339.0d
STF PALONG TIMUR REV.05 ALL RUN BS 17.03.2018 - Overall Update - Drag172.0d -67.0dDate
To Actual 02-Oct-17 08:00 06-Sep-18 08:00 55.5% 43.89%
AM A AM
Milestone 286.0d 0.0d -58.0d 02-Oct-17 08:00 AM A
06-Sep-18 08:00 AM 0% 0%
STF1000 Milestone Start STF 0.0d 0.0d 02-Oct-17 08:00 AM A
02-Oct-17 08:00 AM A 100% 100%
STF1010 Milestone Finish STF 0.0d 0.0d -58.0d 06-Sep-18 08:00 AM*
06-Sep-18 08:00 AM 0% 0%
General & Preliminaries 32.0d 0.0d 02-Oct-17 08:00 AM A
07-Nov-17 05:00 PM A 100% 100%
Underground Tank & Building 194.5d 97.5d 7.5d 11-Dec-17 08:00 AM23-Jun-18
A 12:00 PM 29.4% 33.31%
Wash Water Collection & Sludge Balancing Tank 152.0d 55.0d 49.0d 11-Dec-17 08:00 AM11-May-18
A 05:00 PM 61.03% 58.82%
Site Measurement & Site Preparation 55.0d 0.0d 11-Dec-17 08:00 AM03-Feb-18
A 05:00 PM A 100% 100%
STF1140 Site survey 11.0d 0.0d 11-Dec-17 08:00 AM21-Dec-17
A 05:00 PM A 100% 100%
STF1150 Site clearance 14.0d 0.0d 22-Dec-17 08:00 AM04-Jan-18
A 05:00 PM A 100% 100%
STF1160 Excavation, levelling & compaction works 26.0d 0.0d 05-Jan-18 08:00 AM 3
A0-Jan-18 05:00 PM A 100% 100%
STF1170 Install formwork 3.0d 0.0d 31-Jan-18 08:00 AM 0
A2-Feb-18 05:00 PM A 100% 100%
STF1180 Lay of 75mm thick lean concrete 1.0d 0.0d 03-Feb-18 08:00 AM 03-Feb-18
A 05:00 PM A 100% 100%
Slab for All excluding Drywells 19.0d 0.0d 04-Feb-18 08:00 AM 22-Feb-18
A 05:00 PM A 100% 100%
STF1190 Erect formwork, install reinforcement, kicker & waterstop 15.0d 0.0d 04-Feb-18 08:00 AM 19-Feb-18
A 05:00 PM A 100% 100%
STF1200 Inspection 1.0d 0.0d 19-Feb-18 08:00 AM 19-Feb-18
A 05:00 PM A 100% 100%
STF1210 Concreting & curing works 2.0d 0.0d 20-Feb-18 08:00 AM 21-Feb-18
A 05:00 PM A 100% 100%
STF1500 Erect formwork, install reinforcement 5.0d 5.0d -2.1d 05-Mar-18 08:00 AM21-Apr-18
A 05:00 PM 0% 12.5%
STF1510 Inspection 1.0d 1.0d -2.1d 22-Apr-18 08:00 AM*22-Apr-18 05:00 PM 0% 0%
STF1520 Concreting works 1.0d 1.0d -2.1d 23-Apr-18 08:00 AM*23-Apr-18 05:00 PM 0% 0%
STF1530 Curing works 3.0d 3.0d -2.1d 24-Apr-18 08:00 AM*26-Apr-18 05:00 PM 0% 0%
STF1540 Dismantle formwork, scaffold & stagging 1.0d 1.0d -2.1d 27-Apr-18 08:00 AM*27-Apr-18 05:00 PM 0% 0%
Cantilever Beam, Walkway Slab & Overflow Slab/Wall 12.0d 12.0d -2.1d 16-Apr-18 08:00 AM 27-Apr-18 05:00 PM 0% 0%
STF1550 Erect scaffold & stagging 1.0d 1.0d -2.1d 16-Apr-18 08:00 AM*16-Apr-18 05:00 PM 0% 0%
STF1560 Erect & install formwork, t-props, soffit and reinforcement 4.0d 4.0d -2.1d 17-Apr-18 08:00 AM*20-Apr-18 05:00 PM 0% 0%
