The document lists 39 activities carried out from October 2017 to April 2018 for a construction project. It includes dates for when contractors entered the site, workers prepared the site office, installed formwork and rebar, excavated areas for wastewater treatment tanks, constructed walls and slabs, delivered equipment, and conducted other construction activities. The list provides a timeline of progress over the 6 month period.
The document lists 39 activities carried out from October 2017 to April 2018 for a construction project. It includes dates for when contractors entered the site, workers prepared the site office, installed formwork and rebar, excavated areas for wastewater treatment tanks, constructed walls and slabs, delivered equipment, and conducted other construction activities. The list provides a timeline of progress over the 6 month period.
The document lists 39 activities carried out from October 2017 to April 2018 for a construction project. It includes dates for when contractors entered the site, workers prepared the site office, installed formwork and rebar, excavated areas for wastewater treatment tanks, constructed walls and slabs, delivered equipment, and conducted other construction activities. The list provides a timeline of progress over the 6 month period.