 -9.27499;
706 76 -0.15 -6.275; 719 62.125 13.5 -7.125; 720 62.125 13.5 -7.875;
721 64.025 13.5 -7.125; 722 64.025 13.5 -7.875; 723 63.575 13.5 -7.875;
724 62.575 13.5 -7.875; 725 63.575 13.5 -7.125; 726 62.575 13.5 -7.125;
741 61.15 2.25 -2.25; 742 65 2.25 -2.25; 743 61.15 5.55 -2.25;
744 65 5.55 -2.25; 745 61.15 8.85 -2.25; 746 65 8.85 -2.25; 747 65 11.3 -7.125;
748 64.025 11.3 -7.125; 749 62.125 11.3 -7.125; 750 61.15 11.3 -7.125;
751 62.125 11.3 -7.875; 752 63.575 11.3 -7.125; 753 64.025 11.3 -7.875;
754 63.575 11.3 -7.875; 755 62.575 11.3 -7.125; 756 62.575 11.3 -7.875;
757 61.15 8 -7.125; 758 62.125 8 -7.125; 759 62.575 8 -7.125;
760 62.125 8 -7.875; 761 64.025 8 -7.125; 762 65 8 -7.125; 763 64.025 8 -7.875;
764 63.575 8 -7.875; 765 62.575 8 -7.875; 766 63.575 8 -7.125;
767 62.125 10.45 -7.125; 768 62.125 10.45 -7.875; 769 64.025 10.45 -7.125;
770 64.025 10.45 -7.875; 771 63.575 10.45 -7.875; 772 62.575 10.45 -7.875;
773 63.575 10.45 -7.125; 774 62.575 10.45 -7.125; 775 64.2 3.55 -22.5;
776 12.4 3.55 0.75; 777 12.4 5.55 0.75; 778 6.2 3.55 0.75; 779 6.2 5.55 0.75;
780 6.2 3.55 -20.3; 781 6.2 5.55 -20.3; 782 12.4 3.55 -20.3;
783 12.4 5.55 -20.3; 784 50.5 3.55 -20.3; 785 50.5 5.55 -20.3;
786 27.25 -0.15 -20.3; 787 28.85 -0.15 -20.3; 788 27.25 -0.15 -19.55;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
789 27.25 3.55 -19.55; 790 27.25 3.55 -20.3; 791 28.85 3.55 -20.3;
792 27.25 5.55 -19.55; 793 27.25 5.55 -20.3; 794 28.85 5.55 -20.3;
795 18.9 3.55 -20.3; 796 18.9 5.55 -20.3; 797 64.2 5.55 -22.5;
798 73.8 3.55 -7.125; 799 58.3 5.55 -22.5; 800 58.3 -0.15 -22.5;
801 58.825 -0.15 -22.5; 802 61.15 -0.15 0; 803 65 -0.15 0;
804 62.125 7.2 -7.125; 805 62.125 7.2 -7.875; 806 64.025 7.2 -7.125;
807 64.025 7.2 -7.875; 808 63.575 7.2 -7.875; 809 62.575 7.2 -7.875;
810 63.575 7.2 -7.125; 811 62.575 7.2 -7.125;
MEMBER INCIDENCES
300 254 613; 322 256 257; 324 266 619; 327 271 769; 330 272 273; 331 270 278;
332 271 279; 337 275 721; 338 276 277; 339 274 463; 340 275 464; 341 278 272;
342 279 522; 343 278 279; 718 463 276; 719 464 277; 720 463 464; 808 273 518;
809 271 519; 810 520 527; 811 522 273; 812 522 523; 813 519 524; 814 523 525;
815 523 519; 816 518 526; 817 518 523; 818 524 527; 819 525 520; 820 525 524;
821 526 528; 822 526 525; 823 528 520; 831 531 529; 833 532 530; 834 530 529;
949 254 606; 950 255 607; 951 604 741; 955 607 742; 957 606 612; 958 613 255;
959 613 612; 961 612 607; 965 266 616; 966 267 617; 967 614 745; 968 617 746;
969 616 618; 970 619 267; 971 619 618; 972 618 617; 1101 262 804; 1119 719 274;
1120 719 720; 1121 721 725; 1122 721 722; 1123 722 723; 1124 723 724;
1125 725 726; 1126 725 723; 1127 724 720; 1128 726 719; 1129 726 724;
1161 741 606; 1162 742 609; 1163 741 742; 1167 745 616; 1168 746 615;
1169 745 746; 1171 747 748; 1173 749 750; 1174 749 751; 1175 748 752;
1176 748 753; 1177 753 754; 1178 752 755; 1179 755 749; 1180 754 756;
1181 752 754; 1182 756 751; 1183 755 756; 1185 757 758; 1186 758 759;
1187 758 760; 1189 761 762; 1190 761 763; 1191 763 764; 1192 764 765;
1193 766 761; 1194 766 764; 1195 765 760; 1196 759 766; 1197 759 765;
1198 767 270; 1199 767 768; 1200 769 773; 1201 769 770; 1202 770 771;
1203 771 772; 1204 773 774; 1205 773 771; 1206 772 768; 1207 774 767;
1208 774 772; 7711 804 811; 7712 804 805; 7713 806 263; 7714 806 807;
7715 807 808; 7716 808 809; 7717 810 806; 7718 810 808; 7719 809 805;
7720 811 810; 7721 811 809; 8000 84 37; 8001 37 147; 8002 147 289; 8003 73 26;
8004 26 145; 8005 145 287; 8006 61 14; 8007 14 143; 8008 143 285; 8009 48 1;
8010 1 138; 8011 138 280; 8012 85 38; 8013 38 148; 8014 148 290; 8015 74 303;
8016 62 301; 8017 49 2; 8018 2 139; 8019 139 281; 8020 86 39; 8021 39 149;
8022 149 291; 8023 75 304; 8024 63 302; 8025 50 3; 8026 3 140; 8027 140 282;
8028 51 4; 8029 4 141; 8030 141 283; 8031 87 40; 8032 40 150; 8033 150 292;
8034 76 305; 8035 64 309; 8036 52 5; 8037 5 158; 8038 158 300; 8039 88 41;
8040 41 151; 8041 151 293; 8042 77 212; 8043 65 310; 8044 53 237; 8045 89 42;
8046 42 152; 8047 152 294; 8048 78 213; 8049 66 311; 8050 54 238; 8051 90 43;
8052 43 153; 8053 153 295; 8054 79 306; 8055 67 312; 8056 55 244; 8057 91 44;
8058 44 154; 8059 154 296; 8060 80 247; 8061 68 248; 8062 56 249; 8063 700 590;
8064 800 799; 8065 92 45; 8066 45 155; 8067 155 297; 8068 81 307; 8069 69 313;
8070 57 314; 8071 23 604; 8072 256 315; 8073 262 757; 8074 270 750;
8075 315 262; 8076 604 256; 8077 614 270; 8078 750 274; 8079 757 614;
8080 58 802; 8081 254 252; 8082 252 266; 8083 266 272; 8084 272 276;
8085 802 254; 8086 775 797; 8087 93 46; 8088 46 156; 8089 156 298; 8090 82 308;
8091 24 609; 8092 257 316; 8093 263 762; 8094 271 747; 8095 316 263;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
8096 531 615; 8097 609 257; 8098 615 271; 8099 747 275; 8100 762 531;
8101 59 803; 8102 255 253; 8103 253 532; 8104 267 273; 8105 273 277;
8106 532 267; 8107 803 255; 8108 692 594; 8109 694 595; 8110 687 596;
8111 94 47; 8112 47 157; 8113 157 299; 8114 83 36; 8115 36 146; 8116 146 288;
8117 72 25; 8118 25 144; 8119 144 286; 8120 286 529; 8121 529 527; 8122 60 13;
8123 13 142; 8124 142 284; 8125 284 530; 8126 530 528; 8127 686 603;
8128 682 597; 8129 684 681; 8130 705 600; 8131 706 602; 8200 700 800;
8201 800 801; 8202 113 114; 8203 118 119; 8204 121 123; 8205 786 787;
8206 128 130; 8207 132 134; 8208 37 111; 8209 111 38; 8210 38 112;
8211 112 115; 8212 115 39; 8213 39 116; 8214 116 120; 8215 120 40; 8216 40 122;
8217 122 788; 8218 788 41; 8219 41 42; 8220 42 129; 8221 129 43; 8222 43 131;
8223 131 44; 8224 44 133; 8225 133 699; 8226 699 45; 8227 45 46; 8228 46 47;
8229 623 627; 8230 622 626; 8231 704 705; 8232 651 653; 8233 652 654;
8234 654 706; 8235 621 625; 8236 620 624; 8237 1 95; 8238 95 2; 8239 2 96;
8240 96 3; 8241 3 99; 8242 99 101; 8243 101 4; 8244 4 5; 8245 802 803;
8246 97 98; 8247 100 102; 8300 626 627; 8301 624 625; 8302 26 37; 8303 623 26;
8304 622 623; 8305 14 622; 8306 621 14; 8307 620 621; 8308 1 620; 8309 95 97;
8310 111 113; 8311 96 98; 8312 112 114; 8313 115 118; 8314 99 100;
8315 116 119; 8316 101 102; 8317 120 121; 8318 122 123; 8319 788 786;
8320 41 787; 8321 42 128; 8322 129 130; 8323 131 132; 8324 133 134;
8325 699 700; 8326 45 800; 8327 36 47; 8328 704 36; 8329 651 704; 8330 25 651;
8331 652 25; 8332 13 652; 8333 654 653; 8334 706 705; 8400 695 775;
8401 775 692; 8402 692 694; 8403 694 687; 8404 687 686; 8405 177 780;
8406 780 178; 8407 178 181; 8408 181 782; 8409 782 182; 8410 184 795;
8411 795 186; 8412 186 790; 8413 791 790; 8414 191 193; 8415 193 201;
8416 201 195; 8417 195 784; 8418 784 197; 8419 147 175; 8420 175 148;
8421 148 176; 8422 176 179; 8423 179 149; 8424 149 180; 8425 180 183;
8426 183 150; 8427 150 185; 8428 185 789; 8429 789 151; 8430 151 152;
8431 152 192; 8432 192 153; 8433 153 194; 8434 194 154; 8435 154 196;
8436 196 155; 8437 155 696; 8438 696 156; 8439 156 157; 8440 157 682;
8441 683 684; 8442 631 635; 8443 630 634; 8444 655 657; 8445 144 798;
8446 656 658; 8447 143 678; 8448 629 633; 8449 628 632; 8450 138 159;
8451 159 139; 8452 139 160; 8453 160 140; 8454 140 163; 8455 163 165;
8456 165 141; 8457 141 158; 8458 161 778; 8459 778 162; 8460 162 776;
8461 164 776; 8462 164 166; 8500 634 635; 8501 678 634; 8502 633 678;
8503 632 633; 8504 145 147; 8505 631 145; 8506 630 631; 8507 143 630;
8508 629 143; 8509 628 629; 8510 138 628; 8511 159 161; 8512 175 177;
8513 148 780; 8514 139 778; 8515 160 162; 8516 176 178; 8517 179 181;
8518 149 782; 8519 140 776; 8520 163 164; 8521 180 182; 8522 165 166;
8523 183 184; 8524 150 795; 8525 185 186; 8526 789 790; 8527 151 791;
8528 152 191; 8529 192 193; 8530 153 201; 8531 194 195; 8532 154 784;
8533 196 197; 8534 696 695; 8535 156 775; 8536 157 687; 8537 683 157;
8538 146 683; 8539 655 146; 8540 144 655; 8541 656 144; 8542 142 656;
8543 798 657; 8544 658 798; 8545 682 686; 8546 682 684; 8600 590 799;
8601 799 698; 8602 698 592; 8603 592 797; 8604 797 594; 8605 594 595;
8606 595 596; 8607 596 603; 8608 550 781; 8609 781 551; 8610 551 553;
8611 553 783; 8612 783 554; 8613 555 796; 8614 796 557; 8615 557 793;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
8616 793 794; 8617 561 563; 8618 563 569; 8619 569 565; 8620 565 785;
8621 785 566; 8622 289 367; 8623 367 473; 8624 473 290; 8625 290 549;
8626 549 368; 8627 368 552; 8628 552 291; 8629 291 475; 8630 475 369;
8631 369 477; 8632 477 292; 8633 292 556; 8634 556 383; 8635 383 384;
8636 384 792; 8637 792 293; 8638 293 399; 8639 399 294; 8640 294 562;
8641 562 400; 8642 400 295; 8643 295 401; 8644 401 564; 8645 564 296;
8646 296 482; 8647 482 402; 8648 402 297; 8649 297 697; 8650 697 323;
8651 323 298; 8652 298 427; 8653 427 428; 8654 428 299; 8655 299 597;
8656 324 366; 8657 366 325; 8658 325 375; 8659 375 326; 8660 326 381;
8661 381 327; 8662 327 390; 8663 390 396; 8664 396 328; 8665 328 407;
8666 407 329; 8667 329 413; 8668 413 330; 8669 330 419; 8670 419 331;
8671 331 425; 8672 425 332; 8673 332 335; 8674 335 333; 8675 333 431;
8676 431 437; 8677 437 334; 8678 334 681; 8679 287 365; 8680 365 303;
8681 303 374; 8682 374 304; 8683 304 380; 8684 380 305; 8685 305 389;
8686 389 395; 8687 395 212; 8688 212 406; 8689 406 213; 8690 213 412;
8691 412 306; 8692 306 418; 8693 418 247; 8694 247 424; 8695 424 307;
8696 307 322; 8697 322 308; 8698 308 432; 8699 432 438; 8700 438 288;
8701 288 599; 8702 638 642; 8703 637 641; 8704 336 364; 8705 364 337;
8706 337 373; 8707 373 338; 8708 338 379; 8709 379 339; 8710 339 388;
8711 388 394; 8712 394 340; 8713 340 405; 8714 405 341; 8715 341 411;
8716 411 342; 8717 342 417; 8718 417 343; 8719 343 423; 8720 423 344;
8721 344 345; 8722 345 346; 8723 346 433; 8724 433 439; 8725 439 347;
8726 347 600; 8727 315 321; 8728 321 316; 8729 316 434; 8730 434 440;
8731 440 286; 8732 319 382; 8733 382 309; 8734 309 397; 8735 397 398;
8736 398 310; 8737 310 408; 8738 408 311; 8739 311 414; 8740 414 312;
8741 312 420; 8742 420 248; 8743 248 426; 8744 426 313; 8745 313 320;
8746 515 602; 8747 285 679; 8748 285 363; 8749 363 301; 8750 301 372;
8751 372 302; 8752 302 378; 8753 378 318; 8754 429 435; 8755 435 441;
8756 441 430; 8757 348 640; 8758 348 362; 8759 362 349; 8760 349 371;
8761 371 350; 8762 350 377; 8763 377 351; 8764 351 386; 8765 386 392;
8766 392 352; 8767 352 404; 8768 404 353; 8769 353 410; 8770 410 354;
8771 354 416; 8772 416 355; 8773 355 422; 8774 422 356; 8775 356 357;
8776 743 744; 8777 636 639; 8778 534 535; 8779 535 536; 8780 280 361;
8781 361 465; 8782 465 281; 8783 281 537; 8784 537 370; 8785 370 282;
8786 282 540; 8787 540 467; 8788 467 376; 8789 376 283; 8790 283 317;
8791 317 300; 8792 300 385; 8793 385 391; 8794 391 237; 8795 237 403;
8796 403 238; 8797 238 409; 8798 409 244; 8799 244 415; 8800 415 249;
8801 249 421; 8802 421 314; 8803 314 252; 8804 252 533; 8805 533 253;
8806 253 436; 8807 436 442; 8808 442 284; 8809 538 779; 8810 779 539;
8811 539 777; 8812 777 541; 8813 541 542; 8900 641 642; 8901 679 641;
8902 640 679; 8903 639 640; 8904 324 289; 8905 287 324; 8906 638 287;
8907 637 638; 8908 336 637; 8909 285 336; 8910 348 285; 8911 636 348;
8912 280 636; 8913 366 367; 8914 365 366; 8915 364 365; 8916 363 364;
8917 362 363; 8918 361 362; 8919 465 538; 8920 473 550; 8921 290 781;
8922 325 290; 8923 303 325; 8924 337 303; 8925 301 337; 8926 349 301;
8927 281 349; 8928 281 779; 8929 537 539; 8930 549 551; 8931 375 368;
8932 374 375; 8933 373 374; 8934 372 373; 8935 371 372; 8936 370 371;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
8937 552 553; 8938 291 783; 8939 326 291; 8940 304 326; 8941 338 304;
8942 319 338; 8943 302 319; 8944 350 302; 8945 282 350; 8946 282 777;
8947 540 541; 8948 475 554; 8949 467 542; 8950 381 369; 8951 380 381;
8952 379 380; 8953 382 379; 8954 377 378; 8955 376 377; 8956 477 555;
8957 292 796; 8958 327 292; 8959 305 327; 8960 339 305; 8961 309 339;
8962 309 318; 8963 351 318; 8964 317 351; 8965 556 557; 8966 390 383;
8967 389 390; 8968 388 389; 8969 397 388; 8970 386 397; 8971 385 386;
8972 396 384; 8973 395 396; 8974 394 395; 8975 398 394; 8976 392 398;
8977 391 392; 8978 792 793; 8979 293 794; 8980 328 293; 8981 212 328;
8982 340 212; 8983 310 340; 8984 352 310; 8985 237 352; 8986 407 399;
8987 406 407; 8988 405 406; 8989 408 405; 8990 404 408; 8991 403 404;
8992 294 561; 8993 329 294; 8994 213 329; 8995 341 213; 8996 311 341;
8997 353 311; 8998 238 353; 8999 562 563; 9000 413 400; 9001 412 413;
9002 411 412; 9003 414 411; 9004 410 414; 9005 409 410; 9006 295 569;
9007 330 295; 9008 306 330; 9009 342 306; 9010 312 342; 9011 354 312;
9012 244 354; 9013 419 401; 9014 418 419; 9015 417 418; 9016 420 417;
9017 416 420; 9018 415 416; 9019 564 565; 9020 296 785; 9021 331 296;
9022 247 331; 9023 343 247; 9024 248 343; 9025 355 248; 9026 249 355;
9027 482 566; 9028 402 590; 9029 425 402; 9030 424 425; 9031 423 424;
9032 426 423; 9033 422 426; 9034 421 422; 9035 297 799; 9036 332 297;
9037 307 332; 9038 344 307; 9039 313 344; 9040 356 313; 9041 314 356;
9042 697 698; 9043 323 592; 9044 335 323; 9045 322 335; 9046 345 322;
9047 315 345; 9048 320 315; 9049 357 320; 9050 743 357; 9051 534 743;
9052 252 534; 9053 533 535; 9054 298 797; 9055 333 298; 9056 308 333;
9057 346 308; 9058 321 346; 9059 429 316; 9060 744 429; 9061 536 744;
9062 253 536; 9063 427 594; 9064 431 427; 9065 432 431; 9066 433 432;
9067 434 433; 9068 435 434; 9069 436 435; 9070 428 595; 9071 437 428;
9072 438 437; 9073 439 438; 9074 440 439; 9075 441 440; 9076 442 441;
9077 299 596; 9078 334 299; 9079 288 334; 9080 347 288; 9081 286 347;
9082 515 286; 9083 430 515; 9084 284 430; 9085 597 603; 9086 681 597;
9087 599 681; 9088 600 599; 9089 602 600;
START GROUP DEFINITION
MEMBER
*********************PLINTH BEAM**********************************************
_PLINTHBEAM 8208 TO 8228 8237 TO 8245 8302 TO 8308 8327 TO 8332
*********************TIE BEAM AT +2.4M LVL************************************
_TIEBEAM@2.4M 8419 TO 8439 8450 TO 8457 8504 TO 8510 8537 TO 8542
*********************ROOF BEAM AT +4.95M LVL**********************************
_ROOFBEAM@4.95M 8622 TO 8654 8656 TO 8677 8679 TO 8700 8704 TO 8725 -
8729 TO 8745 8748 TO 8756 8758 TO 8775 8780 TO 8803 8806 TO 8808 -
8904 TO 8918 8922 TO 8927 8931 TO 8936 8939 TO 8945 8950 TO 8955 -
8958 TO 8964 8966 TO 8977 8980 TO 8991 8993 TO 8998 9000 TO 9005 -
9007 TO 9018 9021 TO 9026 9029 TO 9034 9036 TO 9041 9044 TO 9047 -
9055 TO 9058 9064 TO 9069 9071 TO 9076 9078 TO 9084
*********************ROOF BEAM AT +9.85M LVL - MECHANICAL ROOM***************
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
_ROOFBEAM@9.85M 808 TO 810 812 TO 823
*********************TIE BEAM AT MECHANICAL ROOM*****************************
_TIEBEAM-MECHROOM 831 833 834
*********************PROJECTIONS AT PLINTH BEAM LEVEL*************************
_PROJ-PB 8200 TO 8207 8229 TO 8236 8246 8247 8300 8301 8309 TO 8326 8333 8334
*********************PROJECTIONS AT TIE BEAM LVL******************************
_PROJ-TB@2.4M 8400 TO 8418 8440 TO 8449 8458 TO 8462 8500 TO 8503 -
8511 TO 8536 8543 TO 8546
*********************PROJECTIONS AT ROOF BEAM LVL******************************
_PROJ-RB@4.95M 8600 TO 8621 8655 8678 8701 TO 8703 8726 8746 8747 8757 8777 -
8809 TO 8813 8900 TO 8903 8919 TO 8921 8928 TO 8930 8937 8938 8946 TO 8949 -
8956 8957 8965 8978 8979 8992 8999 9006 9019 9020 9027 9028 9035 9042 9043 -
9054 9063 9070 9077 9085 TO 9089
*********************ALL COLUMNS INCLUDING STAIRCASE COLUMNS******************
_COLUMNS 8000 TO 8062 8065 TO 8085 8087 TO 8107 8111 TO 8126
*********************STAIR CASE ALONE****************************************
_STAIRCASE 300 322 324 327 330 TO 332 337 TO 343 718 TO 720 811 949 TO 951 -
955 957 TO 959 961 965 TO 972 1101 1119 TO 1129 1161 TO 1163 1167 TO 1169 -
1171 1173 TO 1183 1185 TO 1187 1189 TO 1208 7711 TO 7721 8071 TO 8085 8091 -
8092 TO 8107 8245 8727 8728 8776 8778 8779 8804 8805 9048 TO 9053 -
9059 TO 9062
*********************PRIMARY BEAMS AT ROOF +4.95 M LVL***********************
_PRIMARY-RB 8622 TO 8654 8679 TO 8700 8729 TO 8745 8748 TO 8753 8780 TO 8803 -
8806 TO 8808 8904 TO 8912 8922 TO 8927 8939 TO 8945 8958 TO 8964 -
8980 TO 8985 8993 TO 8998 9007 TO 9012 9021 TO 9026 9036 TO 9041 -
9055 TO 9058 9078 TO 9084
*********************SECONDARY BEAMS AT ROOF +4.95 M LVL*********************
_SECONDARY-RB 8656 TO 8677 8704 TO 8725 8754 TO 8756 8758 TO 8775 -
8913 TO 8918 8931 TO 8936 8950 TO 8955 8966 TO 8977 8986 TO 8991 -
9000 TO 9005 9013 TO 9018 9029 TO 9034 9044 TO 9047 9064 TO 9069 -
9071 TO 9076
*************************************FOOTINGS********************************
_TEMPERATURE 324 327 330 TO 332 337 TO 342 718 TO 720 808 TO 823 831 833 834 -
965 TO 968 970 1101 1119 TO 1129 1167 1168 1171 1173 TO 1183 1185 TO 1187 -
1189 TO 1208 7711 TO 7721 8001 8002 8004 8005 8007 8008 8010 8011 8013 8014 -
8018 8019 8021 8022 8026 8027 8029 8030 8032 8033 8037 8038 8040 8041 8046 -
8047 8052 8053 8058 8059 8063 8064 8066 8067 8073 TO 8075 8077 TO 8079 8082 -
8083 TO 8084 8086 8088 8089 8093 TO 8096 8098 TO 8100 8103 TO 8106 -
8108 TO 8110 8112 8113 8115 8116 8118 TO 8121 8123 TO 8131 8400 TO 8462 8500 -
