Sunteți pe pagina 1din 1

GENERAL NOTES:

A. FIGURED DIMENSIONS TO BE TAKEN.


B. THIS DRAWING IS NOT TO BE SCALED.
C. ALL LEVELS SHOWN ARE FINISHED LEVELS, UNLESS
OTHERWISE STATED.
D. ANY DISCREPANCY MUST BE REPORTED TO THE ARCHITECTS
BEFORE THE WORK IS PUT IN HAND.
E. CONTRACTORS TO SET OUT ONE COURSE OF BRICKWORK
AND DOOR AND WINDOW FRAMES IN TYPICAL SECTIONS FOR
ARCHITECTS' APPROVAL, BEFORE PUTTING WORK IN HAND.
F. AIR BRICKS AS INDICATED ON 1:50 PLAN.
G. WINDOW DRENCHERS ABOVE ALL WINDOWS WITHIN 3M
OF FIRE ESCAPE STAIR

DRAINAGE NOTES:
A. ALL PLUMBING AND DRAINAGE WORK AND INSTALLATION OF
SANITARY FITTINGS TO COMPLY WITH THE NATIONAL BUILDING
REGULATIONS.
B. PROVIDE I.E.'s TO ALL BENDS AND JUNCTIONS WITH SUITABLE
MARKERS AT GROUND LEVEL.
C. MINIMUM FALL TO ALL DRAIN PIPES TO BE 1:40.
D. PROVIDE APPROVED RESEAL TRAPS TO ALL WASTE FITTINGS,
TO COMPLY WITH NATIONAL BUILDING REGULATIONS.
E. PROVIDE A.E.'s TO FOOT OF ALL SOIL STACKS.
F. I.E.'s TO WASTE PIPES TO BE FULLY ACCESSIBLE AT ALL TIMES.
G. ALL WASTE FITTINGS ON THE SINGLE STACK SYSTEM TO HAVE
230

230

230

230

230

230

230
230 230 230 230 230 230 230 230 230 230 230 75mm DEEP-SEAL RESEALING TRAP AND AN APPROVED VENT
2,540 5,000 5,000 5,000 5,000 5,000 12,230 4,500 6,660 2,000 6,000 4,770 VALVE WHERE REQUIRED.

1,560
2,086
Garbage H. DRAINS UNDER BUILDINGS TO BE ADEQUATELY PROTECTED
2,770

2,770

2,770

2,770

2,770
Garden Garden Garden Garden Garden Garden AGAINST LOAD.
Drying Yard Water

3,886

3,886
Tank
I. PROVIDE ADEQUATE ACCESS TO WASTE AND SOIL PIPES FOR
CLEANING, REPAIRS, ETC.

2,326
N

1,800
230

230

230

230

230

230

230

230
230 230
3,000

3,000

3,000

3,000

3,000
25,920

1,959

1,800
230 115 230
3,500 1,615 1,200

2,953
230

115
115

115

115

115

115

7
5,029
Lounge
8,030

8,030

8,030

8,030

8,030

115
Laundry+

2,429
6,414

2,500
Dining Kitchen

6,914
Pressing
3,100

3,100

3,100

3,100

3,100
Changing

1,276
230 230 230 230 230 Room 115 230
6,000 6,000 4,500 3,500 1,615 1,200

230
115

6
115
115

115

115

115

115
Generator

2,340

2,340
Linen Store

1,770
Room
1,700

1,700

1,700

1,700

1,700
Pantry
115 230 230 230

500 230
1,600 2,785 3,500 2,930
230

230

230

230

230

230

230

230

230

5
05 04 03 02 01 01

1,500

1,500
230 230 230 230 115 230
1,800

1,800

1,800

1,800

1,800
00
Carpark
3,135 1,200 14,168 3,337
06 07 08 09 10

3,115
Store

230
NO. REVISION DATE

230
230

230

230

230

230
Janitor
115 115 Store 115 115 115

1,533

1,533
5,730 800 1,800 7,130 1,495 1,505 2,330 2,215

4
5,730
1,700

1,700

1,700

1,700

1,700

115
115
230
Waiting Store

4,000

4,000

4,000

4,000
Bookings
115

115

115

115

115
Area 6,000 5,000
Garden
Strong

2,500
Store

2,352
2,237
Room
230 230 115 115 177 53
1,270 1,500 2,330 2,215

3
3,100

3,100

3,100

3,100

3,100

230

230

230

230

230

230

230
8,030

8,030

8,030

8,030

1,949
115

115

115

115

115

2
Entrance

4,100
Porch
3,000

3,000

3,000

3,000

3,000

230 230
25,920

1
230

230

230

230

230

5,270
STUDIO
230 230 230 230 230
5,000 5,000 5,000 10,000
Garden Garden

Garden Garden Garden


+971526560289
1 2 3 4 5

Vehicle
Entrance

5,230
Pedestrian
Guard Room
Entrance
PROJECT TITLE

PROPOSED HOTEL FOR


MISHECK KALUBA CHONGO

SITE PLAN, SCHEDULES &SEPTIC TANK


DRAWING

N/02/17 JUL 2017 NITRO


PROJECT NO. DATE DRAWN

A1001 01
DRAWING NO. REVISION

ISSUED FOR

CONSTRUCTION

GSPublisherVersion 0.0.100.100