11644 5743 02

Full detailed

Room Projects Building PLANTA CELCO


Appliance/Project Test Date 6. Jul 2016 Status
11644-02/049 Retest Date 7. Jun 2017 Pass
Appliance name/Device Comment GEOPARK COLOMBIA S.A.S.
ACDA - T.D. SERVICIOS AUXILIARES Test Site PRODUCCION/PLANTA CELCO
Measurement Parameter 1 Parameter 2 Parameter 3 Parameter 4 Parameter 5 Limit Result 1 Status
Visual Test Pass
Continuity 10A 5s Manual 0.20 Ω 0.011 Ω Pass
Continuity 10A 5s Manual 0.20 Ω 0.012 Ω Pass
Continuity 10A 5s Manual 0.20 Ω 0.004 Ω Pass
Continuity 10A 5s Manual 0.20 Ω 0.048 Ω Pass
Continuity 10A 5s Manual 0.20 Ω 0.014 Ω Pass
Continuity 10A 5s Manual 0.20 Ω 0.004 Ω Pass
Continuity 10A 5s Manual 0.20 Ω 0.004 Ω Pass
Insulation 500V 5s single 10.00 MΩ >199.9 MΩ Pass
Insulation 500V 5s single 10.00 MΩ >199.9 MΩ Pass
Insulation 500V 5s single 10.00 MΩ >199.9 MΩ Pass
Insulation 500V 5s single 10.00 MΩ >199.9 MΩ Pass
HV Test 1890V 30s single 100 mA 0.1 mA Pass
Discharge time t = 0.0 s
U peak = 279Vp
Voltage Ul-n = 203 V
Ul-pe = 201 V
Un-pe = 203 V
Phase rotation = 1.2.3 Pass
Functional Test single P = ----- Pass