8501 TO 8546 8600 TO 8775 8777 8780 TO 8813 8900 TO 9052 9054 TO 9089
JOINT
_FOOTING 23 24 48 TO 69 72 TO 94
*********************ROOF SLAB AT +4.95 M LVL********************************
FLOOR
_ROOFSLAB@4.95M 8600 TO 8753 8757 TO 8775 8777 8780 TO 8803 8809 TO 8813 8900 -
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
8901 TO 9052 9054 TO 9058 9063 TO 9067 9070 TO 9074 9077 TO 9082 9085 TO 9089
***ONE WAY SLAB***
_OW-ROOFSLAB@4.95M 8601 8610 8615 TO 8619 8626 8627 8634 TO 8637 8640 TO 8644 -
8649 8702 8703 8747 8757 8777 8782 8784 8785 8787 8809 8811 8813 -
8900 TO 8903 8907 TO 8911 8919 8928 TO 8930 8937 8946 8947 8949 8965 8978 -
8979 8992 8999 9006 9019 9035 9042
***TWO WAY SLAB***
_TW-ROOFSLAB@4.95M 8600 8602 TO 8609 8611 TO 8614 8620 TO 8701 8704 TO 8746 -
8748 TO 8751 8758 TO 8761 8764 TO 8775 8780 TO 8786 8791 TO 8803 8810 8812 -
8904 TO 8918 8920 TO 8948 8950 TO 8953 8956 TO 8977 8980 TO 8991 -
8993 TO 8998 9000 TO 9005 9007 TO 9052 9054 TO 9058 9063 TO 9067 -
9070 TO 9074 9077 TO 9082 9085 TO 9089
*********************ROOF SLAB AT +4.95 M LVL - AHU ROOM*********************
_SLAB-AHU@4.95M 8729 TO 8731 8754 TO 8756 8806 TO 8808 9059 TO 9062 9068 9069 -
9075 9076 9082 TO 9084
*********************ROOF SLAB NEAR BY OPENING******************************
_ROOFSLAB@OPNG 8752 8753 8762 8763 8786 TO 8790 8944 8945 8954 8955 8963 8964
*********************ROOF SLAB AT +9.85 M LVL - MECHANICAL ROOM*************
_ROOFSLAB@9.85M 332 342 808 TO 823
*********************ROOF SLAB AT +12.6M LVL - HEAD ROOM********************
_ROOFSLAB@H.ROOM 337 TO 340 718 TO 720 1119 1121 1125 1128
*********************SLAB PROJECTIONS AT TIE LVL B/W ROOF AND PLINTH********
_SLAB-PROJ-TB@2.4M 8400 TO 8404 8407 8412 8415 8416 8422 8428 8432 8433 8438 -
8439 TO 8441 8443 8447 8448 8452 TO 8454 8459 TO 8461 8501 8502 8507 8508 -
8514 TO 8517 8519 8520 8525 8526 8529 TO 8531 8534 TO 8537 8545 8546
***ONE WAY SLAB***
_OWS-SLAB@TB@2.4M 8400 TO 8403 8407 8412 8415 8416 8422 8428 8432 8433 8438 -
8439 8443 8447 8448 8453 8460 8501 8502 8507 8508 8515 TO 8517 8519 8525 -
8526 8529 TO 8531 8534 TO 8536
***TWO WAY SLAB***
_TWS-SLAB@TB@2.4M 8404 8440 8441 8452 8454 8459 8461 8514 8515 8519 8520 8536 -
8537 8545 8546
*********************PROJECTIONS FOR WINDOWS AT STAIRCASE**************************
_PROJ-STAIRCASE 1120 TO 1129 1174 TO 1183 1186 1187 1190 TO 1197 1199 TO 1208 -
7711 7712 7714 TO 7721
*********************STAIRCASE LANDING SLAB*********************************
_STAIR-LAND-SLAB 327 331 332 343 950 955 957 TO 959 961 966 968 TO 972 1161 -
1163 1167 1169 1198 1200 1204 1207 8776 8778 8779 8805 9051 9053 9061 9062
*************************PRECAST COVERSLAB AT PHE OPENING***************************
_PC-COVERSLAB 8732 8733 8752 8753 8943 8962
***********************************************************************
END GROUP DEFINITION
*****************************************************************************
DEFINE MATERIAL START
ISOTROPIC CONCRETE
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
E 2.17185e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
******************************************************************************
MEMBER PROPERTY AMERICAN
8000 TO 8062 8065 TO 8085 8087 TO 8107 8111 TO 8126 PRIS YD 0.45 ZD 0.45
8208 TO 8215 8219 TO 8223 8237 TO 8244 8302 TO 8308 8327 8400 TO 8404 8440 -
8441 8535 8536 8545 8546 PRIS YD 0.6 ZD 0.3
812 814 819 PRIS YD 0.5 ZD 0.3
810 815 817 820 822 823 PRIS YD 0.6 ZD 0.3
8600 TO 8607 9085 TO 9089 PRIS YD 0.5 ZD 0.2
831 833 834 8419 TO 8439 8450 TO 8457 8504 TO 8510 8537 TO 8541 -
8542 PRIS YD 0.6 ZD 0.2
MEMBER PROPERTY AMERICAN
8216 TO 8218 8224 TO 8228 8328 TO 8332 PRIS YD 0.75 ZD 0.3
8202 TO 8207 8229 8230 8232 8235 8236 8246 8247 8300 8301 8309 TO 8324 -
8333 PRIS YD 0.3 ZD 0.2
MEMBER PROPERTY AMERICAN
8200 8201 8231 8233 8234 8325 8326 8334 PRIS YD 0.55 ZD 0.3
MEMBER PROPERTY AMERICAN
8405 TO 8418 8442 TO 8449 8458 TO 8462 8500 TO 8503 8511 TO 8534 8543 -
8544 PRIS YD 0.45 ZD 0.2
MEMBER PROPERTY AMERICAN
8108 8109 8127 PRIS YD 0.2 ZD 0.2
8063 8064 8086 8110 8128 TO 8131 8245 PRIS YD 0.45 ZD 0.3
MEMBER PROPERTY AMERICAN
8913 TO 8918 8931 TO 8936 8950 TO 8955 8966 TO 8977 8986 TO 8991 9000 TO 9005 -
9013 TO 9018 9029 TO 9034 9044 TO 9047 9057 9058 9064 TO 9069 9071 TO 9075 -
9076 PRIS YD 0.6 ZD 0.3
8656 TO 8677 8704 TO 8725 8745 8758 TO 8775 PRIS YD 0.45 ZD 0.3
808 809 813 816 818 821 8679 TO 8684 8688 TO 8697 8732 8733 8737 TO 8744 8748 -
8749 TO 8753 8806 TO 8808 8922 TO 8927 8939 TO 8945 8958 TO 8964 8980 TO 8985 -
8993 TO 8998 9007 TO 9012 9021 TO 9026 9036 TO 9041 9055 9056 9078 TO 9080 -
9081 PRIS YD 0.7 ZD 0.3
8633 TO 8637 8652 TO 8654 8729 TO 8731 PRIS YD 1 ZD 0.3
8698 TO 8700 PRIS YD 0.9 ZD 0.3
8754 TO 8756 PRIS YD 0.5 ZD 0.3
8655 8678 8701 8726 8746 9028 9035 9043 9054 9063 9070 9077 PRIS YD 0.6 ZD 0.3
8608 TO 8612 8617 TO 8621 8702 8703 8747 8757 8777 8809 TO 8813 8900 TO 8903 -
8919 TO 8921 8928 TO 8930 8937 8938 8946 TO 8949 8956 8965 8978 8992 8999 -
9006 9019 9020 9027 9042 PRIS YD 0.45 ZD 0.2
8613 TO 8616 8957 8979 PRIS YD 0.6 ZD 0.2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
MEMBER PROPERTY AMERICAN
8622 TO 8632 8638 TO 8645 8780 TO 8803 8904 TO 8912 PRIS YD 0.6 ZD 0.3
8646 TO 8651 PRIS YD 0.9 ZD 0.3
MEMBER PROPERTY AMERICAN
300 324 330 958 970 8727 8728 8804 8805 PRIS YD 0.7 ZD 0.2
331 332 341 342 811 949 TO 951 955 965 TO 968 1161 1162 1167 1168 -
9048 TO 9052 9059 TO 9062 PRIS YD 0.9 ZD 0.2
343 1163 1169 8776 PRIS YD 0.45 ZD 0.3
957 959 961 969 971 972 8778 8779 9053 PRIS YD 0.45 ZD 0.2
MEMBER PROPERTY AMERICAN
322 PRIS YD 0.6 ZD 0.2
1120 1122 TO 1124 1126 1127 1129 1174 1176 1177 1180 TO 1183 1187 -
1190 TO 1192 1194 1195 1197 1199 1201 TO 1203 1205 1206 1208 7712 -
7714 TO 7716 7718 7719 7721 PRIS YD 0.3 ZD 0.2
337 TO 340 718 719 1119 1121 1125 1128 PRIS YD 0.5 ZD 0.3
720 PRIS YD 0.3 ZD 0.3
MEMBER PROPERTY AMERICAN
327 1101 1171 1173 1175 1178 1179 1185 1186 1189 1193 1196 1198 1200 1204 -
1207 7711 7713 7717 7720 PRIS YD 0.5 ZD 0.2
MEMBER PROPERTY AMERICAN
8685 TO 8687 8734 TO 8736 9082 TO 9084 PRIS YD 1 ZD 0.4
*******************
CONSTANTS
BETA 90 MEMB 8063 8064 8086 8110
MATERIAL CONCRETE ALL
********************
MEMBER RELEASE
343 720 812 817 822 957 959 969 971 1123 1163 1169 1177 1191 1202 7715 8200 -
8202 TO 8207 8246 8247 8300 8301 8333 8334 8444 8446 8503 8511 8512 8515 -
8516 TO 8517 8520 TO 8523 8525 8526 8529 8531 8533 8534 8656 8704 8732 8754 -
8776 8778 8903 8918 TO 8920 8929 8930 8936 8937 8947 TO 8949 8953 8955 8956 -
8964 8965 8971 8977 8978 8991 8999 9005 9018 9019 9027 9034 9042 9053 9058 -
9069 9076 START MZ
343 720 815 819 820 959 961 971 972 1127 1163 1169 1182 1195 1206 7719 8200 -
8202 TO 8207 8246 8247 8300 8301 8333 8334 8444 8446 8500 8511 8512 8515 -
8516 TO 8517 8520 TO 8523 8525 8526 8529 8531 8533 8534 8745 8753 8756 8757 -
8775 8776 8779 8900 8913 8919 8920 8929 TO 8931 8937 8947 TO 8950 8954 8956 -
8965 8966 8972 8978 8986 8999 9000 9013 9019 9027 9042 9043 9053 9063 -
9070 END MZ
8108 8109 8127 START MX MY MZ
8108 8109 END FX FY MX MY MZ
8127 END FX FY FZ MX MY MZ
********************
SUPPORTS
23 24 48 TO 69 72 TO 94 FIXED
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
**************WIND DEFINITION****************
DEFINE WIND LOAD
TYPE 1
INT 1.38 1.44 HEIG 10 13.5
**********************************************
LOAD 1 LOADTYPE Dead TITLE DL
***********
SELFWEIGHT Y -1 LIST 300 322 324 327 330 TO 332 337 TO 343 718 TO 720 808 -
809 TO 823 831 833 834 949 TO 951 955 957 TO 959 961 965 TO 972 1101 1119 -
1120 TO 1129 1161 TO 1163 1167 TO 1169 1171 1173 TO 1183 1185 TO 1187 1189 -
1190 TO 1208 7711 TO 7721 8000 TO 8131 8200 TO 8247 8300 TO 8334 8400 TO 8462 -
8500 TO 8546 8600 TO 8813 8900 TO 9089
***********
MEMBER LOAD
****************LOAD ON PLINTH BEAM = EXTERNAL WALL LOAD OF HEIGHT 3.15M **********
8202 TO 8230 8232 8233 8235 TO 8247 8300 TO 8324 8327 TO 8333 UNI GY -13.05
****************LOAD ON TIE BEAM AT 2.4M LVL = EXTERNAL WALL LOAD OF HEIGHT 1.45M
831 833 834 8405 TO 8439 8442 TO 8444 8446 8448 TO 8462 8500 TO 8512 8515 -
8516 TO 8517 8520 TO 8523 8525 TO 8529 8531 8533 8537 TO 8544 UNI GY -6.006
****************LOAD ON ROOF BEAM (AHU ROOM)= EXTERNAL WALL LOAD OF HEIGHT 2.45M
8729 TO 8731 8806 TO 8808 9082 TO 9084 UNI GY -9.94
*******RCC PARAPAT LOAD ON PROJECTIONS AT ROOF BEAM +4.95 LVL = HEIGHT 1.2M
809 810 813 818 823 8622 8623 8630 8631 8638 8639 8647 8780 8781 8788 8789 -
8904 TO 8906 8912 UNI GY -5.724
**RCC PARAPAT LOAD ON PROJECTIONS AT ROOF BEAM +4.95 LVL = HEIGHT 1.8M ***
8600 TO 8621 8702 8746 8777 8809 TO 8813 8900 TO 8903 8919 8920 8948 8949 -
8956 8979 8992 9027 9028 9085 TO 9089 UNI GY -8.586
****LOAD DUE TO DROP ON PROJECTIONS AT ROOF BEAM +4.95 LVL = HEIGHT 0.85M ***
8600 TO 8603 8726 8746 9028 9042 9087 TO 9089 UNI GY -4.055
*LOAD ON 2.95M PROJECTIONS AT TIE LVL (AT ARCH. MULLIONS) = HEIGHT 1.5M BLOCK WALL**
8400 TO 8404 8441 8534 8545 8546 UNI GY -6.213
********************125 THK SLAB LOAD ON ROOF + MISC. ******************************
ONEWAY LOAD
_OW-ROOFSLAB@4.95M ONE -7.87 GY
FLOOR LOAD
_TW-ROOFSLAB@4.95M FLOAD -7.87 GY
_ROOFSLAB@OPNG FLOAD -7.87 GY
_ROOFSLAB@9.85M FLOAD -6.55 GY
_ROOFSLAB@H.ROOM FLOAD -6.55 GY
ONEWAY LOAD
_OWS-SLAB@TB@2.4M ONE -3.125 GY
FLOOR LOAD
_TWS-SLAB@TB@2.4M FLOAD -3.125 GY
ONEWAY LOAD
_PC-COVERSLAB ONE -3.125 GY
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
********************125 THK SLAB LOAD ON AHU ROOF + MISC. **************************
FLOOR LOAD
_SLAB-AHU@4.95M FLOAD -9.947 GY
********************200 THK SLAB LOAD ON STAIR CASE LANDING*************************
ONEWAY LOAD
_STAIR-LAND-SLAB ONE -6.322 GY
********LOAD ON PROJECTIONS FOR WINDOWS AT STAIRCASE*******
FLOOR LOAD
_PROJ-STAIRCASE FLOAD -3.125 GY
********************STAIR CASE SUPPORTING BEAMS*************************************
MEMBER LOAD
300 949 TO 951 955 957 TO 959 1161 1162 8778 8804 8805 9048 TO 9053 -
9059 TO 9062 UNI GY -11.805
322 324 965 TO 971 1167 1168 8727 8728 UNI GY -4.97
330 TO 332 341 342 811 UNI GY -10.769
***AT STAIRCASE WINDOWS***
327 1101 1198 TO 1208 7711 TO 7721 UNI GY -1.657
1185 TO 1187 1189 TO 1197 UNI GY -8.284
1171 1173 TO 1183 UNI GY -7.249
*******LOAD DUE TO LANDING AND WAIST SLAB**********
1163 1169 8776 UNI GY -23.1
322 1101 7711 7713 7717 7720 UNI GY -18.42
343 UNI GY -15.06
********************LOAD AT PHE OPENING********************************
8732 8733 8752 8753 8943 8962 UNI GY -4.77
********************LOAD AT ARCH. MULLIONS********************************
8200 8201 8334 UNI GY -27.993
MEMBER LOAD
********************LOAD ON HEAD ROOM ROOF BEAM (300 MM PROJECTION UPWARDS) *****
337 TO 340 718 719 1119 TO 1129 UNI GY -1.279
***********LOAD DUE TO SUNSHADES LIKE FAZARDS***********************************
8419 8425 8542 UNI GY -0.3
8419 8425 UMOM X -0.18
8542 UMOM X 0.18
***********LOAD DUE TO RCC SUNSHADES **********************************
340 UNI GY -2.63 0 1.575
1167 UNI GY -2.63
340 UMOM X -0.886 0 1.575
1167 UMOM X 0.886
************************************************************************************
LOAD 2 LOADTYPE Live TITLE LL(FLOOR)
********************LIVE LOAD ON AHU ROOF + MISC. **************************
FLOOR LOAD
_SLAB-AHU@4.95M FLOAD -5 GY
********************LIVE LOAD ON STAIR CASE LANDING*************************
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
ONEWAY LOAD
_STAIR-LAND-SLAB ONE -4 GY
***LIVE LOAD ON LANDING AND WAIST SLAB**************
MEMBER LOAD
322 1101 1163 1169 7711 7713 7717 7720 8776 UNI GY -10.3
343 UNI GY -6.6
************************************************************************************
LOAD 3 LOADTYPE Live TITLE LL(TERRACE)
ONEWAY LOAD
_OW-ROOFSLAB@4.95M ONE -1.5 GY
FLOOR LOAD
_TW-ROOFSLAB@4.95M FLOAD -1.5 GY
_ROOFSLAB@OPNG FLOAD -1.5 GY
_ROOFSLAB@9.85M FLOAD -1.5 GY
_ROOFSLAB@H.ROOM FLOAD -0.75 GY
ONEWAY LOAD
_OWS-SLAB@TB@2.4M ONE -0.75 GY
FLOOR LOAD
_TWS-SLAB@TB@2.4M FLOAD -0.75 GY
************************************************************************************
LOAD 4 LOADTYPE Wind TITLE WL (+X)
WIND LOAD X 1 TYPE 1 YR -0.15 5.55 ZR -19.55 0
WIND LOAD X 1 TYPE 1 YR 5.55 13.5 ZR -7.125 0
MEMBER LOAD
810 823 8904 TO 8906 8912 UMOM X 0.825
8900 TO 8903 9085 TO 9089 UMOM X 1.857
LOAD 5 LOADTYPE Wind TITLE WL (-X)
WIND LOAD X -1 TYPE 1 XR 76 76 YR -0.15 5.55 ZR -9.275 -6.275
WIND LOAD X -1 TYPE 1 XR 76 76 YR 3.55 5.55 ZR -22.5 -15.675
WIND LOAD X -1 TYPE 1 XR 73.05 73.05 YR -0.15 10.45 ZR -7.125 0
WIND LOAD X -1 TYPE 1 XR 73.05 73.05 YR -0.15 5.55 ZR -19.55 -7.125
WIND LOAD X -1 TYPE 1 XR 65 65 YR 10.45 13.5 ZR -7.125 0
MEMBER LOAD
810 823 8904 TO 8906 8912 UMOM X -0.825
8900 TO 8903 9085 TO 9089 UMOM X -1.857
LOAD 6 LOADTYPE Wind TITLE WL (+Z)
WIND LOAD Z 1 TYPE 1 XR 54.725 58.3 YR -0.15 5.55 ZR -22.5 -22.5
WIND LOAD Z 1 TYPE 1 XR 64.2 76 YR 3.55 5.55 ZR -22.5 -22.5
WIND LOAD Z 1 TYPE 1 XR 0 64.2 YR -0.15 5.55 ZR -19.55 -19.55
WIND LOAD Z 1 TYPE 1 XR 64.2 73.05 YR -0.15 3.55 ZR -19.55 -19.55
WIND LOAD Z 1 TYPE 1 XR 63.5 73.05 YR 5.55 10.45 ZR -7.125 -7.125
WIND LOAD Z 1 TYPE 1 XR 61.15 65 YR 5.55 13.5 ZR -7.125 -7.125
MEMBER LOAD
809 813 818 8622 8623 8630 8631 8638 8639 8647 8746 8780 8781 8788 TO 8790 -
8791 UMOM X 0.825
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
8600 TO 8621 8809 TO 8813 UMOM X 1.857
LOAD 7 LOADTYPE Wind TITLE WL (-Z)
WIND LOAD Z -1 TYPE 1 XR 0 16.875 YR -0.15 13.5
MEMBER LOAD
809 813 818 8622 8623 8630 8631 8638 8639 8647 8746 8780 8781 8788 TO 8790 -
8791 UMOM X -0.825
8600 TO 8621 8809 TO 8813 UMOM X -1.857
LOAD 8 LOADTYPE Seismic TITLE EQ (+X)
JOINT LOAD
138 FX 129.273
139 FX 176.444
140 FX 169.638
141 FX 88.27
142 FX 70.548
143 FX 199.125
144 FX 179.917
145 FX 154.53
146 FX 135.059
147 FX 107.364
148 FX 173.685
149 FX 171.097
150 FX 231.628
151 FX 216.345
152 FX 176.841
153 FX 208.885
154 FX 193.165
155 FX 154.152
156 FX 267.766
157 FX 423.708
158 FX 44.837
212 FX 696.647
213 FX 536.273
237 FX 262.46
238 FX 250.323
244 FX 238.556
247 FX 532.653
248 FX 568.843
249 FX 251.583
252 FX 151.422
253 FX 470.176
254 FX 214.326
255 FX 202.593
256 FX 73.058
257 FX 65.078
262 FX 71.655
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
263 FX 67.42
266 FX 147.477
267 FX 137.138
270 FX 129.609
271 FX 320.49
272 FX 88.247
273 FX 270.044
274 FX 89.044
275 FX 93.512
276 FX 84.375
277 FX 80.584
280 FX 144.158
281 FX 291.101
282 FX 272.276
283 FX 130.959
284 FX 313.522
285 FX 346.452
286 FX 780.826
287 FX 308.682
288 FX 585.016
289 FX 136.792
290 FX 318.08
291 FX 292.869
292 FX 442.115
293 FX 434.85
294 FX 335.579
295 FX 374.094
296 FX 430.339
297 FX 630.567
298 FX 626.819
299 FX 700.888
300 FX 201.652
301 FX 487.03
302 FX 481.419
303 FX 547.136
304 FX 480.428
305 FX 682.452
306 FX 530.069
307 FX 448.299
308 FX 465.993
309 FX 693.858
310 FX 695.527
311 FX 535.748
312 FX 527.062
313 FX 448.688
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
314 FX 232.231
315 FX 171.05
316 FX 603.757
527 FX 191.699
528 FX 170.823
529 FX 82.069
530 FX 82.21
531 FX 36.827
532 FX 43.37
604 FX 95.276
609 FX 93.623
614 FX 62.52
615 FX 59.349
747 FX 48.986
750 FX 51.311
757 FX 50.754
762 FX 50.5
138 FZ 129.273
139 FZ 176.444
140 FZ 169.638
141 FZ 88.27
142 FZ 70.548
143 FZ 199.125
144 FZ 179.917
145 FZ 154.53
146 FZ 135.059
147 FZ 107.364
148 FZ 173.685
149 FZ 171.097
150 FZ 231.628
151 FZ 216.345
152 FZ 176.841
153 FZ 208.885
154 FZ 193.165
155 FZ 154.152
156 FZ 267.766
157 FZ 423.708
158 FZ 44.837
212 FZ 696.647
213 FZ 536.273
237 FZ 262.46
238 FZ 250.323
244 FZ 238.556
247 FZ 532.653
248 FZ 568.843
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
249 FZ 251.583
252 FZ 151.422
253 FZ 470.176
254 FZ 214.326
255 FZ 202.593
256 FZ 73.058
257 FZ 65.078
262 FZ 71.655
263 FZ 67.42
266 FZ 147.477
267 FZ 137.138
270 FZ 129.609
271 FZ 320.49
272 FZ 88.247
273 FZ 270.044
274 FZ 89.044
275 FZ 93.512
276 FZ 84.375
277 FZ 80.584
280 FZ 144.158
281 FZ 291.101
282 FZ 272.276
283 FZ 130.959
284 FZ 313.522
285 FZ 346.452
286 FZ 780.826
287 FZ 308.682
288 FZ 585.016
289 FZ 136.792
290 FZ 318.08
291 FZ 292.869
292 FZ 442.115
293 FZ 434.85
294 FZ 335.579
295 FZ 374.094
296 FZ 430.339
297 FZ 630.567
298 FZ 626.819
299 FZ 700.888
300 FZ 201.652
301 FZ 487.03
302 FZ 481.419
303 FZ 547.136
304 FZ 480.428
305 FZ 682.452
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
306 FZ 530.069
307 FZ 448.299
308 FZ 465.993
309 FZ 693.858
310 FZ 695.527
311 FZ 535.748
312 FZ 527.062
313 FZ 448.688
314 FZ 232.231
315 FZ 171.05
316 FZ 603.757
527 FZ 191.699
528 FZ 170.823
529 FZ 82.069
530 FZ 82.21
531 FZ 36.827
532 FZ 43.37
604 FZ 95.276
609 FZ 93.623
614 FZ 62.52
615 FZ 59.349
747 FZ 48.986
750 FZ 51.311
757 FZ 50.754
762 FZ 50.5
SPECTRUM CQC X 1 ACC SCALE 1.6 DAMP 0.05 LIN
0 0.235; 0.1 0.589; 0.2 0.589; 0.3 0.589; 0.4 0.589; 0.5 0.589; 0.55 0.589;
0.6 0.534; 0.7 0.457; 0.8 0.4; 0.9 0.356; 1 0.32; 1.1 0.291; 1.2 0.267;
1.3 0.246; 1.4 0.229; 1.5 0.213; 1.6 0.2; 1.7 0.188; 1.8 0.178; 1.9 0.169;
2 0.16; 2.1 0.152; 2.2 0.146; 2.3 0.139; 2.4 0.133; 2.5 0.128; 2.6 0.123;
