Documente Academic
Documente Profesional
Documente Cultură
Site: 4997
Table of Contents
1.1 Document version Control ................................................................................................. 2
1.2 Distribution List ................................................................................................................. 2
2. Executive Summary................................................................................................................. 4
3. Scope ..................................................................................................................................... 4
4. Purpose .................................................................................................................................. 4
5. Drive Test Set up..................................................................................................................... 5
5.1 Drive Test Schedule .......................................................................................................... 5
5.2 Centre Frequency Check ................................................................................................... 5
6. Call Setup testing for each sector ............................................................................................. 5
6.1 Voice call for each sector ................................................................................................... 5
6.2 HSDPA download for each sector ...................................................................................... 6
6.3 HSUPA Upload for each sector .......................................................................................... 6
7. Plot of drive Test 2100 UE CPICH RSCP (Dedicated) ............................................................... 7
7.1 Explanation of above plot................................................................................................... 7
8. Plot of drive Test 2100 UE Scrambling Codes (dedicated)......................................................... 8
8.1 Explanation of above plot................................................................................................... 8
9. PLOT of drive Test 2100 UE Ec/No (Dedicated)....................................................................... 9
9.1 Explanation of above plot................................................................................................... 9
10. PLOT of drive Test 2100 UE Active Set (Dedicated) ............................................................ 10
10.1 Explanation of above plot ............................................................................................. 10
11. PLOT of drive Test U900 UE UARFCN,s (Dedicated)........................................................... 11
11.1 Explanation of above plot ............................................................................................. 11
12. Plot of drive Test U900 UE CPICH RSCP (Dedicated) ......................................................... 12
12.1 Explanation of above plot ............................................................................................. 12
13. Plot of drive Test U900 UE Scrambling Codes (dedicated) ................................................... 13
13.1 Explanation of above plot ............................................................................................. 13
14. PLOT of drive Test U900 UE Ec/No (Dedicated) .................................................................. 14
14.1 Explanation of above plot ............................................................................................. 14
15. PLOT of drive Test U900 UE Active Set (Dedicated) ............................................................ 15
15.1 Explanation of above plot ............................................................................................. 15
16. PLOT of drive Test U900 UE UARFCN,s (Dedicated)........................................................... 16
16.1 Explanation of above plot ............................................................................................. 16
2. EXECUTIVE SUMMARY
This report details analysis of the performance of the site 4997 with respect to:
From the Drive test analysis, the planned works have been carried out successfully and the
site is performing as planned.
3. SCOPE
This document has been designed as a record of RF coverage from a single site only.
4. PURPOSE
The purpose of the SSV is to ensure that the integration of the new site has been performed
as planned and the following criteria are met:
1. Post-drive test Carried out on 26-Nov-17, after the integration of the UMTS site.
UE
Recorded Centre Frequency 10663 MHz
Recorded Centre Frequency 10663 MHz
Scanner
Recorded Centre Frequency 1 10663 (2132.6) MHz
Recorded Centre Frequency 2 10688 (2137.6) MHz
Recorded Centre Frequency 3 10713 (2142.6) MHz
Recorded Centre Frequency 4 3000 (940) MHz
6. CALL SETUP TESTING FOR EACH SECTOR
6.1 Voice call for each sector
The purpose of this test is to verify that each sector is radiating and is able to complete a call
request from a test UE.
Sector
SC UARFCN Number of Calls Drop Call Rate Pass / Fail
ID
4997A 82 10663, 10688, 10713, 3000 5 0 Pass
4997B 90 10663, 10688, 10713, 3000 5 0 Pass
4997C 98 10663, 10688, 10713, 3000 5 0 Pass
Sector
SC UARFCN File size Mean Throughput Max Throughput
ID
4997A 82 DcellHSPA10663, 10688 20 Mb 4.3 Mbp/s 4.7 Mbp/s
4997B 90 DcellHSPA10663, 10688 20 Mb 4.1 Mbp/s 4.6 Mbp/s
4997C 98 DcellHSPA10663, 10688 20 Mb 4.2 Mbp/s 5.4 Mbp/s
4997A 82 10713 20 Mb 1.6 Mbp/s 4.6 Mbp/s
4997B 90 10713 20 Mb 1.8 Mbp/s 2.6 Mbp/s
4997C 98 10713 20 Mb 1.8 Mbp/s 2.2 Mbp/s
4997A 82 3000 20 Mb 1.6 Mbp/s 4.1 Mbp/s
4997B 90 3000 20 Mb 1.7 Mbp/s 2.4 Mbp/s
4997C 98 3000 20 Mb 1.7 Mbp/s 3.4 Mbp/s
Site Acceptance
Name Signature
RF Engineer Zeerak Akbar Date 26-Nov-17