STF1570 Install 2 units of 200mm dia. of pipes at Overflow Wall A & C 1.0d 1.0d -2.1d 21-Apr-18 08:00 AM*21-Apr-18 05:00 PM 0% 0%
STF1580 Inspection 1.0d 1.0d -2.1d 22-Apr-18 08:00 AM*22-Apr-18 05:00 PM 0% 0%
STF1590 Concreting works 1.0d 1.0d -2.1d 23-Apr-18 08:00 AM*23-Apr-18 05:00 PM 0% 0%
STF1600 Curing works 3.0d 3.0d -2.1d 24-Apr-18 08:00 AM*26-Apr-18 05:00 PM 0% 0%
STF1610 Dismantle formwork, t-props, soffit, scaffold & stagging 1.0d 1.0d -2.1d 27-Apr-18 08:00 AM*27-Apr-18 05:00 PM 0% 0%
Partial Backfilling (Drywells Area) 6.0d 6.0d -2.1d 28-Apr-18 08:00 AM 03-May-18 05:00 PM 0% 0%
STF1620 Repair of cold joints & honeycomb at affected area 1.0d 1.0d -2.1d 28-Apr-18 08:00 AM*28-Apr-18 05:00 PM 0% 0%
STF1630 Partial backfilling & compaction (1st stage) 1.0d 1.0d -2.1d 29-Apr-18 08:00 AM*29-Apr-18 05:00 PM 0% 0%
STF1640 Reinstate existing sump 2.0d 2.0d -2.1d 30-Apr-18 08:00 AM*01-May-18 05:00 PM 0% 0%
STF1650 Reinstate existing sewer pipes 1.0d 1.0d -2.1d 02-May-18 08:00 AM*
02-May-18 05:00 PM 0% 0%
STF1660 Partial backfilling & compaction (2nd stage) 1.0d 1.0d -2.1d 03-May-18 08:00 AM*
03-May-18 05:00 PM 0% 0%
Repair of Cold Joints, Waterproofing & Painting 4.0d 4.0d 49.0d 29-Apr-18 08:00 AM 02-May-18 05:00 PM 0% 0%
STF1670 Repair of cold joints & honeycomb 2.0d 2.0d 49.0d 29-Apr-18 08:00 AM*30-Apr-18 05:00 PM 0% 0%
STF1680 Waterproofing of internal wall 1.0d 1.0d 49.0d 01-May-18 08:00 AM*
01-May-18 05:00 PM 0% 0%
STF1690 Painting (1 coat resistant primer & 2 coats anti-fungus) 1.0d 1.0d 49.0d 01-May-18 08:00 AM*
01-May-18 05:00 PM 0% 0%
STF1700 Cleanup site 1.0d 1.0d 49.0d 02-May-18 08:00 AM*
02-May-18 05:00 PM 0% 0%
Water Tighness Testing & Backfilling 9.0d 9.0d 49.0d 03-May-18 08:00 AM11-May-18 05:00 PM 0% 0%
STF1710 To fill up WWCT & SBT with water 1.0d 1.0d 49.0d 03-May-18 08:00 AM*
03-May-18 05:00 PM 0% 0%
STF1720 Monitoring 3.0d 3.0d 49.0d 04-May-18 08:00 AM*
06-May-18 05:00 PM 0% 0%
STF1730 To backfill & compact outer perimeter of WWCT & SBT 5.0d 5.0d 49.0d 07-May-18 08:00 AM*
11-May-18 05:00 PM 0% 0%
Dewatering Platform (Geotube) 152.0d 48.0d 7.0d 15-Jan-18 08:00 AM 1
A5-Jun-18 05:00 PM 0% 15.44%
Excavation Works & Hardcore 109.0d 5.0d 7.0d 15-Jan-18 08:00 AM 0
A3-May-18 05:00 PM 0% 18%
STF1740 Site measurement & marking 1.0d 1.0d 7.0d 29-Apr-18 08:00 AM*29-Apr-18 05:00 PM 0% 0%
STF1750 To excavate, level & compact ground 3.0d 3.0d 7.0d 15-Jan-18 08:00 AM 0
A2-May-18 05:00 PM 0% 30%
STF1760 To lay, spread & compact Crusher-run as hardcore (0.3m Thk) 1.0d 1.0d 7.0d 03-May-18 08:00 AM*