2.7 0.119; 2.8 0.114; 2.9 0.11; 3 0.107; 3.1 0.103; 3.2 0.1; 3.3 0.097;
3.4 0.094; 3.5 0.091; 3.6 0.089; 3.7 0.087; 3.8 0.084; 3.9 0.082; 4 0.08;
LOAD 9 LOADTYPE Seismic TITLE EQ (+Z)
SPECTRUM CQC Z 1 ACC SCALE 1.95 DAMP 0.05 LIN
0 0.235; 0.1 0.589; 0.2 0.589; 0.3 0.589; 0.4 0.589; 0.5 0.589; 0.55 0.589;
0.6 0.534; 0.7 0.457; 0.8 0.4; 0.9 0.356; 1 0.32; 1.1 0.291; 1.2 0.267;
1.3 0.246; 1.4 0.229; 1.5 0.213; 1.6 0.2; 1.7 0.188; 1.8 0.178; 1.9 0.169;
2 0.16; 2.1 0.152; 2.2 0.146; 2.3 0.139; 2.4 0.133; 2.5 0.128; 2.6 0.123;
2.7 0.119; 2.8 0.114; 2.9 0.11; 3 0.107; 3.1 0.103; 3.2 0.1; 3.3 0.097;
3.4 0.094; 3.5 0.091; 3.6 0.089; 3.7 0.087; 3.8 0.084; 3.9 0.082; 4 0.08;
LOAD 10 LOADTYPE Seismic TITLE TL (+)
TEMPERATURE LOAD
300 322 324 327 330 TO 332 337 TO 343 718 TO 720 808 TO 823 831 833 834 949 -
950 TO 951 955 957 TO 959 961 965 TO 972 1101 1119 TO 1129 1161 TO 1163 1167 -
1168 TO 1169 1171 1173 TO 1183 1185 TO 1187 1189 TO 1208 7711 TO 7721 8001 -
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
8002 8004 8005 8007 8008 8010 8011 8013 TO 8016 8018 8019 8021 TO 8024 8026 -
8027 8029 8030 8032 TO 8035 8037 8038 8040 TO 8044 8046 TO 8050 8052 TO 8056 -
8058 TO 8064 8066 TO 8070 8072 TO 8079 8081 TO 8086 8088 TO 8090 -
8092 TO 8100 8102 TO 8110 8112 8113 8115 8116 8118 TO 8121 8123 TO 8131 8400 -
8401 TO 8462 8500 TO 8546 8600 TO 8813 8900 TO 9089 TEMP 15.55
LOAD 11 LOADTYPE Seismic TITLE TL (-)
TEMPERATURE LOAD
300 322 324 327 330 TO 332 337 TO 343 718 TO 720 808 TO 823 831 833 834 949 -
950 TO 951 955 957 TO 959 961 965 TO 972 1101 1119 TO 1129 1161 TO 1163 1167 -
1168 TO 1169 1171 1173 TO 1183 1185 TO 1187 1189 TO 1208 7711 TO 7721 8001 -
8002 8004 8005 8007 8008 8010 8011 8013 TO 8016 8018 8019 8021 TO 8024 8026 -
8027 8029 8030 8032 TO 8035 8037 8038 8040 TO 8044 8046 TO 8050 8052 TO 8056 -
8058 TO 8064 8066 TO 8070 8072 TO 8079 8081 TO 8086 8088 TO 8090 -
8092 TO 8100 8102 TO 8110 8112 8113 8115 8116 8118 TO 8121 8123 TO 8131 8400 -
8401 TO 8462 8500 TO 8546 8600 TO 8813 8900 TO 9089 TEMP -15.55
************************LOAD COMBINATIONS********************************
************************UNFACTORED LOAD COMBINATIONS*********************
LOAD COMB 101 DL+LL
1 1.0 2 1.0 3 1.0
***
LOAD COMB 102 DL+WL(+X)
1 1.0 4 1.0
LOAD COMB 103 DL+WL(-X)
1 1.0 5 1.0
LOAD COMB 104 DL+WL(+Z)
1 1.0 6 1.0
LOAD COMB 105 DL+WL(-Z)
1 1.0 7 1.0
***
LOAD COMB 106 DL+EQ(+X)
1 1.0 8 1.0
LOAD COMB 107 DL+EQ(-X)
1 1.0 8 -1.0
LOAD COMB 108 DL+EQ(+Z)
1 1.0 9 1.0
LOAD COMB 109 DL+EQ(-Z)
1 1.0 9 -1.0
***
LOAD COMB 110 DL+LL+WL(+X)
1 1.0 2 0.8 3 0.8 4 0.8
LOAD COMB 111 DL+LL+WL(-X)
1 1.0 2 0.8 3 0.8 5 0.8
LOAD COMB 112 DL+LL+WL(+Z)
1 1.0 2 0.8 3 0.8 6 0.8
LOAD COMB 113 DL+LL+WL(-Z)
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
1 1.0 2 0.8 3 0.8 7 0.8
***
LOAD COMB 114 DL+LL+EQ(+X)
1 1.0 2 0.8 3 0.8 8 0.8
LOAD COMB 115 DL+LL+EQ(-X)
1 1.0 2 0.8 3 0.8 8 -0.8
LOAD COMB 116 DL+LL+EQ(+Z)
1 1.0 2 0.8 3 0.8 9 0.8
LOAD COMB 117 DL+LL+EQ(-Z)
1 1.0 2 0.8 3 0.8 9 -0.8
***
LOAD COMB 118 DL+TL(+)
1 1.0 10 1.0
LOAD COMB 119 DL+TL(-)
1 1.0 11 1.0
***
LOAD COMB 120 DL+LL+TL(+)
1 1.0 2 1.0 3 1.0 10 1.0
LOAD COMB 121 DL+LL+TL(-)
1 1.0 2 1.0 3 1.0 11 1.0
***
LOAD COMB 122 DL+WL(+X)+TL(+)
1 1.0 4 1.0 10 1.0
LOAD COMB 123 DL+WL(-X)+TL(+)
1 1.0 5 1.0 10 1.0
LOAD COMB 124 DL+WL(+Z)+TL(+)
1 1.0 6 1.0 10 1.0
LOAD COMB 125 DL+WL(-Z)+TL(+)
1 1.0 7 1.0 10 1.0
LOAD COMB 126 DL+WL(+X)+TL(-)
1 1.0 4 1.0 11 1.0
LOAD COMB 127 DL+WL(-X)+TL(-)
1 1.0 5 1.0 11 1.0
LOAD COMB 128 DL+WL(+Z)+TL(-)
1 1.0 6 1.0 11 1.0
LOAD COMB 129 DL+WL(-Z)+TL(-)
1 1.0 7 1.0 11 1.0
***
LOAD COMB 130 DL+EQ(+X)+TL(+)
1 1.0 8 1.0 10 1.0
LOAD COMB 131 DL+EQ(-X)+TL(+)
1 1.0 8 -1.0 10 1.0
LOAD COMB 132 DL+EQ(+Z)+TL(+)
1 1.0 9 1.0 10 1.0
LOAD COMB 133 DL+EQ(-Z)+TL(+)
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
1 1.0 9 -1.0 10 1.0
LOAD COMB 134 DL+EQ(+X)+TL(-)
1 1.0 8 1.0 11 1.0
LOAD COMB 135 DL+EQ(-X)+TL(-)
1 1.0 8 -1.0 11 1.0
LOAD COMB 136 DL+EQ(+Z)+TL(-)
1 1.0 9 1.0 11 1.0
LOAD COMB 137 DL+EQ(-Z)+TL(-)
1 1.0 9 -1.0 11 1.0
***
LOAD COMB 138 DL+LL+WL(+X)+TL(+)
1 1.0 2 0.8 3 0.8 4 0.8 10 1.0
LOAD COMB 139 DL+LL+WL(-X)+TL(+)
1 1.0 2 0.8 3 0.8 5 0.8 10 1.0
LOAD COMB 140 DL+LL+WL(+Z)+TL(+)
1 1.0 2 0.8 3 0.8 6 0.8 10 1.0
LOAD COMB 141 DL+LL+WL(-Z)+TL(+)
1 1.0 2 0.8 3 0.8 7 0.8 10 1.0
LOAD COMB 142 DL+LL+WL(+X)+TL(-)
1 1.0 2 0.8 3 0.8 4 0.8 11 1.0
LOAD COMB 143 DL+LL+WL(-X)+TL(-)
1 1.0 2 0.8 3 0.8 5 0.8 11 1.0
LOAD COMB 144 DL+LL+WL(+Z)+TL(-)
1 1.0 2 0.8 3 0.8 6 0.8 11 1.0
LOAD COMB 145 DL+LL+WL(-Z)+TL(-)
1 1.0 2 0.8 3 0.8 7 0.8 11 1.0
***
LOAD COMB 146 DL+LL+EQ(+X)+TL(+)
1 1.0 2 0.8 3 0.8 8 0.8 10 1.0
LOAD COMB 147 DL+LL+EQ(-X)+TL(+)
1 1.0 2 0.8 3 0.8 8 -0.8 10 1.0
LOAD COMB 148 DL+LL+EQ(+Z)+TL(+)
1 1.0 2 0.8 3 0.8 9 0.8 10 1.0
LOAD COMB 149 DL+LL+EQ(-Z)+TL(+)
1 1.0 2 0.8 3 0.8 9 -0.8 10 1.0
LOAD COMB 150 DL+LL+EQ(+X)+TL(-)
1 1.0 2 0.8 3 0.8 8 0.8 11 1.0
LOAD COMB 151 DL+LL+EQ(-X)+TL(-)
1 1.0 2 0.8 3 0.8 8 -0.8 11 1.0
LOAD COMB 152 DL+LL+EQ(+Z)+TL(-)
1 1.0 2 0.8 3 0.8 9 0.8 11 1.0
LOAD COMB 153 DL+LL+EQ(-Z)+TL(-)
1 1.0 2 0.8 3 0.8 9 -0.8 11 1.0
***
************************FACTORED LOAD COMBINATIONS*********************
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
LOAD COMB 201 1.5DL+1.5LL
1 1.5 2 1.5 3 1.5
***
LOAD COMB 202 1.5DL+1.5WL(+X)
1 1.5 4 1.5
LOAD COMB 203 1.5DL+1.5WL(-X)
1 1.5 5 1.5
LOAD COMB 204 1.5DL+1.5WL(+Z)
1 1.5 6 1.5
LOAD COMB 205 1.5DL+1.5WL(-Z)
1 1.5 7 1.5
***
LOAD COMB 206 1.5DL+1.5EQ(+X)
1 1.5 8 1.5
LOAD COMB 207 1.5DL+1.5EQ(-X)
1 1.5 8 -1.5
LOAD COMB 208 1.5DL+1.5EQ(+Z)
1 1.5 9 1.5
LOAD COMB 209 1.5DL+1.5EQ(-Z)
1 1.5 9 -1.5
***
LOAD COMB 210 0.9DL+1.5WL(+X)
1 0.9 4 1.5
LOAD COMB 211 0.9DL+1.5WL(-X)
1 0.9 5 1.5
LOAD COMB 212 0.9DL+1.5WL(+Z)
1 0.9 6 1.5
LOAD COMB 213 0.9DL+1.5WL(-Z)
1 0.9 7 1.5
***
LOAD COMB 214 0.9DL+1.5EQ(+X)
1 0.9 8 1.5
LOAD COMB 215 0.9DL+1.5EQ(-X)
1 0.9 8 -1.5
LOAD COMB 216 0.9DL+1.5EQ(+Z)
1 0.9 9 1.5
LOAD COMB 217 0.9DL+1.5EQ(-Z)
1 0.9 9 -1.5
***
LOAD COMB 218 1.2DL+1.2LL+1.2WL(+X)
1 1.2 2 1.2 3 1.2 4 1.2
LOAD COMB 219 1.2DL+1.2LL+1.2WL(-X)
1 1.2 2 1.2 3 1.2 5 1.2
LOAD COMB 220 1.2DL+1.2LL+1.2WL(+Z)
1 1.2 2 1.2 3 1.2 6 1.2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
LOAD COMB 221 1.2DL+1.2LL+1.2WL(-Z)
1 1.2 2 1.2 3 1.2 7 1.2
***
LOAD COMB 222 1.2DL+1.2LL+1.2EQ(+X)
1 1.2 2 1.2 3 1.2 8 1.2
LOAD COMB 223 1.2DL+1.2LL+1.2EQ(-X)
1 1.2 2 1.2 3 1.2 8 -1.2
LOAD COMB 224 1.2DL+1.2LL+1.2EQ(+Z)
1 1.2 2 1.2 3 1.2 9 1.2
LOAD COMB 225 1.2DL+1.2LL+1.2EQ(-Z)
1 1.2 2 1.2 3 1.2 9 -1.2
***
LOAD COMB 226 1.5DL+1.2TL(+)
1 1.5 10 1.2
LOAD COMB 227 1.5DL+1.2TL(-)
1 1.5 11 1.2
***
LOAD COMB 228 1.5DL+1.5LL+1.2TL(+)
1 1.5 2 1.5 3 1.5 10 1.2
LOAD COMB 229 1.5DL+1.5LL+1.2TL(-)
1 1.5 2 1.5 3 1.5 11 1.2
***
LOAD COMB 230 1.5DL+1.5WL(+X)+1.2TL(+)
1 1.5 4 1.5 10 1.2
LOAD COMB 231 1.5DL+1.5WL(-X)+1.2TL(+)
1 1.5 5 1.5 10 1.2
LOAD COMB 232 1.5DL+1.5WL(+Z)+1.2TL(+)
1 1.5 6 1.5 10 1.2
LOAD COMB 233 1.5DL+1.5WL(-Z)+1.2TL(+)
1 1.5 7 1.5 10 1.2
LOAD COMB 234 1.5DL+1.5WL(+X)+1.2TL(-)
1 1.5 4 1.5 11 1.2
LOAD COMB 235 1.5DL+1.5WL(-X)+1.2TL(-)
1 1.5 5 1.5 11 1.2
LOAD COMB 236 1.5DL+1.5WL(+Z)+1.2TL(-)
1 1.5 6 1.5 11 1.2
LOAD COMB 237 1.5DL+1.5WL(-Z)+1.2TL(-)
1 1.5 7 1.5 11 1.2
***
LOAD COMB 238 1.5DL+1.5EQ(+X)+1.2TL(+)
1 1.5 8 1.5 10 1.2
LOAD COMB 239 1.5DL+1.5EQ(-X)+1.2TL(+)
1 1.5 8 -1.5 10 1.2
LOAD COMB 240 1.5DL+1.5EQ(+Z)+1.2TL(+)
1 1.5 9 1.5 10 1.2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
LOAD COMB 241 1.5DL+1.5EQ(-Z)+1.2TL(+)
1 1.5 9 -1.5 10 1.2
LOAD COMB 242 1.5DL+1.5EQ(+X)+1.2TL(-)
1 1.5 8 1.5 11 1.2
LOAD COMB 243 1.5DL+1.5EQ(-X)+1.2TL(-)
1 1.5 8 -1.5 11 1.2
LOAD COMB 244 1.5DL+1.5EQ(+Z)+1.2TL(-)
1 1.5 9 1.5 11 1.2
LOAD COMB 245 1.5DL+1.5EQ(-Z)+1.2TL(-)
1 1.5 9 -1.5 11 1.2
***
LOAD COMB 246 1.2DL+1.2LL+1.2WL(+X)+1.2TL(+)
1 1.2 2 1.2 3 1.2 4 1.2 10 1.2
LOAD COMB 247 1.2DL+1.2LL+1.2WL(-X)+1.2TL(+)
1 1.2 2 1.2 3 1.2 5 1.2 10 1.2
LOAD COMB 248 1.2DL+1.2LL+1.2WL(+Z)+1.2TL(+)
1 1.2 2 1.2 3 1.2 6 1.2 10 1.2
LOAD COMB 249 1.2DL+1.2LL+1.2WL(-Z)+1.2TL(+)
1 1.2 2 1.2 3 1.2 7 1.2 10 1.2
LOAD COMB 250 1.2DL+1.2LL+1.2WL(+X)+1.2TL(-)
1 1.2 2 1.2 3 1.2 4 1.2 11 1.2
LOAD COMB 251 1.2DL+1.2LL+1.2WL(-X)+1.2TL(-)
1 1.2 2 1.2 3 1.2 5 1.2 11 1.2
LOAD COMB 252 1.2DL+1.2LL+1.2WL(+Z)+1.2TL(-)
1 1.2 2 1.2 3 1.2 6 1.2 11 1.2
LOAD COMB 253 1.2DL+1.2LL+1.2WL(-Z)+1.2TL(-)
1 1.2 2 1.2 3 1.2 7 1.2 11 1.2
***
LOAD COMB 254 1.2DL+1.2LL+1.2EQ(+X)+1.2TL(+)
1 1.2 2 1.2 3 1.2 8 1.2 10 1.2
LOAD COMB 255 1.2DL+1.2LL+1.2EQ(-X)+1.2TL(+)
1 1.2 2 1.2 3 1.2 8 -1.2 10 1.2
LOAD COMB 256 1.2DL+1.2LL+1.2EQ(+Z)+1.2TL(+)
1 1.2 2 1.2 3 1.2 9 1.2 10 1.2
LOAD COMB 257 1.2DL+1.2LL+1.2EQ(-Z)+1.2TL(+)
1 1.2 2 1.2 3 1.2 9 -1.2 10 1.2
LOAD COMB 258 1.2DL+1.2LL+1.2EQ(+X)+1.2TL(-)
1 1.2 2 1.2 3 1.2 8 1.2 11 1.2
LOAD COMB 259 1.2DL+1.2LL+1.2EQ(-X)+1.2TL(-)
1 1.2 2 1.2 3 1.2 8 -1.2 11 1.2
LOAD COMB 260 1.2DL+1.2LL+1.2EQ(+Z)+1.2TL(-)
1 1.2 2 1.2 3 1.2 9 1.2 11 1.2
LOAD COMB 261 1.2DL+1.2LL+1.2EQ(-Z)+1.2TL(-)
1 1.2 2 1.2 3 1.2 9 -1.2 11 1.2
PERFORM ANALYSIS PRINT ALL
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
PAKR RJS/KPP
FINISH
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
4.1 STAAD FILE (South Block)
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 21-Dec-12
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 -0.15 0; 2 4.225 -0.15 0; 3 11.975 -0.15 0; 4
5 33.625 -0.15 0; 6 41.425 -0.15 0; 7 44.275 -0.15 0; 8 48.125 -0.15 0;
9 56.175 -0.15 0; 10 0 -0.15 7.25; 11 4.225 -0.15 7.25; 12 11.975 -0.15 7.25;
13 26.825 -0.15 7.25; 14 33.625 -0.15 7.25; 15 41.425 -0.15 7.25;
17 48.725 -0.15 7.25; 18 56.175 -0.15 7.25; 19 4.225 -0.15 11.9;
20 11.975 -0.15 11.9; 21 26.825 -0.15 11.9; 22 33.625 -0.15 11.9;
23 41.425 -0.15 11.9; 24 48.725 -0.15 11.9; 25 56
26 4.225 -0.15 18.95; 27 11.975 -0.15 18.95; 28
29 33.625 -0.15 18.95; 30 41.425 -0.15 18.95; 31 48.725 -0.15 18.95;
32 56.175 -0.15 18.95; 33 4.225 -0.15 26.8; 34 11.975 -0.15 26.8;
35 26.825 -0.15 26.8; 36 33.625 -0.15 26.8; 37 4
38 48.725 -0.15 26.8; 39 56.175 -0.15 26.8; 40 4.225 -0.15 34.05;
41 11.975 -0.15 34.05; 42 26.825 -0.15 34.05; 43 33.625 -0.15 34.05;
44 41.425 -0.15 34.05; 45 48.725 -0.15 34.05; 46 56.175 -0.15 34.05;
47 4.225 -0.15 15.5; 48 11.975 -0.15 15.5; 50 4.225 1.4 17.5; 54 0 1.4 8.95;
55 4.225 1.4 8.95; 56 -4.475 -0.15 17.5; 57 -4.475 -0.15 13.35;
58 -4.475 -0.15 8.95; 59 0 1.4 0; 60 4.225 1.4 0; 61 11.975 1.4 0;
62 26.825 1.4 0; 63 33.625 1.4 0; 64 41.425 1.4 0; 65 44.275 1.4 0;
66 48.125 1.4 0; 67 56.175 1.4 0; 68 0 1.4 7.25; 69 4.225 1.4 7.25;
70 11.975 1.4 7.25; 71 26.825 1.4 7.25; 72 33.625 1.4 7.25; 73 41.425 1.4 7.25;
74 48.725 1.4 7.25; 75 56.175 1.4 7.25; 76 4.225 1.4 11.9; 77 11.975 1.4 11.9;
78 26.825 1.4 11.9; 79 33.625 1.4 11.9; 80 41.425 1.4 11.9; 81 48.725 1.4 11.9;
82 56.175 1.4 11.9; 83 4.225 1.4 18.95; 84 11.975 1.4 18.95;
85 26.825 1.4 18.95; 86 33.625 1.4 18.95; 87 41.425 1.4 18.95;
88 48.725 1.4 18.95; 89 56.175 1.4 18.95; 90 4.225 1.4 26.8;
91 11.975 1.4 26.8; 92 26.825 1.4 26.8; 93 33.625 1.4 26.8; 94 41.425 1.4 26.8;
95 48.725 1.4 26.8; 96 56.175 1.4 26.8; 97 4.225 1.4 34.05;
98 11.975 1.4 34.05; 99 26.825 1.4 34.05; 100 33.625 1.4 34.05;
101 41.425 1.4 34.05; 102 48.725 1.4 34.05; 103 56.175 1.4 34.05;
104 4.225 1.4 15.5; 105 11.975 1.4 15.5; 107 -4.475 1.4 17.5;
108 -4.475 1.4 13.35; 109 -4.475 1.4 8.95; 111 19.375 -0.15 7.25;
112 19.375 -0.15 11.9; 113 19.375 -0.15 18.95; 114 19.375 -0.15 26.8;
115 19.375 -0.15 34.05; 116 19.375 -0.15 0; 117 19.375 1.4 7.25;
118 19.375 1.4 11.9; 119 19.375 1.4 18.95; 120 19.375 1.4 26.8;
121 19.375 1.4 34.05; 122 19.375 1.4 0; 123 4.225 1.4 33.05;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
124 5.225 1.4 34.05; 125 3.475 1.4 33.05; 126 10.375 1.4 34.05;
127 19.05 1.4 34.05; 128 17.45 1.4 34.05; 129 24.55 1.4 34.05;
130 22.95 1.4 34.05; 131 32.55 1.4 34.05; 132 30.95 1.4 34.05;
133 34 1.4 34.05; 134 35.6 1.4 34.05; 135 41.2 1.4 34.05; 136 42.8 1.4 34.05;
137 48.1 1.4 34.05; 138 46.5 1.4 34.05; 139 54.575 1.4 34.05;
141 11.975 1.4 34.8; 142 5.225 1.4 34.8; 143 10.375 1.4 34.8;
144 19.05 1.4 34.8; 145 17.45 1.4 34.8; 146 24.55 1.4 34.8; 147 22.95 1.4 34.8;
148 32.55 1.4 34.8; 149 30.95 1.4 34.8; 150 34 1.4 34.8; 151 35.6 1.4 34.8;
152 41.2 1.4 34.8; 153 42.8 1.4 34.8; 154 48.1 1.4 34.8; 155 46.5 1.4 34.8;
156 54.575 1.4 34.8; 158 3.475 1.4 34.8; 160 -4.475 1.4 10.02;
161 -4.475 1.4 16.43; 162 4.225 1.4 27.075; 163 4.225 1.4 25.475;
166 56.175 1.4 15.625; 167 56.175 1.4 17.225; 169 -5.225 1.4 17.5;
170 -5.225 1.4 8.95; 171 -5.225 1.4 10.02; 172 -5.225 1.4 16.43;
173 3.475 1.4 27.075; 174 3.475 1.4 25.475; 178 56.925 1.4 15.625;
179 56.925 1.4 17.225; 181 0 5.1 0; 182 4.225 5.1 0; 183 11.975 5.1 0;
184 26.825 5.1 0; 185 33.625 5.1 0; 186 41.425 5.1 0; 187 44.275 5.1 0;
188 48.125 5.1 0; 189 56.175 5.1 0; 190 0 5.1 7.25; 191 4.225 5.1 7.25;
192 33.625 5.1 7.25; 193 41.425 5.1 7.25; 194 48.725 5.1 7.25;
195 56.175 5.1 7.25; 196 4.225 5.1 11.9; 197 11.975 5.1 11.9;
198 26.825 5.1 11.9; 199 33.625 5.1 11.9; 200 41.425 5.1 11.9;
201 48.725 5.1 11.9; 202 56.175 5.1 11.9; 205 26.825 4.8 18.95;
206 33.625 4.8 18.95; 207 41.425 4.8 18.95; 208 48.725 5.1 18.95;
209 56.175 5.1 18.95; 210 4.225 5.1 26.8; 211 33.625 5.1 26.8;
212 41.425 5.1 26.8; 213 48.725 5.1 26.8; 214 56.175 5.1 26.8;
215 4.225 5.1 34.05; 216 11.975 5.1 34.05; 217 26.825 5.1 34.05;
218 33.625 5.1 34.05; 219 41.425 5.1 34.05; 220 48.725 5.1 34.05;
221 56.175 5.1 34.05; 224 -4.475 5.1 17.5; 225 -4.475 5.1 13.35;
226 -4.475 5.1 8.95; 227 19.375 5.1 11.9; 228 19.375 4.8 18.95;
229 19.375 5.1 26.8; 230 19.375 5.1 34.05; 231 19.375 5.1 0;
232 11.975 7.1 7.25; 233 26.825 7.1 7.25; 234 11.975 7.1 26.8;
235 26.825 7.1 26.8; 237 19.375 7.1 7.25; 238 3.475 5.1 33.05;
239 11.975 5.1 34.8; 240 5.225 5.1 34.8; 241 10.375 5.1 34.8;
242 19.05 5.1 34.8; 243 17.45 5.1 34.8; 244 24.55 5.1 34.8; 245 22.95 5.1 34.8;
246 32.55 5.1 34.8; 247 30.95 5.1 34.8; 248 34 5.1 34.8; 249 35.6 5.1 34.8;
250 41.2 5.1 34.8; 251 42.8 5.1 34.8; 252 48.1 5.1 34.8; 253 46.5 5.1 34.8;
254 54.575 5.1 34.8; 256 -5.225 5.1 17.5; 257 -5.225 5.1 8.95;
258 -5.225 5.1 10.02; 259 -5.225 5.1 16.43; 260 3.475 5.1 27.075;
261 3.475 5.1 25.475; 272 4.225 5.1 33.05; 273 5.225 5.1 34.05;
274 10.375 5.1 34.05; 275 19.05 5.1 34.05; 276 17.45 5.1 34.05;
277 24.55 5.1 34.05; 278 22.95 5.1 34.05; 279 32.55 5.1 34.05;
280 30.95 5.1 34.05; 281 34 5.1 34.05; 282 35.6 5.1 34.05; 283 41.2 5.1 34.05;
284 42.8 5.1 34.05; 285 48.1 5.1 34.05; 286 46.5 5.1 34.05;
287 54.575 5.1 34.05; 289 -4.475 5.1 10.02; 290 -4.475 5.1 16.43;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
291 4.225 5.1 27.075; 292 4.225 5.1 25.475; 300 3.475 5.1 34.8; 302 0 7.1 0;
303 4.225 7.1 0; 304 11.975 7.1 0; 305 26.825 7.1 0; 306 33.625 7.1 0;
307 41.425 7.1 0; 308 44.275 7.1 0; 309 48.125 7.1 0; 310 56.175 7.1 0;
311 0 7.1 7.25; 312 4.225 7.1 7.25; 313 33.625 7.1 7.25; 314 41.425 7.1 7.25;
315 48.725 7.1 7.25; 316 56.175 7.1 7.25; 317 4.225 7.1 11.9;
318 11.975 7.1 11.9; 319 26.825 7.1 11.9; 320 33.625 7.1 11.9;
321 41.425 7.1 11.9; 322 48.725 7.1 11.9; 323 56.175 7.1 11.9;
324 4.225 7.1 18.95; 325 11.975 7.1 18.95; 326 26.825 7.1 18.95;
327 33.625 7.1 18.95; 328 41.425 7.1 18.95; 329 48.725 7.1 18.95;
330 56.175 7.1 18.95; 331 4.225 7.1 26.8; 332 33.625 7.1 26.8;
333 41.425 7.1 26.8; 334 48.725 7.1 26.8; 335 56.175 7.1 26.8;
336 4.225 7.1 34.05; 337 11.975 7.1 34.05; 338 26.825 7.1 34.05;
339 33.625 7.1 34.05; 340 41.425 7.1 34.05; 341 48.725 7.1 34.05;
342 56.175 7.1 34.05; 343 4.225 7.1 15.5; 345 -4.475 7.1 17.5;
346 -4.475 7.1 13.35; 347 -4.475 7.1 8.95; 348 19.375 7.1 11.9;
349 19.375 7.1 18.95; 350 19.375 7.1 26.8; 351 19.375 7.1 34.05;
352 19.375 7.1 0; 353 3.475 7.1 33.05; 354 11.975 7.1 34.8; 355 5.225 7.1 34.8;
356 10.375 7.1 34.8; 357 19.05 7.1 34.8; 358 17.45 7.1 34.8;
359 24.55 7.1 34.8; 360 22.95 7.1 34.8; 361 32.55 7.1 34.8; 362 30.95 7.1 34.8;
363 34 7.1 34.8; 364 35.6 7.1 34.8; 365 41.2 7.1 34.8; 366 42.8 7.1 34.8;
367 48.1 7.1 34.8; 368 46.5 7.1 34.8; 369 54.575 7.1 34.8; 371 -5.225 7.1 17.5;
372 -5.225 7.1 8.95; 373 -5.225 7.1 10.02; 374 -5.225 7.1 16.43;
375 3.475 7.1 27.075; 376 3.475 7.1 25.475; 384 4.225 7.1 17.5;
386 4.225 7.1 8.95; 387 4.225 7.1 33.05; 388 5.225 7.1 34.05;
389 10.375 7.1 34.05; 390 19.05 7.1 34.05; 391 17.45 7.1 34.05;
392 24.55 7.1 34.05; 393 22.95 7.1 34.05; 394 32.55 7.1 34.05;
395 30.95 7.1 34.05; 396 34 7.1 34.05; 397 35.6 7.1 34.05; 398 41.2 7.1 34.05;
399 42.8 7.1 34.05; 400 48.1 7.1 34.05; 401 46.5 7.1 34.05;
402 54.575 7.1 34.05; 404 -4.475 7.1 10.02; 405 -4.475 7.1 16.43;
406 4.225 7.1 27.075; 407 4.225 7.1 25.475; 413 4.225 7.1 13.35;
414 0 7.1 8.95; 415 3.475 7.1 34.8; 417 13.2 7.1 0; 418 13.2 7.1 7.25;
419 48.725 7.1 0; 420 8.1 7.1 0; 421 8.1 7.1 7.25; 422 8.1 7.1 11.9;
423 8.1 7.1 18.95; 424 8.1 7.1 26.8; 425 8.1 7.1 34.05; 426 11.975 7.1 15.5;
427 8.1 7.1 15.5; 428 44.275 7.1 7.25; 429 39.1 7.1 0; 430 39.1 7.1 7.25;
431 17.35 7.1 0; 432 17.35 7.1 7.25; 433 21.25 7.1 0; 434 21.25 7.1 7.25;
435 25.15 7.1 0; 436 25.15 7.1 7.25; 437 29.4 7.1 0; 438 29.4 7.1 7.25;
439 52.05 7.1 7.25; 440 52.05 7.1 0; 441 0 7.1 3.625; 442 4.225 7.1 3.625;
443 13.2 7.1 3.625; 444 8.1 7.1 3.625; 445 17.35 7.1 3.625;
