x 2.2.2 Authorized Engineering Change Documents
x A. Are there any changes authorized that are not yet captured by the current print?
Comments: Customer specific documents will be included as applicable.
YES NO N/A
x 2.2.3 Customer Engineering Approval
x A. Are CS or Customer Engineering Approvals Required? ECR - Engineering Change Request, SREA, Forever Req, etc.
x B. Are Approved Customer specific documents included?
Comments: Customer specific documents will be included as applicable. (e.g. Alerts, concerns, notices, SREAs, EWO, TWO, GM3660
[Engineering Source Approval], GM1411 [PPAP Worksheet] DV [Design Verification] and PV [Production Validation] forms)
YES NO N/A
x 2.2.4 Design Failure Mode & Effects Analysis (DFMEA)
x A. If design responsible, is a Design Failure Mode & Effects Analysis (DFMEA) present and in the latest AIAG format?
x B. Is he DFMEA UP-TO-DATE with a current revision?
x C. Are SEV 5-8 and OCC 4-10 identified as Key Characteristic? If none, is there evidence of redesign to reduce SEV or OCC?
x D. Is the document linked to the Drawing ? Part Number / Revision Level or Process/Part Name.
Comments: If the DFMEA is Proprietary, include a blank DFMEA with a Proprietary Information Statement.
YES NO N/A
x 2.2.5 Process Flow Diagram
x A. Is a Process Flow Diagram present?
x B. Is PFD up to date with a current revision?
x C. Is the document linked to the Drawing ?
x D. Is document linked to PFMEA and Control plan? Part Number / Revision Level or Process/Part Name.
Comments:
Page 1 of 37
Appendix 3 - Supplier PPAP Check List Form Rev Date: April 2011
YES NO N/A
x 2.2.7 Control Plans
x A. Is a Control Plan present?
x B. Have all SC and Key Characteristics been identified and are controls adequate? (discuss with CS before submission if not sure)
x C. Is the Control Plan up-to-date with a current revision?
x D. Is there linkage to DFMEA (as applicable), PFMEA, PFD, and Operator Instruction?
x E. Reaction plans are identified and realistic?
x F. Is the document linked to the Drawing (i.e. P/N and Release Date)?
x G. Are both Process and Product Characteristics controlled?
H. Have all important Pass Through Characteristics (PTC) been identified and are controls adequate? (discuss with CS before submission if not
x
sure)
Comments:
YES NO N/A
x 2.2.8 Measurement. System Analysis Studies (MSA)
x A. Are MSAs included and usage of the latest AIAG forms?
x B. Are there MSA for all gages, measurement and test equipment used to control product?
x C. Are the MSAs using the ANOVA method?
x D. Raw data is included in PPAP and available in an Excel file?
E. Do the MSAs meet minimum requirements per AIAG (e.g. % Study Variance should be < 10% Good, 11% - 20% Marginal, 21% - 30%
x
Unacceptable - action plan required, > 30% No Good and may need to use new gage - action plan required).
F. Ford Specific: Does the % Contribution meet minimum requirements (e.g. % Contribution should be <1% is acceptable, 1% to 9% Marginal,
x
> 9% Unacceptable)?
G. Ford Specific: When using MiniTab, do the distinct categories meet minimum Ford requirements (e.g. > 10 Acceptable, 5 to 9 Marginal, < 5
x
Unacceptable)?
H. Ford Specific: When using MiniTab for attribute gages, do they meet minimum Ford requirements (e.g. Sample size should be 50 parts or
x
greater with a >90% Operator Repeatability, and Kappa > 0.70, Ford prefers > 0.90)?
I. Ford Specific: Are Destructive Gage R&R set up as "nested" and utilizing 3 operators, 5 parts (5 different batches each minimum), Multiple
x
replicates. (Note: you should assume that all parts within a single batch are the identical).
Comments:
Use of a specific brand of calibration software is not required. Software is to be tested with the Ford data set & evidence of passing included.
Page 2 of 37
Appendix 3 - Supplier PPAP Check List Form Rev Date: April 2011
YES NO N/A
x 2.2.10 Material/Performance Test Results
x A. Is the AIAG Material and Performance Test Results form are used?
x B. Are records of each specified test included?
x C. Part print information to be recorded on Material/Performance Reports? Including engr. Level, date, p/n, etc.
x D. Any authorized engineering change documents not yet incorporated into the design record, but present in the part?
x E. Number, date and change level of specification to which part was tested?
x F. Date on which testing took place?
x G. Qty. tested if not stated within specification?
x H. Actual results?
x I. Material supplier's name (req'd) and code (if applicable)?
x J. Ford Specific: Is the DVP&R included?
