HEATING, VENTILATING AND AIR

CONDITIONING SYSTEM FOR RADIOLOGY


Inside Design Conditions: 70°F - 75°F
(21°C - 24°)
30% to 60% Relative humidity
Minimum Air Changes per hour: 6
- Supply Air
100% Exhaust: Yes, Radiographic
Room and Toilet
100% Outside air No-
Room Air Balance: Negative for
Radiographic
Room and Toilet
Dedicated Exhaust System: No
Occupancy: 4 people
AC Load-Equipment: 13,500 Btuh
(4000 W)
AC Load-Lighting: 1.5 W/SF (16 W/M2)
Notes:
1. Verify cooling loads and other
requirements with the equipment
manufacturer on a specific project.
PLUMBING AND MEDICAL GASES
Cold Water: Yes
Hot Water: Yes
Laboratory Air: --
Laboratory Vacuum: --
Sanitary Drain: Yes
Reagent grade Water: --
Medical Air: Yes
Medical Vacuum: Yes
Oxygen: Yes
Notes

Inside Design Conditions: 70°F - 75°F (21°C - 24°) for Special Procedure Room and Special Procedure
Control Room, 70°F (21°C) for Special Procedure System Component Room. 30% - 60% Relative humidity
for all rooms Minimum Air Changes per hour- Supply Air 15 for Special Procedure Room 6 for other
rooms 100% Exhaust: No 100% Outside air No Room Air Balance: Positive – All Rooms Dedicated Exhaust
System: No Occupancy: 6 people for Special Procedures Room, 2 People for other Rooms AC Load-
Equipment: 2,500 Btuh – (750W) for Special Procedures Room 1500 Btuh (500W) for Special Procedures
Control Room, 12,000 Btuh (3,500W) for Special Procedures System Component Room AC Load-Lighting:
2.6 W/SF (27 W/M2 ) in Special Procedures Room, W/SF ( 25 W/M2 ) in Special Procedures Control
Room, 1.7 W/SF ( 18 W/M2 ) in Special Procedure System Component Room. Notes: 1. Verify cooling
loads and other specific requirements with the equipment manufacturer on a specific project. 2. Provide
dedicated AC unit to serve the Special Procedure System Component Room.