446 33.625 7.1 3.625; 447 39.1 7.1 3.625; 448 29.4 7.1 3.625;
449 48.725 7.1 3.625; 450 44.275 7.1 3.625; 451 52.05 7.1 3.625;
452 56.175 7.1 3.625; 453 19.375 7.1 5.075; 454 26.825 7.1 5.075;
455 21.25 7.1 5.075; 456 25.15 7.1 5.075; 457 21.25 7.1 2.5375;
458 25.15 7.1 2.5375; 459 44.275 7.1 2.525; 460 39.1 7.1 2.525;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
461 41.425 7.1 2.525; 462 15.675 7.1 11.9; 463 23.1 7.1 11.9;
464 15.675 7.1 18.95; 465 23.1 7.1 18.95; 466 15.675 7.1 26.8;
467 23.1 7.1 26.8; 468 15.675 7.1 7.25; 469 23.1 7.1 7.25; 470 15.675 7.1 15.5;
471 19.375 7.1 15.5; 472 23.1 7.1 15.5; 473 26.825 7.1 15.5;
474 11.975 7.1 22.875; 475 19.375 7.1 22.875; 476 26.825 7.1 22.875;
477 8.1 7.1 22.875; 478 15.675 7.1 22.875; 479 23.1 7.1 22.875;
480 4.225 7.1 22.875; 481 48.725 7.1 9.975; 482 26.825 7.1 9.975;
483 33.625 7.1 9.975; 484 41.425 7.1 9.975; 485 26.825 7.1 14.375;
486 33.625 7.1 14.375; 487 26.825 7.1 17.675; 488 33.625 7.1 17.675;
489 26.825 7.1 20.925; 490 33.625 7.1 20.925; 491 33.625 7.1 24.075;
492 26.825 7.1 24.075; 493 30.225 7.1 26.8; 494 30.225 7.1 9.975;
495 30.225 7.1 14.375; 496 30.225 7.1 17.675; 497 30.225 7.1 20.925;
498 30.225 7.1 24.075; 499 30.225 7.1 34.05; 500 30.225 7.1 7.25;
501 33.625 7.1 13.675; 502 41.425 7.1 13.675; 503 41.425 7.1 24.075;
504 48.725 7.1 24.075; 505 56.175 7.1 24.075; 512 44.275 7.1 34.05;
513 48.725 7.1 13.675; 514 44.275 7.1 18.95; 515 44.275 7.1 26.8;
516 44.275 7.1 9.975; 517 44.275 7.1 24.075; 518 44.275 7.1 13.675;
519 47.425 7.1 7.25; 520 47.425 7.1 9.975; 521 47.425 7.1 13.675;
522 52.05 7.1 34.05; 523 52.05 7.1 18.95; 524 52.05 7.1 26.8;
525 52.05 7.1 11.9; 526 52.05 7.1 24.075; 527 56.175 7.1 9.975;
528 52.05 7.1 9.975; 529 52.05 7.1 15.675; 530 56.175 7.1 15.675;
531 48.725 7.1 15.675; 533 46.9 7.1 18.95; 534 46.9 7.1 24.075;
535 48.725 7.1 17.925; 536 48 7.1 18.95; 538 48 7.1 17.925; 539 13.6 7.1 26.8;
541 47.15 7.1 26.8; 542 13.6 7.1 34.05; 544 47.15 7.1 34.05;
545 23.1 7.1 34.05; 546 8.1 7.1 30.425; 547 56.175 7.1 30.425;
548 4.225 7.1 30.425; 549 41.425 7.1 30.425; 550 33.625 7.1 30.425;
551 19.375 7.1 30.425; 552 11.975 7.1 30.425; 553 26.825 7.1 30.425;
554 48.725 7.1 30.425; 555 30.225 7.1 30.425; 556 44.275 7.1 30.425;
557 52.05 7.1 30.425; 558 13.6 7.1 30.425; 560 47.15 7.1 30.425;
561 23.1 7.1 30.425; 564 -1.2742e-008 7.1 17.5; 565 -2.2375 7.1 8.95;
566 -2.2375 7.1 17.5; 567 2.11014e-008 7.1 13.35; 568 -2.2375 7.1 13.35;
569 11.975 12.05 7.25; 570 26.825 12.05 7.25; 571 11.975 12.05 26.8;
572 26.825 12.05 26.8; 573 11.975 12.05 15.5; 574 19.375 12.05 7.25;
575 4.225 12.05 0; 576 11.975 12.05 0; 577 26.825 12.05 0; 578 33.625 12.05 0;
579 41.425 12.05 0; 580 44.275 12.05 0; 581 48.125 12.05 0; 582 56.175 12.05 0;
583 4.225 12.05 7.25; 584 33.625 12.05 7.25; 585 41.425 12.05 7.25;
586 48.725 12.05 7.25; 587 56.175 12.05 7.25; 588 4.225 12.05 11.9;
589 11.975 12.05 11.9; 590 26.825 12.05 11.9; 591 33.625 12.05 11.9;
592 41.425 12.05 11.9; 593 48.725 12.05 11.9; 594 56.175 12.05 11.9;
595 4.225 12.05 18.95; 596 11.975 12.05 18.95; 597 26.825 12.05 18.95;
598 33.625 12.05 18.95; 599 41.425 12.05 18.95; 600 48.725 12.05 18.95;
601 56.175 12.05 18.95; 602 4.225 12.05 26.8; 603 33.625 12.05 26.8;
604 41.425 12.05 26.8; 605 48.725 12.05 26.8; 606 56.175 12.05 26.8;
607 4.225 12.05 34.05; 608 11.975 12.05 34.05; 609 26.825 12.05 34.05;
610 33.625 12.05 34.05; 611 41.425 12.05 34.05; 612 48.725 12.05 34.05;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
613 56.175 12.05 34.05; 614 4.225 12.05 15.5; 615 19.375 12.05 26.8;
616 19.375 12.05 34.05; 617 19.375 12.05 0; 618 11.975 9.75 7.25;
619 26.825 9.75 7.25; 620 11.975 9.75 26.8; 621 26.825 9.75 26.8;
623 19.375 9.75 7.25; 624 4.225 10.05 0; 625 11.975 10.05 0;
626 26.825 10.05 0; 627 33.625 10.05 0; 628 41.425 10.05 0; 629 44.275 10.05 0;
630 48.125 10.05 0; 631 56.175 10.05 0; 632 4.225 10.05 7.25;
633 33.625 9.75 7.25; 634 56.175 10.05 7.25; 635 4.225 10.05 11.9;
636 11.975 9.75 11.9; 637 26.825 9.75 11.9; 638 33.625 10.05 11.9;
639 56.175 10.05 11.9; 642 26.825 9.75 18.95; 643 33.625 10.05 18.95;
644 48.725 10.05 18.95; 645 56.175 10.05 18.95; 646 4.225 10.05 26.8;
647 33.625 9.75 26.8; 648 41.425 9.75 26.8; 649 48.725 9.75 26.8;
651 4.225 10.05 34.05; 652 11.975 10.05 34.05; 653 26.825 10.05 34.05;
654 33.625 10.05 34.05; 655 41.425 10.05 34.05; 656 48.725 10.05 34.05;
657 56.175 10.05 34.05; 659 19.375 9.75 26.8; 660 19.375 10.05 34.05;
661 19.375 10.05 0; 662 48.725 12.05 0; 663 19.375 12.05 11.9;
664 19.375 12.05 18.95; 665 56.175 12.05 15.5; 666 4.225 12.05 3.625;
667 4.225 12.05 30.425; 668 56.175 12.05 3.625; 669 56.175 12.05 30.425;
670 8.1 12.05 0; 671 37.525 12.05 0; 672 30.225 12.05 0; 673 52.45 12.05 0;
674 8.1 12.05 15.5; 675 30.225 12.05 34.05; 676 37.525 12.05 34.05;
677 52.45 12.05 34.05; 678 8.1 12.05 34.05; 679 8.1 12.05 18.95;
680 8.1 12.05 7.25; 681 30.225 12.05 7.25; 682 37.525 12.05 7.25;
683 52.45 12.05 7.25; 684 8.1 12.05 11.9; 685 30.225 12.05 11.9;
686 37.525 12.05 11.9; 687 52.45 12.05 11.9; 688 30.225 12.05 18.95;
689 37.525 12.05 18.95; 690 52.45 12.05 18.95; 691 8.1 12.05 26.8;
692 30.225 12.05 26.8; 693 37.525 12.05 26.8; 694 52.45 12.05 26.8;
695 11.975 12.05 3.625; 696 11.975 12.05 30.425; 697 19.375 12.05 3.625;
698 26.825 12.05 3.625; 699 33.625 12.05 3.625; 700 41.425 12.05 3.625;
701 48.725 12.05 30.425; 702 19.375 12.05 30.425; 703 19.375 12.05 15.5;
704 26.825 12.05 30.425; 705 26.825 12.05 15.5; 706 33.625 12.05 30.425;
707 33.625 12.05 15.5; 708 41.425 12.05 30.425; 709 41.425 12.05 15.5;
710 48.725 12.05 3.625; 711 48.725 12.05 15.5; 712 52.45 12.05 15.5;
713 37.525 12.05 15.5; 714 30.225 12.05 15.5; 715 52.45 12.05 3.625;
716 37.525 12.05 3.625; 717 30.225 12.05 3.625; 718 8.1 12.05 3.625;
719 52.45 12.05 30.425; 720 37.525 12.05 30.425; 721 30.225 12.05 30.425;
722 8.1 12.05 30.425; 723 41.425 12.05 9.975; 724 41.425 12.05 13.675;
725 48.725 12.05 9.975; 726 48.725 12.05 13.675; 727 47.425 12.05 9.975;
728 47.425 12.05 13.675; 729 48.725 12.05 17.925; 730 48 12.05 18.95;
731 48 12.05 17.925; 732 48 12.05 15.5; 733 45.075 12.05 34.05;
734 45.075 12.05 0; 735 45.075 12.05 7.25; 736 45.075 12.05 18.95;
737 45.075 12.05 26.8; 738 45.075 12.05 15.5; 739 45.075 12.05 3.625;
740 45.075 12.05 30.425; 741 45.075 12.05 9.975; 742 45.075 12.05 13.675;
743 4.225 12.05 23.025; 744 56.175 12.05 23.025; 745 11.975 12.05 23.025;
746 19.375 12.05 23.025; 747 26.825 12.05 23.025; 748 33.625 12.05 23.025;
749 41.425 12.05 23.025; 750 48.725 12.05 23.025; 751 30.225 12.05 23.025;
752 37.525 12.05 23.025; 753 52.45 12.05 23.025; 754 8.1 12.05 23.025;
755 45.075 12.05 23.025; 756 23.1 12.05 0; 757 15.675 12.05 0;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
758 15.675 12.05 11.9; 759 15.675 12.05 26.8; 760 23.1 12.05 26.8;
761 23.1 12.05 11.9; 762 15.675 12.05 7.25; 763 23.1 12.05 7.25;
764 15.675 12.05 23.025; 765 23.1 12.05 23.025; 766 15.675 12.05 34.05;
767 23.1 12.05 34.05; 768 14.45 12.05 7.25; 769 14.45 12.05 23.025;
770 14.45 12.05 11.9; 771 14.45 12.05 26.8; 772 16.75 12.05 7.25;
773 16.75 12.05 23.025; 774 16.75 12.05 11.9; 775 16.75 12.05 26.8;
776 14.45 12.05 11.125; 777 16.75 12.05 11.125; 778 14.45 12.05 9.925;
779 16.75 12.05 9.925; 780 14.45 12.05 24.275; 781 16.75 12.05 24.275;
782 26.825 12.05 24.275; 783 23.1 12.05 24.275; 784 26.825 12.05 11.125;
785 23.1 12.05 11.125; 786 26.825 12.05 9.925; 787 23.1 12.05 9.925;
788 24.5 12.05 23.025; 789 24.5 12.05 24.275; 790 24.5 12.05 11.125;
791 24.5 12.05 9.925; 792 4.225 3.85 18.95; 793 4.225 3.85 15.5;
794 11.975 5.5 18.95; 795 4.225 5.5 18.95; 796 11.975 5.5 15.5;
797 4.225 5.5 15.5; 798 11.975 3.85 15.5; 799 11.975 3.85 18.95;
800 11.125 3.85 15.5; 801 11.125 3.85 18.95; 802 6.375 5.5 18.95;
803 6.375 5.5 15.5; 804 11.125 7.1 18.95; 805 11.125 7.1 15.5;
806 11.975 8.8 15.5; 807 4.225 8.8 18.95; 808 11.975 8.8 18.95;
809 4.225 8.8 15.5; 810 6.375 8.8 15.5; 811 6.375 8.8 18.95;
812 11.975 10.4 15.5; 813 4.225 10.4 18.95; 814 11.975 10.4 18.95;
815 4.225 10.4 15.5; 816 11.125 10.4 15.5; 817 11.125 10.4 18.95;
818 6.375 12.05 15.5; 819 6.375 12.05 18.95; 820 11.975 14.8 15.5;
821 4.225 14.8 18.95; 822 11.975 14.8 18.95; 823 4.225 14.8 15.5;
824 8.1 14.8 15.5; 825 8.1 14.8 18.95; 826 3.475 1.4 34.05; 827 4.225 1.4 34.8;
828 56.175 1.4 34.8; 830 3.475 5.1 34.05; 831 4.225 5.1 34.8;
833 56.175 5.1 34.8; 834 3.475 7.1 34.05; 835 4.225 7.1 34.8;
836 56.175 7.1 34.8; 837 4.225 5.1 18.95; 838 4.225 5.1 15.5;
840 15.675 12.05 18.95; 841 23.1 12.05 18.95; 842 15.675 12.05 15.5;
843 23.1 12.05 15.5; 844 23.1 12.05 3.625; 845 15.675 12.05 3.625;
846 23.1 12.05 30.425; 847 15.675 12.05 30.425; 849 4.225 10.05 18.95;
850 4.225 10.05 15.5; 851 11.975 9.75 18.95; 852 11.975 9.75 15.5;
853 41.425 9.75 7.25; 854 41.425 9.75 11.9; 855 41.425 9.75 18.95;
856 36.3625 7.1 0; 857 36.3625 7.1 3.625; 858 52.05 7.1 5.925;
859 56.175 7.1 5.925; 862 11.975 4.8 18.95; 863 26.825 7.1 3.625;
864 37.95 7.1 30.425; 865 37.95 7.1 34.05; 866 37.95 7.1 7.25;
867 37.95 7.1 20.925; 868 37.95 7.1 18.95; 869 37.95 7.1 26.8;
870 37.95 7.1 9.975; 871 37.95 7.1 13.675; 872 37.95 7.1 24.075;
873 4.225 10.05 33.05; 874 3.475 10.05 33.05; 875 3.475 10.05 34.05;
876 3.475 10.05 34.8; 877 4.225 10.05 34.8; 878 5.225 10.05 34.8;
879 5.225 10.05 34.05; 880 10.375 10.05 34.05; 881 10.375 10.05 34.8;
882 11.975 10.05 34.8; 883 19.05 10.05 34.05; 884 19.05 10.05 34.8;
885 17.45 10.05 34.8; 886 17.45 10.05 34.05; 887 24.55 10.05 34.05;
888 24.55 10.05 34.8; 889 22.95 10.05 34.8; 890 22.95 10.05 34.05;
891 32.55 10.05 34.05; 892 32.55 10.05 34.8; 893 30.95 10.05 34.8;
894 30.95 10.05 34.05; 895 35.6 10.05 34.05; 896 35.6 10.05 34.8;
897 34 10.05 34.8; 898 34 10.05 34.05; 899 42.8 10.05 34.05;
900 42.8 10.05 34.8; 901 41.2 10.05 34.8; 902 41.2 10.05 34.05;
903 48.1 10.05 34.05; 904 48.1 10.05 34.8; 905 46.5 10.05 34.8;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
906 46.5 10.05 34.05; 911 56.175 10.05 34.8; 912 54.575 10.05 34.8;
913 54.575 10.05 34.05; 914 4.225 10.05 27.075; 915 3.475 10.05 27.075;
916 3.475 10.05 25.475; 917 4.225 10.05 25.475; 929 56.175 1.4 31.225;
930 56.175 1.4 29.625; 931 56.925 1.4 29.625; 932 56.925 1.4 31.225;
934 -5.225 7.1 13.35; 935 56.175 1.4 12.425; 936 56.175 1.4 10.825;
937 56.925 1.4 10.825; 938 56.925 1.4 12.425; 939 56.175 1.4 1.6;
940 56.925 1.4 0; 941 56.925 1.4 1.6; 943 56.175 5.1 15.625;
944 56.925 5.1 15.625; 945 56.925 5.1 17.225; 946 56.175 5.1 17.225;
948 56.175 5.1 29.625; 949 56.925 5.1 29.625; 950 56.925 5.1 31.225;
951 56.175 5.1 31.225; 952 56.175 5.1 10.825; 953 56.925 5.1 10.825;
954 56.925 5.1 12.425; 955 56.175 5.1 12.425; 956 56.925 5.1 0;
957 56.925 5.1 1.6; 958 56.175 5.1 1.6; 960 56.175 7.1 15.625;
961 56.925 7.1 15.625; 962 56.925 7.1 17.225; 963 56.175 7.1 17.225;
965 56.175 7.1 29.625; 966 56.925 7.1 29.625; 967 56.925 7.1 31.225;
968 56.175 7.1 31.225; 969 56.175 7.1 10.825; 970 56.925 7.1 10.825;
971 56.925 7.1 12.425; 972 56.175 7.1 12.425; 973 56.925 7.1 0;
974 56.925 7.1 1.6; 975 56.175 7.1 1.6; 986 56.175 10.05 10.825;
987 56.925 10.05 10.825; 988 56.925 10.05 12.425; 989 56.175 10.05 12.425;
990 56.925 10.05 0; 991 56.925 10.05 1.6; 992 56.175 10.05 1.6;
1014 4.225 10.05 5.925; 1015 4.225 10.05 4.325; 1016 4.225 10.05 14.925;
1017 4.225 10.05 13.325; 1018 3.475 10.05 14.925; 1019 3.475 10.05 13.325;
1020 3.475 10.05 5.925; 1021 3.475 10.05 4.325; 1026 4.225 12.05 33.05;
1027 3.475 12.05 33.05; 1028 3.475 12.05 34.05; 1029 3.475 12.05 34.8;
1030 4.225 12.05 34.8; 1031 5.225 12.05 34.8; 1032 5.225 12.05 34.05;
1033 10.375 12.05 34.05; 1034 10.375 12.05 34.8; 1035 11.975 12.05 34.8;
1036 19.05 12.05 34.05; 1037 19.05 12.05 34.8; 1038 17.45 12.05 34.8;
1039 17.45 12.05 34.05; 1040 24.55 12.05 34.05; 1041 24.55 12.05 34.8;
1042 22.95 12.05 34.8; 1043 22.95 12.05 34.05; 1044 32.55 12.05 34.05;
1045 32.55 12.05 34.8; 1046 30.95 12.05 34.8; 1047 30.95 12.05 34.05;
1048 35.6 12.05 34.05; 1049 35.6 12.05 34.8; 1050 34 12.05 34.8;
1051 34 12.05 34.05; 1052 42.8 12.05 34.05; 1053 42.8 12.05 34.8;
1054 41.2 12.05 34.8; 1055 41.2 12.05 34.05; 1056 48.1 12.05 34.05;
1057 48.1 12.05 34.8; 1058 46.5 12.05 34.8; 1059 46.5 12.05 34.05;
1060 54.575 12.05 34.8; 1061 54.575 12.05 34.05; 1062 4.225 12.05 27.075;
1063 3.475 12.05 27.075; 1064 3.475 12.05 25.475; 1065 4.225 12.05 25.475;
1066 56.175 12.05 34.8; 1068 26.825 12.05 34.8; 1073 56.175 12.05 15.625;
1082 56.175 12.05 10.825; 1083 56.925 12.05 10.825; 1084 56.925 12.05 12.425;
1085 56.175 12.05 12.425; 1086 56.925 12.05 0; 1087 56.925 12.05 1.6;
1088 56.175 12.05 1.6; 1091 56.925 12.05 7.25; 1098 56.175 12.05 4.425;
1099 52.95 12.05 34.8; 1101 14.7125 12.05 34.05; 1102 38.4 12.05 34.05;
1103 50.525 12.05 34.05; 1104 52.95 12.05 34.05; 1105 4.225 12.05 14.925;
1106 3.475 12.05 14.925; 1107 3.475 12.05 13.325; 1108 4.225 12.05 13.325;
1109 4.225 12.05 5.925; 1110 3.475 12.05 5.925; 1111 3.475 12.05 4.325;
1112 4.225 12.05 4.325; 1113 3.475 12.05 7.25; 1115 3.475 12.05 11.9;
1118 11.6 10.05 0; 1119 12.9 10.05 0; 1121 5.525 10.05 0; 1122 20.675 10.05 0;
1123 28.125 10.05 0; 1124 34.7 10.05 0; 1125 36 10.05 0; 1126 40.7 10.05 0;
1127 42 10.05 0; 1128 4.225 10.05 -0.75; 1129 26.825 10.05 -0.75;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
1130 19.375 10.05 -0.75; 1131 11.6 10.05 -0.75; 1132 12.9 10.05 -0.75;
1133 5.525 10.05 -0.75; 1134 20.675 10.05 -0.75; 1135 28.125 10.05 -0.75;
1136 34.7 10.05 -0.75; 1137 36 10.05 -0.75; 1138 40.7 10.05 -0.75;
1139 42 10.05 -0.75; 1146 4.225 8.05 0; 1147 11.975 8.05 0; 1148 26.825 8.05 0;
1149 33.625 8.05 0; 1150 41.425 8.05 0; 1151 44.275 8.05 0;
1152 4.225 8.05 7.25; 1153 4.225 8.05 11.9; 1154 19.375 8.05 0;
1155 4.225 8.05 15.5; 1156 4.225 8.05 14.925; 1157 3.475 8.05 14.925;
1158 3.475 8.05 13.325; 1159 4.225 8.05 13.325; 1160 4.225 8.05 5.925;
1161 3.475 8.05 5.925; 1162 3.475 8.05 4.325; 1163 4.225 8.05 4.325;
1164 4.225 8.05 -0.75; 1165 26.825 8.05 -0.75; 1166 19.375 8.05 -0.75;
1167 11.6 8.05 0; 1168 11.6 8.05 -0.75; 1169 12.9 8.05 0; 1170 12.9 8.05 -0.75;
1171 5.525 8.05 0; 1172 5.525 8.05 -0.75; 1173 20.675 8.05 0;
1174 20.675 8.05 -0.75; 1175 28.125 8.05 0; 1176 28.125 8.05 -0.75;
1177 34.7 8.05 0; 1178 34.7 8.05 -0.75; 1179 36 8.05 0; 1180 36 8.05 -0.75;
1181 40.7 8.05 0; 1182 40.7 8.05 -0.75; 1183 42 8.05 0; 1184 42 8.05 -0.75;
1185 4.225 12.05 -0.75; 1186 26.825 12.05 -0.75; 1187 19.375 12.05 -0.75;
1188 11.6 12.05 0; 1189 11.6 12.05 -0.75; 1190 12.9 12.05 0;
1191 12.9 12.05 -0.75; 1192 5.525 12.05 0; 1193 5.525 12.05 -0.75;
1194 20.675 12.05 0; 1195 20.675 12.05 -0.75; 1196 28.125 12.05 0;
1197 28.125 12.05 -0.75; 1198 34.7 12.05 0; 1199 34.7 12.05 -0.75;
1200 36 12.05 0; 1201 36 12.05 -0.75; 1202 40.7 12.05 0; 1203 40.7 12.05 -0.75;
1204 42 12.05 0; 1205 42 12.05 -0.75; 1209 8.5625 12.05 0; 1210 23.75 12.05 0;
1211 38.35 12.05 0; 1212 11.125 12.05 15.5; 1213 11.125 12.05 18.95;
1214 56.175 10.05 26.8; 1217 11.975 7.1 17.425; 1218 11.125 7.1 17.425;
1219 11.125 10.4 17.425; 1220 11.975 10.4 17.425; 1221 11.975 5.5 17.425;
1223 26.825 13.35 23.025; 1224 15.675 13.35 23.025; 1225 14.45 13.35 23.025;
1226 16.75 13.35 23.025; 1227 14.45 13.35 11.125; 1228 16.75 13.35 11.125;
1229 14.45 13.35 9.925; 1230 16.75 13.35 9.925; 1231 14.45 13.35 24.275;
1232 16.75 13.35 24.275; 1233 26.825 13.35 24.275; 1234 26.825 13.35 11.125;
1235 26.825 13.35 9.925; 1236 24.5 13.35 23.025; 1237 24.5 13.35 24.275;
1238 24.5 13.35 11.125; 1239 24.5 13.35 9.925; 1256 33.625 7.1 15.675;
1258 56.175 7.1 20.925; 1259 19.375 7.1 3.625; 1260 19.375 7.1 2.5375;
1261 26.825 7.1 2.5375; 1262 15.675 7.1 34.05; 1263 15.675 7.1 30.425;
1264 36.3625 7.1 7.25; 1265 41.425 7.1 20.925; 1266 48.725 7.1 20.925;
1267 44.275 7.1 20.925; 1268 52.05 7.1 20.925; 1269 46.9 7.1 20.925;
1270 41.425 7.1 15.675; 1271 44.275 7.1 15.675; 1272 37.95 7.1 15.675;
1274 39.1 7.1 4.8875; 1275 44.275 7.1 4.8875; 1276 48 7.1 15.675;
1277 56.925 7.1 18.95; 1278 56.925 7.1 20.925; 1279 56.925 7.1 24.075;
1280 56.925 7.1 26.8; 1287 23.1 12.05 -0.75; 1288 8.1 12.05 -0.75;
1289 37.525 12.05 -0.75; 1290 56.925 12.05 3.625; 1291 52.45 12.05 34.8;
1292 37.525 12.05 34.8; 1293 15.675 12.05 34.8; 1294 3.475 12.05 30.425;
1295 4.225 5.1 17.5; 1296 4.225 5.1 8.95; 1297 54.875 7.1 18.95;
1298 54.875 7.1 20.925; 1299 56.175 7.1 19.45; 1300 54.875 7.1 19.45;
1301 52.05 7.1 15.125; 1302 56.175 7.1 15.125; 1303 53.2 7.1 15.675;
1304 53.2 7.1 15.125;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
MEMBER INCIDENCES
1314 795 802; 1317 797 803; 1320 793 800; 1321 792 801; 1322 800 798;
1323 801 799; 1324 800 801; 1325 797 795; 1326 802 794; 1327 803 796;
1328 803 802; 1336 809 810; 1337 807 811; 1338 809 807; 1339 810 806;
1340 811 808; 1341 810 811; 1346 815 816; 1347 813 817; 1348 816 812;
1349 817 814; 1350 816 1219; 1359 823 824; 1360 820 822; 1361 822 825;
1362 823 821; 1363 824 820; 1364 825 821; 1365 824 825; 1951 812 1220;
1959 796 1221; 1965 1219 817; 1966 1220 814; 1967 1221 794; 1971 1219 1220;
1989 1223 1233; 1990 1224 1226; 1991 1225 1224; 1992 1225 1231; 1993 1226 1232;