Comments:
YES NO N/A
x 2.2.11 Initial Process Studies
A. Per AIAG, all Special Characteristics need to show acceptable initial process capability prior to submission based on 125 pcs. Minimum? If
x
non-normal data set, reason are supplied to support acceptability?
x B. Supplier shall obtain concurrence from the customer on which index is to be used? Use PpK (1.67 PpK)
x C. Gage R&R is to be performed in order to understand how measurement error impacts the study measurements?
x D. Initial studies will be provided in accordance with the Important Characteristics Summary sheet or Engineering designed drawing?
x E. Initial process studies are summarized with capability or performance indices?
F. Studies were evaluated using these common techniques? Ie. Xbar Chart, Capability Histogram, R Chart, Normal Prob. Plot, Last 25
x
Subgroups, Capability Plot. (MiniTab software provides all of theses.)
x G. Is the P Value >5%, if not has the study been evaluated for improvements?
x H. Raw data is included in PPAP?
x I. Electronic data format to be submitted either in Minitab, or the Raw Data provided in an Excel File.
J. If initial process studies are not satisfactory, is control plan modified for 100% inspection and Corrective action plan submitted to become
x
capable?
Comments:
YES NO N/A
x 2.2.12 Qualified Laboratory
x A. Testing performed by external qualified laboratory need to be certified to ISO/IEC 17025 or national equivalent?
x B. Scope of laboratory is Defined (whether internal or 3rd party lab)?
x C. If tested externally to supplier, results to be submitted on independent lab letterhead or their normal lab report?
x D. If tested externally to supplier, Name of lab, date of tests and standards used to run the tests need to be enclosed?
Comments:
Page 3 of 37
Appendix 3 - Supplier PPAP Check List Form Rev Date: April 2011
YES NO N/A
x 2.2.14 Sample Production Parts
x A. Supplier provides sample parts as specified by the Cooper using plant
x B. Include a note in the PPAP package indicating # of functional sample submitted to which Cooper plant
Comments:
YES NO N/A
x 2.2.15 Master Sample
x A. Master sample supplied and retained meeting PPAP requirements per AIAG?
x B. Master sample is properly identified and stored?
x C. Include a note in the PPAP package referencing supplier's internal procedure governing master samples and their storage?
Comments:
YES NO N/A
x 2.2.16 Checking Aids
x A. Supplier to certify all aspects of checking aid to agree with dimensional requirements?
x B. Supplier to certify all released changes have been incorporated into checking aid?
x C. Supplier to provide for Preventive Maintenance on any checking aid for the life of the part?
x D. MSA to be conducted in accordance with AIAG and customer requirements?
E. Checking Aids can include fixtures either variable and attribute gages, models, templates, Mylar's, etc. specific to the product being
x
submitted?
Comments:
YES NO N/A
x 2.2.17 Customer Specific
x A. Raw data for part weight (10 random parts) is included?
x B. Submit IMDS submission screen-shot provided?
x C. PV results data must be less than one year old?
x D. Submit Barcode Label form per CS Requirements?
x E. Submit Run @ Rate form (Appendix VII) per CS Guidebook?
x F. Submit Submission and Approval of the Tooling form (Appendix 21) per CS Guidebook?
x G. Submit Packaging form (Appendix 15) per CS Guidebook?
x H. Valid TS16949 or ISO9000 certification uploaded in CS supplier portal?
x I. Annual CQI-9 Heat Treat / Braze Assessment (Appendix 04) uploaded in CS supplier portal?
x J. Annual CQI-11 Plating Assessment (Appendix 18) uploaded in CS supplier portal?
x K. Annual CQI-12 Coating Assessment (Appendix 19) uploaded in CS supplier portal?
x L. Annual CQI-15 Welding Assessment (Appendix 22) uploaded in CS supplier portal?
x M. Annual CQI-17 Soldering Assessment (Appendix 23) uploaded in CS supplier portal?
x N. Annual Supplier Profile (Appendix II) uploaded in CS supplier portal?
x O. Product with Studs or Fasteners - Does the manufacture of stud/fastener have a PM on thread rolling tools to prevent usage of worn out tools?
