Notes:
1. Differential hardness of 50 BHN shall be maintained between two wear rings
2. Motor sizing shall be such that the pump can be started even with 20% reverse flow from other
pump.
3. CHP- Customer hold point
4. Commissioning assistance shall be provided by deputing commissioning Engineer to KAPP site
for 2 days for two times.
5. Maintenance and commissioning manual are required to be submitted.