1994 1229 1227; 1995 1230 1228; 1996 1227 1228; 1997 1229 1230; 1998 1231 1232;
1999 1235 1234; 2000 1236 1223; 2001 1237 1233; 2002 1238 1234; 2003 1239 1235;
2004 1239 1238; 2005 1236 1237; 3000 60 61; 3001 61 122; 3002 122 62;
3003 62 63; 3004 63 64; 3005 64 65; 3006 67 940; 3007 941 939; 3008 170 109;
3009 109 54; 3010 54 55; 3011 160 171; 3012 936 937; 3013 938 935;
3014 166 178; 3015 172 161; 3016 179 167; 3017 107 169; 3018 107 50;
3019 174 163; 3020 162 173; 3021 930 931; 3022 932 929; 3023 123 125;
3024 97 826; 3025 124 97; 3026 126 124; 3027 98 126; 3028 128 98; 3029 127 128;
3030 121 127; 3031 130 121; 3032 129 130; 3033 99 129; 3034 132 99;
3035 131 132; 3036 100 131; 3037 133 100; 3038 134 133; 3039 135 134;
3040 101 135; 3041 136 101; 3042 138 136; 3043 137 138; 3044 102 137;
3045 139 102; 3046 103 139; 3047 158 827; 3048 827 142; 3049 143 141;
3050 144 145; 3051 146 147; 3052 148 149; 3053 151 150; 3054 153 152;
3055 154 155; 3056 828 156; 3500 171 170; 3501 169 172; 3502 160 109;
3503 108 160; 3504 161 108; 3505 107 161; 3506 59 68; 3507 68 54; 3508 173 174;
3509 125 826; 3510 826 158; 3511 55 69; 3512 76 55; 3513 50 104; 3514 83 50;
3515 83 163; 3516 90 163; 3517 162 90; 3518 123 162; 3519 97 123; 3520 97 827;
3521 142 124; 3522 126 143; 3523 141 98; 3524 145 128; 3525 127 144;
3526 147 130; 3527 129 146; 3528 149 132; 3529 131 148; 3530 150 133;
3531 134 151; 3532 152 135; 3533 136 153; 3534 155 138; 3535 137 154;
3536 156 139; 3537 67 939; 3538 939 75; 3539 75 936; 3540 936 82; 3541 82 935;
3542 935 166; 3543 166 167; 3544 167 89; 3545 89 96; 3546 96 930; 3547 930 929;
3548 929 103; 3549 103 828; 3550 940 941; 3551 937 938; 3552 178 179;
3553 931 932; 4000 182 183; 4001 183 231; 4002 231 184; 4003 184 185;
4004 185 186; 4005 186 187; 4006 189 956; 4007 957 958; 4008 226 257;
4009 226 1296; 4010 289 258; 4011 952 953; 4012 954 955; 4014 943 944;
4015 259 290; 4016 945 946; 4017 224 256; 4018 224 1295; 4022 261 292;
4024 291 260; 4025 948 949; 4026 950 951; 4027 272 238; 4028 215 830;
4029 215 273; 4030 273 274; 4031 274 216; 4032 216 276; 4033 276 275;
4034 275 230; 4035 230 278; 4036 278 277; 4037 277 217; 4038 217 280;
4039 280 279; 4040 279 218; 4041 218 281; 4042 281 282; 4043 282 283;
4044 283 219; 4045 219 284; 4046 284 286; 4047 286 285; 4048 285 220;
4049 220 287; 4050 287 221; 4051 300 831; 4052 831 240; 4053 241 239;
4054 243 242; 4055 245 244; 4056 247 246; 4057 248 249; 4058 250 251;
4059 253 252; 4060 254 833; 4500 257 258; 4503 256 259; 4504 226 289;
4505 289 225; 4506 225 290; 4507 290 224; 4508 181 190; 4509 260 261;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
4510 238 830; 4511 830 300; 4512 191 1296; 4513 1296 196; 4514 196 838;
4515 838 1295; 4516 1295 837; 4517 837 292; 4518 292 210; 4519 210 291;
4520 291 272; 4521 272 215; 4522 215 831; 4523 273 240; 4524 274 241;
4525 216 239; 4526 276 243; 4527 275 242; 4528 278 245; 4529 277 244;
4530 280 247; 4531 279 246; 4532 281 248; 4533 282 249; 4534 283 250;
4535 284 251; 4536 286 253; 4537 285 252; 4538 287 254; 4539 189 958;
4540 958 195; 4541 195 952; 4542 952 202; 4543 202 955; 4544 955 943;
4545 943 946; 4546 946 209; 4547 209 214; 4550 214 948; 4551 948 951;
4552 951 221; 4553 221 833; 4554 956 957; 4555 953 954; 4556 944 945;
4562 949 950; 5000 302 303; 5001 303 420; 5002 420 304; 5003 304 417;
5004 417 431; 5005 431 352; 5006 352 433; 5007 433 435; 5008 435 305;
5009 305 437; 5010 437 306; 5011 306 856; 5012 856 429; 5013 429 307;
5014 307 308; 5015 308 309; 5016 309 419; 5017 419 440; 5018 440 310;
5019 310 973; 5020 975 974; 5021 460 461; 5022 461 459; 5024 457 458;
5025 458 1261; 5026 441 442; 5027 442 444; 5028 444 443; 5029 443 445;
5030 445 1259; 5031 863 448; 5032 448 446; 5033 446 857; 5034 857 447;
5035 450 449; 5036 449 451; 5037 451 452; 5041 455 456; 5042 456 454;
5043 858 859; 5044 311 312; 5045 312 421; 5046 421 232; 5047 232 418;
5048 418 468; 5049 468 432; 5050 432 237; 5051 237 434; 5052 434 469;
5053 469 436; 5054 436 233; 5055 233 438; 5056 438 500; 5057 500 313;
5058 313 1264; 5059 1264 866; 5060 866 430; 5061 430 314; 5062 314 428;
5063 428 519; 5064 519 315; 5065 315 439; 5066 439 316; 5067 372 347;
5068 347 565; 5069 565 414; 5070 414 386; 5071 482 494; 5072 494 483;
5073 483 870; 5074 870 484; 5075 484 516; 5076 516 520; 5077 520 481;
5078 481 528; 5079 528 527; 5080 404 373; 5081 969 970; 5082 317 422;
5083 422 318; 5084 318 462; 5085 462 348; 5086 348 463; 5087 463 319;
5088 322 525; 5089 525 323; 5090 972 971; 5091 346 934; 5092 346 568;
5093 568 567; 5094 567 413; 5095 501 871; 5096 871 502; 5097 502 518;
5098 518 521; 5099 521 513; 5100 485 495; 5101 495 486; 5102 343 427;
5103 427 805; 5104 805 426; 5105 426 470; 5106 470 471; 5107 471 472;
5108 472 473; 5109 960 961; 5110 1256 1272; 5111 1272 1270; 5112 1270 1271;
5113 1271 1276; 5114 1276 531; 5115 531 529; 5116 529 1303; 5117 374 405;
5118 963 962; 5119 1218 1217; 5120 371 345; 5121 345 566; 5122 566 564;
5123 564 384; 5124 487 496; 5125 496 488; 5126 538 535; 5127 324 423;
5128 423 804; 5129 804 325; 5130 325 464; 5131 464 349; 5132 349 465;
5133 465 326; 5134 327 868; 5135 868 328; 5136 328 514; 5137 514 533;
5138 533 536; 5139 536 329; 5140 329 523; 5141 523 1297; 5142 330 1277;
5143 489 497; 5144 497 490; 5145 490 867; 5146 867 1265; 5147 1265 1267;
5149 1269 1266; 5150 1266 1268; 5151 1268 1298; 5152 1258 1278; 5153 480 477;
5154 477 474; 5155 474 478; 5156 478 475; 5157 475 479; 5158 479 476;
5159 492 498; 5160 498 491; 5161 491 872; 5162 872 503; 5163 503 517;
5164 517 534; 5165 534 504; 5166 504 526; 5167 526 505; 5168 505 1279;
5169 376 407; 5170 331 424; 5171 424 234; 5172 234 539; 5173 539 466;
5174 466 350; 5175 350 467; 5176 467 235; 5177 235 493; 5178 493 332;
5179 332 869; 5180 333 869; 5181 333 515; 5182 515 541; 5183 541 334;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
5184 334 524; 5185 524 335; 5186 335 1280; 5187 406 375; 5188 965 966;
5189 548 546; 5190 546 552; 5191 552 558; 5192 558 1263; 5193 1263 551;
5194 551 561; 5195 561 553; 5196 553 555; 5197 555 550; 5198 550 864;
5199 549 864; 5200 549 556; 5201 556 560; 5202 560 554; 5203 554 557;
5204 557 547; 5205 968 967; 5206 353 387; 5207 834 336; 5208 336 388;
5209 388 425; 5210 425 389; 5211 389 337; 5212 337 542; 5213 542 1262;
5214 1262 391; 5215 391 390; 5216 390 351; 5217 351 393; 5218 393 545;
5219 545 392; 5220 392 338; 5221 338 499; 5222 499 395; 5223 395 394;
5224 394 339; 5225 339 396; 5226 396 397; 5227 397 865; 5228 865 398;
5229 398 340; 5230 340 399; 5231 399 512; 5232 512 401; 5233 401 544;
5234 544 400; 5235 400 341; 5236 341 522; 5237 522 402; 5238 402 342;
5239 415 835; 5240 835 355; 5241 354 356; 5242 358 357; 5243 360 359;
5244 362 361; 5245 363 364; 5246 365 366; 5247 368 367; 5248 369 836;
5500 372 373; 5501 373 934; 5502 934 374; 5503 371 374; 5504 404 347;
5505 346 404; 5506 346 405; 5507 405 345; 5508 565 568; 5509 568 566;
5510 302 441; 5511 441 311; 5512 311 414; 5513 567 564; 5514 414 567;
5515 375 376; 5516 353 834; 5517 834 415; 5518 303 442; 5519 442 312;
5520 312 386; 5521 386 317; 5522 317 413; 5523 413 343; 5524 343 384;
5525 384 324; 5526 324 480; 5527 480 407; 5528 407 331; 5529 331 406;
5530 406 548; 5531 548 387; 5532 387 336; 5533 336 835; 5534 388 355;
5535 420 444; 5536 444 421; 5537 421 422; 5538 422 427; 5539 423 477;
5540 477 424; 5541 424 546; 5542 546 425; 5543 356 389; 5544 805 1218;
5545 1218 804; 5546 232 318; 5547 318 426; 5548 426 1217; 5549 1217 325;
5550 325 474; 5551 474 234; 5552 234 552; 5553 552 337; 5554 337 354;
5555 417 443; 5556 443 418; 5557 539 558; 5558 558 542; 5559 468 462;
5560 462 470; 5561 470 464; 5562 464 478; 5563 478 466; 5564 466 1263;
5565 1263 1262; 5566 431 445; 5567 445 432; 5568 391 358; 5569 357 390;
5570 352 1260; 5571 1260 1259; 5572 1259 453; 5573 453 237; 5574 237 348;
5575 348 471; 5576 471 349; 5577 349 475; 5578 475 350; 5579 350 551;
5580 551 351; 5581 433 457; 5582 457 455; 5583 455 434; 5584 393 360;
5585 469 463; 5586 463 472; 5587 472 465; 5588 465 479; 5589 479 467;
5590 467 561; 5591 561 545; 5592 359 392; 5593 435 458; 5594 458 456;
5596 305 1261; 5597 1261 863; 5598 863 454; 5599 454 233; 5600 233 482;
5601 482 319; 5602 319 485; 5603 485 473; 5604 473 487; 5605 487 326;
5606 326 489; 5607 489 476; 5608 476 492; 5609 492 235; 5610 235 553;
5611 553 338; 5612 437 448; 5613 448 438; 5614 500 494; 5615 494 495;
5616 495 496; 5617 496 497; 5618 497 498; 5619 498 493; 5620 493 555;
5621 555 499; 5622 395 362; 5623 361 394; 5624 306 446; 5625 446 313;
5626 313 483; 5627 483 320; 5628 320 501; 5629 501 486; 5630 486 1256;
5631 1256 488; 5632 488 327; 5633 327 490; 5634 490 491; 5635 491 332;
5636 332 550; 5637 550 339; 5638 396 363; 5639 364 397; 5640 856 857;
5641 857 1264; 5642 866 870; 5643 870 871; 5644 871 1272; 5645 1272 868;
5646 867 868; 5647 872 867; 5648 869 872; 5649 864 869; 5650 864 865;
5651 429 460; 5652 460 447; 5653 447 1274; 5654 1274 430; 5655 398 365;
5656 307 461; 5657 461 314; 5659 314 484; 5660 484 321; 5661 321 502;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
5662 502 1270; 5663 1270 328; 5664 328 1265; 5665 1265 503; 5666 503 333;
5667 333 549; 5668 549 340; 5669 366 399; 5670 308 459; 5671 459 450;
5672 450 1275; 5673 1275 428; 5675 516 518; 5676 518 1271; 5677 514 1271;
5678 514 1267; 5679 1267 517; 5680 517 515; 5681 515 556; 5682 556 512;
5683 401 368; 5684 533 1269; 5685 1269 534; 5686 541 560; 5687 560 544;
5688 519 520; 5689 520 521; 5690 1276 538; 5691 536 538; 5692 367 400;
5693 419 449; 5694 449 315; 5695 315 481; 5696 481 322; 5697 322 513;
5698 513 531; 5699 531 535; 5700 535 329; 5701 329 1266; 5702 1266 504;
5703 504 334; 5704 334 554; 5705 554 341; 5706 440 451; 5707 451 858;
5708 858 439; 5709 439 528; 5710 528 525; 5711 525 1301; 5712 529 523;
5713 523 1268; 5714 1268 526; 5715 526 524; 5716 524 557; 5717 557 522;
5718 402 369; 5719 310 975; 5720 975 452; 5721 859 452; 5722 859 316;
5723 316 527; 5724 527 969; 5725 969 323; 5726 323 972; 5727 972 1302;
5728 960 530; 5729 963 530; 5730 330 963; 5731 330 1299; 5732 1258 505;
5733 335 505; 5734 335 965; 5735 965 547; 5736 968 547; 5737 342 968;
5738 342 836; 5739 973 974; 5740 970 971; 5741 961 962; 5742 962 1277;
5743 1277 1278; 5744 1278 1279; 5745 1279 1280; 5746 1280 966; 5747 966 967;
6000 1164 1172; 6001 1168 1170; 6002 1166 1174; 6003 1165 1176; 6004 1178 1180;
6005 1182 1184; 6006 1146 1171; 6007 1171 1167; 6008 1167 1147; 6009 1147 1169;
6010 1169 1154; 6011 1154 1173; 6012 1173 1148; 6013 1148 1175; 6014 1175 1149;
6015 1149 1177; 6016 1177 1179; 6017 1179 1181; 6018 1181 1150; 6019 1150 1183;
6020 1183 1151; 6021 1162 1163; 6022 1160 1161; 6023 1158 1159; 6024 1156 1157;
6500 1162 1161; 6501 1158 1157; 6502 1146 1164; 6503 1146 1163; 6504 1163 1160;
6505 1160 1152; 6506 1152 1153; 6507 1153 1159; 6508 1159 1156; 6509 1156 1155;
6510 1171 1172; 6511 1167 1168; 6512 1169 1170; 6513 1154 1166; 6514 1173 1174;
6515 1148 1165; 6516 1175 1176; 6517 1177 1178; 6518 1179 1180; 6519 1181 1182;
6520 1183 1184; 7000 1128 1133; 7003 1131 1132; 7004 1130 1134; 7007 1129 1135;
7008 1136 1137; 7011 1138 1139; 7012 624 1121; 7013 1121 1118; 7015 1118 625;
7016 625 1119; 7017 1119 661; 7018 661 1122; 7019 1122 626; 7021 626 1123;
7022 1123 627; 7023 627 1124; 7024 1124 1125; 7025 1125 1126; 7027 1126 628;
7028 628 1127; 7029 1127 629; 7030 629 630; 7031 630 631; 7032 631 990;
7033 991 992; 7034 1021 1015; 7036 1014 1020; 7040 986 987; 7042 988 989;
7043 1019 1017; 7044 1016 1018; 7045 916 917; 7046 914 915; 7048 873 874;
7049 651 875; 7050 651 879; 7051 879 880; 7052 880 652; 7053 652 886;
7055 886 883; 7056 883 660; 7057 660 890; 7058 890 887; 7059 887 653;
7060 653 894; 7061 894 891; 7062 891 654; 7063 654 898; 7064 898 895;
7065 895 902; 7067 902 655; 7068 655 899; 7069 899 906; 7070 906 903;
7071 903 656; 7072 656 913; 7075 913 657; 7076 876 877; 7077 877 878;
7078 881 882; 7081 885 884; 7082 889 888; 7085 893 892; 7086 897 896;
7089 901 900; 7090 905 904; 7094 912 911; 7500 1021 1020; 7505 1019 1018;
7506 916 915; 7509 874 875; 7510 875 876; 7511 624 1128; 7512 624 1015;
7513 1015 1014; 7514 1014 632; 7515 632 635; 7517 635 1017; 7518 1017 1016;
7519 1016 850; 7520 850 849; 7521 849 917; 7522 917 646; 7523 646 914;
7524 914 873; 7526 873 651; 7527 651 877; 7528 878 879; 7529 1121 1133;
7531 880 881; 7532 1118 1131; 7533 882 652; 7534 1119 1132; 7536 885 886;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
7537 883 884; 7538 661 1130; 7539 1122 1134; 7540 889 890; 7542 887 888;
7543 626 1129; 7545 1123 1135; 7546 893 894; 7547 891 892; 7548 897 898;
7549 1124 1136; 7550 895 896; 7551 1125 1137; 7554 1126 1138; 7555 901 902;
7556 1127 1139; 7557 899 900; 7558 905 906; 7559 903 904; 7562 912 913;
7563 631 992; 7564 992 634; 7566 634 986; 7567 986 639; 7568 639 989;
7569 645 989; 7570 645 1214; 7571 1214 657; 7572 657 911; 7573 990 991;
7577 987 988; 8000 1185 1193; 8001 1193 1288; 8002 1288 1189; 8003 1189 1191;
8004 1187 1195; 8005 1195 1287; 8006 1287 1186; 8007 1186 1197; 8008 1199 1201;
8009 1201 1289; 8010 1289 1203; 8011 1203 1205; 8012 575 1192; 8013 1192 670;
8014 670 1209; 8015 1209 1188; 8016 1188 576; 8017 576 1190; 8018 1190 757;
8019 757 617; 8020 617 1194; 8021 1194 756; 8022 756 1210; 8023 1210 577;
8024 577 1196; 8025 1196 672; 8026 672 578; 8027 578 1198; 8028 1198 1200;
8029 1200 671; 8030 671 1211; 8031 1211 1202; 8032 1202 579; 8033 579 1204;
8034 1204 580; 8035 580 734; 8036 734 581; 8037 581 662; 8038 662 673;
8039 673 582; 8040 582 1086; 8041 1087 1088; 8042 666 718; 8043 718 695;
8044 695 845; 8045 845 697; 8046 697 844; 8047 844 698; 8048 698 717;
8049 717 699; 8050 699 716; 8051 716 700; 8052 700 739; 8053 739 710;
8054 710 715; 8055 715 668; 8056 668 1290; 8057 1111 1112; 8058 1109 1110;
8059 583 1113; 8060 583 680; 8061 680 569; 8062 569 768; 8063 768 762;
8064 762 772; 8065 772 574; 8066 574 763; 8067 763 570; 8068 570 681;
8069 681 584; 8070 584 682; 8071 682 585; 8072 585 735; 8073 735 586;
8074 586 683; 8075 683 587; 8076 587 1091; 8077 778 779; 8078 787 791;
8079 791 786; 8080 723 741; 8081 741 727; 8082 727 725; 8083 1082 1083;
8084 776 777; 8085 785 790; 8086 790 784; 8087 588 1115; 8088 588 684;
8089 684 589; 8090 589 770; 8091 770 758; 8092 758 774; 8093 774 663;
8094 663 761; 8095 761 590; 8096 590 685; 8097 685 591; 8098 591 686;
8099 686 592; 8100 593 687; 8101 687 594; 8102 1084 1085; 8103 1107 1108;
8104 724 742; 8105 742 728; 8106 728 726; 8107 1105 1106; 8108 614 818;
8109 674 818; 8110 1212 674; 8111 573 1212; 8112 573 842; 8113 842 703;
8114 703 843; 8115 843 705; 8116 705 714; 8117 714 707; 8118 707 713;
8119 713 709; 8120 709 738; 8121 738 732; 8122 732 711; 8123 711 712;
8124 712 665; 8125 731 729; 8126 595 819; 8127 679 819; 8128 1213 679;
8129 596 1213; 8130 596 840; 8131 840 664; 8132 664 841; 8133 841 597;
8134 597 688; 8135 688 598; 8136 598 689; 8137 689 599; 8138 599 736;
8139 736 730; 8140 730 600; 8141 600 690; 8142 690 601; 8143 743 754;
8144 754 745; 8145 745 769; 8146 769 764; 8147 764 773; 8148 773 746;
8149 746 765; 8150 765 788; 8151 788 747; 8152 747 751; 8153 751 748;
8154 748 752; 8155 752 749; 8156 749 755; 8157 755 750; 8158 750 753;
8159 753 744; 8160 780 781; 8161 783 789; 8162 789 782; 8163 1064 1065;
8164 602 691; 8165 691 571; 8166 571 771; 8167 771 759; 8168 759 775;
8169 775 615; 8170 615 760; 8171 760 572; 8172 572 692; 8173 692 603;
8174 603 693; 8175 693 604; 8176 604 737; 8177 737 605; 8178 605 694;
8179 694 606; 8180 1062 1063; 8181 667 1294; 8182 667 722; 8183 722 696;
8184 696 847; 8185 847 702; 8186 702 846; 8187 846 704; 8188 704 721;
8189 721 706; 8190 706 720; 8191 720 708; 8192 708 740; 8193 740 701;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
8194 701 719; 8195 719 669; 8196 1026 1027; 8197 607 1028; 8198 607 1032;
8199 1032 678; 8200 678 1033; 8201 608 1033; 8202 608 1101; 8203 1101 766;
8204 1039 766; 8205 1036 1039; 8206 1036 616; 8207 616 1043; 8208 1043 767;
8209 1040 767; 8210 609 1040; 8211 609 675; 8212 1047 675; 8213 1044 1047;
8214 610 1044; 8215 610 1051; 8216 1051 1048; 8217 1048 676; 8218 1102 676;
8219 1055 1102; 8220 611 1055; 8221 611 1052; 8222 1052 733; 8223 733 1059;
8224 1056 1059; 8225 612 1056; 8226 612 1103; 8227 1103 677; 8228 1104 677;
8229 1061 1104; 8230 613 1061; 8231 1029 1030; 8232 1030 1031; 8233 1034 1035;
8234 1035 1293; 8235 1293 1038; 8236 1038 1037; 8237 1042 1041; 8238 1041 1068;
8239 1068 1046; 8240 1046 1045; 8241 1050 1049; 8242 1049 1292; 8243 1292 1054;
8244 1054 1053; 8245 1058 1057; 8246 1057 1291; 8247 1291 1099; 8248 1099 1060;
8249 1060 1066; 8500 1111 1110; 8501 1110 1113; 8502 1113 1115; 8503 1115 1107;
8504 1107 1106; 8505 1064 1063; 8506 1063 1294; 8507 1294 1027; 8508 1027 1028;
8509 1028 1029; 8510 575 1185; 8511 575 666; 8512 666 1112; 8513 1112 1109;
8514 1109 583; 8515 583 588; 8516 588 1108; 8517 1108 1105; 8518 1105 614;
8519 614 595; 8520 595 743; 8521 743 1065; 8522 1065 602; 8523 602 1062;
8524 1062 667; 8525 667 1026; 8526 1026 607; 8527 607 1030; 8528 1031 1032;