P. Product with Studs or Fasteners - Does the print or engineering specifications define a thread lap criteria and how is this controlled each
x
production run?
Q. Product with Studs or Fasteners that get Heat Treated - Does the supplier/heat treater verify each batch for proper HT specification? Are
x
checks on parts for hardness and embrittlement adequate?
Comments
Page 4 of 37
Appendix 3 - Supplier PPAP Check List Form Rev Date: April 2011
ACC REJ
At a minimum, the Supplier PPAP should be reviewed and dispositioned by the CS Supplier Quality Engineer or the CS Business Unit Engineer
Page 5 of 37
ENGINEERING CHANGE DOCUMENTS
Not Applicable
CUSTOMER ENGINEERING APPROVAL
NOT APPLICABLE
PROCESS FLOW DIAGRAM
PART NUMBER: 1032130 DATE: 6/21/2012
PART DESCRIPTION: ECL: #1
Machined Valve, Ball 3 port PREPARED BY: Christina Raynak
FABRICATION
INSPECT
STORE
MOVE
PRODUCT AND
ITEM #
ITEM #
OPERATION PROCESS CONTROL
STEP DESCRIPTION CHARACTERISTICS METHODS
1 Receiving Inspection Correct Valve in Visual
of 1032131 Valve Package
2 Move Valves to
Machining Area
3 Maching Op Machine Radius on 1032130 Machine
Valve Cutting Program,
(1.7345 +/- .005) Operator Instructions,
First Piece Approval,
Inprocess Audit every
5 pcs.
4 Move Valves to
Washing Area
5 Wash Valves to No residue on Valves Operator Instruction,
remove any Dish Washer Cycle
Deburring
Contamination
6 Move Valves to Blow-
Off station
7 Compressed Air Remove any Chips Operator Instruction
Blow-Off from Valves
8 Move Valves to
Packaging & Shipping
Area
9 Labeling & Packaging Parts to be packed Operator Instruction,
Final Audit and labeled per Verification Form
Operator Instruction
10 Ship Product No damage when Visual
loaded
Page 11 of 37
POTENTIAL FMEA Number: 1032130
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA) Prepared by: Dave Weber
Item: 1032130 Process Responsibility P&L DEVELOPMENT FMEA Date (Orig.) 6/21/2012
Model Year(s)/Program(s) 2013 DS/DJ Key Date 7/1/2012 FMEA Date (Rev.)
Core Team: Quality, Manufacturing, Engineering
Classification
Current Current
Occurrence
Responsibility
Detection
/ Function
Occurrence
Severity
Potential Potential Potential
Detection
Process Process Recommended & Target
Severity
RPN
Failure Effect(s) Causes(s) Actions Taken
RPN
Controls Controls Action Completion
Mode of Failure of Failure & Effective Date
Prevention Detection Date
Requirements
1 / RECEIVING PARTS OUT OF DIFFICULTY IN 7 SUPPLIER SHIPPED 2 1ST PIECE INPROCESS 6 84 None
SPECIFICATION PROCESSING PARTS OUT OF CHECK AT SET- CHECKS
SPECIFICATION UP
3 / MACHINING RADIUS NOT ASSY WILL NOT 8 ∆ 3 WRONG RADIUS TOOL 2 VERIFY 1ST PIECE 6 96 None
RADIUS ON MACHINED TO FUNCTION SET IN TURNING CORRECT TOOL APPROVAL,
VALVE PRINT PROPERLY CENTER SET IN MACHINE INPROCESS
AT START UP CHECKS
5 / WASH CONTAMINATION MAY CAUSE ASSY 8 OPERATOR FAILED TO 2 OPERATOR VISUAL 8 128 None
VALVES FROM DEBURRING TO NOT FUNCTION COMPLETE THE WASH TRAINING,
PROCESS ON PROCESS VERIFICATION
VALVE FORM, ROUTER
7/ CHIPS FROM MAY CAUSE ASSY 8 OPERATOR FAILED TO 2 OPERATOR PARTS ARE 8 128 None
COMPRESSED MACHINING TO NOT FUNCTION COMPLETE BLOW-OFF TRAINING, PLACED IN A
AIR BLOW-OFF PROCESS ON OPERATION VERIFICATION GREEN BIN
PARTS FORM, ROUTER AFTER BLOW-
OFF OPERATION
Page 12 of 37
POTENTIAL FMEA Number: 1032130
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA) Prepared by: Dave Weber
Item: 1032130 Process Responsibility P&L DEVELOPMENT FMEA Date (Orig.) 6/21/2012
Model Year(s)/Program(s) 2013 DS/DJ Key Date 7/1/2012 FMEA Date (Rev.)
