CHECK LIST FOR THE SCHEME CWSS to 1766 HABITATIONS

IN PUDUKKOTTAI DISTRICT AND 125 HABITATIONS IN SIVAGANGAI DISTRICT

CWSS to 1766 Rural habitations in Viralimalai


Name of Scheme (part), Annavasal (part), Ponnamaravathy,
Thirumaiyam, Arimalam, Kunnandarkoil (part )
Pudukkottai (part) unions of Pudukkottai District
and 125 Rural habitations in S. Pudur and
Sakottai unions of Sivagangai District.
CE/TNJ No.50/2012-13/dt.28.1.113 for
Technical Sanction Rs.294.23 Crores
M/s. LARSEN & TOUBRO LTD., CHENNAI.
Name of Contractor
CE/TWAD/TNJ Lr. No. 3121/F.CWSS 1766
Work Order /SDO1/2013/ dt.18.12.2013

30.1.2014 / Rs.236,01,63,810/- ( 24 Months +


Agreement 6 Months trial run) (+17.94%)
1 Head Works Collector well @ Thirupparaithurai 6 m dia x 18
m depth
a. Infiltration Wells Does not arise

b Radial Arms 704 m


c Yield Report Enclosed

d Quality Potable

Pump House

Whether white washing/colour washing Yes


i) completed

Whether duct arrangement for the cables Yes


ii) provided

Whether gantry girder with Chain pulley Yes


iii) arrangement provided

Whether weathering course over roof Yes


iv) slab laid
v) Whether ramp is provided Yes

vi) Check whether ventilating arrangement is Yes


provided
vii) Check whether the earth pit provided Yes
viii) Whether painting for the door completed Yes
Pumpsets and Panel Board

Check for pre delivery inspection report Yes


i)
Check the discharge and head of pump set Yes. As per specification
ii) with reference to the performance curve
To verify whether the pressure gauge is fixed Yes
iii) properly in the delivery line

To check whether the Valves / Water Meters Yes


iv) are provided as per sanctioned estimate and
are in working condition
Yes. The size is as per specification
v) Check for the cable size and quality

Whether required size and No. of runs of Yes


vi) cable provided with respect to panel board

Whether volt meter, ammeter provided are in Yes


vii) working condition

Whether change over switch and bus-bar Yes


viii) arrangements as per requirements are
provided

ix) Check for functioning of HT/LT transformers Yes. Functioning as per specification
x) Whether all the electrical / mechanical Yes
arrangements are provided as per IE rules

xi) Whether sluice valves, flow meters/water Yes


meters are provided in the delivery line
2 Treatment Plant
i) Whether arrangements for pre and post Does not arise
chlorination has been provided

ii) Whether the sizes provided for stilling Does not arise
chamber, flash mixer, dividing chamber,
clarifloculators, sludge well, filter house, clear
water sumps and slow sand filters are as per
the design and agreement
iii) Check whether back wash arrangements Does not arise
provided
iv) Check whether the required size of filter Does not arise
media are sieved and placed to the required
depth
v) Whether the Mechanical / Electrical Does not arise
equipments are provided as per specification
3 Connecting Main
Check whether proper anchorage has been Does not arise
i) provided for river crossing etc.

Check whether all the joints laid underground Does not arise
ii) / bed level under water are intact
4 Pumping Main
i) Verification of pre delivery inspection report Completed.
ii) Verification of factory test report of pipes Yes

iii) Whether pipe sample collected by the TWAD Yes


Officer and test report obtained from TWAD
Lab
iv) Checking of trench depth as per specification Yes

v) Check whether hydraulic tests were Yes


completed at site
vi) Verify the proper refilling after hydraulic test Yes

vii) Whether cover slab for valve pits provided Yes

viii) Check the provision of air valves in pumping Provided as per estimate
main if main is too long
ix) Whether valve pits are constructed as per Yes
type design
x) Whether sluice valves, scour valves and air Yes
valves are provided as per estimate and
functioning properly.
xi) Check whether pipe lines are laid with Yes
reference to sanctioned estimate and M.Books
5 Sumps
i) Whether water meters are provided in the Yes
inlet and outlet of sumps and as per estimate
ii) Whether proper air vents are provided Yes
iii) Whether insider RCC ladder and outside M.S. Yes
Ladders are provided
iv) Whether colour washing is done Under progress. It will not affect the supply
of water.
Whether water level indicator for the sump is No provision in the estimate
v) provided
6 Booster Station
Pump sets and Panel Board
i) Check for pre delivery inspection report Checked
ii) Check the discharge and head of pump set Yes. As per specification
with reference to the performance curve
iii) To verify whether the pressure gauge is fixed Yes
properly in the delivery line
iv) To check whether the valves water meters are Yes
provided as per sanctioned estimate and are
in working condition.
v) Whether required size and No. of runs of Yes
cable provided with respect to panel board
Whether volt meter, ammeter provided are in Yes
vi) working condition
vii) Whether change over switch and bus-bar Yes
arrangements as per requirements are
provided
viii) Check for functioning of LT transformers Yes
ix) Whether all the electrical ./ mechanical Yes
arrangements are provided as per IE rules
x) Whether sluice valves, flow meters / water Yes
meters are provided in the delivery line
Pump House
i) Whether white washing / colour washing Under progress; It will not affect the supply
completed. of water
ii) Whether duct arrangement for the cables Yes
provided.
iii) Whether gantry girder with Chain pulley Yes
arrangement provided
iv) Whether weathering course over roof slab laid Yes

v) Whether ramp is provided Yes

vi) Check whether ventilating arrangements is Yes


provided
vii) Check whether the earth pit provided Yes

viii) Whether painting for the doors completed Under progress; It will not affect the supply
of water
7 Service Reservoirs
i) Whether SR Constructed as per type design Yes
ii) Whether SBC of soil test conducted Does not arise
iii) Whether the SR is water tight Yes
iv) Whether cube tests for important concrete Yes
work conducted
v) MS Ladder with door and looking Yes
arrangements and RCC inside ladders
provided as per specification
vi) Whether MS ladder has been properly Yes
anchored with the columns at two points and
at top & bottom
vii) Whether painting / colour washing for the Under progress; It will not affect the supply
S.R. Completed of water.

viii) Whether cover slab for valve pits provided Yes

ix) Whether Name of scheme with TWAD Under progress; It will not affect the supply
Emblem printed on the S.R. of water

x) Whether Rain Water Harvesting arrangements No provision in the estimate


completed
8 Distribution System
i) Verification of pre delivery inspection report Yes
ii) Verification of factory test report of pipes Yes
iii) Pipe sample collected by the TWAD officer Yes
and test report obtained from TWAD Lab
Checking of trench depth as per specification Yes
iv)
v) Check whether hydraulic tests were Yes
completed at site
vi) Verify the proper refilling after hydraulic test Yes
vii) Whether cover slab for valve pits provided Yes
viii) Whether valve pits are constructed as per Yes
type design
ix) Whether Sluice valves and Scour valves are Yes
provided as per estimate and functioning
properly
x) Check whether pipe lines are laid with Yes
reference to sanctioned estimate and M.Books
9 Public Fountains
i) Whether No. of PFs are provided as per Yes
estimate and as per agreement
ii) Whether ferrule and waste not tap having ISI Yes
mark

Executive Engineer, TWAD Board,


Urban Division, Trichy.