8529 1192 1193; 8530 818 819; 8531 670 1288; 8532 670 718; 8533 718 680;
8534 680 684; 8535 684 674; 8536 679 754; 8537 754 691; 8538 691 722;
8539 722 678; 8540 1033 1034; 8541 1212 1213; 8542 1188 1189; 8543 576 695;
8544 695 569; 8545 569 589; 8546 589 573; 8547 573 596; 8548 596 745;
8549 745 571; 8550 571 696; 8551 696 608; 8552 1035 608; 8553 1190 1191;
8554 768 778; 8555 778 776; 8556 776 770; 8557 769 780; 8558 780 771;
8559 757 845; 8560 845 762; 8561 758 842; 8562 842 840; 8563 840 764;
8564 759 847; 8565 847 766; 8566 766 1293; 8567 772 779; 8568 779 777;
8569 777 774; 8570 773 781; 8571 781 775; 8572 1038 1039; 8573 1036 1037;
8574 617 1187; 8575 617 697; 8576 697 574; 8577 574 663; 8578 663 703;
8579 703 664; 8580 664 746; 8581 746 615; 8582 615 702; 8583 702 616;
8584 1194 1195; 8585 1042 1043; 8586 756 1287; 8587 756 844; 8588 844 763;
8589 763 787; 8590 787 785; 8591 785 761; 8592 761 843; 8593 843 841;
8594 841 765; 8595 765 783; 8596 783 760; 8597 760 846; 8598 846 767;
8599 791 790; 8600 788 789; 8601 1040 1041; 8602 577 1186; 8603 577 698;
8604 698 570; 8605 570 786; 8606 786 784; 8607 784 590; 8608 590 705;
8609 705 597; 8610 597 747; 8611 747 782; 8612 782 572; 8613 572 704;
8614 704 609; 8615 609 1068; 8616 1196 1197; 8617 672 717; 8618 717 681;
8619 681 685; 8620 685 714; 8621 714 688; 8622 688 751; 8623 751 692;
8624 692 721; 8625 721 675; 8626 1046 1047; 8627 1044 1045; 8628 578 699;
8629 699 584; 8630 584 591; 8631 591 707; 8632 707 598; 8633 598 748;
8634 748 603; 8635 603 706; 8636 706 610; 8637 1050 1051; 8638 1198 1199;
8639 1048 1049; 8640 1200 1201; 8641 671 1289; 8642 671 716; 8643 716 682;
8644 682 686; 8645 686 713; 8646 713 689; 8647 689 752; 8648 752 693;
8649 693 720; 8650 720 676; 8651 676 1292; 8652 1202 1203; 8653 1054 1055;
8654 579 700; 8655 700 585; 8656 585 723; 8657 723 592; 8658 592 724;
8659 724 709; 8660 709 599; 8661 599 749; 8662 749 604; 8663 604 708;
8664 708 611; 8665 1204 1205; 8666 1052 1053; 8667 734 739; 8668 739 735;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
8669 735 741; 8670 741 742; 8671 742 738; 8672 738 736; 8673 736 755;
8674 755 737; 8675 737 740; 8676 740 733; 8677 1058 1059; 8678 727 728;
8679 732 731; 8680 731 730; 8681 1056 1057; 8682 662 710; 8683 710 586;
8684 586 725; 8685 725 593; 8686 593 726; 8687 726 711; 8688 711 729;
8689 729 600; 8690 600 750; 8691 750 605; 8692 605 701; 8693 701 612;
8694 673 715; 8695 715 683; 8696 683 687; 8697 687 712; 8698 712 690;
8699 690 753; 8700 753 694; 8701 694 719; 8702 719 677; 8703 677 1291;
8704 1060 1061; 8705 582 1088; 8706 1088 668; 8707 668 1098; 8708 1098 587;
8709 587 1082; 8710 1082 594; 8711 594 1085; 8712 1085 665; 8713 665 1073;
8714 1073 601; 8715 601 744; 8716 744 606; 8717 606 669; 8718 669 613;
8719 613 1066; 8720 1086 1087; 8721 1087 1290; 8722 1290 1091; 8723 1091 1083;
8724 1083 1084; 9500 58 109; 9501 109 226; 9502 226 347; 9503 57 108;
9504 108 225; 9505 225 346; 9506 107 56; 9507 224 107; 9508 345 224; 9509 1 59;
9510 59 181; 9511 181 302; 9512 10 68; 9513 68 190; 9514 190 311; 9515 2 60;
9516 60 182; 9517 182 303; 9518 303 1146; 9519 1146 624; 9520 624 575;
9521 11 69; 9522 69 191; 9523 191 312; 9524 312 1152; 9525 1152 632;
9526 632 583; 9527 19 76; 9528 76 196; 9529 196 317; 9530 317 1153;
9531 1153 635; 9532 635 588; 9533 47 104; 9534 104 793; 9535 793 838;
9536 838 797; 9537 797 343; 9538 343 1155; 9539 1155 809; 9540 850 809;
9541 815 850; 9542 614 815; 9543 614 823; 9544 26 83; 9545 83 792;
9546 792 837; 9547 837 795; 9548 795 324; 9549 324 807; 9550 849 807;
9551 813 849; 9552 595 813; 9553 595 821; 9554 33 90; 9555 90 210;
9556 210 331; 9557 331 646; 9558 646 602; 9559 40 97; 9560 97 215;
9561 215 336; 9562 336 651; 9563 651 607; 9564 3 61; 9565 61 183; 9566 183 304;
9567 304 1147; 9568 1147 625; 9569 625 576; 9570 12 70; 9571 70 232;
9572 232 618; 9573 618 569; 9574 20 77; 9575 77 197; 9576 197 318;
9577 318 636; 9578 636 589; 9579 48 105; 9580 105 798; 9581 798 796;
9582 796 426; 9583 426 806; 9584 852 806; 9585 812 852; 9586 573 812;
9587 573 820; 9588 27 84; 9589 84 799; 9590 799 862; 9591 862 794;
9592 794 325; 9593 325 808; 9594 851 808; 9595 814 851; 9596 596 814;
9597 596 822; 9598 34 91; 9599 91 234; 9600 234 620; 9601 620 571; 9602 41 98;
9603 98 216; 9604 216 337; 9605 337 652; 9606 652 608; 9607 778 1229;
9608 776 1227; 9609 769 1225; 9610 780 1231; 9611 764 1224; 9612 779 1230;
9613 777 1228; 9614 773 1226; 9615 781 1232; 9616 116 122; 9617 122 231;
9618 231 352; 9619 352 1154; 9620 1154 661; 9621 661 617; 9622 111 117;
9623 117 237; 9624 237 623; 9625 623 574; 9626 112 118; 9627 118 227;
9628 227 348; 9629 113 119; 9630 119 228; 9631 228 349; 9632 114 120;
9633 120 229; 9634 229 350; 9635 350 659; 9636 659 615; 9637 115 121;
9638 121 230; 9639 230 351; 9640 351 660; 9641 660 616; 9642 791 1239;
9643 790 1238; 9644 788 1236; 9645 789 1237; 9646 4 62; 9647 62 184;
9648 184 305; 9649 305 1148; 9650 1148 626; 9651 626 577; 9652 13 71;
9653 71 233; 9654 233 619; 9655 619 570; 9656 786 1235; 9657 784 1234;
9658 21 78; 9659 78 198; 9660 198 319; 9661 319 637; 9662 637 590; 9663 28 85;
9664 85 205; 9665 205 326; 9666 326 642; 9667 642 597; 9668 747 1223;
9669 782 1233; 9670 35 92; 9671 92 235; 9672 235 621; 9673 621 572; 9674 42 99;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
9675 99 217; 9676 217 338; 9677 338 653; 9678 653 609; 9679 5 63; 9680 63 185;
9681 185 306; 9682 306 1149; 9683 1149 627; 9684 627 578; 9685 14 72;
9686 72 192; 9687 192 313; 9688 313 633; 9689 633 584; 9690 22 79; 9691 79 199;
9692 199 320; 9693 320 638; 9694 638 591; 9695 29 86; 9696 86 206;
9697 206 327; 9698 327 643; 9699 643 598; 9700 36 93; 9701 93 211;
9702 211 332; 9703 332 647; 9704 647 603; 9705 43 100; 9706 100 218;
9707 218 339; 9708 339 654; 9709 654 610; 9710 6 64; 9711 64 186; 9712 186 307;
9713 307 1150; 9714 1150 628; 9715 628 579; 9716 15 73; 9717 73 193;
9718 193 314; 9719 314 853; 9720 853 585; 9721 23 80; 9722 80 200;
9723 200 321; 9724 321 854; 9725 854 592; 9726 30 87; 9727 87 207;
9728 207 328; 9729 328 855; 9730 855 599; 9731 37 94; 9732 94 212;
9733 212 333; 9734 333 648; 9735 648 604; 9736 44 101; 9737 101 219;
9738 219 340; 9739 340 655; 9740 655 611; 9741 7 65; 9742 65 187; 9743 187 308;
9744 308 1151; 9745 1151 629; 9746 629 580; 9747 8 66; 9748 66 188;
9749 188 309; 9750 309 630; 9751 630 581; 9752 17 74; 9753 74 194;
9754 194 315; 9755 315 586; 9756 24 81; 9757 81 201; 9758 201 322;
9759 322 593; 9760 31 88; 9761 88 208; 9762 208 329; 9763 329 644;
9764 644 600; 9765 38 95; 9766 95 213; 9767 213 334; 9768 334 649;
9769 649 605; 9770 45 102; 9771 102 220; 9772 220 341; 9773 341 656;
9774 656 612; 9775 9 67; 9776 67 189; 9777 189 310; 9778 310 631; 9779 631 582;
9780 18 75; 9781 75 195; 9782 195 316; 9783 316 634; 9784 634 587; 9785 25 82;
9786 82 202; 9787 202 323; 9788 323 639; 9789 639 594; 9790 32 89; 9791 89 209;
9792 209 330; 9793 330 645; 9794 645 601; 9795 39 96; 9796 96 214;
9797 214 335; 9798 335 1214; 9799 1214 606; 9800 46 103; 9801 103 221;
9802 221 342; 9803 342 657; 9804 657 613; 9805 1297 330; 9806 1298 1258;
9807 1297 1300; 9808 1299 1258; 9809 1300 1298; 9810 1300 1299; 9811 1301 529;
9812 1302 960; 9813 1301 1304; 9814 1303 530; 9815 1304 1302; 9816 1304 1303;
START GROUP DEFINITION
MEMBER
_ARCHPRO-PB 3006 TO 3008 3011 TO 3017 3019 TO 3024 3047 TO 3056 3500 3501 -
3508 TO 3510 3520 TO 3536 3549 TO 3553
_PB 3000 TO 3005 3009 3010 3018 3025 TO 3046 3502 TO 3507 3511 TO 3519 3537 -
3538 TO 3548
_GFTB 4000 TO 4005 4009 4018 4029 TO 4050 4504 TO 4508 4512 TO 4521 -
4539 TO 4546 4550 TO 4552
_ARCHPRO-GFTB 4016 4025 4546 4550
_FFBEAMS 5000 TO 5022 5024 TO 5037 5041 TO 5117 5119 TO 5141 5143 TO 5147 -
5149 TO 5151 5153 TO 5167 5169 TO 5185 5187 5189 TO 5248 5500 TO 5594 5596 -
5597 TO 5646 5648 TO 5656 5659 TO 5673 5675 5676 5678 TO 5689 5691 TO 5730 -
5734 TO 5741 5747 9805 9806 9811 9812 9814
_FFLOORPRO 5019 5020 5067 5080 5081 5090 5091 5109 5117 5120 5169 5187 5205 -
5206 TO 5207 5239 TO 5248 5500 TO 5503 5515 TO 5517 5533 5534 5543 5554 5568 -
5569 5584 5592 5622 5623 5638 5639 5655 5669 5683 5692 5718 5738 TO 5741 -
5747
_MBEAMS@4.95 5000 TO 5018 5044 TO 5066 5068 TO 5070 5082 TO 5089 5092 TO 5094 -
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
5102 TO 5104 5121 TO 5123 5127 TO 5141 5170 TO 5185 5208 TO 5238 -
5504 TO 5507 5510 5511 5518 TO 5532 5546 TO 5553 5570 TO 5580 5596 TO 5611 -
5624 TO 5637 5656 5659 TO 5668 5670 TO 5673 5693 TO 5705 5719 TO 5730 5734 -
5735 TO 5737 9805 9812
_SILLBEAM 6000 TO 6024 6500 TO 6520
_ARCHPRO-FFTB 7000 7003 7004 7007 7008 7011 7012 7015 7016 7018 7021 7024 -
7027 7028 7032 TO 7034 7036 7040 7042 TO 7046 7048 TO 7050 7052 7055 7056 -
7058 TO 7061 7064 7067 7068 7070 7071 7075 TO 7078 7081 7082 7085 7086 7089 -
7090 7094 7500 7505 7506 7509 TO 7511 7513 7514 7517 7518 7522 7523 7526 -
7527 TO 7529 7531 TO 7534 7536 TO 7540 7542 7543 7545 TO 7551 7554 TO 7559 -
7562 7563 7566 TO 7568 7572 7573 7577
_ARCHPRO@9.85TER 8000 8001 8003 TO 8005 8007 TO 8009 8011 TO 8017 -
8020 TO 8024 8028 TO 8033 8040 8041 8056 TO 8059 8076 8083 8087 8102 8103 -
8107 8163 8180 8181 8196 TO 8198 8201 TO 8205 8208 TO 8213 8216 TO 8221 8224 -
8225 TO 8233 8235 TO 8242 8244 8245 8247 TO 8249 8510 8513 8514 8516 8517 -
8522 8523 8525 TO 8529 8531 8540 8542 8552 8553 8566 8572 TO 8574 -
8584 TO 8586 8601 8602 8615 8616 8626 8627 8637 TO 8641 8651 TO 8653 8665 -
8666 8677 8681 8703 TO 8711 8719 TO 8721 8723 8724
_MBEAM@9.85TER 8012 TO 8039 8060 TO 8075 8088 TO 8101 8126 TO 8142 -
8164 TO 8179 8198 TO 8230 8511 TO 8514 8516 TO 8523 8525 8526 8543 TO 8551 -
8575 TO 8583 8603 TO 8614 8628 TO 8636 8654 TO 8664 8682 TO 8693 -
8705 TO 8718
_SECBEAM@9.85TER 8042 TO 8055 8077 TO 8082 8084 TO 8086 8104 TO 8106 8108 -
8109 TO 8125 8143 TO 8162 8182 TO 8195 8530 8532 TO 8539 8541 8554 TO 8565 -
8567 TO 8571 8587 TO 8600 8617 TO 8625 8642 TO 8650 8667 TO 8676 -
8678 TO 8680 8694 TO 8702
_STAIRCASE 1314 1317 1320 TO 1325 1328 1336 TO 1341 1346 TO 1350 1359 TO 1365 -
1951 1959 1965 TO 1967 1971 3513 3514 5102 TO 5104 5119 5127 TO 5129 5524 -
5525 5544 5545 5548 5549 7520 8108 TO 8111 8126 TO 8129 8519 8530 8541 8547 -
9533 TO 9553 9579 TO 9597
_FFSECBEAMS 5021 5022 5024 5026 TO 5029 5031 TO 5037 5041 TO 5043 -
5071 TO 5079 5095 TO 5101 5105 TO 5108 5115 5116 5119 5124 TO 5126 -
5143 TO 5145 5153 TO 5167 5189 TO 5191 5194 TO 5204 5508 5509 5512 TO 5514 -
5535 TO 5542 5544 5545 5555 TO 5563 5566 5567 5581 TO 5583 5585 TO 5591 5593 -
5594 5612 TO 5621 5640 5642 TO 5646 5648 TO 5654 5675 5676 5678 TO 5682 5684 -
5685 TO 5689 5691 5706 TO 5712 5715 TO 5717 9811 9814
_SFMAINBEAM 8012 TO 8039 8060 TO 8075 8088 TO 8101 8108 8126 8130 TO 8142 -
8164 TO 8179 8198 TO 8230 8511 TO 8514 8516 TO 8523 8525 8526 8543 TO 8551 -
8575 8576 8582 8583 8603 TO 8614 8628 TO 8636 8654 TO 8664 8682 TO 8693 8705 -
8706 TO 8713
_SFSECBEAM 8042 TO 8044 8046 8048 TO 8055 8077 TO 8082 8084 TO 8086 -
8104 TO 8106 8112 8114 8116 TO 8125 8143 TO 8162 8182 TO 8184 8186 -
8188 TO 8195 8530 8532 TO 8539 8554 TO 8559 8561 8564 8567 TO 8571 -
8577 TO 8581 8587 8589 TO 8592 8595 TO 8597 8599 8600 8617 TO 8625 -
8642 TO 8650 8667 TO 8676 8678 8680 8694 TO 8702
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
_FFTB 7012 7015 TO 7018 7021 TO 7024 7027 TO 7031 7050 TO 7052 7055 TO 7064 -
7067 TO 7071 7075 7512 TO 7514 7517 TO 7523 7526 7563 7566 TO 7568
_WALLLOAD-1ST 5021 5022 5071 5072 5076 TO 5078 5088 5098 TO 5101 5115 5116 -
5124 TO 5126 5137 TO 5141 5143 5144 5159 5160 5163 TO 5167 5546 5547 5550 -
5551 5555 TO 5558 5566 5567 5579 TO 5583 5593 5594 5601 TO 5608 5610 TO 5613 -
5627 TO 5634 5636 5637 5651 TO 5654 5660 TO 5665 5670 TO 5673 5675 5676 5678 -
5679 5684 TO 5689 5691 5696 TO 5698 5700 5706 TO 5711 9805 9811 9814
_GFTERRACE 5000 5026 5044 5068 TO 5070 5092 TO 5094 5121 TO 5123 5504 TO 5514 -
5518 TO 5524
_16.1WALLLOAD 5021 5022 5043 5045 5046 5064 5065 5071 TO 5074 5076 TO 5078 -
5082 5083 5088 5095 5096 5099 TO 5101 5116 5124 TO 5126 5137 TO 5141 5143 -
5144 5159 TO 5162 5164 TO 5167 5170 5171 5555 TO 5558 5566 5567 5579 TO 5583 -
5593 5594 5601 5606 TO 5613 5627 TO 5637 5649 TO 5654 5660 5664 5665 5670 -
5671 TO 5673 5675 5676 5678 5679 5684 TO 5689 5691 5696 TO 5700 5706 TO 5709 -
5711 9805 9811 9814
_1.2MPARAPET 8018 8019 8025 TO 8027 8034 TO 8039 8199 8200 8206 8207 8214 -
8215 8222 8223 8511 8512 8518 TO 8521 8712 8713
_1.8MPARAPET 8000 8001 8003 TO 8005 8007 TO 8009 8011 8040 8057 8102 8107 -
8163 8231 TO 8233 8235 TO 8242 8244 8245 8247 TO 8249 8510 8528 8540 8553 -
8573 8574 8585 8616 8627 8637 8638 8665 8666 8677 8720 8721 8723 8724
FLOOR
_1STERRACE 5000 5026 5044 5067 TO 5070 5080 5091 TO 5094 5117 5120 TO 5123 -
5500 TO 5511 5513 5514 5518 5519 5521 TO 5524
_2TERRACELL 8012 TO 8039 8042 TO 8055 8060 TO 8075 8077 TO 8082 8084 TO 8086 -
8088 TO 8090 8092 TO 8094 8096 TO 8101 8104 TO 8106 8108 8112 TO 8126 8130 -
8131 TO 8162 8164 TO 8179 8182 TO 8195 8198 TO 8230 8511 TO 8515 8520 TO 8526 -
8532 TO 8534 8536 TO 8539 8543 TO 8545 8547 TO 8551 8554 TO 8560 -
8562 TO 8565 8567 TO 8571 8575 TO 8577 8579 TO 8583 8587 TO 8591 -
8593 TO 8600 8603 TO 8614 8617 TO 8625 8628 TO 8636 8642 TO 8650 -
8654 TO 8664 8667 TO 8676 8678 TO 8680 8682 TO 8684 8686 8687 8689 TO 8695 -
8697 8699 TO 8702 8705 TO 8708 8711 8712 8715 TO 8718
_2FLOORSLAB 8000 8001 8003 TO 8005 8007 TO 8009 8011 TO 8055 8057 TO 8180 -
8182 TO 8233 8235 TO 8242 8244 8245 8247 TO 8249 8510 TO 8514 8516 TO 8518 -
8520 TO 8523 8525 TO 8529 8532 TO 8540 8542 TO 8565 8567 TO 8585 -
8587 TO 8640 8642 TO 8650 8652 TO 8702 8704 TO 8713 8719 TO 8721 8723 8724
_4FLOORLL 5001 TO 5005 5007 5009 TO 5012 5015 TO 5018 5024 5027 TO 5037 5041 -
5043 5045 TO 5066 5071 TO 5076 5078 5079 5082 TO 5089 5095 TO 5097 -
5100 TO 5108 5110 TO 5112 5116 5124 5125 5127 TO 5137 5143 TO 5147 -
5153 TO 5167 5170 TO 5185 5189 5190 5192 TO 5201 5203 5204 5208 TO 5211 5213 -
5214 TO 5233 5236 TO 5238 5518 TO 5523 5526 TO 5532 5535 TO 5542 5546 TO 5553 -
5555 TO 5567 5570 TO 5582 5585 TO 5591 5593 5594 5596 TO 5621 5624 TO 5637 -
5640 TO 5646 5648 TO 5654 5659 TO 5668 5670 TO 5673 5675 TO 5682 -
5684 TO 5688 5693 5694 5703 TO 5711 5715 TO 5717 5719 TO 5721 5723 TO 5728 -
5733 TO 5737 9811 9813 TO 9816
_4FLOORLL1 5006 5008 5025 5042 5570 TO 5572 5581 5582 5593 5594 5596 TO 5598
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
_3FLOORLL 5013 5014 5021 5022 5061 5062 5651 TO 5654 5656 5670 TO 5673
_5ELECLL 5138 TO 5141 5149 TO 5151 5165 TO 5167 5684 5685 5701 5702 5713 5714 -
5731 5732 9805 TO 9810
_ONEWAY 5043 5064 5066 5077 5078 5088 5114 5126 5134 5145 5172 5183 5191 5202 -
5212 5234 5235 5552 5553 5557 5558 5633 5646 5686 TO 5688 5690 5695 5696 -
5699 5704 5705 5708 5710 5722 5728 9812 9814 TO 9816
_2TERRACEONEWAY 8082 8084 TO 8086 8091 8092 8095 8106 8122 8125 8556 8569 -
8591 8607 8678 8679 8685 8686 8688
_2TERRACELL2 8074 8075 8088 TO 8095 8100 8101 8108 TO 8115 8123 8124 8126 -
8127 TO 8129 8141 TO 8144 8516 TO 8518 8520 8535 8536 8546 8548 8561 8578 -
8592 8608 8684 8685 8688 8689 8696 8698 8709 8710 8713 8714
_2TLLONEWAY 8082 8084 TO 8086 8091 8092 8095 8106 8122 8125 8556 8569 8591 -
8607 8678 8679 8685 8686 8688
_2ONEWAY 5114 5126 5690 5699
_1TERRACEONEWAY 5044 5070 5512 5520
_HEADROOMSLAB 1359 TO 1365
_STAIRLANSLAB 1314 1317 1325 1328 1336 TO 1338 1341 1349 1965 TO 1967 1971 -
5119 5129 5545 5549 8108 8126 8519 8530
_STAIRONEWAY 1322 TO 1324 1348 1350 1951 1959 1971 5104 5119 5544 5548 8111 -
8129 8541 8547
_SUNKEN400MM 5013 5014 5021 5022 5051 5061 TO 5063 5075 5076 5098 5573 5583 -
5651 TO 5654 5656 5659 5670 TO 5673 5675 5688 5689
_SUNKEN300MM 5041 5042 5052 TO 5054 5064 5065 5077 5078 5088 5098 5099 5113 -
5114 TO 5115 5137 5138 5140 5164 5583 5599 5676 TO 5679 5684 5685 5688 5690 -
5691 5697 TO 5700 5709 5711 5712 9811
_SLAB2WAY2 5079 5089 5115 5116 5135 TO 5141 5146 5147 5149 5646 5664 5678 -
5684 5699 TO 5701 5710 5712 5724 5725 5729 5730 9805 9814
_SLAB2WAY1 5001 TO 5018 5021 5022 5024 5025 5027 TO 5037 5041 TO 5043 5045 -
5046 TO 5066 5071 TO 5076 5078 5079 5082 TO 5089 5095 TO 5108 5110 TO 5115 -
5124 5125 5127 TO 5138 5140 5141 5143 TO 5147 5149 TO 5151 5153 TO 5167 5170 -
5171 TO 5185 5189 5190 5192 TO 5201 5203 5204 5208 TO 5211 5213 TO 5233 5236 -
5237 TO 5238 5518 TO 5523 5526 TO 5532 5535 TO 5542 5546 TO 5553 5555 TO 5567 -
5570 TO 5583 5585 TO 5591 5593 5594 5596 TO 5621 5624 TO 5637 5640 TO 5645 -
5647 TO 5654 5656 5659 TO 5663 5665 TO 5668 5670 TO 5673 5675 TO 5677 5679 -
5680 TO 5682 5685 TO 5691 5693 TO 5695 5697 5698 5701 TO 5709 5711 -
5713 TO 5717 5719 TO 5721 5723 5726 TO 5728 5732 TO 5737 9806 TO 9811 9813 -
9815
_PRECAST 1989 TO 2005
_ROOF@9.85 8001 8005 8009 8012 TO 8055 8057 TO 8085 8087 TO 8094 8096 TO 8114 -
8116 TO 8132 8134 TO 8150 8152 TO 8159 8161 8163 TO 8167 8169 8170 -
8172 TO 8180 8182 TO 8184 8186 8188 TO 8203 8205 TO 8209 8211 TO 8231 8242 -
8247 8248 8510 TO 8514 8516 TO 8518 8520 TO 8523 8525 TO 8529 8532 8533 8535 -
8536 TO 8540 8542 TO 8544 8546 TO 8554 8556 TO 8565 8567 TO 8585 8587 TO 8640 -