Core Team: Quality, Manufacturing, Engineering
Classification
Current Current
Occurrence
Responsibility
Detection
/ Function
Occurrence
Severity
Potential Potential Potential
Detection
Process Process Recommended & Target
Severity
RPN
Failure Effect(s) Causes(s) Actions Taken
RPN
Controls Controls Action Completion
Mode of Failure of Failure & Effective Date
Prevention Detection Date
Requirements
9 / LABELING & INCORRECT INCORRECT PART 5 MISLABELED, OLD 2 OPERATOR SHIPPING 8 80 None
PACKAGING LABELING OF NUMBER RECEIVED TAGS NOT REMOVED INSTRUCTION, PERSONNEL TO
FINAL AUDIT CONTAINER AT CUSTOMER VERIFICATION VERIFY
FORM PRODUCT PRIOR
TO SHIPPING
Page 13 of 37
CONTROL PLAN
Prototype Pre-Launch ✘ Production
Control Plan Number Key Contact/Phone Date (Orig.) Date (Rev.)
Dave Langley / 989-820-5699 6/21/2012
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd.)
1032130 / #1 Quality, Manufacturing, Engineering
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd.)
Machined Valve, Ball 3 Port Christina Raynak / 6-21-12
Supplier/Plant Supplier Code Other Approval/Date (If Req'd.) Other Approval/Date (If Req'd.)
P & L Development PLDE01
MACHINE, CHARACTERISTICS SPECIA METHODS
PART/ PROCESS NAME/
DEVICE L PRODUCT/PROCESS EVALUATION/ SAMPLE REACTION
PROCESS OPERATION
JIG, TOOLS CHAR. SPECIFICATION/ MEASUREMENT CONTROL PLAN
NUMBER DESCRIPTION NO. PRODUCT PROCESS
FOR MFG. CLASS SIZE FREQ. METHOD
TOLERANCE TECHNIQUE
RECEIVING CORRECT VALVE IN VISUAL PER LOT VISUAL QUARANTINE
INSPECTION OF PACKAGING PRODUCT,
1032131 VALVE CONTACT
1
SUPPLIER FOR
RESOLUTION
MACHINING CNC ∆3 MACHINE 1032130 ∆3 1.7354 +/- .005 MICROMETER 1 1ST CUTTING QUARANTINE
TURNING RADIUS ON CUTTING PIECE, PROGRAM, PRODUCT,
CENTER VALVE PROGRAM EVERY 5 OPERATOR CONTACT
3 PCS INSTRUCTION, SUPERVISOR
IN-PROCESS FOR
CHECKS RESOLUTION
VALVE WASH PART REMOVE WASHER NO RESIDUE ON VISUAL, PART 100% PER LOT VISUAL QUARANTINE
WASHER DEBURRING CYCLE VALVES ROUTER PRODUCT,
CONTAMI- CONTACT
5 NATION SUPERVISOR
FOR
RESOLUTION
COMPRESSED BLOW-OFF REMOVE NO CHIPS ON VISUAL, PART 100% PER LOT OPERATOR QUARANTINE
AIR BLOW-OFF STATION CHIPS FROM PARTS ROUTER INSTRUCTION, PRODUCT,
PARTS IN-PROCESS CONTACT
7 CHECKS SUPERVISOR
FOR
RESOLUTION
Page 14 of 37
CONTROL PLAN
Prototype Pre-Launch ✘ Production
Control Plan Number Key Contact/Phone Date (Orig.) Date (Rev.)
Dave Langley / 989-820-5699 6/21/2012
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd.)
1032130 / #1 Quality, Manufacturing, Engineering
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd.)
Machined Valve, Ball 3 Port Christina Raynak / 6-21-12
Supplier/Plant Supplier Code Other Approval/Date (If Req'd.) Other Approval/Date (If Req'd.)