03-May-18 05:00 PM 0% 0%
STF2050 Cleanup site 1.0d 1.0d 7.0d 15-Jun-18 08:00 AM*15-Jun-18 05:00 PM 0% 0%
Polymer Building 159.5d 50.5d 7.5d 15-Jan-18 08:00 AM 2
A3-Jun-18 12:00 PM 0% 7.93%
Footing (1m x 1m - 0.3m Thk) & Stump (0.3m x 0.3m - 0.45m Thk) 117.0d 8.0d -2.0d 15-Jan-18 08:00 AM 1
A1-May-18 05:00 PM 0% 15.45%
STF2060 To excavate, level & compact ground to receive foundation 1.0d 1.0d -2.1d 15-Jan-18 08:00 AM 0
A4-May-18 05:00 PM 0% 50%
STF2070 Install formwork, lay of 50mm thick lean concrete 1.0d 1.0d -2.1d 01-Feb-18 08:00 AM 05-May-18
A 05:00 PM 0% 30%
STF2080 Erect formwork & install reinforcement 3.0d 3.0d -3.0d 01-Feb-18 07:00 PM07-May-18
A 05:00 PM 0% 30%
STF2090 Inspection 1.0d 1.0d -2.0d 07-May-18 08:00 AM*
07-May-18 05:00 PM 0% 0%
STF2100 Concreting works 1.0d 1.0d -2.0d 08-May-18 08:00 AM*
08-May-18 05:00 PM 0% 0%
STF2110 Curing works 2.0d 2.0d -2.0d 09-May-18 08:00 AM*
10-May-18 05:00 PM 0% 0%
STF2120 Dismantle formwork 1.0d 1.0d -2.0d 10-May-18 08:00 AM*
10-May-18 05:00 PM 0% 0%
STF2130 Backfilling & compaction works to the level of top stump 1.0d 1.0d -2.0d 11-May-18 08:00 AM*
11-May-18 05:00 PM 0% 0%
Ground Beam (0.3m x 0.6m) & Ground Slab (0.2m Thk) 109.0d 9.0d -2.0d 01-Feb-18 08:00 AM 20-May-18
A 05:00 PM 0% 12.5%
STF2140 Erect formwork surround the outer of stump 1.0d 1.0d -2.0d 01-Feb-18 08:00 AM 12-May-18
A 05:00 PM 0% 30%
STF2150 Backfilling & compaction works to the level of bottom slab 2.0d 2.0d -2.0d 13-May-18 08:00 AM*
14-May-18 05:00 PM 0% 0%
STF2160 Install formwork, lay of 50mm thick lean concrete 1.0d 1.0d -2.0d 01-Feb-18 08:00 AM 15-May-18
A 05:00 PM 0% 30%
STF2170 Install reinforcement both ground beam & slab 3.0d 3.0d -3.0d 01-Feb-18 07:00 PM17-May-18
A 05:00 PM 0% 30%
STF2180 Inspection 1.0d 1.0d -2.0d 17-May-18 08:00 AM*
17-May-18 05:00 PM 0% 0%
STF2190 Concreting works 1.0d 1.0d -2.0d 18-May-18 08:00 AM*
18-May-18 05:00 PM 0% 0%
STF2200 Curing works 2.0d 2.0d -2.0d 19-May-18 08:00 AM*
20-May-18 05:00 PM 0% 0%
STF2210 Dismantle formwork 1.0d 1.0d -2.0d 20-May-18 08:00 AM*
20-May-18 05:00 PM 0% 0%
Column - 5.5m (0.25mm x 0.25mm) 116.0d 8.0d 34.0d 01-Feb-18 08:00 AM 27-May-18
A 05:00 PM 0% 9%
STF2220 Install reinforcement 2.0d 2.0d -3.0d 01-Feb-18 08:00 AM 21-May-18
A 12:00 PM 0% 30%
STF2230 Erect formwork & bracing 1.0d 1.0d -3.0d 01-Feb-18 01:00 PM21-May-18
A 11:00 PM 0% 30%
STF2240 Inspection 1.0d 1.0d 34.0d 21-May-18 08:00 AM*
22-May-18 08:00 AM 0% 0%
STF2250 Concreting works 2.0d 2.0d 34.0d 22-May-18 08:00 AM*
23-May-18 05:00 PM 0% 0%