8642 TO 8650 8652 TO 8685 8687 8690 TO 8696 8699 TO 8702 8704 TO 8711 8713 -
8715 TO 8719 8721
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
_ROOF@9.85-2 8060 TO 8062 8085 8088 TO 8090 8095 8100 8101 8115 8123 8124 -
8133 8141 8142 8150 8151 8160 TO 8162 8167 TO 8169 8171 8185 8187 -
8204 TO 8206 8209 8210 8515 8534 8545 8554 TO 8556 8558 8564 8565 8571 8582 -
8583 8591 TO 8594 8596 TO 8598 8601 8607 TO 8610 8612 TO 8615 8686 TO 8689 -
8697 8698 8711 TO 8714
_2FLOORLL 5041 5042 5051 TO 5054 5064 5065 5076 TO 5078 5088 5098 5099 5113 -
5114 TO 5116 5126 5137 5138 5140 5141 5573 5583 5599 5675 TO 5677 -
5688 TO 5691 5695 5697 TO 5700 5709 5711 5712 5729 5730 9805 9811 9814
_ARCHPRO@4.95 5019 5020 5081 5090 5109 5118 5142 5152 5168 5169 5186 TO 5188 -
5205 TO 5208 5211 5215 5218 5219 5223 5226 5229 5230 5233 5234 5238 5240 -
5241 TO 5248 5515 5516 5528 5529 5532 TO 5534 5543 5554 5568 5569 5584 5592 -
5622 5623 5638 5639 5655 5669 5683 5692 5718 5719 5725 5726 5728 TO 5736 -
5738 TO 5747 9808
_ARCHPRO@9.85 8000 TO 8017 8020 TO 8024 8028 TO 8033 8040 8041 8056 TO 8059 -
8076 8083 8087 8102 8103 8107 8163 8180 8181 8196 TO 8198 8201 TO 8206 8208 -
8209 TO 8213 8215 TO 8221 8224 TO 8230 8233 TO 8249 8500 TO 8507 8510 8512 -
8513 TO 8518 8522 TO 8529 8531 8540 8542 8552 8553 8566 8572 TO 8574 8584 -
8585 TO 8586 8601 8602 8615 8616 8626 8627 8637 TO 8641 8651 TO 8653 8665 -
8666 8677 8681 8703 TO 8711 8719 TO 8724
_ARCPRO-GFTB 4016 4025 4546 4550
_ARCHPRO-DL@4.95 5080 5091 5117 5118 5142 5152 5168 5186 5188 5501 5502 5505 -
5506 5730 TO 5734 5742 TO 5746 9808
_ARCPRO2Y@9.85 8196 TO 8198 8231 8232 8508 8509 8526 TO 8528
_ARCPRO-FFTB 7000 7003 7004 7007 7008 7011 7012 7015 7016 7018 7021 7024 7027 -
7028 7032 TO 7034 7036 7040 7042 TO 7046 7048 TO 7050 7052 7055 7056 7058 -
7059 TO 7061 7064 7067 7068 7070 7071 7075 7078 7081 7082 7085 7086 7089 7090 -
7094 7500 7505 7506 7511 7513 7514 7517 7518 7522 7523 7526 TO 7529 7531 -
7532 TO 7534 7536 TO 7540 7542 7543 7545 TO 7551 7554 TO 7559 7562 7563 7566 -
7567 TO 7568 7572 7573 7577
_ARCPROFFTB-1WAY 7048 TO 7050 7076 7077 7509 7510 7526 TO 7528
JOINT
END GROUP DEFINITION
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
3025 TO 3046 3502 TO 3506 3515 TO 3519 3537 TO 3548 5110 TO 5114 5126 5142 -
5143 TO 5147 5149 TO 5158 5189 TO 5204 5508 5509 5512 TO 5514 5535 TO 5538 -
5555 5556 5566 5567 5593 5594 5612 5613 5640 5641 5684 TO 5687 5690 5691 -
5706 TO 5717 5723 TO 5737 9806 9808 9811 9812 PRIS YD 0.6 ZD 0.3
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
1989 TO 2005 3006 TO 3008 3011 TO 3017 3019 TO 3024 3047 TO 3056 3500 3501 -
3508 TO 3510 3520 TO 3536 3549 TO 3553 4006 TO 4008 4010 TO 4012 -
4014 TO 4017 4022 4024 TO 4028 4051 TO 4060 4500 4503 4509 TO 4511 -
4522 TO 4538 4553 TO 4556 4562 5020 5067 5080 5081 5090 5091 5109 5117 5118 -
5120 5169 5187 5188 5205 TO 5207 5239 TO 5248 5500 TO 5503 5515 TO 5517 5533 -
5534 5543 5554 5568 5569 5584 5592 5622 5623 5638 5639 5655 5669 5683 5692 -
5718 5738 TO 5747 6000 TO 6005 6021 TO 6024 6500 TO 6502 6510 TO 6520 7000 -
7003 7004 7007 7008 7011 7032 TO 7034 7036 7040 7042 TO 7046 7048 7049 7076 -
7077 TO 7078 7081 7082 7085 7086 7089 7090 7094 7500 7505 7506 7509 TO 7511 -
7527 TO 7529 7531 TO 7534 7536 TO 7540 7542 7543 7545 TO 7551 7554 TO 7559 -
7562 7572 7573 7577 8000 TO 8011 8041 8057 8058 8083 8102 8103 8107 8163 -
8180 8196 8231 TO 8249 8500 TO 8509 8528 8529 8540 8542 8553 8572 8573 8584 -
8601 8616 8626 8627 8637 TO 8640 8652 8653 8665 8666 8677 8681 8704 8720 -
8721 TO 8724 PRIS YD 0.3 ZD 0.2
MEMBER PROPERTY AMERICAN
9500 TO 9558 9564 TO 9573 9579 TO 9587 9598 TO 9606 9616 TO 9621 9626 TO 9631 -
9637 TO 9641 9646 TO 9655 9670 TO 9799 PRIS YD 0.45 ZD 0.45
1359 TO 1364 3000 TO 3005 8077 8084 8161 8162 PRIS YD 0.5 ZD 0.3
5043 9807 9809 9810 9813 9815 9816 PRIS YD 0.45 ZD 0.3
MEMBER PROPERTY AMERICAN
6006 TO 6020 6503 TO 6509 PRIS YD 0.5 ZD 0.2
MEMBER PROPERTY AMERICAN
9607 TO 9615 9642 TO 9645 9656 9657 9668 9669 PRIS YD 0.2 ZD 0.2
MEMBER PROPERTY AMERICAN
9559 TO 9563 9574 TO 9578 9588 TO 9597 9622 TO 9625 9632 TO 9636 9658 TO 9667 -
9800 TO 9804 PRIS YD 0.6 ZD 0.6
MEMBER PROPERTY AMERICAN
5006 TO 5008 5044 TO 5050 5055 TO 5057 5134 TO 5141 5208 TO 5238 5504 TO 5507 -
5510 5511 5518 TO 5523 5526 TO 5532 5550 TO 5553 5557 5558 5570 TO 5573 5581 -
5582 TO 5583 5596 TO 5599 5624 5625 5664 TO 5668 9805 PRIS YD 0.7 ZD 0.3
MEMBER PROPERTY AMERICAN
3009 3010 3018 3507 3511 TO 3514 5170 TO 5186 5575 TO 5580 5719 TO 5721 -
5722 PRIS YD 0.75 ZD 0.3
MEMBER PROPERTY AMERICAN
5016 TO 5019 5065 5066 5082 TO 5089 5115 5116 5124 5125 5130 TO 5133 5602 -
5603 TO 5611 5628 TO 5637 5693 TO 5705 9814 PRIS YD 0.75 ZD 0.3
5000 TO 5005 5009 5010 5014 5015 5071 TO 5079 5095 TO 5101 5105 TO 5107 -
5108 PRIS YD 0.6 ZD 0.3
5159 TO 5168 PRIS YD 0.6 ZD 0.3
5026 TO 5030 5539 TO 5542 5559 TO 5565 5574 5585 TO 5591 5600 5601 -
5614 TO 5621 5626 5627 5642 TO 5650 5675 TO 5682 PRIS YD 0.45 ZD 0.3
5021 5022 5024 5025 5031 TO 5037 5041 5042 5546 5547 5688 -
5689 PRIS YD 0.5 ZD 0.3
5068 TO 5070 5092 TO 5094 5121 TO 5123 PRIS YD 0.75 ZD 0.4
MEMBER PROPERTY AMERICAN
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
5051 TO 5054 PRIS YD 1.1 ZD 0.4
5656 5657 PRIS YD 0.8 ZD 0.3
5011 TO 5013 5058 TO 5064 5651 TO 5654 5670 TO 5673 PRIS YD 1.2 ZD 0.4
5659 TO 5663 PRIS YD 1 ZD 0.4
MEMBER PROPERTY AMERICAN
8012 TO 8039 8042 TO 8055 8080 TO 8082 8104 TO 8106 8112 TO 8124 8143 TO 8159 -
8182 TO 8195 8198 TO 8230 8511 TO 8518 8520 TO 8526 8705 TO 8717 -
8718 PRIS YD 0.6 ZD 0.3
8090 TO 8095 8130 TO 8133 PRIS YD 1.2 ZD 0.5
8060 TO 8075 8088 8089 8096 TO 8101 8134 TO 8142 8164 TO 8179 8543 TO 8546 -
8548 TO 8551 8575 8576 8582 8583 8603 TO 8614 8628 TO 8636 8654 TO 8664 8682 -
8683 TO 8693 PRIS YD 0.7 ZD 0.3
8078 8079 8085 8086 8532 TO 8539 8554 TO 8565 8567 TO 8571 8587 TO 8598 8617 -
8618 TO 8625 8642 TO 8650 8667 TO 8676 8678 TO 8680 8694 TO 8701 -
8702 PRIS YD 0.45 ZD 0.3
8577 TO 8581 PRIS YD 0.75 ZD 0.3
1365 8040 8056 8059 8076 8087 8125 8160 8181 8197 8510 8527 8531 8552 8566 -
8574 8585 8586 8599 8600 8602 8615 8641 8651 8703 8719 PRIS YD 0.3 ZD 0.3
MEMBER PROPERTY AMERICAN
4000 TO 4005 4009 4018 4029 TO 4050 4504 TO 4508 4512 TO 4514 4517 TO 4521 -
4539 TO 4547 4550 TO 4552 7012 7013 7015 TO 7019 7021 TO 7025 7027 TO 7031 -
7050 TO 7053 7055 TO 7065 7067 TO 7072 7075 7512 TO 7515 7517 TO 7519 7521 -
7522 TO 7524 7526 7563 7564 7566 TO 7571 PRIS YD 0.6 ZD 0.2
MEMBER PROPERTY
1324 1350 1965 1971 5119 5544 5545 8541 PRIS YD 0.45 ZD 0.2
1328 1341 8530 PRIS YD 0.45 ZD 0.3
1314 1317 1320 TO 1323 1326 1327 1336 1337 1339 1340 1346 TO 1349 -
5102 TO 5104 5127 TO 5129 8108 TO 8111 8126 TO 8129 PRIS YD 0.9 ZD 0.2
1325 1338 1951 1959 1966 1967 4515 4516 5524 5525 5548 5549 7520 8519 -
8547 PRIS YD 0.7 ZD 0.2
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 TO 15 17 TO 48 56 TO 58 111 TO 116 FIXED
MEMBER RELEASE
1324 1328 1341 1350 1365 1971 3049 TO 3056 3500 3501 3508 3509 3550 TO 3553 -
4053 TO 4060 4503 4509 4510 4554 TO 4556 5021 5024 5026 5031 5035 5041 5043 -
5071 5080 5095 5100 5117 5119 5124 5143 5149 5153 5159 5189 5241 TO 5248 -
5503 5508 5515 5516 5535 5539 5544 5555 5557 5559 5581 5585 5593 5614 5640 -
5642 5684 5686 5688 5691 5693 5706 5739 TO 5741 7000 7004 7008 7081 7085 -
7089 7094 7505 7573 8000 8004 8008 8042 8077 8078 8080 8084 8085 8104 8125 -
8143 8160 8161 8530 8536 8541 8554 8557 8559 8561 8564 8567 8570 8599 8600 -
8617 8667 8678 8679 8694 8720 START MZ
1324 1328 1341 1365 1965 1971 3010 3018 3048 TO 3056 3500 3501 3507 3508 3510 -
3550 TO 3553 4052 TO 4060 4509 4511 4554 4555 4562 5022 5034 5037 5042 5043 -
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
5070 5079 5080 5094 5099 5101 5108 5117 5119 5123 5125 5126 5158 5204 5240 -
5241 TO 5248 5509 5513 5515 5517 5538 5542 5545 5556 5558 5583 5591 5621 5650 -
5682 5685 5687 5689 5691 5717 5739 5740 5747 7003 7007 7011 7077 7078 7082 -
7086 7090 7500 7506 7510 7577 8003 8007 8011 8077 8079 8082 8084 8086 8106 -
8124 8125 8159 8160 8162 8232 8530 8535 8539 8541 8556 8558 8560 8563 8569 -
8571 8598 TO 8600 8625 8676 8678 8680 8724 9814 END MZ
5030 END MZ
5565 END MZ
5500 START MZ
5641 END MZ
8505 START MZ
8500 START MZ
8504 END MZ
8509 END MZ
8195 END MZ
5025 END MZ
5612 START MZ
5613 END MZ
5566 START MZ
5567 END MZ
5690 START MZ
5110 START MZ
8056 END MZ
8531 END MZ
8586 END MZ
8641 END MZ
8181 END MZ
8566 END MZ
8651 END MZ
8703 END MZ
8233 START MZ
8236 END MZ
8237 START MZ
8240 END MZ
8241 START MZ
8244 END MZ
8245 START MZ
8249 END MZ
8682 START MZ
4500 START MZ
9816 START MZ
9816 END MZ
9813 START MZ
9815 END MZ
9807 START MZ
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
9809 END MZ
9810 START MZ
9810 END MZ
7078 7082 7086 7090 START MZ
7081 7085 7089 7094 END MZ
4500 4503 END MZ
7500 START MZ
7505 END MZ
7506 START MZ
7000 7004 7008 END MZ
7003 7007 7011 START MZ
7573 END MZ
7577 START MZ
5594 END MZ
5147 END MZ
DEFINE WIND LOAD
INT 1.146 1.206 HEIG 10 15
*CUT OFF MODE SHAPE 125
LOAD 1 LOADTYPE Dead TITLE DL
SELFWEIGHT Y -1
******************************Wall Load:**********************
MEMBER LOAD
3000 TO 3008 3011 TO 3017 3019 TO 3023 3025 TO 3056 3500 TO 3506 3508 TO 3510 -
3515 TO 3519 3521 TO 3548 3550 TO 3553 UNI GY -13.047
3513 3514 UNI GY -14.9
3009 3010 3018 3507 3511 3512 UNI GY -21.12
4000 TO 4008 4010 TO 4012 4014 TO 4017 4022 4024 TO 4027 4029 TO 4060 4500 -
4503 TO 4511 4517 TO 4521 4523 TO 4546 4550 TO 4556 4562 UNI GY -6
4547 UNI GY -6 5.125 7.85
4547 UNI GY -6 1.975 5.125
4547 UNI GY -6 0 1.975
5015 TO 5020 5081 5090 5169 5187 5206 TO 5248 5515 TO 5517 5526 TO 5534 5543 -
5554 5568 5569 5584 5592 5622 5623 5638 5639 5655 5669 5683 5692 -
5718 TO 5740 9808 9812 UNI GY -9.941
5001 TO 5014 5518 TO 5523 UNI GY -1.66
6000 TO 6024 6500 TO 6520 UNI GY -6.213
7000 7003 7004 7007 7008 7011 7012 7015 TO 7018 7021 TO 7024 7027 TO 7032 -
7034 7042 7044 7045 7050 TO 7052 7055 TO 7064 7067 TO 7071 7075 TO 7078 7081 -
7082 7085 7086 7089 7090 7094 7500 7505 7506 7509 TO 7514 7517 TO 7523 7526 -
7528 7529 7531 7532 7534 7537 TO 7540 7543 7545 7547 TO 7549 7551 7554 7556 -
7557 TO 7558 7562 7563 7566 TO 7573 7577 UNI GY -6.213
7515 UNI GY -6.213 2.325 4.65
7515 UNI GY -6.213 0 2.325
7524 UNI GY -6.213 2.9875 5.975
7524 UNI GY -6.213 0 2.9875
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
7053 UNI GY -6.213 2.7375 5.475
7053 UNI GY -6.213 0 2.7375
7065 UNI GY -6.213 2.8 5.6
7065 UNI GY -6.213 0 2.8
7072 UNI GY -6.213 4.225 5.85
7072 UNI GY -6.213 1.8 4.225
7072 UNI GY -6.213 0 1.8
7564 UNI GY -6.213 2.825 5.65
7564 UNI GY -6.213 0 2.825
7025 UNI GY -6.213 2.35 4.7
7025 UNI GY -6.213 0 2.35
7019 UNI GY -6.213 3.075 6.15
7019 UNI GY -6.213 0 3.075
7013 UNI GY -6.213 3.0375 6.075
7013 UNI GY -6.213 0 3.0375
8077 8079 8084 8086 8146 8147 8151 8160 8162 8555 8557 8568 8570 8599 8600 -
8606 8611 UNI GY -4.89
5109 5205 5741 TO 5747 UNI GY -5.85
6007 6010 6012 6014 6017 6020 UMOM X -0.14
6503 6505 TO 6507 6509 UMOM X 0.14
5021 5022 5037 5041 TO 5043 5045 TO 5062 5064 5065 5071 TO 5074 5076 TO 5078 -
5082 5083 5088 5095 5096 5098 TO 5101 5115 5116 5124 TO 5126 5137 TO 5141 -
5143 5144 5159 TO 5167 5170 TO 5185 5546 5547 5550 5551 5555 TO 5558 5566 -
5567 5573 5579 TO 5583 5593 5594 5599 5601 TO 5608 5610 TO 5613 5627 TO 5634 -
5636 5637 5649 TO 5654 5660 TO 5665 5670 TO 5673 5675 TO 5679 5684 TO 5689 -
5691 5696 TO 5698 5700 5706 TO 5711 9805 9811 9814 UNI GY -17.7
FLOOR LOAD
_SLAB2WAY2 FLOAD -4.95 GY
_SLAB2WAY1 FLOAD -4.95 GY
_1STERRACE FLOAD -7.15 GY
_SUNKEN300MM FLOAD -8.7 GY
_SUNKEN400MM FLOAD -8.7 GY
_HEADROOMSLAB FLOAD -7.87 GY
MEMBER LOAD
5068 5069 5121 TO 5123 5510 TO 5512 8018 8019 8025 TO 8027 8034 TO 8039 8199 -
8200 8206 8207 8214 8215 8222 8223 8511 8512 8518 8520 8521 8712 TO 8717 -
8718 UNI GY -5.724
5067 5120 5500 TO 5503 8000 TO 8011 8040 8057 8102 8107 8163 8231 TO 8249 -
8500 TO 8510 8528 8540 8553 8573 8574 8585 8616 8627 8637 8638 8665 8666 -
8677 8719 TO 8724 UNI GY -8.6
******************************STAIRCASE LoadS:**********************
MEMBER LOAD
1320 TO 1323 UNI GY -4.82
1324 5544 5545 5548 5549 UNI GY -11.5
1314 1317 1325 TO 1327 1959 1967 UNI GY -4.62
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
1346 TO 1349 UNI GY -4.62
5524 5525 UNI GY -5.2
5102 TO 5104 5127 TO 5129 UNI GY -5.02
1338 UNI GY -11.8
1336 1337 1339 1340 UNI GY -4.82
1350 1951 1965 1966 1971 UNI GY -4.62
8519 8547 UNI GY -9.32
8108 TO 8111 8126 TO 8129 UNI GY -9.32
1359 TO 1364 UNI GY -1.24
1324 1350 1965 5544 5545 UNI GY -18.3
1328 1341 8530 UNI GY -20.9
FLOOR LOAD
_STAIRLANSLAB FLOAD -7.48 GY
ONEWAY LOAD
_STAIRONEWAY ONE -7.48 GY
FLOOR LOAD
_PRECAST FLOAD -2.5 GY
_ROOF@9.85 FLOAD -7.9 GY
_ROOF@9.85-2 FLOAD -7.9 GY
ONEWAY LOAD
_ARCHPRO@9.85 ONE -7.9 GY
ONEWAY LOAD
_ARCHPRO-DL@4.95 ONE -3.125 GY
MEMBER LOAD
8082 8106 8125 8140 8678 8680 8685 8686 8689 UNI GY -4.77
6007 6010 6012 6014 6017 6020 6503 6505 TO 6507 6509 UNI GY -0.937
ONEWAY LOAD
_1TERRACEONEWAY ONE -7.15 GY
ONEWAY LOAD
_ONEWAY ONE -4.95 GY
MEMBER LOAD
4032 4037 4038 4043 4048 4049 UNI GY -0.3
MEMBER LOAD
4541 UNI GY -2.63 0.825 2.825
4541 UMOM X -1.54 0.875 2.875
7017 7022 7023 UNI GY -1.15
7017 7022 7023 UMOM X -0.45
4508 4516 4517 UNI GY -0.3
4520 UNI GY -0.3
MEMBER LOAD
1362 8519 UNI GY -1.15 1.25 2.45
1362 8519 UMOM X 0.45 1.25 2.45
1364 UNI GY -2.63 1.875 3.875
1364 UMOM X -1.54 1.875 3.875
4032 4037 4038 4043 4049 UMOM X -0.18
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
4508 4516 4517 4520 UMOM X -0.18
5116 9805 9807 9810 9813 9816 UNI GY -0.75
MEMBER LOAD
4505 4506 7059 7060 7071 7514 7517 7566 UNI GY -7.62
7515 UNI GY -7.62 2.325 4.65
7515 UNI GY -7.62 0 2.325
7524 UNI GY -7.62 2.9875 5.975
7524 UNI GY -7.62 0 2.9875
7053 UNI GY -7.62 2.7375 5.475
7053 UNI GY -7.62 0 2.7375
7065 UNI GY -7.62 2.8 5.6
7065 UNI GY -7.62 0 2.8
7072 UNI GY -7.62 4.225 5.85
7072 UNI GY -7.62 1.8 4.225
7072 UNI GY -7.62 0 1.8
7564 UNI GY -7.62 2.825 5.65
7564 UNI GY -7.62 0 2.825
7025 UNI GY -7.62 2.35 4.7
7025 UNI GY -7.62 0 2.35
7019 UNI GY -7.62 3.075 6.15
7019 UNI GY -7.62 0 3.075
7013 UNI GY -7.62 3.0375 6.075
7013 UNI GY -7.62 0 3.0375
4505 4506 7059 7060 7071 UMOM X 4.66
7053 UMOM X 4.66 2.7375 5.475
7053 UMOM X 4.66 0 2.7375
7065 UMOM X 4.66 2.8 5.6
7065 UMOM X 4.66 0 2.8
7072 UMOM X 4.66 4.225 5.85
7072 UMOM X 4.66 1.8 4.225
7072 UMOM X 4.66 0 1.8
4546 4550 UNI GY -8.2
4547 UNI GY -8.2 5.125 7.85
4547 UNI GY -8.2 1.975 5.125
4547 UNI GY -8.2 0 1.975
4546 4550 UMOM X -5.1
4547 UMOM X -5.1 5.125 7.85
4547 UMOM X -5.1 1.975 5.125
4547 UMOM X -5.1 0 1.975
7514 7517 UMOM X 4.66
7515 UMOM X 4.66 2.325 4.65
7515 UMOM X 4.66 0 2.325
7524 UMOM X 4.66 2.9875 5.975
7524 UMOM X 4.66 0 2.9875
7566 UMOM X -4.66
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
7564 UMOM X -4.66 2.825 5.65
7564 UMOM X -4.66 0 2.825
7025 UMOM X -4.66 2.35 4.7
7025 UMOM X -4.66 0 2.35
7019 UMOM X -4.66 3.075 6.15
7019 UMOM X -4.66 0 3.075
7013 UMOM X -4.66 3.0375 6.075
7013 UMOM X -4.66 0 3.0375
LOAD 2 LOADTYPE Live TITLE LL1
FLOOR LOAD
_4FLOORLL FLOAD -4 GY
_3FLOORLL FLOAD -3 GY
_5ELECLL FLOAD -5 GY
ONEWAY LOAD
_ONEWAY ONE -4 GY
_2ONEWAY ONE -2 GY
MEMBER LOAD
1324 1350 1965 5544 5545 UNI GY -9.55
1328 1341 8530 UNI GY -9.55
ONEWAY LOAD
_STAIRONEWAY ONE -1.5 GY
FLOOR LOAD
_STAIRLANSLAB FLOAD -1.5 GY
_2FLOORLL FLOAD -2 GY
_4FLOORLL1 FLOAD -4 GY
LOAD 3 LOADTYPE Roof Live TITLE LL2
FLOOR LOAD
_1STERRACE FLOAD -1.5 GY
_2TERRACELL FLOAD -1.5 GY
ONEWAY LOAD
_2TLLONEWAY ONE -1.5 GY
FLOOR LOAD
_2TERRACELL2 FLOAD -1.5 GY
ONEWAY LOAD
_1TERRACEONEWAY ONE -1.5 GY
FLOOR LOAD
_HEADROOMSLAB FLOAD -0.75 GY
FLOOR LOAD
_ARCHPRO@4.95 FLOAD -0.75 GY
ONEWAY LOAD
_ARCHPRO@9.85 ONE -1.5 GY
FLOOR LOAD
_ARCPRO2Y@9.85 FLOAD -1.5 GY
ONEWAY LOAD
_ARCPRO-FFTB ONE -0.75 GY
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
FLOOR LOAD
_ARCPROFFTB-1WAY FLOAD -0.75 GY
MEMBER LOAD
7059 7060 7071 7514 7517 7566 UNI GY -0.45
7515 UNI GY -0.45 2.325 4.65
7515 UNI GY -0.45 0 2.325
7524 UNI GY -0.45 2.9875 5.975
7524 UNI GY -0.45 0 2.9875
7053 UNI GY -0.45 2.7375 5.475
7053 UNI GY -0.45 0 2.7375
7065 UNI GY -0.45 2.8 5.6
7065 UNI GY -0.45 0 2.8
7072 UNI GY -0.45 4.225 5.85
7072 UNI GY -0.45 1.8 4.225
7072 UNI GY -0.45 0 1.8
7564 UNI GY -0.45 2.825 5.65
7564 UNI GY -0.45 0 2.825
7025 UNI GY -0.45 2.35 4.7
7025 UNI GY -0.45 0 2.35
7019 UNI GY -0.45 3.075 6.15
7019 UNI GY -0.45 0 3.075
7013 UNI GY -0.45 3.0375 6.075
7013 UNI GY -0.45 0 3.0375
7059 7060 7071 UMOM X 0.18
7053 UMOM X 0.18 2.7375 5.475
7053 UMOM X 0.18 0 2.7375
7065 UMOM X 0.18 2.8 5.6
7065 UMOM X 0.18 0 2.8
7072 UMOM X 0.18 4.225 5.85
7072 UMOM X 0.18 1.8 4.225
7072 UMOM X 0.18 0 1.8
4546 4550 UNI GY -0.45
4547 UNI GY -0.45 5.125 7.85
4547 UNI GY -0.45 1.975 5.125
4547 UNI GY -0.45 0 1.975
4546 4550 UMOM X -0.18
4547 UMOM X -0.18 5.125 7.85
4547 UMOM X -0.18 1.975 5.125
4547 UMOM X -0.18 0 1.975
7514 7517 UMOM X 0.18
7515 UMOM X 0.18 2.325 4.65
7515 UMOM X 0.18 0 2.325
7524 UMOM X 0.18 2.9875 5.975
7524 UMOM X 0.18 0 2.9875
7566 UMOM X -0.18
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
7564 UMOM X -0.18 2.825 5.65
7564 UMOM X -0.18 0 2.825
