Sunteți pe pagina 1din 3

S.

No START DATE END DATE Number of days


1 8/1/2013 8/3/2013 3
2 8/26/2013 8/28/2013 3
3 8/29/2013 9/3/2013 5
4 9/4/2013 9/7/2013 4
5 9/10/2013 9/20/2013 9
6 9/23/2013 9/30/2013 6
7 10/1/2013 10/7/2013 5
8 10/8/2013 10/19/2013 10
9 10/22/2013 11/1/2013 9
10 11/6/2013 11/7/2013 2
11 11/8/2013 11/20/2013 10
12 11/21/2013 11/30/2013 7
13 12/2/2013 12/7/2013 6
14 12/18/2013 12/31/2013 11
15 1/1/2014 1/11/2014 9
16 1/13/2014 1/20/2014 6
17 1/22/2014 2/12/2014 18
18 2/13/2014 2/28/2014 13
19 3/3/2014 3/5/2014 3
20 3/6/2014 3/8/2014 3
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
TASK NAME PROGRAM
BIW & HTX MESHING LAMV
DATA DOWNLOAD & SEGGREGATION TATA 1620 HYBRID BUS
UNDERBODY PARTS MESHING TATA 1620 HYBRID BUS
FAN STUDY R&D
MESHING FRONT-END UPDATES WINGER 2.2 L FL
FLUENT CASE SETUP FOR 2.2L & 4DL SIMULATION WINGER 2.2 L FL
DV05 SIMULATION OF UDS
2.2 L & 4DL REPORT
DATA DOWNLOAD & SEGGREGATION AND MESHING FICV- WHAP AIS INTAKE
VOLUME MESHING
POROSITY STUDY OF CYLINDRICAL MEDIA R&D
BEND LOSES IN PIPES R&D
UNDERHOOD MESHING X601-AUV
ENGINE MTGS MESHING & CONNECTIVITY FICV-WHAP
FLUENT CASE SETUP & SIMULATION
REPORT PREPARATION
BUFFETING STUDY R&D
DATA COLLECTION AND MESHING UPDATE SUMO CAPSULE
PRISM GENERATION & VOLUME MESHING
ORVM UPDATE
Project description ADDITIONAL INFO
MESHING TASK
DATA MANAGMENT
MESHING TASK
STUDYING MRF VS DISK FAN MODELLING
MESHING TASK
CASE SETUP FOR AIR FLOW SIMULATION
CASE SETUP , SIMULATION FOR UDS STUDY
REPORT PREPARATION
MESHING TASK
VOLUME MESHING
NEED INFO
MAJOR & MINOR LOSS DEANS VORTEX FLOW- KM MADE
MESHING TASK NEED INFO
MESHING TASK NEED INFO
CASE SETUP & SIMULATION FOR ENGINE MTG UPDATE NEED INFO
REPORT NEED INFO
BUFFETING STUDY
MESHING TASK
VOLUME MESHING
MESHING UPDATE

S-ar putea să vă placă și