STF2260 Curing works 3.0d 3.0d 34.0d 24-May-18 08:00 AM*
26-May-18 05:00 PM 0% 0%
STF2270 Dismantle formwork & bracing 1.0d 1.0d 34.0d 27-May-18 08:00 AM*
27-May-18 05:00 PM 0% 0%
Intermediate Beam (0.25mm x 0.5mm) 118.0d 8.0d -2.0d 01-Feb-18 08:00 AM 29-May-18
A 05:00 PM 0% 12%
STF2350 Erect scaffold, stagging, t-prox & soffit 1.0d 1.0d -3.0d 01-Mar-18 08:00 AM22-May-18
A 05:00 PM 0% 30%
STF2360 Install reinforcement 2.0d 2.0d -3.0d 01-Feb-18 07:00 PM23-May-18
A 11:00 PM 0% 30%
STF2370 Erect formwork 1.0d 1.0d -3.0d 01-Feb-18 08:00 AM 24-May-18
A 05:00 PM 0% 30%
STF2380 Inspection 1.0d 1.0d -2.0d 24-May-18 08:00 AM*
24-May-18 05:00 PM 0% 0%
STF2390 Concreting works 1.0d 1.0d -2.0d 25-May-18 08:00 AM*
25-May-18 05:00 PM 0% 0%
STF2620 Excavation & levelling works 2.0d 2.0d 6.0d 15-Jan-18 08:00 AM 1
A0-Jun-18 05:00 PM 0% 30%
STF2630 Erect formwork 1.0d 1.0d 9.4d 01-Feb-18 07:00 PM11-Jun-18
A 12:00 PM 0% 30%
STF2640 Install reinforcement 3.0d 3.0d 9.4d 01-Feb-18 01:00 PM13-Jun-18
A 12:00 PM 0% 30%
STF2650 Inspection 1.0d 1.0d 6.5d 12-Jun-18 01:00 PM*13-Jun-18 12:00 PM 0% 0%
STF2660 Concreting works 1.0d 1.0d 6.5d 13-Jun-18 01:00 PM*14-Jun-18 12:00 PM 0% 0%
STF2670 Curing works 2.0d 2.0d 6.5d 14-Jun-18 01:00 PM*16-Jun-18 12:00 PM 0% 0%
STF2680 Dismantle formwork 1.0d 1.0d 6.5d 16-Jun-18 01:00 PM*17-Jun-18 12:00 PM 0% 0%
Apron & Ramp - Team C 141.9d 5.9d 6.5d 01-Feb-18 01:00 PM23-Jun-18
A 12:00 PM 0% 11.25%
STF2690 Backfilling, levelling & compaction works 1.0d 1.0d 6.5d 17-Jun-18 01:00 PM*18-Jun-18 12:00 PM 0% 0%
STF2700 Erect formwork, install reinforcement 3.0d 3.0d 9.4d 01-Feb-18 01:00 PM20-Jun-18
A 12:00 PM 0% 30%
STF2710 Inspection 1.0d 1.0d 6.5d 19-Jun-18 01:00 PM*20-Jun-18 12:00 PM 0% 0%
STF2720 Concreting works 1.0d 1.0d 6.5d 20-Jun-18 01:00 PM*21-Jun-18 12:00 PM 0% 0%
STF2730 Curing works 1.0d 1.0d 6.5d 21-Jun-18 01:00 PM*22-Jun-18 12:00 PM 0% 0%
STF2740 Dismantle formwork & cleanup site 1.0d 1.0d 6.5d 22-Jun-18 01:00 PM*23-Jun-18 12:00 PM 0% 0%
Pipeworks (200mm & 300mm Dia. Pipe) 143.0d 88.0d 1.0d 22-Jan-18 08:00 AM 1
A3-Jun-18 05:00 PM 63.7% 10%
Reinstatement of Damaged Existing Road 7.0d 7.0d 7.0d 16-Jun-18 08:00 AM 22-Jun-18 05:00 PM 0% 0%
STF3420 Site clearance, levelling & compaction 5.0d 5.0d 7.0d 16-Jun-18 08:00 AM 20-Jun-18 05:00 PM 0% 0%
STF3430 Lay & compact crusher-run & premix (binder and wearing coarse) 7.0d 7.0d 7.0d 16-Jun-18 08:00 AM 22-Jun-18 05:00 PM 0% 0%
Site Handover Works 13.0d 13.0d -58.0d 22-Aug-18 08:00 AM 05-Sep-18 05:00 PM 0% 0%