7025 UMOM X -0.18 2.35 4.7
7025 UMOM X -0.18 0 2.35
7019 UMOM X -0.18 3.075 6.15
7019 UMOM X -0.18 0 3.075
7013 UMOM X -0.18 3.0375 6.075
7013 UMOM X -0.18 0 3.0375
LOAD 4 LOADTYPE Wind TITLE WL (+X)
MEMBER LOAD
8511 8512 8518 TO 8521 UMOM X -0.87
8500 TO 8509 UMOM X -1.95
8712 TO 8718 UMOM X -0.87
8719 TO 8724 UMOM X -1.95
LOAD 5 LOADTYPE Wind TITLE WL (-X)
MEMBER LOAD
8712 TO 8718 UMOM X 0.87
8719 TO 8724 UMOM X 1.95
8511 8512 8518 TO 8521 UMOM X 0.87
8500 TO 8509 UMOM X 1.95
LOAD 6 LOADTYPE Wind TITLE WL (+Z)
MEMBER LOAD
8231 TO 8249 UMOM X -1.95
8199 8200 8206 8207 8222 8223 UMOM X -0.87
8000 TO 8011 UMOM X -1.95
8018 8019 8025 TO 8027 8034 UMOM X -0.87
LOAD 7 LOADTYPE Wind TITLE WL (-Z)
MEMBER LOAD
8000 TO 8011 UMOM X 1.95
8018 8019 8025 TO 8027 8034 UMOM X 0.87
8231 TO 8249 UMOM X 1.95
8199 8200 8206 8207 8222 8223 UMOM X 0.87
LOAD 8 LOADTYPE Seismic TITLE EQ(X)
JOINT LOAD
181 FX 68.561 FZ 68.561
182 FX 84.03 FZ 84.03
183 FX 121.805 FZ 121.805
184 FX 114.806 FZ 114.806
185 FX 117.843 FZ 117.843
186 FX 93.717 FZ 93.717
187 FX 33.227 FZ 33.227
189 FX 115.029 FZ 115.029
190 FX 109.945 FZ 109.945
191 FX 58.551 FZ 58.551
195 FX 107.482 FZ 107.482
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
196 FX 56.475 FZ 56.475
202 FX 146.056 FZ 146.056
209 FX 192.525 FZ 192.525
210 FX 160.329 FZ 160.329
214 FX 193.749 FZ 193.749
215 FX 198.004 FZ 198.004
216 FX 161.883 FZ 161.883
217 FX 148.391 FZ 148.391
218 FX 180.859 FZ 180.859
219 FX 165.984 FZ 165.984
220 FX 157.631 FZ 157.631
221 FX 184.909 FZ 184.909
224 FX 135.007 FZ 135.007
225 FX 118.603 FZ 118.603
226 FX 121.462 FZ 121.462
230 FX 168.064 FZ 168.064
231 FX 118.693 FZ 118.693
232 FX 686.001 FZ 686.001
233 FX 788.861 FZ 788.861
234 FX 916.573 FZ 916.573
235 FX 804.008 FZ 804.008
237 FX 810.531 FZ 810.531
302 FX 82.943 FZ 82.943
303 FX 246.11 FZ 246.11
304 FX 335.111 FZ 335.111
305 FX 401.268 FZ 401.268
306 FX 339.793 FZ 339.793
307 FX 474.387 FZ 474.387
308 FX 231.326 FZ 231.326
309 FX 331.97 FZ 331.97
310 FX 345.219 FZ 345.219
311 FX 228.765 FZ 228.765
312 FX 491.651 FZ 491.651
313 FX 724.966 FZ 724.966
314 FX 996.718 FZ 996.718
315 FX 989.688 FZ 989.688
316 FX 418.65 FZ 418.65
317 FX 353.207 FZ 353.207
318 FX 513.926 FZ 513.926
319 FX 561.629 FZ 561.629
320 FX 630.652 FZ 630.652
321 FX 912.971 FZ 912.971
322 FX 1034.37 FZ 1034.37
323 FX 398.71 FZ 398.71
324 FX 326.501 FZ 326.501
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
325 FX 564.292 FZ 564.292
326 FX 797.57 FZ 797.57
327 FX 891.592 FZ 891.592
328 FX 1033.68 FZ 1033.68
329 FX 1247.67 FZ 1247.67
330 FX 555.706 FZ 555.706
331 FX 462.173 FZ 462.173
332 FX 974.34 FZ 974.34
333 FX 951.218 FZ 951.218
334 FX 979.459 FZ 979.459
335 FX 520.701 FZ 520.701
336 FX 292.985 FZ 292.985
337 FX 452.081 FZ 452.081
338 FX 395.179 FZ 395.179
339 FX 456.527 FZ 456.527
340 FX 419.067 FZ 419.067
341 FX 421.306 FZ 421.306
342 FX 253.503 FZ 253.503
343 FX 233.097 FZ 233.097
345 FX 194.445 FZ 194.445
346 FX 339.204 FZ 339.204
347 FX 138.759 FZ 138.759
348 FX 413.353 FZ 413.353
349 FX 566.477 FZ 566.477
350 FX 826.258 FZ 826.258
351 FX 452.694 FZ 452.694
352 FX 443.614 FZ 443.614
426 FX 316.977 FZ 316.977
569 FX 542.584 FZ 542.584
570 FX 467.788 FZ 467.788
571 FX 660.837 FZ 660.837
572 FX 618.505 FZ 618.505
573 FX 338.589 FZ 338.589
574 FX 640.186 FZ 640.186
575 FX 252.619 FZ 252.619
576 FX 405.672 FZ 405.672
577 FX 366.675 FZ 366.675
578 FX 359.879 FZ 359.879
579 FX 357.702 FZ 357.702
581 FX 268.529 FZ 268.529
582 FX 252.34 FZ 252.34
583 FX 335.737 FZ 335.737
584 FX 482.488 FZ 482.488
585 FX 515.703 FZ 515.703
586 FX 569.285 FZ 569.285
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
587 FX 337.295 FZ 337.295
588 FX 205.106 FZ 205.106
589 FX 575.795 FZ 575.795
590 FX 694.064 FZ 694.064
591 FX 399.678 FZ 399.678
592 FX 407.861 FZ 407.861
593 FX 413.945 FZ 413.945
594 FX 281.076 FZ 281.076
595 FX 316.464 FZ 316.464
596 FX 910.959 FZ 910.959
597 FX 948.976 FZ 948.976
598 FX 536.286 FZ 536.286
599 FX 619.755 FZ 619.755
600 FX 646.485 FZ 646.485
601 FX 319.84 FZ 319.84
602 FX 341.779 FZ 341.779
603 FX 602.24 FZ 602.24
604 FX 622.087 FZ 622.087
605 FX 647.559 FZ 647.559
606 FX 323.058 FZ 323.058
607 FX 231.53 FZ 231.53
608 FX 381.399 FZ 381.399
609 FX 361.077 FZ 361.077
610 FX 382.509 FZ 382.509
611 FX 386.71 FZ 386.71
612 FX 385.704 FZ 385.704
613 FX 232.001 FZ 232.001
614 FX 224.389 FZ 224.389
615 FX 702.807 FZ 702.807
616 FX 356.019 FZ 356.019
617 FX 353.948 FZ 353.948
624 FX 131.026 FZ 131.026
625 FX 128.84 FZ 128.84
626 FX 125.519 FZ 125.519
627 FX 113.972 FZ 113.972
628 FX 108.347 FZ 108.347
629 FX 76.805 FZ 76.805
630 FX 63.282 FZ 63.282
631 FX 124.451 FZ 124.451
632 FX 105.21 FZ 105.21
634 FX 112.6 FZ 112.6
635 FX 81.28 FZ 81.28
639 FX 92.402 FZ 92.402
645 FX 78.361 FZ 78.361
646 FX 124.041 FZ 124.041
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
651 FX 146.769 FZ 146.769
652 FX 126.65 FZ 126.65
653 FX 129.743 FZ 129.743
654 FX 134.303 FZ 134.303
656 FX 130.135 FZ 130.135
657 FX 127.652 FZ 127.652
660 FX 120.487 FZ 120.487
661 FX 120.763 FZ 120.763
792 FX 116.805 FZ 116.805
794 FX 72.947 FZ 72.947
796 FX 67.835 FZ 67.835
798 FX 109.159 FZ 109.159
799 FX 120.759 FZ 120.759
806 FX 54.713 FZ 54.713
807 FX 131.173 FZ 131.173
808 FX 62.065 FZ 62.065
809 FX 132.977 FZ 132.977
812 FX 117.45 FZ 117.45
814 FX 123.361 FZ 123.361
820 FX 87.561 FZ 87.561
821 FX 95.546 FZ 95.546
822 FX 92.129 FZ 92.129
823 FX 94.128 FZ 94.128
837 FX 147.106 FZ 147.106
838 FX 164.812 FZ 164.812
849 FX 86.099 FZ 86.099
850 FX 74.197 FZ 74.197
902 FX 120.279 FZ 120.279
1146 FX 108.577 FZ 108.577
1147 FX 99.708 FZ 99.708
1148 FX 94.506 FZ 94.506
1149 FX 94.021 FZ 94.021
1150 FX 81.12 FZ 81.12
1151 FX 19.928 FZ 19.928
1152 FX 81.387 FZ 81.387
1153 FX 53.954 FZ 53.954
1154 FX 97.111 FZ 97.111
1155 FX 34.723 FZ 34.723
1214 FX 79.456 FZ 79.456
SPECTRUM CQC X 1 ACC SCALE 2.2 DAMP 0.05 LIN SAVE
0 0.235; 0.1 0.589; 0.2 0.589; 0.3 0.589; 0.4 0.589; 0.5 0.589; 0.55 0.589;
0.6 0.534; 0.7 0.457; 0.8 0.4; 0.9 0.356; 1 0.32; 1.1 0.291; 1.2 0.267;
1.3 0.246; 1.4 0.229; 1.5 0.213; 1.6 0.2; 1.7 0.188; 1.8 0.178; 1.9 0.169;
2 0.16; 2.1 0.152; 2.2 0.146; 2.3 0.139; 2.4 0.133; 2.5 0.128; 2.6 0.123;
2.7 0.119; 2.8 0.114; 2.9 0.11; 3 0.107; 3.1 0.103; 3.2 0.1; 3.3 0.097;
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
3.4 0.094; 3.5 0.091; 3.6 0.089; 3.7 0.087; 3.8 0.084; 3.9 0.082; 4 0.08;
LOAD 9 LOADTYPE Seismic TITLE EQ (+Z)
SPECTRUM CQC Z 1 ACC SCALE 2.8 DAMP 0.05 LIN SAVE
0 0.235; 0.1 0.589; 0.2 0.589; 0.3 0.589; 0.4 0.589; 0.5 0.589; 0.55 0.589;
0.6 0.534; 0.7 0.457; 0.8 0.4; 0.9 0.356; 1 0.32; 1.1 0.291; 1.2 0.267;
1.3 0.246; 1.4 0.229; 1.5 0.213; 1.6 0.2; 1.7 0.188; 1.8 0.178; 1.9 0.169;
2 0.16; 2.1 0.152; 2.2 0.146; 2.3 0.139; 2.4 0.133; 2.5 0.128; 2.6 0.123;
2.7 0.119; 2.8 0.114; 2.9 0.11; 3 0.107; 3.1 0.103; 3.2 0.1; 3.3 0.097;
3.4 0.094; 3.5 0.091; 3.6 0.089; 3.7 0.087; 3.8 0.084; 3.9 0.082; 4 0.08;
LOAD 10 LOADTYPE Temperature TITLE TL(+)
TEMPERATURE LOAD
1314 1317 1320 TO 1328 1336 TO 1341 1346 TO 1350 1359 TO 1365 1951 1959 1965 -
1966 TO 1967 1971 1989 TO 2005 4000 TO 4012 4014 TO 4018 4022 4024 TO 4060 -
4500 4503 TO 4547 4550 TO 4556 4562 5000 TO 5022 5024 TO 5037 5041 TO 5147 -
5149 TO 5248 5500 TO 5594 5596 TO 5657 5659 TO 5673 5675 TO 5747 -
6000 TO 6024 6500 TO 6520 7000 7003 7004 7007 7008 7011 TO 7013 7015 TO 7019 -
7021 TO 7025 7027 TO 7034 7036 7040 7042 TO 7046 7048 TO 7053 7055 TO 7065 -
7067 TO 7072 7075 TO 7078 7081 7082 7085 7086 7089 7090 7094 7500 7505 7506 -
7509 TO 7515 7517 TO 7524 7526 TO 7529 7531 TO 7534 7536 TO 7540 7542 7543 -
7545 TO 7551 7554 TO 7559 7562 TO 7564 7566 TO 7573 7577 8000 TO 8249 8500 -
8501 TO 8724 9501 9502 9504 9505 9507 9508 9510 9511 9513 9514 9516 TO 9520 -
9522 TO 9526 9528 TO 9532 9534 TO 9543 9545 TO 9553 9555 TO 9558 -
9560 TO 9563 9565 TO 9569 9571 TO 9573 9575 TO 9578 9580 TO 9587 -
9589 TO 9597 9599 TO 9601 9603 TO 9615 9617 TO 9621 9623 TO 9625 9627 9628 -
9630 9631 9633 TO 9636 9638 TO 9645 9647 TO 9651 9653 TO 9657 9659 TO 9662 -
9664 TO 9669 9671 TO 9673 9675 TO 9678 9680 TO 9684 9686 TO 9689 -
9691 TO 9694 9696 TO 9699 9701 TO 9704 9706 TO 9709 9711 TO 9715 -
9717 TO 9720 9722 TO 9725 9727 TO 9730 9732 TO 9735 9737 TO 9740 -
9742 TO 9746 9748 TO 9751 9753 TEMP 15.55
9754 9755 9757 TO 9759 9761 TO 9764 9766 TO 9769 9771 TO 9774 9776 TO 9779 -
9781 TO 9784 9786 TO 9789 9791 TO 9794 9796 TO 9799 9801 TO 9815 -
9816 TEMP 15.55
LOAD 11 LOADTYPE Temperature TITLE TL(-)
TEMPERATURE LOAD
1314 1317 1320 TO 1328 1336 TO 1341 1346 TO 1350 1359 TO 1365 1951 1959 1965 -
1966 TO 1967 1971 1989 TO 2005 4000 TO 4012 4014 TO 4018 4022 4024 TO 4060 -
4500 4503 TO 4547 4550 TO 4556 4562 5000 TO 5022 5024 TO 5037 5041 TO 5147 -
5149 TO 5248 5500 TO 5594 5596 TO 5657 5659 TO 5673 5675 TO 5747 -
6000 TO 6024 6500 TO 6520 7000 7003 7004 7007 7008 7011 TO 7013 7015 TO 7019 -
7021 TO 7025 7027 TO 7034 7036 7040 7042 TO 7046 7048 TO 7053 7055 TO 7065 -
7067 TO 7072 7075 TO 7078 7081 7082 7085 7086 7089 7090 7094 7500 7505 7506 -
7509 TO 7515 7517 TO 7524 7526 TO 7529 7531 TO 7534 7536 TO 7540 7542 7543 -
7545 TO 7551 7554 TO 7559 7562 TO 7564 7566 TO 7573 7577 8000 TO 8249 8500 -
8501 TO 8724 9501 9502 9504 9505 9507 9508 9510 9511 9513 9514 9516 TO 9520 -
9522 TO 9526 9528 TO 9532 9534 TO 9543 9545 TO 9553 9555 TO 9558 -
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
9560 TO 9563 9565 TO 9569 9571 TO 9573 9575 TO 9578 9580 TO 9587 -
9589 TO 9597 9599 TO 9601 9603 TO 9615 9617 TO 9621 9623 TO 9625 9627 9628 -
9630 9631 9633 TO 9636 9638 TO 9645 9647 TO 9651 9653 TO 9657 9659 TO 9662 -
9664 TO 9669 9671 TO 9673 9675 TO 9678 9680 TO 9684 9686 TO 9689 -
9691 TO 9694 9696 TO 9699 9701 TO 9704 9706 TO 9709 9711 TO 9715 -
9717 TO 9720 9722 TO 9725 9727 TO 9730 9732 TO 9735 9737 TO 9740 -
9742 TO 9746 9748 TO 9751 9753 TEMP -15.55
9754 9755 9757 TO 9759 9761 TO 9764 9766 TO 9769 9771 TO 9774 9776 TO 9779 -
9781 TO 9784 9786 TO 9789 9791 TO 9794 9796 TO 9799 9801 TO 9815 -
9816 TEMP -15.55
************************LOAD COMBINATIONS********************************
************************UNFACTORED LOAD COMBINATIONS*********************
LOAD COMB 101 DL+LL
1 1.0 2 1.0 3 1.0
***
LOAD COMB 102 DL+WL(+X)
1 1.0 4 1.0
LOAD COMB 103 DL+WL(-X)
1 1.0 5 1.0
LOAD COMB 104 DL+WL(+Z)
1 1.0 6 1.0
LOAD COMB 105 DL+WL(-Z)
1 1.0 7 1.0
***
LOAD COMB 106 DL+EQ(+X)
1 1.0 8 1.0
LOAD COMB 107 DL+EQ(-X)
1 1.0 8 -1.0
LOAD COMB 108 DL+EQ(+Z)
1 1.0 9 1.0
LOAD COMB 109 DL+EQ(-Z)
1 1.0 9 -1.0
***
LOAD COMB 110 DL+LL+WL(+X)
1 1.0 2 0.8 3 0.8 4 0.8
LOAD COMB 111 DL+LL+WL(-X)
1 1.0 2 0.8 3 0.8 5 0.8
LOAD COMB 112 DL+LL+WL(+Z)
1 1.0 2 0.8 3 0.8 6 0.8
LOAD COMB 113 DL+LL+WL(-Z)
1 1.0 2 0.8 3 0.8 7 0.8
***
LOAD COMB 114 DL+LL+EQ(+X)
1 1.0 2 0.8 3 0.8 8 0.8
LOAD COMB 115 DL+LL+EQ(-X)
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
1 1.0 2 0.8 3 0.8 8 -0.8
LOAD COMB 116 DL+LL+EQ(+Z)
1 1.0 2 0.8 3 0.8 9 0.8
LOAD COMB 117 DL+LL+EQ(-Z)
1 1.0 2 0.8 3 0.8 9 -0.8
***
LOAD COMB 118 DL+TL(+)
1 1.0 10 1.0
LOAD COMB 119 DL+TL(-)
1 1.0 11 1.0
***
LOAD COMB 120 DL+LL+TL(+)
1 1.0 2 1.0 3 1.0 10 1.0
LOAD COMB 121 DL+LL+TL(-)
1 1.0 2 1.0 3 1.0 11 1.0
***
LOAD COMB 122 DL+WL(+X)+TL(+)
1 1.0 4 1.0 10 1.0
LOAD COMB 123 DL+WL(-X)+TL(+)
1 1.0 5 1.0 10 1.0
LOAD COMB 124 DL+WL(+Z)+TL(+)
1 1.0 6 1.0 10 1.0
LOAD COMB 125 DL+WL(-Z)+TL(+)
1 1.0 7 1.0 10 1.0
LOAD COMB 126 DL+WL(+X)+TL(-)
1 1.0 4 1.0 11 1.0
LOAD COMB 127 DL+WL(-X)+TL(-)
1 1.0 5 1.0 11 1.0
LOAD COMB 128 DL+WL(+Z)+TL(-)
1 1.0 6 1.0 11 1.0
LOAD COMB 129 DL+WL(-Z)+TL(-)
1 1.0 7 1.0 11 1.0
***
LOAD COMB 130 DL+EQ(+X)+TL(+)
1 1.0 8 1.0 10 1.0
LOAD COMB 131 DL+EQ(-X)+TL(+)
1 1.0 8 -1.0 10 1.0
LOAD COMB 132 DL+EQ(+Z)+TL(+)
1 1.0 9 1.0 10 1.0
LOAD COMB 133 DL+EQ(-Z)+TL(+)
1 1.0 9 -1.0 10 1.0
LOAD COMB 134 DL+EQ(+X)+TL(-)
1 1.0 8 1.0 11 1.0
LOAD COMB 135 DL+EQ(-X)+TL(-)
1 1.0 8 -1.0 11 1.0
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
LOAD COMB 136 DL+EQ(+Z)+TL(-)
1 1.0 9 1.0 11 1.0
LOAD COMB 137 DL+EQ(-Z)+TL(-)
1 1.0 9 -1.0 11 1.0
***
LOAD COMB 138 DL+LL+WL(+X)+TL(+)
1 1.0 2 0.8 3 0.8 4 0.8 10 1.0
LOAD COMB 139 DL+LL+WL(-X)+TL(+)
1 1.0 2 0.8 3 0.8 5 0.8 10 1.0
LOAD COMB 140 DL+LL+WL(+Z)+TL(+)
1 1.0 2 0.8 3 0.8 6 0.8 10 1.0
LOAD COMB 141 DL+LL+WL(-Z)+TL(+)
1 1.0 2 0.8 3 0.8 7 0.8 10 1.0
LOAD COMB 142 DL+LL+WL(+X)+TL(-)
1 1.0 2 0.8 3 0.8 4 0.8 11 1.0
LOAD COMB 143 DL+LL+WL(-X)+TL(-)
1 1.0 2 0.8 3 0.8 5 0.8 11 1.0
LOAD COMB 144 DL+LL+WL(+Z)+TL(-)
1 1.0 2 0.8 3 0.8 6 0.8 11 1.0
LOAD COMB 145 DL+LL+WL(-Z)+TL(-)
1 1.0 2 0.8 3 0.8 7 0.8 11 1.0
***
LOAD COMB 146 DL+LL+EQ(+X)+TL(+)
1 1.0 2 0.8 3 0.8 8 0.8 10 1.0
LOAD COMB 147 DL+LL+EQ(-X)+TL(+)
1 1.0 2 0.8 3 0.8 8 -0.8 10 1.0
LOAD COMB 148 DL+LL+EQ(+Z)+TL(+)
1 1.0 2 0.8 3 0.8 9 0.8 10 1.0
LOAD COMB 149 DL+LL+EQ(-Z)+TL(+)
1 1.0 2 0.8 3 0.8 9 -0.8 10 1.0
LOAD COMB 150 DL+LL+EQ(+X)+TL(-)
1 1.0 2 0.8 3 0.8 8 0.8 11 1.0
LOAD COMB 151 DL+LL+EQ(-X)+TL(-)
1 1.0 2 0.8 3 0.8 8 -0.8 11 1.0
LOAD COMB 152 DL+LL+EQ(+Z)+TL(-)
1 1.0 2 0.8 3 0.8 9 0.8 11 1.0
LOAD COMB 153 DL+LL+EQ(-Z)+TL(-)
1 1.0 2 0.8 3 0.8 9 -0.8 11 1.0
***
************************FACTORED LOAD COMBINATIONS*********************
LOAD COMB 201 1.5DL+1.5LL
1 1.5 2 1.5 3 1.5
***
LOAD COMB 202 1.5DL+1.5WL(+X)
1 1.5 4 1.5
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
LOAD COMB 203 1.5DL+1.5WL(-X)
1 1.5 5 1.5
LOAD COMB 204 1.5DL+1.5WL(+Z)
1 1.5 6 1.5
LOAD COMB 205 1.5DL+1.5WL(-Z)
1 1.5 7 1.5
***
LOAD COMB 206 1.5DL+1.5EQ(+X)
1 1.5 8 1.5
LOAD COMB 207 1.5DL+1.5EQ(-X)
1 1.5 8 -1.5
LOAD COMB 208 1.5DL+1.5EQ(+Z)
1 1.5 9 1.5
LOAD COMB 209 1.5DL+1.5EQ(-Z)
1 1.5 9 -1.5
***
LOAD COMB 210 0.9DL+1.5WL(+X)
1 0.9 4 1.5
LOAD COMB 211 0.9DL+1.5WL(-X)
1 0.9 5 1.5
LOAD COMB 212 0.9DL+1.5WL(+Z)
1 0.9 6 1.5
LOAD COMB 213 0.9DL+1.5WL(-Z)
1 0.9 7 1.5
***
LOAD COMB 214 0.9DL+1.5EQ(+X)
1 0.9 8 1.5
LOAD COMB 215 0.9DL+1.5EQ(-X)
1 0.9 8 -1.5
LOAD COMB 216 0.9DL+1.5EQ(+Z)
1 0.9 9 1.5
LOAD COMB 217 0.9DL+1.5EQ(-Z)
1 0.9 9 -1.5
***
LOAD COMB 218 1.2DL+1.2 LL+1.2WL(+X)
1 1.2 2 1.2 3 1.2 4 1.2
LOAD COMB 219 1.2DL+1.2 LL +1.2WL(-X)
1 1.2 2 1.2 3 1.2 5 1.2
LOAD COMB 220 1.2DL+1.2 LL +1.2WL(+Z)
1 1.2 2 1.2 3 1.2 6 1.2
LOAD COMB 221 1.2DL+1.2 LL +1.2WL(-Z)
1 1.2 2 1.2 3 1.2 7 1.2
***
LOAD COMB 222 1.2DL+1.2 LL(F) +1.2EQ(+X)
1 1.2 2 1.2 8 1.2
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
LOAD COMB 223 1.2DL+1.2 LL(F) +1.2EQ(-X)
1 1.2 2 1.2 8 -1.2
LOAD COMB 224 1.2DL+1.2 LL(F) +1.2EQ(+Z)
1 1.2 2 1.2 9 1.2
LOAD COMB 225 1.2DL+1.2 LL(F) +1.2EQ(-Z)
1 1.2 2 1.2 9 -1.2
***
LOAD COMB 226 1.5DL+1.2TL(+)
1 1.5 10 1.2
LOAD COMB 227 1.5DL+1.2TL(-)
1 1.5 11 1.2
***
LOAD COMB 228 1.5DL+1.5LL+1.2TL (+)
1 1.5 2 1.5 3 1.5 10 1.2
LOAD COMB 229 1.5DL+1.5LL +1.2TL(-)
1 1.5 2 1.5 3 1.5 11 1.2
***
LOAD COMB 230 1.5DL+1.5WL(+X)+1.2TL(+)
1 1.5 4 1.5 10 1.2
LOAD COMB 231 1.5DL+1.5WL(-X)+1.2TL(+)
1 1.5 5 1.5 10 1.2
LOAD COMB 232 1.5DL+1.5WL(+Z)+1.2TL(+)
1 1.5 6 1.5 10 1.2
LOAD COMB 233 1.5DL+1.5WL(-Z)+1.2TL(+)
1 1.5 7 1.5 10 1.2
LOAD COMB 234 1.5DL+1.5WL(+X)+1.2TL(-)
1 1.5 4 1.5 11 1.2
LOAD COMB 235 1.5DL+1.5WL(-X)+1.2TL(-)
1 1.5 5 1.5 11 1.2
LOAD COMB 236 1.5DL+1.5WL(+Z)+1.2TL(-)
1 1.5 6 1.5 11 1.5
LOAD COMB 237 1.5DL+1.5WL(-Z)+1.2TL(-)
1 1.5 7 1.5 11 1.2
***
LOAD COMB 238 1.5DL+1.5EQ(+X)+1.2TL(+)
1 1.5 8 1.5 10 1.2
LOAD COMB 239 1.5DL+1.5EQ(-X)+1.2TL(+)
1 1.5 8 -1.5 10 1.2
LOAD COMB 240 1.5DL+1.5EQ(+Z)+1.2TL(+)
1 1.5 9 1.5 10 1.2
LOAD COMB 241 1.5DL+1.5EQ(-Z)+1.2TL(+)
1 1.5 9 -1.5 10 1.2
LOAD COMB 242 1.5DL+1.5EQ(+X)+1.2TL(-)
1 1.5 8 1.5 11 1.2
LOAD COMB 243 1.5DL+1.5EQ(-X)+1.2TL(-)
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP
1 1.5 8 -1.5 11 1.2
LOAD COMB 244 1.5DL+1.5EQ(+Z)+1.2TL(-)
1 1.5 9 1.5 11 1.2
LOAD COMB 245 1.5DL+1.5EQ(-Z)+1.2TL(-)
1 1.5 9 -1.5 11 1.2
***
LOAD COMB 246 1.2DL+1.2LL+1.2WL(+X)+1.2TL(+)
1 1.2 2 1.2 3 1.2 4 1.2 10 1.2
LOAD COMB 247 1.2DL+1.2LL +1.2WL(-X)+1.2TL(+)
1 1.2 2 1.2 3 1.2 5 1.2 10 1.2
LOAD COMB 248 1.2DL+1.2LL +1.2WL(+Z)+1.2TL(+)
1 1.2 2 1.2 3 1.2 6 1.2 10 1.2
LOAD COMB 249 1.2DL+1.2LL +1.2WL(-Z)+1.2TL(+)
1 1.2 2 1.2 3 1.2 7 1.2 10 1.2
LOAD COMB 250 1.2DL+1.2LL +1.2WL(+X)+1.2TL(-)
1 1.2 2 1.2 3 1.2 4 1.2 11 1.2
LOAD COMB 251 1.2DL+1.2LL +1.2WL(-X)+1.2TL(-)
1 1.2 2 1.2 3 1.2 5 1.2 11 1.2
LOAD COMB 252 1.2DL+1.2LL +1.2WL(+Z)+1.2TL(-)
1 1.2 2 1.2 3 1.2 6 1.2 11 1.2
LOAD COMB 253 1.2DL+1.2LL +1.2WL(-Z)+1.2TL(-)
1 1.2 2 1.2 3 1.2 7 1.2 11 1.2
***
LOAD COMB 254 1.2DL+1.2LL(F) +1.2EQ(+X)+1.2TL(+)
1 1.2 2 1.2 8 1.2 10 1.2
LOAD COMB 255 1.2DL+1.2LL(F) +1.2EQ(-X)+1.2TL(+)
1 1.2 2 1.2 8 -1.2 10 1.2
LOAD COMB 256 1.2DL+1.2LL(F) +1.2EQ(+Z)+1.2TL(+)
1 1.2 2 1.2 9 1.2 10 1.2
LOAD COMB 257 1.2DL+1.2LL(F) +1.2EQ(-Z)+1.2TL(+)
1 1.2 2 1.2 9 -1.2 10 1.2
LOAD COMB 258 1.2DL+1.2LL(F) +1.2EQ(+X)+1.2TL(-)
1 1.2 2 1.2 8 1.2 11 1.2
LOAD COMB 259 1.2DL+1.2LL (F) +1.2EQ(-X)+1.2TL(-)
1 1.2 2 1.2 8 -1.2 11 1.2
LOAD COMB 260 1.2DL+1.2LL (F) +1.2EQ(+Z)+1.2TL(-)
1 1.2 2 1.2 9 1.2 11 1.2
LOAD COMB 261 1.2DL+1.2LL (F) +1.2EQ(-Z)+1.2TL(-)
1 1.2 2 1.2 9 -1.2 11 1.2
PERFORM ANALYSIS PRINT ALL
FINISH
C-17 Beddown Facilities Airforce Station at Document No DATE
PROJECT:
Hindan O12205-C-DP-06-DC-1002 15.01.2013
PREPARED CHECKED SHEET
TITLE: Squadron Operations/AMU
MVS RJS/KPP

S-ar putea să vă placă și