P & L Development PLDE01
MACHINE, CHARACTERISTICS SPECIA METHODS
PART/ PROCESS NAME/
DEVICE L PRODUCT/PROCESS EVALUATION/ SAMPLE REACTION
PROCESS OPERATION
JIG, TOOLS CHAR. SPECIFICATION/ MEASUREMENT CONTROL PLAN
NUMBER DESCRIPTION NO. PRODUCT PROCESS
FOR MFG. CLASS SIZE FREQ. METHOD
TOLERANCE TECHNIQUE
SHIPPING SHIP NO DAMAGE WHEN VISUAL PER LOT SHIPPER QUARANTINE
PRODUCT LOADED PROCEDURE PRODUCT,
CONTACT
10 SUPERVISOR
FOR
RESOLUTION
Page 15 of 37
Production Part Approval Page 21 of 37 Pages
March CFG-1003
2006
MATERIAL/PERFORMANCE TEST RESULTS
NOT APPLICABLE
QUALIFIED LABORATORY
NOT APPLICABLE
APPEARANCE APPROVAL REPORT
NOT APPLICABLE
SAMPLE PRODUCTION PARTS HAVE BEEN SH
E BEEN SHIPPED PER RELEASES.
MASTER SAMPLES HAVE BEEN RETAINED
AND IDENTIFED.
TAINED
CHECKING AIDS
NOT APPLICABLE
Weight Measurement for 1032130
1) .0157
2) .0158
3) .0156
4) .0157
5) .0157
6) .0158
7) .0158
8) .0156
9) .0157
10) .0157
18" OUTSIDE LENGTH STACKING STRENGTH HAND HOLES SMALL MANUAL TOTE - NESTABLE
18" OUTSIDE WIDTH (BURST OR ECT) OTHER SMALL MANUAL TOTE - COLLAPSIBLE
17.75 INSIDE LENGTH REGULAR SLOTTED (SEE REVERSE SIDE) SUPPLIER PURCHASED - SUPPLIER OWNED
17.75 INSIDE WIDTH x HALF SLOTTED PICTURES ON PAGE 2 CSA PURCHASED - SUPPLIER OWNED
LENGTH (RUNNER) HARD WOOD HEIGHT SINGLE WING NUMBER OF CONTAINERS ON PALLET
WIDTH (DECK BOARD) SOFT WOOD WEIGHT DOUBLE WING NUMBER OF PARTS PER PALLET
HEIGHT PAPER FLUSH WING GROSS WEIGHT PER CONTAINER WITH PARTS
TRANSPORTATION INFORMATION
SCHEDULED PICK UP DAY(S): x MONDAY x TUESDAY x WEDNESDAY x THURSDAY x FRIDAY WEEKLY BI-WEEKLY MONTHLY BI-MONTHLY OTHER:
SUPPLIER TO COMPLETE
Approved Packaging
Signature Date
Approved Transportation
Signature Date
Approved Purchasing
Signature Date
Part Submission Warrant
Part Name Machined Valve, Ball 3 Port Cust. Part Number 1032130
Shown on Drawing Number 1032130 Orig. Part Number 1032130
Engineering Change Level #1 Dated 27SE11
Additional Engineering Changes N/A Dated N/A
Safety and/or Government Regulation Yes ✘ No Purchase Order No. C256000038 Weight (kg) 0.0157
Checking Aid Number N/A Checking Aid Eng. Change Level N/A Dated N/A
ORGANIZATION MANUFACTURING INFORMATION CUSTOMER SUBMITTAL INFORMATION
MATERIALS REPORTING
Are polymeric parts identified with appropriate ISO marking codes? ✘ Yes No ✘ n/a
REASON FOR SUBMISSION (Check at least one)
✘ Initial submission Change to Optional Construction or Material
Engineering Change(s) Sub-Supplier or Material Source Change
Tooling: Transfer, Replacement, Refurbishment, or additional Change in Part Processing
Correction of Discrepancy Parts produced at Additional Location
Tooling Inactive > than 1 year Other - please specify
SUBMISSION RESULTS
The results for ✘ dimensional measurementsmaterial and functional testsappearance criteria statistical process package
✘ Yes
These results meet all design record requirements: NO (If "NO" - Explanation Required)
Mold / Cavity / Production Process CNC Machining
DECLARATION
I affirm that the samples represented by this warrant are representative of our parts, which were made by a process that meets all
Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production
rate of _300_/_1_ hours. I also certify that documented evidence of such compliance is on file and available for your review. I have noted
any deviation from this declaration below.
March CFG-1001
2006